BOM material transfer from ECC 6.0 to GTS 10.0

We are trying to transfer BOM (Bill of Material) type materials through sales order from ECC to GTS system. However we need to classify in GTS system both parent iteam and child items else the sales order containing BOM material will remain in "blocked state".
We want to know the configuration setup in ECC for those type of materials wherein we control their sucessful transfer to GTS10.0. If possible could you guys shrae some config document for BOM in both ECC and GTS systems. WOuld really appreciate your help.

Hello Chetan,
see ECC IMG:
Sales and Distribution --> Foreign Trade/Customs --> SAP Global Trade Services - Plug-In --> Control Data for Transfer to SAP Global Trade Services --> Control Transfer of Bills of Product for Preference and Re-Export
here you can specify your criteria. From your message is not really clear which scenario you trying to run. With sales order you are simply transferring material unless you have preference KMAT scenario implemented. Maybe you can give more information.
Cheers,
Gabriel.

Similar Messages

  • Material PR transfer from ECC to SRM without Account Assignment

    Hello,
    When a material PR without account assignment is transferred to SRM. The scenario is determined as direct procurement and system will behave in extended classic scenario.
    I would need the PO to be posted in backend ie Classic scenario.
    We are in SRM 7.0 using SOA PR transfer from ECC EHP 4 system.
    I believe there is  consulting note available for this scenario. If any body has the note number please share it.
    Thanks,
    Rohith

    Symptom
    While running Materials Replenishment Planning (MRP) purchase requisitions (PR) will be created in SAP ERP (e.g. after creating a Planned Order in MD10).
    Before SAP SRM 7.0 these requisition got the field EPROFILE assigned which enabled the system to extract the PR document to SAP SRM by using report BBP_EXTREQ_TRANSFER. As of SAP SRM 7.0 and SAP ERP 6.04 you configured Business Add-In ME_REQ_SOURCING_CUST to trigger SOA message PurchaseRequestERPSourcingRequest_Out.
    After running MRP you notice that no sourcing request SOA message got generated.
    Other terms
    SOA, MRP, Sourcing, external sourcing,
    BBP_EXTREQ_TRANSFER, EPROFILE
    MD10, MD14, MD04
    Reason and Prerequisites
    Program error.
    Solution
    Due to complexity it is not possible to provide a SAP core correction. However PP-MRP application provides a BAdI interface that gives the possiblity to trigger this functionality of external sourcing.
    If you need to use the external sourcing with SAP MRP create a new implementation for BAdI MD_PURREQ_POST and inherite from the class provided in attached correction instruction.
    Note 1546980 - MRP PReq: PurchaseRequestERPSouricingRequest_Out not send
    1263876 - SAP SRM: Configuration of Procure-to-Pay Scenario
    Note 1504247 - ME54/ME55 does not trigger sourcing SOA message
    Note 1436550 - Multiple PR scenario PurchaseRequestERPSourcingRequest_Out

  • Material Updates from ECC to CRM

    Hi Experts,
    We recently had application of Enhancement Pack4 on our ECC system. After the application EHP4 pack, we have started getting some material updates from ECC to CRM. And those updates are failing in CRM as we do not have any material set up in CRM. Due to these failed updates, lot of dumps are getting created in CRM. So can u please advice where/how in ECC i can restrict these updates to go to CRM. Any help in this will be highly appreciable.
    Regards
    Charitha

    Hello Charitha,
    In txnn:R3AC4 of CRM , check INACTIVE flag for object MATERIAL (and any other objects whose data is not required in CRM)
    for your RFC destination (ECC).
    This would prevent any automatic data flow for this object from R/3 to CRM.
    Hope this helps!
    Best Regards,
    Shanthala Kudva.

