BOM explosion in VA01

Hi,
I am working with IS-retail and I have created a BOM for commercial use. When I enter the material in the item level of the sales order the system triggers the explosion of the BOM. Everything is ok except the number of items created. The BOM has 5 positions and in the order 9 subposition are generated.
Any idea? Maybe it is a material master problem cause there is one material that is not being duplicated but I do not see relevant differences!!
Thanks in advance.
Mikel

Hi,
please check that if you have multilevel bom maintained.So it can be possible that one of your sub item in BOM is also exploded.
also check the BOM in cs03 for the sub items and the object dependencies attached to that.
Regards,
Krishna O

Similar Messages

  • BOM explosion not done because there is no free item number anymore

    Hello,
    I have a problem with BOM explosion when creating a sales order.
    All the following actions are done with VA01 :
    -  I enter a material (main item 10) with a rejection reason, so the BOM explosion is not done :OK.
    - Then  I add the same material (main item 20) without rejection code, so the BOM explosion is done, it means sub items 21, 22., ...,31,32 are determined:OK
    - Finally, I remove the rejection code on item 10, the problem is that there is no place anymore to do the BOM explosion because I have 12 sub items (10 +12 = 22 and it is not possible as I have already an item 20).
    I have a popup with message V1-142 (There are not enough item numbers free for a structure explosion).
    I know that it is possible to change the increment with VOV8, but my customer want to keep this one: 10 by 10 for main item and 1 by 1 for sub item.
    He told me that he think that there is a user exit in order to put the remaining sub items at the end of the sales order like this
    10 main item A
    11 sub item 1 (A)
    12 sub item 2 (A)
    19 sub item 9 (A)
    20 second main item (B)
    21 sub item 1 (B)
    22 sub item 2 (B)
    32 sub item 12 (B)
    33 sub item 10 (A)
    34 sub item 11 (A)
    35 sub item 12 (A)
    Maybe it's a strange idea, but could you please tell me what are the different possibilities to manage sub items when there is no place to put them :
    - put a higher increment in VOV8? Ok but my customer don't agree
    - other solutions?
    Thanks.

    Hello,
    Did you ever find a solution for this? The notes mentioned in the earlier post dont appear to be relevent for 6.0.
    I have a similar issue when dealing with Cross Sell items. When it tries to insert the additional items I get the V1142 message, then the items are copied at the end of the list but the higher level item reference is incorrect for the cross sell items.
    I do not want to change the increments but it appears to be the only option.
    Any ideas are appreciated.

  • Need FM to bring BOM explosion and quantity

    Hi,
    I'm using FM CS_BOM_EXPL_MAT_V2 to bring BOM explosion, but this function doesn't return the correct quantity like VA01 when I enter the main material and its order quantity.
    Does someone know any other function to explode BOM material and return each quantity, depending the main material order quantity entered?
    My codes are:
        CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
          EXPORTING
            capid                 = 'SD01'
            datuv                 = sy-datum
            emeng                 = w_qtd
            mtnrv                 = material-matnr
            werks                 = material-werks
          TABLES
            stb                   = gt_stb
          EXCEPTIONS
            alt_not_found         = 1
            call_invalid          = 2
            material_not_found    = 3
            missing_authorization = 4
            no_bom_found          = 5
            no_plant_data         = 6
            no_suitable_bom_found = 7
            conversion_error      = 8
            OTHERS                = 9.
    Thank you.
    Chang

    Hi a®s,
    The only difference in putting MEHRS ='X'. is the function returns multilevel of part list. The function still doesn't return the quantity based on main material order quantity like VA01 (salesorder create) does.
    Thank you anyway.
    Chang

  • BOM Explosion for Multiple Process Orders

    Hi,
    I hope someone can assist me with the following: Is there a report I can run or transaction I can do to have BOM explosion for multiple Process Orders? I would like to input process orders for a week and see the BOM details per PO.
    Thanks

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM Explosion needed on PO and/or Delivery for Stock Transfer PO Process

