BOM middleware

Hi Experts,
I am trying to replicate the BOM adapter object in CRM 7.0. All the materials in the BOM belong to the same plant but when applying filter criteria on MAST I am only getting the field STLAN and now WERKS.WERKS field is not appearing in the filter corresponding to MAST table.
When i run an initial load for BOM I am getting an error:
You triggered an initial download of bills of material (BOM) from SAP ERP to SAP CRM using the BOM_ERP middleware adapter object. However, your filter settings are incorrect.
System Response
No data was downloaded.
Procedure
Change you filter settings in the transaction R3AC1. For each filter on a table (MAST, EQST, and TPST), you can only set one filter for the field STLAN and one filter for the field WERKS.
You can then restart the initial download.
There is no BOM_ERP middleware adapter object and only BOM is there.
Regards
Shilpi

You could refer to the note 1451626.
Summary
Symptom
Unable to perform an initial load of object BOM and you get the below errors:
      Parent objects have not been downloaded
      Message no. COM_BOM_EXCHANGE012
                  OR/AND
      Change your filter settings for the BOM_ERP adapter object
      Message no. COM_BOM_EXCHANGE011
Other terms
COM_BOM_EXCHANGE012,BOM,BOM_ERP,CRM_BOM_ERP_CHECK_FOR_FATAL,COM_BOM_EXCHANGE011
Reason and Prerequisites
This is due to the program error.
Solution
Please implement the attached correction instruction.

Similar Messages

  • BOM Explosion in CRM & ECC

    Does anyone know of a way to control Sales BOM explosion at the item category level in the middleware?  We have boms created in our ECC system for both standard and configurable materials.  For our standard materials I need the sales BOMs to explode on the CRM order (for ISA shopping basket purposes) and to prevent a duplicate explosion in the ECC backend I have parameter NOSTRUCTURE set to X in SMOFPARSFA.
    CRM does not support using configurable products as the header or component of sales boms so for these materials I do want the bom explosion to happen in ECC as the order flows from CRM to ECC.
    I've tried adding order types and item categories to the parameter names for NOSTRUCTURE but it didn't work.  OSS confirmed my findings that it would not work.

    Hi,
    I did work on single level BOM explosion in a couple of projects. As per SAP note 549341 - FAQ: BOMs in the sales order, it is very much possible to explode multi-level BOMs.
    Check this note and item category BOM explosion options.
    <b>Do not forget to reward if it helps,</b>
    Regards,
    Paul Kondaveeti

  • BOM DAta Access in SRM

    Hi,
    WE are implementing a PLM - SRM integration wherein products once finalised would need to be communicated over to the Vendors for finalising product design. we would be having SAP R/3 as the system which would be the bedrock so as to say. after product design stage where the BOM would be constructed, how can we access the BOM DATA through SRM ? i checked the SRM master data, ALL of which would be sourced through R/3 using CRM Middleware, what i want to knwo is, how will we import BOM data into SRM ?
    regards
    authi

    SRM does not have native capability to store structured items (like bill of materials or bill of services) like in R/3.  Even if you somehow replicate the BOM into SRM (using CRM middleware) the procurement documents cannot handle such structure items.
    Kind Regards, Suresh.
    Message was edited by: Suresh Ramanathan

  • Trade promotion with BOM

    Hello together,
    is anybody experienced with using BOM's in trade promotion or does anybody knows a good documentation for this issus. We are using CRM 7.0.
    Thanks in advance.
    Werner

    BoM in ERP becomes a structured product in CRM when downloaded by the middleware.  For TPM, we use them for the display pallet scenario.
    Try looking for display pallet documentation
    ex: http://help.sap.com/saphelp_crm70/helpdata/EN/ff/e2afec1bc6419395eb34aa2205b788/frameset.htm
    Let me know if you need more info.
    Regards,
    Anik

  • BOM is not getting displayed in case of centralized planning plant.