  • Material transfer from SAP R/3 to SAP Business One is blocked

    Hello experts,
    Please I need your help for the following scenario:
    Our client has B1iSN and SAP R/3 in the headquarter company and B1if and SAP B1 in the subsidiary. The material transfer from SAP R/3 to SAP Business One failed and the following message is diplayed:
    Result message :
    com.sap.b1i.xcellerator.XcelleratorException: XCE001 Nested exception: com.sap.b1i.bizprocessor.BizProcException: BPE001 Nested exception: com.sap.b1i.xcellerator.XcelleratorException: XCE001 Nested exception: com.sap.b1i.xcellerator.XcelleratorException: XCE001 Nested exception: java.lang.RuntimeException: DI Error: (-2028) No matching records found (ODBC -2028)
    The Material database transfer is blocked due to message in status
    failure which block all other messages.
    We tried to restart the server (Business One and B1iSN) but it didnu2019t solve the issue.
    Any idea please? Thank you.

    Hi Nadia,
    did you check the WRITE-POLICY settings of your scenario?
    when reading the displayed DI Error message, it looks like B1iSN is trying to update an B1 item which does not exists.
    Please open SAP B1iSN Tools -> Development Tools -> Graphical scenario Design and select your Bizpackage, BizStep and BIUMETA.
    Open the WRITE-POLICY symbol and check the entries:
    Insert on Exist = error or fallback2U
    Update on Miss = fallback2I
    The Update Policy should stay to value regular.
    To activate changes of the WRITE-POLICY please deactivate, modify and reactivate your Business Process instance.
    If a WRITE-POLICY change has no effect, please check your data mapping (BIU) and especially the parameter <QueryParams>, which mustn't be filled for "insert/Add" operations into B1.
    Best regards
    Bastian

  • Material Transfer From one Material Type to another should not be possible

    Dear Gurus ,
                        I have a issue here i want to lock the transfer posting from one Material Type to Another Material Type . The point is the Transefr Posting Shuold happen from same Material Type  . So can anybody help me out that what should I do for the same

    Hi ,
            I tried for the same but its not working . I just kept a Break point in this exit . Tried to transfer from MB1B its not stopping at the Break Point Can U suggest as I am doing it from MB1B .
    Regards
    Shankar

  • Need to Populate Material Type from ECC to APO Product Master

    Hi All,
    I need to update the material type field from ECC to APO.
    I am using the userexit CIFMAT01 and component EXIT_SAPLCMAT_001.
    I need to extract field MTART from MARA table and need to Populate it in APO Product master.
    In APO i am using the ATT01 field of table /SAPAPO/MATKEY.
    But this does not work the data of material type is not getting populated in APO.
    We have tried to use a break point in the user exit and while executing the transaction CFM2 it does not stop at the break point.
    Can anyonwe guide me as to how to go about in implemeting this user exit.
    Regards
    Nitin

    Hi Nitin,
           Make sure that u r pass the material type as a below :
    CT_CIF_MATKEY-ATT01 = Pass the Material Type.
    CIF_MATKYX -ATT01      = 'X'.
    Check the below thread to debug the CIF queue:
    debugging CIF user exit
    Regards,
    Siva.

  • Report on New vendor transfer from ECC to GTS

    Hi we have run the batch job daily basis to transfer new vendors from ECC to GTS system, my client want to know that list of the venodors(Business Partners) has been transfered today in GTS system on particular day to screening SPL. where i can see this, or any possible solution saying that get mail notification  to users - once vendors are transfered based on job batch runs.
    regards
    Satish

    Satish,
    You can see the log  in System Monitoring > Transfer logs for business partners or by executing the transaction:  /SAPSLL/PARTNER_APPL.
    However in order to see the required logs,  you need to  configure the  u2018Control Profile for Loggingu2019 in IMG.
    Hope this helps.

  • Vendor Transfer from ECC to SRM-EBP

    I want to transfer vendor from ECC to SRM-EBP.I tried the T code BBPGETVD. But I am getting the below log:
    "Error: Error while Creating Business Partner (BP) Module: BUPA_CREATE_FROM_DATA Vendor: 0000100011".
    Please suggest.

