BOM Explosion problem

Hi,
I have multilevel BOM (almost 10 levels with around 1500 materials), in which many materials repeat at different levels.
I am facing problem in one of the material during MRP, This material is used at 10 different levels. Altogether to produce a FG it requires in 36 numbers. In different levels quantity of it required is different. Say 8,1,4,2 etc but total qty is 36.
When MRP is run the requirement generated for this material is same at all levels i.e 36(total qty) / 10  (BOM levels) = 3.6
But actually system must generate requirements as per BOM quantity. Not sure what is wrong.
Requesting you all to reply quickly for this issue.
Regards,
Pavan

Hi,
Below is the little knowledge i have which want to share with all the august people around.Hope it would be helpful enough for you to get the results.
A BOM is not exploded in the following situations:
- No BOM is effective:
-- On the explosion date and in the given area of validity
For the given effectivity parameters
- The BOM has a deletion indicator.
- The BOM is a multiple BOM, and has no alternative that matches the lot size for your required quantity.
- No BOM matches the selection criteria of the BOM application you selected.
- This is possible in the following situations, for example:
-- The application does not take all BOM usages into account.
For example, the application only takes BOMs that are relevant to production into account, so a BOM that is relevant to sales and distribution is not exploded.
-- The application selects a specific alternative on the explosion date you require. The material master record supports alternative determination by Explosion date.
If the specified alternative is not valid on the explosion date, the BOM is not exploded.
-- The application takes production versions in the material master record into account, but no production version has a BOM that is valid on the explosion date you require. The material master record supports alternative determination by Production version.
The system only explodes the BOM defined for the production version that matches the alternative and/or usage entered on the explosion date required.
-- The application only takes BOMs with certain status indicators into account.
For example, the application for MRP only explodes BOMs that have at least the status Explosion for MRP.
Further checks:
- Do the proper Scheduling in Routing (Backward/forward). In md61 give the requirement in next month.check your in-house production, planned delivery time in md02 give MRP Control parameter Rexplode BOM and Routing.
- Check BOM explosion data in MRP4 view of material master view ( Individual/Coll data).
Please revert with your response
Thanking You in Anticipation
Regards
Chandra

Similar Messages

  • BOM explosion - problem in transferring based quantity from R/3 to APO

    Gurus,
    i would like to know if what are the reason why sometimes theres a failure in tranferring chnages done on based quantity header of  certain SKu going to APO.  we usually do by running RIMODGEN/RIMODAC2/RIMODDEL program and then lastly the DELTA PPM program..
    For this scenario, we manually fix the issue by manually running CFP3 and this is unsually process. May i know if what are the parameter that causes of this failure?
    Any help would greatly appreciated. Thank you in advance.
    Regards,
    kne3ow

    Hi kne3ow,
    CFP3 is the SAP standard transaction to send any changes at the PPM level.
    The programs RIMODGEN, ACT etc., will transfer any changes overall at
    the product level.
    I would suggest you need to revise your process by incorporating
    CFP3 for transferring PPM related changes in your system.
    Regards
    R. Senthil Mareeswaran.

  • BOM Explosion needed on PO and/or Delivery for Stock Transfer PO Process

    Good afternoon,
      I have been researching the SDN and web for a solution to my problem to no avail so far. 
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery.  This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC.  I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category.  But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component.  Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before?  Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM Explosion needed on Delivery for Intercompany Stock Transfer Order

