Bom for lsmw

Hi friends,
I want to upload the bom through lsmw. I have created two sourct structures.
1. Header level
2 low level is item level.
How to assign the excel sheets for these two structures.
Please explain the steps for uploading the bom
Please help me on this
Venkat

Dear Venket
Please refer the below thread for your requirement :
1.How to upload the Excel sheet into SAP
2.How to transfer data from excel sheet to SAP data base ?
3.Material master upload thro' LSMW using Multiple tabs of excel sheet:
4.uploading data in exel sheet
5.Load excel sheet
Hope this will be useful
Regards
JH

Similar Messages

  • Mass upload of BOM for Equipment & Functional Locations

    Dear Gurus,
    I have an existing system with Functional Locations & Superior Functional Locations, Equipments with Superior equipments. I need to update the BOM for all (most) of these. Can we do it through LSMW or any other Mass update transactions?? Please guide me with the process.
    Thanks & Regards
    Krishna

    Hi Krishna,
    You Can use LSMW object by Direct INPUT method In which Sap ECC 6.00 has Standard Programme for uplaoding of BOM.Details are as below
    Object:0030---> Material BOM
    Method:0002--->Change
    Program Name:--->RCSBI010
    Program Type:B--->Batch Input
    Regards,
    Rakesh

  • Problem while Creating BOM using LSMW Direct Input

    Hi  all ,
    I am trying to create the BOM Using LSMW Direct Input Method .
    I am getting problem at step 9 that is Read Data.
    It is able to read the values from header and item files .
    but it is not able to write , so the Written is 0 always .
    I put the field names first in the flat file and correcponding values below it with tab delimited.
    Please let me know where the Problem would be.... I am trying this from long time ..
    Regards ,
    Raj

    hi ,
    Yes i am specify files i am attaching 2 files .
    ones is header and the other is line item data .
    my strucure is :
    Hi ,
    I am still getting problem while for writing the records after reading the data .....
    my header structure :
    STYPE
    MATNR
    WERKS
    SELAL
    STLAN
    DATUV
    ZTEXT
    my item structure :
    STYPE
    MATNR
    WERKS
    SELAL
    POSTP
    MENGE
    my header data :
    STYPE     MATNR     WERKS     SELAL     STLAN     DATUV     ZTEXT
    1     388     0110     20     1     06.01.2009     SAMPLE ZTEXT     
    my item data :
    STYPE     MATNR1     WERKS     SELAL     POSTP     MENGE
    1     388     0110     20     N     1234
    1     382     0110     20     N     12345
    Above text files are delimited by tabulator.
    Please guide me . The files are reading but unable to write .....
    Regards,
    Raj

  • BOM in LSMW

    Hi all,
        can any one of u send me the step by step  procedure to upload BOM using LSMW..
    Thanks and Regards,
    R.Premkumar

    hi.
    just follow the usual steps of LSMW for the t code cs01 (creation of BOM).
    but i think u need to have two source structure for the header and the line item (child screen). i mean u have to create two flat files viz BOM  header and BOM line item. then u need to give logical connection between these two..
    regds,
    jigar

  • What are the transaction codes we use for LSMW in MM, SD, PP  & FI/CO gnrly

    Hi all,
    What are the transaction codes we use for LSMW in MM, SD, PP  & FI/CO generally?
    Help will be surely rewarded.
    Thanks and Regards,
    Creasy

    > What are the transaction codes we use for LSMW in MM, SD, PP  & FI/CO generally?
    General threads about LSMW in MM, SD, PP, FICO will be locked and deleted generally.
    > Help will be surely rewarded.
    &********************** Please read "the rules" if found usefull... ************************&
    Cheers,
    Julius

  • What are the main steps to be taken care while doing recording for LSMW

    Hi,
    I am facing problem in LSMW.
    Can anybody suggest me that What are the main steps to be taken care while doing recording for LSMW for recording mm01 ?
    thanks'
    naresh

    Hi,
    Recording in LSMW is similar as SHDB.
    in LSMW after you give Project-Subproject and Object.
    1)Go to-> Maintain Object Attributes -> double click
    2)Press Display/Change Button at top left to make editable mode.
    3)Select radiobuton -> Batch Input -> Give Recording name say Z_mm01
    4) Click the Recording Overview boton on right -> Give TCode which u want to record....
    Rest refer the Document link attached.
    Please find the links to various threads on the same.
    Re: LSMW - Using a BAPI
    BAPI, IDOC in LSMW
    Upload the data in LSMW using BAPI
    This one is the most complete document for the same
    http://sapabap.iespana.es/sapabap/manuales/pdf/lsmw.pdf
    http://service.sap.com/lsmw.
    Regards
    Kiran

  • Bom for production order and subcontracting

    Dear guru ,
    I have a finished material that can be use both produced in-house and procured externally with subcontracting.
    Now i use one only bom with usage 1 (production ) for the two process.
    I have a problem for one component.
    For subcontracting i must consider this component as a phantom (with explosion of its components) , instead for the in-house production I must consider this component as a normal stock item.
    Can I use only one bom or I must create an alternative bom for manage the two cases ?
    Thanks for your help.