    Hi
    I have seen this error. However kindly check in SRM side
    In BP transaction 0000100011. Is this vendor is vailable or not.
    OR
    do some cosmetic change in this vendor in XK02 and when you run BBP_VENDOR_sync REPORT BRINGS you this vendor in SRM
    Muthu

  • No Business Partner generated for new employee transfer from ECC to SRM

    Hi All,
    I am working on SRM 5.0 with ECC 6.0 backend. The HR structure is replicated from ECC using ALE, message type:HRMD_ABA.
    When I am trying to replicate a new employee from ECC to SRM, I run the O-insert first, then the S-insert and then the P-insert using PFAL transaction.
    The Org structure was already in place in SRM, so it just adds the new position to it by A003 relation. The S-insert generated idoc shows status as '53' in both ECC and SRT with the relation A003, B007 and A008. But, when I check the table HRP1001, the A008 entry is missing. Due to this, no CP is generated for this position and also no business partner is generated for this user.
    When I run the P-insert for this employee, the idoc is posted in ECC. But, the status of the idoc in SRT is '52' and the message shown is "The Parameter Country Has Not been Entered During Naming Format Check" Message No. R11206.
    I checked the Name Format for this employee, and it is maintained as 2.
    Where am I going wrong? Why is no CP person generated even when the idoc status is 53? Why isn't the new employee getting transferred to SRM server?
    I have checked the SAP notes related to HR-ECC Org transfer, but I am unable to figure out the reason for this problem.
    Could anyone help me out in this?
    Regards,
    Ancy

    Maintained the name format tables (SA13)on ECC and SRM side.

  • Material Transfer from Storage Location 2 Storage loc

    Hi Gurus,
    Here Client want to transfer Material from 1 loc to another. Std T Code is MB1B with Mov Type 309. But here we have to enter material, qty,& batch no.But client's requirement is that he dont want  to enter all these things.He want to select the material,batches collectively sothat seperate entry should be minimised. Is there any functionality through which we can transfer the selected materials?
    Please reply soon its urgent.
    Regards,
    Mayur

    Hi mayur
    First of all 309 movement is ussed for Material to material transfer
    like our friend said for storage loc to storage loc. you need to use 311
    Now when you go to MB1B then goto Edit in that you can see default value
    enter your default value , so after that you need to choose only material and batch
    collectively
    Thanks
    Bala

  • Demand transfer from ECC to SNC using RSMIPROACT Programme

    Hi,
    Presently we are using RSMIPROACT to transfer demand (Planned independent Requirements-T-code MD61)from ECC to SNC.
    It transfers the demand always from version 02 and not from the active version 00.
    I want to know whether there is config to change this.We want to send through 00 verison also.
    Thanks and Regards
    Raghavendra Pai

    Hi Raghavendra Pai
    In ERP system, transaction OMPD. Each transaction has been assigned to active version.
    I believe in your case it is version 02 as active.(Guess)
    If you want both active version and other version data to be sent, then try to enhance the code in includes available in RSMIPROACT program.
    Kindly seek help of PP guy and ABAPER.
    Hope this helps, As per my knowledge we have different versions, so that we can simulate long term PIR and differentiate between various planning approaches.
    Best Regards
    Vinod

  • Material Replication from ECC to SRM 7.0

    Hi Experts,
    I am working on Extended classic scenario SRM 7.0 with ECC 6.0, I have created the Material Group and Master data in ECC system. While doing replication via R3AS i am getting the following error msg( I have applied Note 720819 & 330401in ECC ).
    Errors:
    Hierarchy for material types does not exist
    (Before materials are imported from the ERP system, the material types from the  ERP system must exist as categories in CRM/EBP. When the Customizing object DNL_CUST_PROD1 is imported, the material types are imported automatically and created under the category MAT in the category hierarchy R3PRODSTYP (product subtype).)
    MATERIAL: Object will not be loaded
    Pl do the needful.
    Regards
    Mohan