    Good afternoon,
    I have been researching the SDN and web for a solution to my problem to no avail so far.
    The business problem I need to solve is the requirement for our STPO process to explode certain BOM's that are transfered from one company/plant to another company/plant in order to record batch/serial # component information by the delivering plant on the delivery and verification of the batch/serial # in the receiving plant during MIGO processing of the delivery. This is needed by our Service Mgmt department in order to track servicable items within the Finished Good (medical devices industry).
    It appears on the SDN that a BOM can not be exploded on a non-Subcontracting PO (which would be ideal for us), but barring this problem, we are trying to have the BOM explode in the Delivery created from the STPO via the VL10B transaction.
    The STPO generates a Delivery doc with type NLCC and item category NLC. I have maintained the material master for the BOM material to have an Item Category Group of ERLA, and I have modified Item Category Determination in configuration in Logistics Execution for deliveries to include ERLA, usage V, and NLC as default item category. But, the deliveries generated from the STPO still do not explode, like what normally happens if the delilvery of the BOM was created from a standard Order.
    The components for the BOM need to be displayed on the Delivery (if not the STPO), so the cleark can record the Batch/Serial #'s for each component. Then when the receiving plant posts the Goods Receipt for the delivery a user exit we have (based on movement type and material document code) builds a Service Mgmt table that is then processed to De-install the BOM and components from the former plant and install the BOM and components at the receiving plant (and then subsequently at the ultimate customer's location when a normal sale is made), generating a new Functional Location.
    Has anyone here had to do anything like this before? Would any of you have any ideas on how this BOM explosion might work on the PO or Delivery?
    Thanks in advance.
    Scott.

    No responses to this question.
    Subject dropped.

  • BOM explosion in subcontracting PR

    Hi...
    I have one issue of BOM explosion in subcontracting PR.
    I have created BOM, routing & PV. Production version maintained in info record.
    While creating manaul subcontracting PR , BOM is not exploded giving error message as "Not possible to determine any components".
    I have checked validity of BOM, PV found ok.
    Also Proc. type X & Spl. proc type 30 maintained.
    Any suggestion to the problem appreciated
    Regards
    Tushar

    Dear Tushar,
    Check this link
    [Sub contracting PO - BOM components are not seen;
    Regards
    Madhu

  • BOM explosion in sales order

    Hi Experts,
    I have met a problem in BOM explosion in sales order.
    I have maintained the BOM with usage 5 and the conversion between header material and component of the BOM. But in the sales order entry, no matter how many qty I entered for the header material, after the BOM explosion, the qty of component is 1.
    Can anyone help?
    Regards,
    Emily

    Hi,
    Go to CS02 and select ur bom and go to components give 1 that means 1;1
    hope u get it
    regards,
    sadanandam kasarla

  • BOM explosion in Sales order with material variants

    Dear all,
    we would like to work with Variant Matching in the Sales Order. Additionaly we would like to explode the BOM....according to the SAP help this is not possible....
    http://help.sap.com/erp2005_ehp_06/helpdata/en/bd/05a7d69d3211d190380000e8a49aad/frameset.htm
    Does anybody of you has any ideas how and where to make this happen?
    Thanks for your help and kind regards
    Jan

    Hi,
    I have gonethrough the SAP link referred by you but never come across with any problem in type matching during Sales order even if the BOM explosion is set for Multilevel in Configuration Profile provided the other pre requisite set up was perfect.
    Regards
    Brahmaji D

  • BOM EXPLOSION IN SUBCONTRACTING SCENERIO

    Hi,
    To all Experts,
    This is regarding the bom explosion in subcontracting P.O(scenerio).Scenerio prob. is explained as follows -
    1) I have an assembly which includes the semifinish & raw materials.
    2) By cs11 it explpodes whole BOm
    3) When i made P.O. for job work order(subcon.), in mateial data view it displys only the semifinish components(i.e. component or explode bom) ,but not the raw,which we want to send to vendor.
    so due to above,how we can determine, what the material we are sending to vendor?
    In short i want to explode the bom in po,in which it displys the semifinish as well as its raw.
    So please suggest a propper solution for above query.
    Hoping suggestion quickly
    Thanks in advance
    Manish

    Hello Manish,
    Could you please tell me how you have resolved this problem. I have the similar requirement.
    "want to explode the bom in subcontracting po,in which it displys the semifinish as well as its raw."
    we are exploring the PHANTOM ASSEMBLY but still no luck.
    When i set at BOM item level - Phantom Assembly off indictor and  Spec. Procurement 50
    system is still requesting for transfer of Phantom Assembly instead of components to the vendor.
    Thanks in advance

  • BOM Explosion in Shopping Basket for CRM B2C 6.0

    Hi Gurus,
    Can we have a BOM explosion in shopping basket . As per few links I explored BOM Concept is possible only in ECC and we can implement it is CRM based by some additional configurations .  (BOM in CRM) .
    We have configured component for products and XCM setting for BOM is also in place . But BOM explosion is happening only at Order confirmation level .
    Can anybody give some insights to get BOM explosion in Shopping Basket of CRM B2C 6.0 .
    Thanks and Regards,
    Tony Isaac

    Hi Rahul,
    Thanks for the reply.
    I could find the UI component setting : ui.fields.order.bomExplosion = Visible and I have already done this . Due to this I am able to see BOM explosion on Checkout Page / Order Confirmation Page .
    But  still I am not able to find ui.fields.order.subitemDetailview = Visible.
    Is that available only in R/3 version ?
    My problem is BOM explosion is not visible in Shopping basket .
    Regards,
    Tony Isaac.