    Dear CRIS,
    In my understanding this may create discrepancies during the material transfer from own stock to the vendor and also during
    month end checking process.
    What's the problem of maintaining that component as a stock item?why it should be treated as a phantom only for sub-
    contracting?
    Even if you are maintaining 2 different alternative BOM's for the final product one with the component as a normal assembly and
    the next one as a phantom,you will be facing issues during costing purpose and material inventory also.
    Come back with your further questions.
    Regards
    Mangalraj.S

  • Functional Specifications for LSMW required urgently

    Hi Friends,
    Can you please provide me with the functional specifications for lsmw. I need a template document which i should be able to use as Func Specs for different lsmw objects.
    Kindly forward the same to [email protected]
    Thanks & Regards,
    Vijaya

    see the link...u will get the documents for LSMW
    https://websmp110.sap-ag.de/~form/sapnet?_SHORTKEY=01100035870000615616

  • How to enable purchasing tab in BOM, while defining bom for a item

    dear gurus,
    while defining a bom for a item, there ae various tabs like main, effectivity, OM etc. among that purchasing tab is in disabled state. how to enable that.
    pls provide setup and whats actual use of that.
    waiting fr reply.

    Dear,
    For a phantom assy the special procurement key in the material master should be 50. You have done the right thing.
    But in the BOM of FERT please remove the phantome assy Off indicator. Once you maintained the special procurement key 50 in material master, the phantom indicator will be acutomatically set in the high level bom.
    Hence if you activate the phantom assy off then this will override the phantom indicator
    For more understanding please see trhe below links
    http://www.sap-img.com/production/what-exactly-is-a-phantom-item-or-assembly-means.htm
    Regards,
    R.Brahmankar

  • How to create  the BOM for co product

    Dear friends,
    How to create the BOM for Co product  and How the production will create and  how the costing will capture for that.
    Regards,
    Sabhapathy R

    Dear Umesh,
    How Bom created for co product
    By product
    Header
    xxx
    101
    mvt
    mvt
    qty
    item
    yyy
    261
    1
    zzz
    531
    0.5-
    By product
    Same way how we create co product for BOM. pl explain with simple example.
    Thanks &regards,
    Sabhapathy R

  • Adding alternate component in the same BOM for 2 level BOM setup

    Hello,
    I have a BOM with the following setups -
         BOM_A components are BOM_B, Comp_A1, Comp_A2
         BOM_B components are Comp_B1, Comp_B2
    The need is to have an a BOM with components Comp_B1, Comp_B2, Comp_C1. if I create this as an Alt of BOM_B, how can I use this alternate in BOM_A?
    Can anyone please let me know if there is a way to specify the alternate of BOM components in multi level BOM?
    Regards,
    Manju

    Hello Manju,
    Can you please specify the exact business requirement.
    Why this is required at BOM Level?
    If BOM_B (comp_B1,comp_B2 & comp_C1) is Alt. bom & WIP job completed using this Alt. BOM then syste will take care / consider valuation as per Alt. BOM for first level bom (BOM_A) WIP job.
    Thanks
    NS

  • How to create group bom for multiple plants with different company codes

    Dear all,
    In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
    So how to do this?
    Thanks in Advance
    Bhushan

    For that first extend all the materials to all the plants... In one plant create a BOM for the material..
    In all other polants in CS01,   click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
    karthick

  • How to Generate Diffrent Subcontarcting BOM for Diff. Vendor in MRP

    Hi Experts,
    Ii have query @ how to generate to Diffrent Subcontracting BOM for Diffrent Vendor for same material in one plant in MRP(Material Requiremnt Planning)
    Example: I have X Finished material having 3 Vendor with their Quota Arrangement with 40,30 & 30% quota. This 3 vendors have diffrent BOM,i.e. Alternative BOM. how shall i generate Diifrent PR with Diffrent Subcontracting BOM for according Vendor.
    Pls tell me procedure for this.
                 Thanks in Advance,
    Best Regards,
    Dev