    Hi  Pl check whether you follwed these steps are not.
    Hi find below for the product cat
    Steps to create the product category in SRM:
    1) Create MM material groups in ECC client. This will create a transport. Go to SRM Tcode R3AS and select the object u201CDNL_CUST_PROD1u201D from the list and run it. You can monitor the job using R3AM1 in SRM. This will bring the material group into SRM. This can be seen in TCode u201CCOMM_HIERARCHYu201D in SRM.
    2) Once it is done. Go to IMG in SRM and go to path SRM> SRM server> Cross app biz settings> Account aassigmnet> Define GL code for Acc *** Cat and Prod Cat. Maintain the GL code against this prod cat for all the account assignment codes. This is client specific setting and need to be done in every client by opening it. This GL code is given in the form in ticket.
    3) Do a test and check if the product category is available for procurement in SC.
    Regards,
    Satish

  • Material replication from ECC to SRM

    Dear SRM 7.0 Experts,
    We are implementimg SRM 7.0 and we are trying to execute the Initial Load of materials into SRM 7 from ECC. We have completed all the Middleware settings and all the customising required for material replication. Whe we run the initial load (tcode R3AS) and select the first object DNL_CUST_BASIS3, it runs but the status remains "Running" in R3AM1. There is no errors in SMQ1as the entry runs and completes and therefore disappears. There is no errors recorded in SMW0 or SLG1 either. What could be the problem?
    I checked in SMQ1 & SMQ2 as well, but there is no entries here for the object DNL_CUST_BASIS3. what we can do to resolve the issue ?
    Regds,
    Cb

    Have you checked the outbound queue in backend R/3 system  ?
    Have you defined the additional user in CRMCONSUM table apart from the CRM user? 
    Verify and, if necessary, change or insert entries in tables CRMCONSUM and CRMRFCPAR as
    described in SAP Note 430980. See also SAP Note 720819.
    Hope this helps you.
    Regards
    Abhijeet

  • Access Material Master from ECC 6 via PI

    Hi everyone,
    I am very new with SAP PI. I hope someone here could give me a guidance. I am trying to access the material master data from ECC 6 via SAP PI using web service. Is there any document for step by step instruction that I could follow?
    It is much appreciate that someone could give me some hints.
    Thanks,
    Chris

    Hi,
    Check this link IDoc To Web Service Scenario
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/5474f19e-0701-0010-4eaa-97c4f78dbf9b
    There is no weblog on IDOC to webservice. But u can have a look at blogs on RFC to webservice.
    Then using above given Steps + weblogs u can build ur scenario.
    /people/shabarish.vijayakumar/blog/2006/03/23/rfc--xi--webservice--a-complete-walkthrough-part-1
    /people/shabarish.vijayakumar/blog/2006/03/28/rfc--xi--webservice--a-complete-walkthrough-part-2
    Thanks!
    Edited by: monica bhosale on Aug 26, 2011 10:08 AM

  • Purchase Requisition transfer from ECC to SRM via XI

    Experts,
    Please let me know if you have any information on  the following issue:
    Environment : SRM 7.0,  ECC ep4,  Extended Classic scenario
    The purchase requisitions have been created in ECC and released. I believe in SRM 7.0  the PR's get automatically transferred to  SRM Sourcing cockpit via XI from ECC.
    One PR was pushed manually from SMQ1(Outbound queue ) in  ECC and this failed due to a login issue in XI.
    The XI was using the interface  PurchaseRequestERPSourcingRequest.
    My question is
    1. When the PR is released in ECC, where to check if the PR is pushed to XI. Do we need to schedule a job? When I checked SMQ1 (outbound queue, the queues are empty)
    2. Do we need to define the partner profile in ECC for XI in We20. If so, then what message types to use for the  IDocs going from ECC to XI.
    2. Do we need to configure the interface PurchaseRequestERPSourcingRequest in XI to map the incoming PR from ECC.
    3. In transaction SXMB_moni in XI  I am not able to pull the  XML messages. What options options do I need to
    set to pull the messages that errored out.
    Thanks,
    Scott.

