BOM Explosion where Material Type is set to X0 to X9

Hi All,
Trust you are well.
I am finishing of the detailed design for Production Planning and have come across an issue which I was wondering you might be able to help with.
In my design the sales quantities plan in BI will be used as a basis for the production quantity plan. This will then be retracted from BI to COPA and the sent to S&OP. However, I understand that it will not be possible to explode the BOM's in MRP because the MRP type is set to X0 to X9 for all our finished products, hence we will not be able to run simulative MRP in SAP system for Long term planning.
I think this is because the material is already being planned with SAP APO and the system will not allow longterm planning for finished materials in SAP ECC at the same time.
Did you come across something similar? Any ideas, workarounds?
Thanks,
Milind

Hi Anand,
I have a similar requirement and raised a question on the forum and simultaneously raised a OSS message. SAP responded that we cannot do LTP and MRP for materials planned in APO as this is a system restriction in SAP ECC 2005.
I am very keen to know the settings that are needed in the MRP type and LTP settings that would enable me to carry out LTP for materials that are planned in APO with MRP Type X0 to X9.
When I run simulative MRP run, I get a error message "Material is not planned automatically". Are there any modification that you have done in your system to make LTP work. I am keen to know what changes were implemented to get LTP work for MRP Type X0 to X9.
Warm regards,
Prem

Similar Messages

  • BOM Explosion - special procurement  type 52 (collective order)

    In BOM explosion, special procurement type -> collective order (52) for the item  is considered as phantom assembly. I wish to know the business reason for this. Any help please ??

    hi Janardhan,
    phantom assembly is the assembly which is not kept in stock rather it consumes directly.
    Use of phantom assemblies are as below
    Phantom assemblies are assemblies that have their own product structure, but whose assembly does not actually physically exist. The components of the phantom assembly are incorporated directly in the superordinate product. The product structure of the superordinate product contains a reference to the phantom assembly.
    example - A car with music system.
    During backflush, only the goods movement for the phantom assembly components are posted. The phantom assembly is marked as backflushed but does not trigger any goods movement.
    Experts pl correct me if i'm wrong.
    Regards,
    Anil

  • BOM explosion where first BOM alternative has deletion flag

    Hi,
    I got the following very basic scenario:
    One FERT material has two BOM alternatives (alternative 1 and 2). Both of them are valid in terms of date, status and lot size. When a production order is created by CO01 the system will pick automatically alternative 1 (which is ok for me). BUT if this BOM alternative 1 gets a deletion flag (on BOM alternative header) I would expect that the system would automatically pick alternative 2 (it is the "next" suitable alternative). But the systems says there is no valid BOM available.
    Only if I really delete alternative 1 (so I cannot see it anymore in CS02), the system would pick alternative 2 (because it is now the really first one available - no version in front with only deletion flag). But in terms of documentation I cannot delete the alternatives.
    Maybe somebody could explain that to me or had a similar problem...
    BR and thanks in advance.
    Christian

    Hi Guys,
    many thanks for your suggestions. Setting the status to inactive did the trick. Obviously the deletion flag is not enough at this point.
    Just to clarify - production version of course would be an option but that did not work with the following:
    I have 6 different routings for this FERT and the user has to choose when the production order is created. That works basically fine when the order is created with CO01 (popup for selection of production version based on MRP4 setting). BUT when a planned order is converted directly from MD04 into a production order the system would automatically pick production version 1 (no matter what setting in MRP4 view). If there are no production version the user would get at least a popup for choosing a routing. But this would maybe an additional thread in the forum
    Thanks
    Christian

  • Po Ref to PR for a particular material type

    Hi...
    I already did the configuration for the creation of PO with reference to PR, means without PR, PO will not be generated and throw the error message like, "You have no authorization to create without reference to another document".
    Now, I want to restrict this error message only for ERSA and HIBE material type.
    Please suggest me to proceed further.
    Regards,
    Mohd Ali.

    Mohd Ali
    You can use BADI ME_PROCESS_PO_CUST - Enhancements for Processing Enjoy Purchase Order.  This BADI will allow you to Processing Item Data of the purchase order. 
    Ask your ABAP person to give the error message "You have no authorization to create without reference to another document" the message should be issued when a person tries to create a purchase order without reference to a requisition.
    The logic is a follows: where material type equals ERSA or HIBE info stored in table EKPO and requisition number not populated in table EKPO, then issue message.
    Zimboy

  • Material Type for By product??

    hii
    What is the material type has to be followed while creating material master for By products.
    In subcontracting scenario ??
    In real time , those who r  having this type of scenrio can confidently tel , how we can go abt  ???