    Hi Dev,
    You can acheive your requirement using Production Version in Material Master MRP 4 view , production versions tab.
    Create three different production version as below  and assign the same to the Vendor in Vendor Info record Tcode : ME11 / ME12 :
    Prod Version                  Alt BOM            For Vendor
    01                                       01                 XXXXXX
    02                                       02                YYYYY
    03                                        03               ZZZZZZ
    Assign the Production Version to corresponding vendor in Vendor Info Record.
    Goto t.code : ME11 /ME12 put the Vendor (say XXXXXX), Material No , Purchase Org and Plant and seeect the sub contract vendor radio button and press enter.
    System will take you to CIR : General Data screen , Select the Purch Org Data 1 and enter the Production version  "01" number in the field "Version"  save and comeout.
    Similarly do it for the other two vendors YYYYYY -02 and ZZZZZZ -03 .
    Now if you create a sub contracting P.O system will propose the Alt BOM 1 for the Vendor XXXXXX , Alt BOM 2 for the vendor "YYYYYY" and Alt BOM 3 for the vendor "ZZZZZZ".
    Hope this will help you.
    regards
    radhak mk

  • Version Management for LSMW Objects

    Hi,
    I want to maintain versions for LSMW objects. How can I do it.
    Regards,
    Tuhin

    Unfortunately, there is no tool delivered with SAP BW that provides the ability to compare objects across the landscape. There are some third-party tools that provide this functionality.
    You could create your own by create an ABAP program, or several ABAP programs, using the following BAPI Function Modules to get the details of the objects in each environment and then do a comparison:
    InfoCube - BAPI_CUBE_GETDETAIL
    InfoObject Catalog - BAPI_IOBC_GETDETAIL
    InfoObject - BAPI_IOBJ_GETDETAIL
    InfoPackage - BAPI_IPAK_GETDETAIL
    InfoSet - BAPI_ISET_GETDETAIL
    DSO - BAPI_ODSO_GETDETAIL
    MultiProvider - BAPI_MPRO_GETDETAIL

  • Use of Alternate Components in BOM for Production

    Hi Experts,
    We implement for a customer who are manufacturers of Electronic Products.
    There are possibilities of producing a Finished Products with an Alternate Child Parts some times.
    Is it possible to automate this.
    More examplified below.
    XYZ is a Finished Product whose Components are A, B, C.
    To produce the same XYZ, the components used may be
    A1, B, C or
    A, B, C1 or
    A1, B, C1. So there are binary concept number of combinations.
    Since the components are more in number & there are chain alternates (i.e. if one changes other has to be changed), it is not practically possible to maintain many number of BOMs for a single Finished Product.
    Is there any way implement this scenario upfront.
    Advance Thanks & Regards
    Aru

    Hello Friend,
    SAP does not have such type of functionality we can make one bill of material for one finished Item.
    Manually:-
    You may try like make big bill of material ,which have all alternative materials ,raw material in single BOM.
    and whenever you make production order delete that materials which you are not going to use that production.
    Import from excel file:-
    If we want to make combination then goto excel and import it by Data transfer workbench(DTW)
    i am working in same industry , i m using same in excel make all combination and varified it engg. then import in Bill of materials as well production order.
    for import i have made .bat file AND  end user put the excel file in predefined location and click on .bat file it execute and all data import in SAP with using manually DTW.
    Thanks
    Manvendra Singh Niranjan

Maybe you are looking for

  • A TWM that can use Trayer/Tint2? Plus some other things I "need" in it

    I know the beauty of TWM and all, but here's the real problem I'm having: I want to use my tray/bar setup. I've got it exactly how I want it and I don't want to mess with it right now. Specifically, I have conky, tint, and trayer all on the same line

  • UCCX Historical Reports Doubt

    Hi , I have telephony setup running on CUCM 9.x integrated with UCCX 9.x. Everything working fine and I can generate the Historical reports. I have some doubts for generating the reports which is mentioned below. 1. Need to generate the agents  aband

  • Forum etiquette FAQ + Moderator Enforcement

    jochemd wrote: Since despite the plethora of messages nobody is even attempting to provide any arguments or suggestions towards improving the FAQ, this thread is being locked. Since the only currently provided reason for changing the FAQ is rather po

  • Hlep.

    Hi, Can someone help me in implementing this simple logic in ABAP. Set of values :  (00:10:00,00:18:00,02:14:00,05:30:00,10:40:00) If the value is not in this interval then it is updated to next higher value. Ex: 1)If the hour timing is 02:18:00 , it

  • Mighty Mouse button remapping

    Hi, this is about a mighty mouse, not magic mouse, though the principle should be the same. Some time ago my scroll ball got stuck so I tore the mouse apart to fix it(bad idea) and in the process destroyed the ribbon cable connecting the mouse shell