    Hi All,
    Hope this helps you for XI configuration
       Importing Business Scenarios for Sourcing
    In this section, you transfer the business scenario Strategic Sourcing from the SAP Integration Repository, generate it, and activate it.
    Prerequisites
    You have:
    Defined the business systems for SAP Supplier Relationship Management (SAP SRM) and SAP ERP in the SAP System Landscape Directory. For more information about SAP NetWeaver Process Integration (SAP NetWeaver PI), see the SAP Marketplace
    Imported the SAP NetWeaver PI content for SAP SRM into the SAP Integration Repository.
    Procedure
    Log on to the SAP Netweaver PI system.
    Choose Integration Builder: Configuration.
    In the left pane, select the Objects tab.
    Choose  Service Without Partner  Business System .
    Right-click to display the context menu and choose  Business Systems  Assign Business System . This opens the wizard.
    Choose Continue. The wizard guides you through the required steps.
    Create the business system for both SAP SRM and ERP (you can bypass this step if the business system is already setup).
    Select a business system.
    You can create communication channels either manually or automatically. You can create them automatically here. In this case, the systems are applied from the SAP System Landscape Directory (SLD). Channels must be complete in terms of URLs and authentication information.
    Choose Finish, and then choose Close.
    11. On the main screen, choose  Tools  Transfer Integration Scenario from Integration Repository . This opens a wizard.
    Choose Name using input help SE_Sourcing_Enhancements
    Choose Continue. The scenario name is SE_Sourcing_Enhancements.
    Choose Finish and then choose Close. The Business Scenario Configurator opens automatically.
    Choose Component View.
    The Select Component View window opens.
    Choose Apply.
    Choose Assign Services. The Assign Services to Application Component window opens.
    Press F4 to retrieve the available services.
    Choose Assign.
    Select the related service and choose OK.
    Assign a business service to all roles.
    Choose Configure Connections.
    Select the connections from the Service Assignment tab.
    Press F4 in the Communication Channel field.
    Select a communication channel. This channel must be of type XI.
    Note
    If the systems are applied from the SAP Landscape Directory, the Integration Builder automatically creates the communication channels.
    If the systems are not applied from the SAP Landscape Directory, you create communication channels manually. To do this choose an existing service and then Communication Channel using context menu New. You must assign a communication channel for each connection.
    End of the note.
    Choose OK and then choose Apply.
    Choose Generate to open the Create Configuration Objects window.
    Choose Simulation, then Generate, then mark all in the list Scope of Generation.
    Choose Start to generate a log. Check the log for errors and save it if required.
    In the Close Integration Scenario screen, choose Apply.
    In the left pane, select the Scenarios tab; your scenario has been added.
    In the left pane, select the Change List tab.
    Expand the Standard Change List.
    Right click on the scenario name SE_Sourcing_Enhancements and choose Activate.
    Regards
    Sam

Maybe you are looking for

  • Speakers

    I have external Harmon Kardens' I went to sound preferences and there is no choice for external speakers? I can't get sound out of them... imac   Mac OS X (10.4.4)  

  • Check Number Confirmation

    I have a client using SAP Business One 8.8. I print Checks using Document Printing, Checks for Payment. The checks print correctly, but the Check Number Confirmation window does not automatically appear. I have to go to the Banking menu and open the

  • Invoke-sqlcmd with domain user name and password

    I am trying to execute below small SQL script from powershell by passing my domain user name and password..but it is throwing an error login failed for the user. Howerver I am able to execute the same query by passing normal user 'non domain' and pas

  • Lightroom 4 Help does not work

    When I go to Help in Lightroom 4 the search panel only has references to Photoshop Elements and not Lightroom. Is that normal? The Lightroom help is in the panel to the right but how do I search in it?

  • Unicode convertion source=target

    Hi, I'm tring a Unicode convertion on a send-box system just copied from production system. I'm in export phase now in our Solaris 10 SPARC + Oracle 10.2.04 box For the import I must use the same server, same <SID> name and system number... is it nec