    Good afternoon,
      I have been researching the SDN and web for a solution to my problem to no avail so far. 
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery.  This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC.  I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category.  But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component.  Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before?  Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM Explosion needed on Delivery for Intercompany Stock Transfer Order

    Good afternoon,
    I have been researching the SDN and web for a solution to my problem to no avail so far.
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery. This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC. I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category. But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component. Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before? Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM explosion in subcontracting PR

    Hi...
    I have one issue of BOM explosion in subcontracting PR.
    I have created BOM, routing & PV. Production version maintained in info record.
    While creating manaul subcontracting PR , BOM is not exploded giving error message as "Not possible to determine any components".
    I have checked validity of BOM, PV found ok.
    Also Proc. type X & Spl. proc type 30 maintained.
    Any suggestion to the problem appreciated
    Regards
    Tushar

    Dear Tushar,
    Check this link
    [Sub contracting PO - BOM components are not seen;
    Regards
    Madhu

  • How to restrict BOM explosion in Quotation and Sales  Order

    Dear all,
    How can we restrict BOM main item explosion in Sales Order.
    this BOM main item is having special order items which have to generate purchase requisition (item category - BANC),
    with out exploding bom main item, can we generate a  purchase requisition for BOM subitems, can any body explain me that how can we do that.
    your suggestions will be highly appreciated.
    thank you
    Raghu Ram

    Hi Raghu Ram,
    The BOM explosion is controlled by item category.
    In the item category configuration screen, under "Bills of Material/ Configuration", you can see "Structure Scope" field.
    Select the one which is applicable to your case:-
    "blank" - Do not explode material structure
    A - Explode single-level BOM
    B - Explode multi-level BOM
    C - Configuration, no BOM explosion
    D - Configuration, poss. with BOM explosion
    E - Structure from Customer_Function (product selection)
    Hope this helps
    Regards,
    Nicole

  • BOM Explosion Number in Sales Order

    Hi Experts,
         For a make-to-order case, I would like to assign a predefined BOM explosion number with fixed key date to a sales order item. Instead of manually assigning the BOM explosion number to the sales order item, is there any way to let the system automatically assign the BOM explosion number?
         As I read from SAP Library under the BOM Explosion Number (Fixed Key Date), it states "The system can automatically specify the BOM explosion number when entering planned independent requirements or customer independent requirements or when entering the sales order." So is there any configuration to be done in advance to enable the BOM explosion number to be automatically assigned to sales order item?
    Thanks,
    SW

    I tried also setting up the material and its BOM determination by specifying only 1 BOM out of multiple BOMs. Still,
    1. When I add the said material into sales order line and save the sales order, the BOM explosion number value never appear automatically in the sales order line.
    2. When I run the planning on the sales order through MD50, the planned results do not have the BOM explosion number attached.
    I think your advice is more applicable to selection of a BOM from multiple BOMs instead of determining the fixed key date based on appropriate BOM explosion number, correct me if I am wrong.
    Regards

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • Bom explosion in sales order mrp(MD50)

    Hi Experts,
    In sales order MRP i.e. MD50 Getting the planned orders for header material(Finished goods) generated but for raw materials (BOM items) Purchase requisitions are not getting generated.
    Details:
    Header material A and raw materials B and C.
    In material B in MRP 4 coll/ind indicator is 2 And same indicator for C is blank.
    Now when we are running the MRP sales order based it will generate the purchase requisition for C only but not for B.
    In OPPQ we have done the setting for sales order BOM explosion.
    Can anyone please throw some light what is the setting missing in customization or in front end?
    Thanks in advance.
    Regards
    Vilas

    Dear,
    If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments. Check in MRP4 view Individual / Collective .
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50).
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03)
    Please try and come back.
    Regards,
    R.Brahmankar

  • BOM explosion in Sales order with material variants

    Dear all,
    we would like to work with Variant Matching in the Sales Order. Additionaly we would like to explode the BOM....according to the SAP help this is not possible....
    http://help.sap.com/erp2005_ehp_06/helpdata/en/bd/05a7d69d3211d190380000e8a49aad/frameset.htm
    Does anybody of you has any ideas how and where to make this happen?
    Thanks for your help and kind regards
    Jan