  • BOM explosion from Production Order

    Hi All,
      I understand from SAP Help files that we can explode BOM from Production Order using Read PP Master Data. But it also says, that we cannot do this if items have already been issued out. So would like to know is there anyway out to ensure that the production order is reading the latest version of BOM.
      The reason i want to know is because, at present the BOM keeps getting updated & so the work order has to reflect the new items. The BOM contains about 300 or more items, so manual changes is very tedious & error prone at the moment. Furthermore some components are outsourced. So i want to receive them back & post new materials for them. Hope my problem is clear & await inputs
    Vivek

    Hi All,
    Thanks for the inputs. I think for the situation am facing, the Order change management method, should be of help, as the BOM changes does not take place on scheduled dates, for me to fix the BOM explosion dates & assign them. As of now the BOM gets changed, depending the customer requirements, which is unpredictable.
    Clarification required:
    1. The profile which is created using OPL7 & assigned in OPL9 is unique, i.e. for any change numbers of BOM will always follow the profile entered in 'Overall Profile' in Work Scheduling view & i do not need to create new profiles for each new change number of BOM
    2. Once i run the COCM with the new change number, in the production order - components view will i be able to see any error message for those items which no longer feature in the new version of BOM? & will the materials added in the new BOM automatically feature in that list or do i have to manually add these to the order & if so, how will i know which materials need to be added?
      Hope the clarifications sought are clear, await inputs
    Vivek

  • No BOM Explosion in Planning Order

    Hello Folks,
    i have a problem with the BOM explosion at creating a planning order.
    Our BOMs are created without plant number and are enterprise wide available.
    If we create new BOM's with direct plant association via CS01, the BOM explosion in creating a planning order is possible.
    I've already searched in Customizing and Transactions and didn't find anything to make a BOM explosion possible with an enterprise BOM.
    Do you have any idea how it is possible to do that? We don't want to create new BOMs because it is too much workload to create all new BOMs. We use a SAP ECC 6.0 with IS-Retail.
    Hope you can help me.

    I think that it is a must to have the BOM defined for plant to be exploded in a planned order.
    Nevertheless, you don't need to create it a gain for each plant, you can instead just do a plant assignment (CS07).

  • BOM Explosion report

    Hi All,
    I have problem with BOM explosion report CS12.
    We have material with 3 level BOM. While we are running CS12, upto 2nd level appears in the report. 3 rd level components dose'nt show. what may be the reason. I have checked validity period & BOM status is active for all levels.
    REgards,
    Srijit.

    HI
    Check the explosion types in OS17 also check whether phantom asseblies indicator in OS17.
    Check In BOM for whether you have defined some material as Phantom or not?
    Check and revert
    Regards
    Anupam Sharma

  • BOM Explosion with order finish date

    Hi,
    In transaction OPPQ it is possible to configure the BOM explosion date used by MRP and creation of a process order (see SAP NOTE 506345).
    I suppose this setting is also considered when re-reading master data during release of an order.
    The field BESAL can have the following values:
                BOM explosion number/order start date
    1     Order start date
    2     Order finish date
    3     BOM explosion number/order start date
    4     BOM explosion number/order finish date
    What I do not understand is that value 4 also end up in using the order start date when re-reading master data. Here the function module CO_ZF_VALIDATIONDATE_DET is called which contains the following coding:
    + Festwerte Feld BESAL:+*
    * ' ' Seriennummer/Eckstarttermin
    * 1   Eckstarttermin
    * 2   Eckendtermin
    * 3   Seriennummer
    IF T399D-BESAL <> CHAR2.
    * Auflösung mit Starttermin
    u2026
    ELSE.
    * Auflösung mit Endtermin
    u2026
    ENDIF.
    which says only use the Order finish date if BESAL has the value 2. The comment showing the possible values gives me the impression that SAP simply forgot to adapt this coding when splitting the value 3 (prev. only BOM explosion number) into 3 BOM explosion number/order start date and 4 BOM exlosion number/order finish date.
    On the other hand the SAP Note mentioned above documents this behaviour.
    Does anyone know the reason why value 4 (BOM exlosion number/order finish date) results in using the order start date ?