    The main point in deciding the material type to use is the materials characteristics, including whether you valuate it. The scenario that produced it is of less importance. We value our bi-products as they have commercial value to us and they have the same characteristics as HALBs, therefore we create as HALBs.
    If we chose not to value, then it would just be a case of creating a copy of HALB material type and setting as unvaluated, which would also have the advantage of creating easily distinguishable bi-products but there are very few in any event.
    Regards,
    Nick

  • Material type for our by-product (CO2)

    Hi
    We are not storing the bye-product CO2 and we are selling. How to map this senario in SAP
    Regards,
    Bhaskar
    Edited by: Csaba Szommer on Feb 16, 2012 8:52 PM

    The main point in deciding the material type to use is the materials characteristics, including whether you valuate it. The scenario that produced it is of less importance. We value our bi-products as they have commercial value to us and they have the same characteristics as HALBs, therefore we create as HALBs.
    If we chose not to value, then it would just be a case of creating a copy of HALB material type and setting as unvaluated, which would also have the advantage of creating easily distinguishable bi-products but there are very few in any event.
    Regards,
    Nick

  • Bill of Material (BOM) for any Material

    Dear all,
    I want to fetch the BOM Components for any material.
    can any body tell me the Flow of tables with link between them for finding the bom.
    Thans in advance
    Regards,
    Anshuman

    Use the FM
    CS_BOM_EXPL_MAT_V2 (BOM explosion for material) or
    CS_BOM_EXPLOSION (General BOM explosion)
    Hope this helps!!
    Regards,
    Prashant

  • Doing GR for a material type, system should give a message like QI required

    Dear Friends
    While doing MIGO(GR) for a material type, system should give a message like Quality Inspection required
    but Client requirement is not to maintain QM view or Inspection Type 01for  material type
    Any setting required 
    Thanks & Regards
    Gajendranath

    Hi
    Please check user exit QBCK0003 |Extended QM check for goods receipt                        
    Regards
    sujit

  • Sales order MTO for non-valuated Material type

    Hi Friends,
    I need to create MTO sales order for non-valued material type, and at the time of save, I am getting an error that, Material "JOBFINISH" cannot be costed
    Message no. CK113.
    Diagnosis
    In accordance with material type UNBW for material JOBFINISH, the material is not relevant for costing.
    System Response
    Material JOBFINISH is not costed.
    Procedure
    1. Check the master data for material JOBFINISH.
    Display material master record
    2. If you have authorization for Customizing, check whether the material type is correctly set for this material. A material can only be costed if the Costing indicator in the material type is set.
    Can you please suggest to handel this kind of error.
    Rgds, Krishan Raheja.

    First in MM03 ,check the Material Type & Costing View whether any cost is there.If it is not there ,then ask FI consultant to provide the Costing.
    Then Go to OMS2 > Select Details against your Material Type > Can activate the Costing View ( if it is not there in MM03).
    Best Regards,
    Ankur

  • No Bom Explosion for Fert material

    I try to create a BOM where a A1 material(FERT) is link to 3 raw material, A, B and C. Enter the qty in MD61 independent requirement, after that i tried to run MRP and found out that there is no requirement/PR created for the 3 raw materials, only the A1 has the indep requirement. seems there is not BOM explosion.
    After that i try to create B1 material(SEMI) is link to 3 raw materials as well. But the 3 raws material able to show the requirement/PR after the MPR run.
    Am i miss out any step in the config for the material type? or may be other steps?

    Dear ,
    MRP will explode BOM  for FERT or HALB which has valid BOM , based on the following set up :
    1.In MRP4 view of FERT/HALB , keep BOM Selection method -Blank or 1 .If you have Production Version with valid Lot size , Valididt dates (To/From ) , then keep the BOM selection method as 2/3.
    In case of Blank , MRP will  selt the BOM as per the Qty or BOM lot size ( Valid Lot Size-TO/From -CS02-BOM Header )
    In case of 2/3 -System will  Check the Production Version Validdity or Lot size , select the PV and explode .
    2.In OPPQ-MRP Plant parametrs -Keep BOM Explosion indicator as Blank -BOM explosion method /order start date .
    3.Keep MRP Dep.Req filed in MRP4 vewi of FERT /HALB as Blank ( meand you want to plan the dependent ofr FERT/HALB-BOM Compoenet -a,b,c  etc )
    4.All the material (FERT/RAW/HALB) should have porper MRP1-MRP4 view parameters  like MRP Type -PD , Procurement Type E-In house /F-External procured item .
    5.All the material should be Block for Procurement in Basic Data1 -X plant status as 01
    6.All of them should have Planning File Entry in MDRE/MD20/MDAB
    7.Run MRP in MD02-2,1,3,3,2,NETCH
    Hope this is clear .Check Point 1 to Point 4 frist and try
    Regards
    JH