    Hi,
    I have gonethrough the SAP link referred by you but never come across with any problem in type matching during Sales order even if the BOM explosion is set for Multilevel in Configuration Profile provided the other pre requisite set up was perfect.
    Regards
    Brahmaji D

  • MRP RUN- KIT BOM explosion not working

    We setup one layer BOM’s for our maintenance KITs as parent material and components as child material.  For  example KIT is TS10000-K1 and components are TS10001, TS10002 etc setup as next layer with in the BOM. Both KITS and components are defined as material types ERSA (Spare parts). These one layers BOMs are setup as production BOMs and expected to create purchase requisitions for KITS and components by exploding BOMs during MRP runs. We use purchase requisitions and convert them into POs to procure both KITS and components. We DO NOT USE Panned orders and Production orders. 
    The safety stocks / reorder point are considered as demand for KITS and components as we do not have any external demand for KITS and components.  
    MRP run is creating purchase requisitions automatically for both KITS and components as per safety stocks and reorder point defined in MRP Views of Material Master. This is working as expected.  
    The issue is: KIT BOM’s are not exploding to generate purchase requisitions for the dependent components of KIT BOM. Please suggest the way to resolve this issue. 
    Split valuation: Also we plan to use split valued KITS with both new and refurbished. So we need BOM explosion for split valued KITS
    also (after the 1st issue is resolved).   
    I verified the following items to make sure the required configuration and data setup is defined correctly.
    1) Planning file activated Plant - OMDU 
    2) Executed MRP run with Total Planning - MDBT and MD02 (single item, multiple levels)
    3) BOM explosion for MRP activated- OS23 
    4) MRP type in MRP1 view- PD and VB (I tried both separately but BOM is not exploding).
    5) Procurement type “F” (MRP 2 view) and lot size “EX”  
    6) Planning strategy in MRP 3 view (tested w/o planning strategy and with strategies 10 and 40. But BOM is not exploded)
    7) BOM status and usage (status is active and usage is for production-CS02 and OS20)  
    8) BOM Validity date (Valid) 
    9) BOM structure in CS12 (BOM is exploding in CS11) 
    10) Availability check  
    11) Selection of BON ID to have BOM usage indicator assign (OS31).
    12) No alternate BOMs or production versions or work scheduling view are used.
    Please review the above 2 issues and suggest any workable solution. Thanks in advance!
    NOTE: I extensively used MRP with multi-level BOM explosion in my earlier projects without any issue. However the above issue is a  bit strange  why one layer BOM is not exploded in this case. 
    Regards
    Srini  

    Hi
    Thanks for your response. I reviewed all SAP notes and none of them are applicable to my scenario.
    1808396 - BOM changes not considered by MRP: I have not changed BOMs.
    1781324 - MD11: Valid BOM alternative is not found. We do not have alternative BOMs.
    1791009 - No BOM explosion after changing production version: We am not using production versions.
    Our Material KITS are PM spare assemblies set up as BOMs and consists of individual spare parts as components. We are creating purchase requisitions and not planned orders. We are not using PP functionality/Production orders.
    MRP is generating purchase requisitions for KITS and components as per ROP and safety stocks. In other words it is working as expected.  The issue is BOMs which are parent assemblies are not exploding to the next lower level components.
    Please note that I am not getting any error messages when MRP is executed.
    Regards
    Srini.

  • Report for Cost of Multiple products with Multilevel BOM explosion

    Hi,
    Our client has a requirement of a report showing standard cost estimate of multiple FG products, with multi-level BOM explosion.
    In short, the requirement is to get a CK13N report for multiple products.
    Has anyone come across such requirement? The requirements seems to be very normal.
    But, I have not seen any standard report for the same. If there is any, please suggest.
    or suggest a better solution for the same.
    Thanks in advance. Pts guaranteed.