    hi,
    The defination in OPPQ is only working for the MRP, when the planned order is created.
    Then the explosion date will be copied from planned order to production/process order when you convert the planned order.
    However, when the production or process order is created manually, or when you do a re-read master data process, then a different BOM explosion date process will be carried out as described in the SAP note 506345, it has explained the behavior clearly base on the different value of paramter:
    V_T399D_S-BESAL = initial, 1, 3 or 4
    V_T399D_S-BESAL = 2 (Explosion with order finish date)
    So there is no problem to have different behavior of planned order and production/process order.
    Regards,
    Rachel

  • BOM Explosion with Versions

    Hi,
    I am trying to build BOM Explosion Hierarchy with levels, but one of the requirements is to also generate the hierarchy with versions.
    So for instance I have Parent BOM with version C and component with version D. I need to also generate the hierarchy for all the versions of the Parent  (o,A,B) and to what components and versions do they tie to.
    I am not sure how is this possible. All I have been able to do is get the latest version via BOM, and BOM Component tables.
    Thanks

    hi,
    The defination in OPPQ is only working for the MRP, when the planned order is created.
    Then the explosion date will be copied from planned order to production/process order when you convert the planned order.
    However, when the production or process order is created manually, or when you do a re-read master data process, then a different BOM explosion date process will be carried out as described in the SAP note 506345, it has explained the behavior clearly base on the different value of paramter:
    V_T399D_S-BESAL = initial, 1, 3 or 4
    V_T399D_S-BESAL = 2 (Explosion with order finish date)
    So there is no problem to have different behavior of planned order and production/process order.
    Regards,
    Rachel

  • No Sales BOM explosion via BAPIs

    Hi all,
    We use BAPI_INQUIRY_CREATEFROMDATA to create inquiries; however this does not explode sales BOM; rather it creates just one line for the main material.
    Are there any specific input parameters that need to be modified to trigger BOM explosion in the background.
    Alternatively, are there any BAPIs or FMs at least to simulate BOM explosion and return the results so that we can pass them explicitly to the inquiry create BAPI.
    Or is there any other way to create sales documents with sales BOM explosion. (we can't change the BAPI as its part of the source code of a 3rd party application; but we have user exits before and after this BAPI call).
    Thanks,
    KC
    SAP SD

    Solved. Sales BOM does get exploded even in BAPIs. Checked with a different user ID and it worked. The RFC user seemed to have an authorization problem.

Maybe you are looking for

  • How do I Restore my iPhoto library from my time machine if it does not give me the restore option?

    How do I Restore my iPhoto library from my time machine if it does not give me the restore option? When I go into my backups and click on the iPhoto library it does not come up with an option to restore it just says open and of course then won't let

  • Urgent- o/p of report in excel format

    Hi All, I want to generate o/p of my report in excel format. Please send me the sample code for it at [email protected] Thanks in advance bhushan

  • I can't reinstall firefox 7.0.1

    I uninstalled firefox in windows 7 because of audio problems in the browser. I then tried to reinstall it. I downloaded version 7.0.1. I ran the installer and it extracted files and it gave a message : "you may not have the necessary permissions to u

  • How do you apply the iphoto library upgrader to iPhoto?

    I just upgraded to Mountain Lion which was fine. However, afterwards I upgraded to the latest iphoto version and now it says that I need the iPhoto Library upgraded. So I downloaded that application. However, I have no idea how to make the "upgrader"

  • Relationship Between PO / GR / Services Tables

    Hello experts I am trying to find out the relationship between ESSR ESLH ESLL EKPO and EKBE tables. Below is some sample data and my requirement. Could you please tell me how I should consider linking the tables. Am I missing any table in between. Ou