    Dear All,
    there are 2 plants for which we have centralized planning. the users have created Equipment BOM for the two plants. but in case of the second plant for which the planning plant is different from the maintenance plant, the BOM is not getting displayed in the Maintenance Order (i.e. in the components tab).
    kindly through some light on it. whether i have to do some settings for it.
    Regards,
    Ritesh Kapoor

    Hi,
    Yes while using IH01, i have ticked the BOM explosion option, but when i am giving the plant there then only it is displaying the BOM of that equipment.
    Also when i am creating an order for the same equipment, then it does not displays the BOm & shows the message which i have written in my previous mail.
    Ritesh

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

  • Error while creating BOM

    Hi
    iam facing error while creating, changing and display BOM.
    Error: Status MHCO of the user interface SAPLCSDI missing.
    rgads

    Dear,
    MHCO - BOM item screen GUI status..Are you using any Alternative item?
    Have you applied any new patch in the system?
    Contact ABAPer, can give more details
    In SAP service place serach for this interface program,,,you will get many notes on this.

  • Giving BOM material as free good in Sales Order

    Hi,
    I have a business requirement.
    I want to give a free good in Sales Oreder which is a BOM material.This should be possible by manually changing Item category for the line item in the Sales Order just like how we can change TAN to TANN in normal circumsatnces when we add free good material for any NON BOM material.
    In standard functionality,the item category determined for this BOM material is TAQ but this item category field in Sales Order is non editable because of which I can not include the BOM material as free good in my sales order.
    I have already defined one z Item category for free goods for this BOM material & want to use it in Sales Order.
    Can you please suggest how this can be handled ?
    Or is there any other work around by which will allow me to include BOM material as free good in my Sales Order ?
    Thanks in advance
    Regards,
    BM

    Hi,
    Thanks everyone for the feedback.I agree with Samir Danish.It is a standard functionality of SAP which does not allow free goods for BOM material.
    However, can someone suggest work around to deal with this issue.I mean if any one has been doing any work around for this issue then please let me know.It s becoming critical for me.
    Regards,
    BM

  • BOM in Scheduling agreement (Type LZ)

    HI
    I am using scheduling agreement (Type LZ) for maintaining my sales plan for a period of 4 months. (1st one month - daily & subsequent months as weekly requirements). Ii would create delivery and invoices for each supply.
    Pricing previously was based on the finished product (basic price for product was available). SO there was no problem.
    <u>New requirement:</u>
    finished Product above - is made up of components. Now, price should be derived from components. For this I have enabled SD Bom for my finish product.
    But the problem is when i use the Finish product code in scheduling agreement type LZ, the BOM doesn't explode (it explodes in other scheduling agreement types, say LP)
    Clarification:
    1. Is it possible to calculate price of the higher level material by summing up the components' price?, with out BOM explosion
    2. Is BOM explosion possible in scheduling agreement with delivery schedule (LZ).
    Note:
    1. Necessary settings for item category & BOM master already in place.
    2. BOM is exploding in sales order and other sheduling types, except doc type LZ.

    If it is maintained as error message, it does not allow me to maintain delivery schedule more than target quantity of 100 EA. Also the overdelivery tolerance is maintained as 20 %, so it should allow me to maintain delivery schedule of 120 EA, but it does not allow me to maintain greater than target quantity of 100 EA. Please let me know your comments.

  • Variable size item problem in BOM

    hi all,
    We have semi-finished material with componets as variable size items (item cat. R)
    Now in the variable size tem data, Size 1 = 1,406 MM, Size 2 = 1,220 MM. Numner is 1 ST, formaula place is blank.
    Qty Var-Sz Item is calculated by system is 3.957 M2. On what basis this value is calculated?
    In the component material we have maintained a componenet scrap quantity as 15%.
    BOM ratio of header : component = 1NOS : 1 ST
    Again when we create a production order for the header, for 1 NOS header quantity component qty becomes 2.
    For 2 NOS of header qty, component becomes 3 like this.
    Why this happens..
    Regards,
    Srijit.