    Hi,
    I totally agree with you that this is a totally vague requirement.
    However, let me share the reason for such client requirement.
    We have a customer, for which we produce certain parts for select models. Now, the arrangement with customer for pricing is based on the raw material and other production cost for all such parts. Based on the fluctuations in cost, the pricing would be finalised.. on a monthly or quarterly basis.
    For this purpose, the customer requires to know the raw materials used in each of the part.
    Individually it could have been managed. But the price change in terms of % is decided at global level and not for each part.
    Please suggest

  • Routing details with bom explosion

    hi friends
    i have developend the report for pp,in routing details
    how to get the details of bom explosion with workcenter and routing operations
    If procurement type is E or X, system has to check the routing through CA03.
    If procurement type if F, leave this field as blank and then fetch the relevant vendor
    CS_BOM_EXPL_MAT_V2 - using this fm to get the bom explosion
    after that how to relate between workcenter and routing details.
    input is material number
    plant
    1.operator
    2.material - i got through fm
    3.material description i got through fm
    4.workcenter
    5.vendor
    6.operation description
    7.uom -i got through fm
    8.qty - i got through fm
    9.uom
    10.setuptime
    11.processingtime
    12.deliverytime
    code for review.
    TABLES : MAST
    DATA: BEGIN OF ISTPO OCCURS 1000.
    INCLUDE STRUCTURE STPOX.
    DATA: END OF ISTPO.
    DATA: BEGIN OF MATCAT OCCURS 1000.
    INCLUDE STRUCTURE CSCMAT.
    DATA: END OF MATCAT.
    DATA: W_TOPMAT LIKE CSTMAT.
    SELECT-OPTIONS : P_MATNR FOR MAST-MATNR.
    PARAMETERS : P_WERKS TYPE MAST-WERKS.
    DATA : BEGIN OF ITAB OCCURS 0,
    MATNR LIKE MAST-MATNR,
    WERKS LIKE MAST-WERKS,
    END OF ITAB.
    DATA: IT_STB LIKE ISTPO OCCURS 0 WITH HEADER LINE.
    data : istpotemp like stpox occurs 0 with header line.
    data : istpofinal like stpox occurs 0 with header line.
    START-OF-SELECTION.
    CLEAR ISTPO. REFRESH ISTPO.
    SELECT MATNR WERKS FROM MAST INTO TABLE ITAB
    WHERE MATNR IN P_MATNR AND WERKS = P_WERKS.
    LOOP AT ITAB.
    CALL FUNCTION 'CS_BOM_EXPL_MAT_V2'
    EXPORTING
    CAPID = 'PP01'
    MEHRS = 'X'
    MMAPS = ' '
    MDMPS = ' '
    BREMS = 'X'
    DISMM = ' '
    LIFNR = ' '
    WEBAZ = ' '
    DATUV = SY-DATUM
    MTNRV = ITAB-MATNR
    WERKS = P_WERKS
    EMENG = '1'
    STKKZ = ' '
    FBSTP = ' '
    FTREL = ' '
    IMPORTING
    TOPMAT = W_TOPMAT
    TABLES
    STB = ISTPO
    MATCAT = MATCAT
    EXCEPTIONS
    ALT_NOT_FOUND = 1
    CALL_INVALID = 2
    MATERIAL_NOT_FOUND = 3
    MISSING_AUTHORIZATION = 4
    NO_BOM_FOUND = 5
    NO_PLANT_DATA = 6
    NO_SUITABLE_BOM_FOUND = 7
    OTHERS = 8.
    WRITE: / W_TOPMAT-MATNR UNDER TEXT-H00 COLOR COL_HEADING,
    W_TOPMAT-MAKTX UNDER TEXT-H01 COLOR COL_HEADING.
    sort istpo by index descending.
    loop at istpo.
    WRITE :/ ISTPO-POSNR,
    ISTPO-IDNRK,
    ISTPO-OJTXP,
    ISTPO-MENGE,
    ISTPO-MEINS,
    endloop.
    refresh istpo.
    endloop.

    HI,
            i got the workcenter also,but i need to classify
    if the material procurment type is E OR X CHECK FOR routing details
    or else if its F THEN pick the vendor and uom -PLPO-VGE01,PLPO-PLIFZ.
    how shall i implement this
    Regards
    ds