BOM Explosions for Materials and Plant

I am looking for the same functionality as in CS15 where I can check if a component within a BOM is part of another BOM.
How can I achieve this?
I have tried the FM: CS_BOM_EXPLOSION or CS_BOM_EXPL_MAT_V2, but I can not get these to work as I wish.
I have material number and plant as a selection criteria as well as BOM usage.
Does anyone have a good solution to this?
Please help out as soon as possible, since I am stuck.
Rgds,
/Fredrik.

Hi Fredrik,
in the past i used FM CSEP_MAT_BOM_SELECT_WHERE_USED  (and afterwards CSAP_MAT_BOM_READ to get details).
Also you could have a look at FM CS_WHERE_USED_MAT - it should be like CS15.
Hope it helps,
BR,
Sebastian

Similar Messages

  • BOM Explosion for Multiple Process Orders

    Hi,
    I hope someone can assist me with the following: Is there a report I can run or transaction I can do to have BOM explosion for multiple Process Orders? I would like to input process orders for a week and see the BOM details per PO.
    Thanks

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • BOM Explosion for MRP Area

    Dear Expert,
    I have doubt regarding BOM explosion for MRP Area. This doubt is triggered when performing MD01, as result I do not find the dependent requirement in MD04 for my FG. I have maintained the BOM through CS61 and MRP area for all component, I understand that only component level system is taking into account MRP area (storage location). FYI before maintaining all components to MRP area, the BOM explosion was successful exploded. Your advice is appreciated.
    Best regards,
    Mahnansa

    Dear,
    Please check the Explosion control in Customizing, Transaction OMIW.
    Try to explode the BOM in CS11 , CS12 or CS13 if it is working there in curret date then chack the planning file entry in MD21.
    You need to convert the planning file entery at MRP area in OM0F.
    Also note the dependent requirement is not generated in the corresponding MRP area to which the production storage location in the material master has been not assigned for the data of the MRP area.
    Regards,
    R.Brahmankar

  • No BOM explosion for sub-contract purchased materials

    Hello,
    I have searched google and this forum and have not found any info on this.  Hopefully someone has run across this same situation and can help.
    We do not want to have a bom explosion happen for externally procured materials (using CU51).  We are using user exit CCUX0800 (EXIT_SAPLCUKO_008) to set no_expl_ext_procurement = 'X'.   This works good, except if the material is set up for external procurement (marc-beskz = "F") and also has a special procurement (marc-sobsl) of "30".  Include LCUKOFFB says to still explode the BOM if the special procurement is "30". 
    Does anyone know why it does this?  We don't want the bom to explode for externally procured parts even if they are set up as subcontracting ("30").  Any way we can do this with a different user exit?
    Thank you.

    Melissa,
    Since you are using Special proc 30 ( subcontracting) system assumes BOM components will be supplied by purchaser.
    When a Subcontract purchase order for subcontracted material is cut on vendor, the components of the subcontrated product is typically supplied by buyer to the vendor. Hence MRP(system ) typically explodes BOM to plan for those compoments in buyer's plant.
    If however you do not want BOM to be exploded &/or components planned in buyer's plant you can set that in BOM of subcontract material at the component level. In the BOM component item detail screen (under tab status/long text) there is a field called Material provision indicator. Set that to L(material provided by vendor).
    This should prevent planning of components (or explosion of BOM) for the subcontract material ( with settings F, 30).
    Hope this clarifies & solves your issue. else please come back with further questions.
    Thanks,
    Ram

  • Reg:T-CODE for open and close period for materials(new plant).

    hi sap guru's
    T-code for following process
        can anybody send me , how to create calendar to new plant . and what is the T-code to be use for open and close period of materials for new plant.
    thanks
    sakthi..

    Hi Sakthi,
    I am assuming that you are asking about the factory calendars which are assigned while difing the plant.
    Factory calendars are created through transaction "SCAL".
    Opening and closing of MM periods can be done through transaction MMPV.This is based on the company code.Before using MMPV ,you can look the last opened period in the transaction MMRV.
    Reward points if it helps.
    Regards
    Karan

  • BOM explosion for Multiple  materials

    Dear All
    In Cs11 where we can get bom explosion  report for single material,but i need multiple material more than one material as desired.
    Any Std T code is there.