    Thread closed

  • Error in BOM Dependency update

    Hi Experts,
    I have developed a BDC for BOM dependency it is working fine in foreground and it is throwing error in background, I am attaching the error screen and the code, please let me know where I am going wrong:

    The error log in your screen shoot says that a certain field is not an input field. If it is working fine in foreground and giving this error in background, it could be because some programs have different screens or different versions of screens for background processing so if you made a recording in foreground the screens won't be quite right when run in background. To correct this issue you could try going to SHDB and making a new recording selecting check box "Simulate Background Mode".

  • PP - Explosão de BOM Phantom em Ordem Planejada

    Olá pessoal!
    Tenho um cenário onde dentro do meu Produto Acabado, tenho vários componentes organizados em  Grupo de Alternates, e para cada grupo, defino um componente como Principal ( 100% de utilização ) e os outros como Opcionais ( 0% de utilização ). Entre esses componentes existem alguns que são configurados como Phantom ( Special Procurement 50 ), e esses itens Phantom, quando são Opcionais na BOM, ou seja, 0% de Probabilidade de Uso em Alternate Item Group, ele não é carregado na lista de componentes da Ordem Planejada. Apenas o Phantom que está como Principal aparece na Ordem Planejada, juntamente com seus subcomponentes.
    Os demais componentes que não são Phantom, aparecem normalmente dentro da Ordem Planejada, tanto os que tem 100% de utilização, quanto os que tem 0% definido na BOM. Obviamente, toda a necessidade é apontada no item Principal, mas eu posso modificar de acordo com a disponibilidade do material.
    Quando a Ordem de Produção é criada diretamente pela CO01, sem conversão de Ordem Planejada, a lista de componentes traz todos os Phantoms normalmente, independente do percentual de utilização.
    Alguém sabe me dizer se existe algum tipo de configuração para permitir que os Phantoms Opcionais, também sejam carregados para lista de componentes das Ordens Planejadas sem precisar alterar o percentual de utilização na BOM?
    Agradeço antecipadamente.

    Olá Márcio,
    você descobriu se há parametrização para sua questão?
    Abraço.

  • Using SAP PI instead of CRM Middleware

    Hi experts,
    Is it recommend to use SAP PI instead of SAP CRM Middleware.
    If yes how can I do that.
    I have read in forum requests that it can be implemented by using iDOC instead of BDocs.
    I need a technical guideline how data (eg. Business Partner Data) can be tranferred from CRM to other ERP System.
    Thank you for help.
    Greetings
    Mario
    Edited by: Mario Bauer on Jun 22, 2010 9:24 AM
    Edited by: Mario Bauer on Jun 22, 2010 9:28 AM

    Hi!
    SAP PI itself is a middleware Product but very roboust and capable enough to integrate any system to any other system, either it is SAP or Non-SAP. And there are two ways to integrate other ERP System to SAP CRM using SAP PI.
    1. SAP PI will receive the message from back end ERP system & convert it to the XML format. SAP CRM receives the message using the Middleware XIF adaptor and convert the incoming XML Messages in the BDocs and the BDocs upload the data in the SAP-CRM Data base.
    2. SAP PI will receive the message from back end ERP system & convert it to the XML format. SAP CRM receives the message and using the Functional Module convert the data into the  BDocs and the BDocs upload the data in the SAPCRM Data base. In thsi situation, you need an expert ABAP Consultant to write the accurate functional Module.
    The data inside the SAP_CRM System always transported in the BDocs not in Idocs. It is the BDocs data containers which transport the data from CRM Middleware to CRM Database and CRM Database upto CRM Middleware.

  • Message type BOMMAT (change BOM)