  • BOM explosion in Sales order with material variants

    Dear all,
    we would like to work with Variant Matching in the Sales Order. Additionaly we would like to explode the BOM....according to the SAP help this is not possible....
    http://help.sap.com/erp2005_ehp_06/helpdata/en/bd/05a7d69d3211d190380000e8a49aad/frameset.htm
    Does anybody of you has any ideas how and where to make this happen?
    Thanks for your help and kind regards
    Jan

    Hi,
    I have gonethrough the SAP link referred by you but never come across with any problem in type matching during Sales order even if the BOM explosion is set for Multilevel in Configuration Profile provided the other pre requisite set up was perfect.
    Regards
    Brahmaji D

  • BOM explosion for variant material

    Hi Gurus!
    I created a material variant, when type match is done, the configurable material is changed for the variant properly, in this case, BOM explosion is done in the sales order and components are shown properly (I did this thought customizing).
    When I try to sale the variant material directly (without configurable material and type match), the system do not show the BOM explosion.
    I need the BOM explosion in the sales order for invoicing proposes.
    Can anyone help me?.
    Thanks!!.
    J. Carlos.

    Hi,
    To do a requirements explosion for a configured material, you must maintain the data in the
    material master record and link a BOM to the configured material.
    If the material of the material variant is the same as the configurable material, the link
    is already there.
    You can either create a BOM especially for the configured material (perhaps using the copy from
    function) or allocate the configured material to the BOM for the configurable product. The second
    option is the more common solution.
    If you allocate the configured material to the BOM for the configurable product, the BOM for the
    configurable product is interpreted and exploded according to the characteristic values assigned.
    The interpretation includes the processing of selection conditions and the setting of field values in
    BOM items according to the relevant actions.
    Allocating a Configured Material to a BOM: From the bills of material menu, choose Bills of material   Material BOM   Alloc. config.
    mat.   Create.
    Chidambaram

  • Material BOM explosion in Service Order components

    Hi experts,
    I created a Material BOM with transaction code CS01.
    Then I try to add this BOM in the component of a service order.
    What I expected is the BOM to be exploded in the service order. But this behaviour doesn't occur.
    Do you know what I can do to trigger a Material BOM explosion at service order level.
    By the way, the BOM is not exploded after the service order (in the reservation or in MIGO).
    Thank you for your help.

    Hi Özgen,
    Thank you for help.
    Special Procurement 50 didn't exist in my system.
    I created it in SPRO for the plant with the Procurement Type F (External Procurement) and the flag Phantom Item checked..
    Then I created
    - Material A (MM01)
    - Material BOM A (CS01) with:
    -- item 1 Material B (which has Spec Proc Type 50 in MM02-MRP2)
    -- item 2 Material C (which has Spec Proc Type 50 in MM02-MRP2)
    After that I created a Service Order (IW31)
    I put Material A in the Component tab with quantity 1.
    The BOM remains unexploded.
    Did I miss something?

  • Material type for BOM

    i want to know which material type can i use for creatig BOM first level
    this material type not qty and value updated also it can't be procured and can't be sold.the main usage of this material is grouping and as assembly of parts.

    Hi ,
    you can set it following IMG ; and  standart customizing gives you some idea about your question
    Production -- Basic Data -- Bill of Material --General Data -- Define Material Types Allowed for BOM Header
    hope helps

  • BOM explosion  with Two Material Number

    Hi
    How can  i Explosion in  BOM with  two material number, if any Fm is there in sap or any othre options
    Please tell me
    Regards
    Mani

    Your question is not complete.
    There are two types of bom explosion. from child to parent and parent to child.
    You have to pass one material at a time. Please search in sdn for the fm's. This question ihas been widely discussed here.

Maybe you are looking for

  • Unable to run Memory profiling, help please

    Hi there, I installed the lastest version of JDeveloper 10 and created a very simple project(only have one class with Main()method) for testing purpose. I configure the Profiler in Project Properties page, setting the class as included instance, howe

  • Transaction Type is 922 does not exist

    Hi, While posting FI document I am getting below error message : Error: Enter another transaction type (Transaction type 922 does not exist) Message no. AA816 Diagnosis: According to your entry or specification, you want to use transaction type 922.

  • External Hard Drive Compatibility with Surface Pro 3

    what external hard drive will work with the surface pro 3

  • Data Migration Template for Singapore Payroll.

    Hi I need a help on data migration template for Singapore Payroll. Would also need guidance on what i srequired in case i want to migrate the last year payroll cluster data from legacy system to ECC 6.0. Will appreciate if you can send me the migrati

  • CS5 Content Aware Fill

    Demos of the new Photoshop CS5 "content aware fill" feature on the Youtubes -- it looks impressive.  I know " Past performance is not necessarily indicative of  future results", but any guesses on when (or if) this feature would hit the PS Elements c