    Dear Sukendar,
    1.For this requirement you have to go for a Z report and you can give the Functional Spec's to prepare
    this report to your ABAP consultant.Prepare the input format,logic of the program and the output format.
    In the logic part you can make use of this Functional Modules's CSAP_MAT_BOM_READ or 
    CSEP_MAT_BOM_READ  or CS_BOM_EXPLOSION   or CS_BOM_EXPL_MAT_V2 .
    2.Using CEWB helps you to identify all the material that's having the BOM,but here the report does not
    shows you the level by level by BOM for a FERT.
    Check and revert back.
    Regards
    Mangalraj.S

  • No Bom Explosion for Fert material

    I try to create a BOM where a A1 material(FERT) is link to 3 raw material, A, B and C. Enter the qty in MD61 independent requirement, after that i tried to run MRP and found out that there is no requirement/PR created for the 3 raw materials, only the A1 has the indep requirement. seems there is not BOM explosion.
    After that i try to create B1 material(SEMI) is link to 3 raw materials as well. But the 3 raws material able to show the requirement/PR after the MPR run.
    Am i miss out any step in the config for the material type? or may be other steps?

    Dear ,
    MRP will explode BOM  for FERT or HALB which has valid BOM , based on the following set up :
    1.In MRP4 view of FERT/HALB , keep BOM Selection method -Blank or 1 .If you have Production Version with valid Lot size , Valididt dates (To/From ) , then keep the BOM selection method as 2/3.
    In case of Blank , MRP will  selt the BOM as per the Qty or BOM lot size ( Valid Lot Size-TO/From -CS02-BOM Header )
    In case of 2/3 -System will  Check the Production Version Validdity or Lot size , select the PV and explode .
    2.In OPPQ-MRP Plant parametrs -Keep BOM Explosion indicator as Blank -BOM explosion method /order start date .
    3.Keep MRP Dep.Req filed in MRP4 vewi of FERT /HALB as Blank ( meand you want to plan the dependent ofr FERT/HALB-BOM Compoenet -a,b,c  etc )
    4.All the material (FERT/RAW/HALB) should have porper MRP1-MRP4 view parameters  like MRP Type -PD , Procurement Type E-In house /F-External procured item .
    5.All the material should be Block for Procurement in Basic Data1 -X plant status as 01
    6.All of them should have Planning File Entry in MDRE/MD20/MDAB
    7.Run MRP in MD02-2,1,3,3,2,NETCH
    Hope this is clear .Check Point 1 to Point 4 frist and try
    Regards
    JH

  • BOM report showing materials and their prices

    Hi all,
    I'm trying to spool a report that shows the BOM materials and all their different prices so I can sum them up and know the total.
    I tried using CS13. I changed the layout so the display can include the standard prices of the materials(as maintained in the material master) but nothing is displayed at all.
    Is it possible that I'm using the wrong tcode? What am I doing wrong and how can I get the report?
    Thank you very much.

    Dear Uzoamaka,
    Check this links
    [Multi level BOM explosion in CS11/12/13 Cost of items are not displayed;
    [CS11,CS12,CS13;
    Regards
    Madhu

  • Need Single Billing Document for Materials and Services in Sales Order

    Hello Friends,
    I am selling FERT items and DIEN items in the Sales Order.
    Document flow as follows:
    Finished goods - Order-Delivery-Billing
    Services - Order-Billing
    In this process 2 seperate billing documents are created
    i.  Delivery Related Billing document for Finished goods.
    ii. Order related Billing document for services.
    I want to create a single billing document for both the items (FG & Services) in the sales order.
    Please suggest.
    Thnx.

    Sorry for the delay friends.
    Somebody suggested me to make services 'relevant for delivery' to ensure single billing document.
    What I did were the following steps:
    1. Copy Item Category TAD to ZTAD and make is 'relevant foir delivery'
    2. Assign Item Category ZTAD to Sales Order type and Item Cat Group 'LEIS'
    3. Go to Deliveries Item Categories and through new Entries add ZTAD. Make ZTAD relevant for Picking.
    4. Go to copy control 'Order to Delivery' and insert ZTAD in Item Categories relevant for this combination.
    Now when I create sales order with materials and services, they pass over to the delivery document and in the Services item, storage location/plant is greyed out. Only the picking quantity is required to be filled.
    PROBLEM :
    I am not getting the price of Services item in the billing document.
    Billing document copies all line items (tangible and intangible) from Delivery Document
    It takes the services item details/quantities etc. to VF01 but the price comes '00.00'
    Any suggestions.
    Is this legally viable? Someone told me its not legally correct.
    Thanks.
    Mohammed

  • BOM explosion for component in ECC which are relevant for planning in APO

    Hi ,
    as we assign materials the MRP type X0 with the MRP procedure X (without MRP, with BOM explosion) which are relevant to APO, so if i have BOM under this item then how this below level Items will be plan in ECC....?
    as we are excluding the component from planning so how the below level will be plan .....?
    Regards

    Dear SCM APO 22 ,
    Answer lies in your question only.
    as the assembly is relevant to be planned in APO but it will be exploded in MRP and the lower level component will be planned in R/3 only if required.
    Only teh assembly which have MRP type X0 will be planned in APO.
    Revert back if you need further clarification.
    Hope it helps you.
    Regards
    Ritesh

  • BOM explosion for variant material

    Hi Gurus!
    I created a material variant, when type match is done, the configurable material is changed for the variant properly, in this case, BOM explosion is done in the sales order and components are shown properly (I did this thought customizing).
    When I try to sale the variant material directly (without configurable material and type match), the system do not show the BOM explosion.
    I need the BOM explosion in the sales order for invoicing proposes.
    Can anyone help me?.
    Thanks!!.
    J. Carlos.