    Hello Guru,
    I have some question and need help, when i try a standard transaction CS02, try to change a BOM material existing for example, the base quantity of the BOM was 650, i enter new data as 655, but suddenly retain the original Qty as 650 and save the changes as SAP will accept the changes i've done (BOM for material 2456 changed) but eventual i have not change any value to the original BOM. SO it mean this is standard SAP funtionality for CS02.
    But when we use an interface using message type BOMMAT a standard SAP message tpye, we have created an IDOC using this message type and same data as the original was maintain to it, to be more exact we plan to change a BOM thru this IDOC but all the data we have is the same value of the original BOM, so we expect no error could be encounter of this IDOC since in standard CS02, changing of BOM even same value was inidicated did not had error message encountered when saving.
    But thru our process, when we try to process the IDOC with message type BOMMAT in program RBDAPP01 (BD20) the idoc did not pass it when into status 51(Error when saving BOM. Please see the application log.) and when we check the BOM it has duplicate value upon executing the program we able to fix it when we delete the duplicate line segment in the IDOC and reprocess it once again.
    my question is why in standard message type BOMMAT had encountered error when processing when we try to make change of BOM even the same value is carried out by the IDOC, and why in standard CS02 saving a change of BOm with same value as it is SAP accept the process? Please help and clear the process.
    Any inputs R.Brahamankar and Vivek
    Thanks
    Edited by: Ryan on Feb 9, 2009 9:23 AM

    BOMMAT  and process code BOMM

  • IPAD App for SAP without Middleware

    Hi experts,
    I am new about mobility topics and I am involved in a new project that consists in developing iPAD apps using data from SAP ECC and saved into the tablet.
    In my business scenario there will be about 1.000 users that need to synchronize data from SAP ECC with the following characteristics:
    Volumes
    Basically there are 2 type of data to store into the iPAD:
    Clients assigned in Portfolio (about 1500 clients per User to download)
    Static data (i.e. configuration table/parameter)
    Let's assume that the size of data exchanged is about 3 Megabyte
    Frequency
    The initial upload has to be made once a year and thereafter once a day it should be checked for updates
    At the very present time we are supposing to use web services calling SAP ECC in order to retrieve and store data.Is there any particular drawback in doing it without a Middleware?
    I have heard about Sybase, but I cannot find the real advantage since it seems to be another database where data can be replicated into it. As for the device management console, my client is adopting yet AirWatch.
    I have also heard about SAP Netweaver Gateway but I cannot catch the real advantage into using it.
    Thanks
    E.

    Hi Emanuele,
    In your case, SUP would provide the development tools, framework and APIs to easily handle the authentication, synchronization etc. You wouldn't need to define your own synchronization mechanism, it's in the product. Now if the updates are only sent from the server to the mobile devices, this shouldn't be to difficult to handle even without SUP.
    You could easily create REST Web Services using Gateway and then consume them using the mobile devices. You don't want to consume SOAP Web Services using a mobile application, trust me. You could do this using the ICF (Internet Communication Framework) to  achieve this but again it would be easier with Gateway.
    You don't necessarily need SUP or Gateway to create only a simple mobile application. But then if your customer is happy with their first mobile application, they'll want more. And then products such as SUP or Gateway can make the difference. These products prodvide a standard development environment, tools to manage the apps and the users etc. With multiple mobile apps connected to multiple back-ends with more and more users, you'll need a middleware to manage all this and make sure the performance is great.
    Usually people don't use SUP or Gateway for their first mobile application but then they start to see the benefits of mobility and they want more. And then they start to realize the benefits of these products and they understand that a real mobile strategy has to be defined etc.
    Regards,
    Pierre

Maybe you are looking for

  • How do I permanently save my picture in Messages?

    I can change it, but each time I login it reverts back to a default picture.  Thanks in advance for your suggestion.

  • TS3694 I have an Iphone 3G and trying to sync: Getting error code OxE8004002

    I have an Iphone 3G and trying to sync: Getting error code OxE8004002 . Please provide info on how to resolve.

  • Apache and 5.1.0

    We are using the apache bridge on solaris with WL5.1.0 and mostly it           seems to work. We have a problem however if a server is down and a user           starts a new browser session. The bridge is using a round robin           algorithm to ch

  • Jquery to check for overlapping of dates

    Hi All, I have a conference room booking calendar on moss 2007 site. i want to check for overlapping date i.e. no body should book the conference room for a time period which has already been booked by some one else. I need to include a jquery code o

  • APKs compiled with 3.9 do not register in Scout.

    Hi, I've tried this on my Tegra 2 and Exynos tablets.  I've tried both debug and release builds with no luck.  But If I set my SDK back to 3.8, Scout can see the APKs I've compiled in it just fine. I'm using Scout version 111.354079 and AIR SDK is 3.