    Hi,
    To do a requirements explosion for a configured material, you must maintain the data in the
    material master record and link a BOM to the configured material.
    If the material of the material variant is the same as the configurable material, the link
    is already there.
    You can either create a BOM especially for the configured material (perhaps using the copy from
    function) or allocate the configured material to the BOM for the configurable product. The second
    option is the more common solution.
    If you allocate the configured material to the BOM for the configurable product, the BOM for the
    configurable product is interpreted and exploded according to the characteristic values assigned.
    The interpretation includes the processing of selection conditions and the setting of field values in
    BOM items according to the relevant actions.
    Allocating a Configured Material to a BOM: From the bills of material menu, choose Bills of material   Material BOM   Alloc. config.
    mat.   Create.
    Chidambaram

  • Idoc for materials and service for same contract.

    Dear All
       I have an scope where i have to migrate the data for material and services for the same contract.Is there an Idoc which does it so or otherwise ?Earlier in scope materials contracts have been loaded with the help of idoc type :- PURCONTRACT_CREATE01  and that of Service Contract using Idoc type :- BLAORD03.No customization is however permitted .Tcode for the same is ME32K.
    Regards
    Somnath

    Hi,
    It is not clear to me if you are working with sapscript or smartforms.
    You have only to find a variable which identifies the kind of invoice
    I do not know that variable so i use an example variable
    for sapscript:
    /: IF &VBDKR-FKTYP& = '1'
    /  INVOICE
    /: ELSE
    /  SERVICE ORDER
    /: ENDIF.
    In a smartform you can also do something like that.
    but There you work with conditions (eq, BOOLEAN)
    You have only to find the right variable
    success,
    Gr., Frank

  • User Exit to check whether chapter id for Material and Plant combination is maintained while creating sales order

    Hello all,
    my requirement is, system should give error message while creating sales order, if chapter ID is not maintained for a material and plant combination.
    please suggest the user exit.

    Hi
    CASE 1 : All Plants are excisable.
    In Material master , Foreign Trade data tab-  mentioned Control code field mandatory. ( i.e nothing but Chapter ID)
    CASE 2 : Few Plants are excisable
    In the Case 2 you need to go for Enhancement
    Program Name : MV45AFZB 
    User Exit:            USEREXIT_CHECK_VBAP ( Item Level Check )
    By using above user exit you write a logic with the help of ABAPer
    Plant and Chapter ID combination table : J_1IMTCHID

  • How to restrict BOM explosion in Quotation and Sales  Order

    Dear all,
    How can we restrict BOM main item explosion in Sales Order.
    this BOM main item is having special order items which have to generate purchase requisition (item category - BANC),
    with out exploding bom main item, can we generate a  purchase requisition for BOM subitems, can any body explain me that how can we do that.
    your suggestions will be highly appreciated.
    thank you
    Raghu Ram

    Hi Raghu Ram,
    The BOM explosion is controlled by item category.
    In the item category configuration screen, under "Bills of Material/ Configuration", you can see "Structure Scope" field.
    Select the one which is applicable to your case:-
    "blank" - Do not explode material structure
    A - Explode single-level BOM
    B - Explode multi-level BOM
    C - Configuration, no BOM explosion
    D - Configuration, poss. with BOM explosion
    E - Structure from Customer_Function (product selection)
    Hope this helps
    Regards,
    Nicole

  • Characteristics values for material and plant

    Hi Experts,
    I need to fetch characterstic values from a class Y-xx . I belive badi BAPI_CLASS_GET_characteristics
    will give the result but my problem is in selection screen I am passing material no and plant
    for this material and plant i need to fetch the characteristics values from the Y_xx class
    Could any one suggest the BADI or FM or tables to fetch the results
    Thanks in advance

    Hi,
    Go to MEK2, here enter the freight condition type, go to the output screen as pr the access maintained and select the line item and click on "Scales" button to see the from and to value.
    Also you can check the same in "Conditions" button in Purchase Info record.

Maybe you are looking for