Hi,
  Anyone have done a BOM quantity change (STPO-MENGE) where the resulting quantity is less than 1.  Please help.
  Thanks,
     Hazel

Do you mean base quantity by saying header quantity?  I'm running variant configuration.  The base quantity is restricted to 1.  Moreover, changing the unit of measure is not an option.  Each is the official base unit of measure.
Sample Scenario/Requirement:
An order for a qty of 1000 requires a total 84 plates.  Each plate can yield a qty of 12.
SAP uses the equation -->
Current Component Qty =
            (required qty/base qty) * saved component qty
Calculations:
Step 1) Derive Current Component Qty
Let required qty = order qty (VBAP-KWMENG),
          base qty = max yield per plate (given)
Current Component Qty =
             ceiling (VBAP-KWMENG/max yield per plate)
          = ceiling (1000/12)
          = ceiling (83.333333)
          = 84
The Current Component Qty (84) is the qty used production orders and is equal to the Requirements Qty of the component (RESBD-MENGE)
Step 2) Derive save component qty.  In Variant Configuration, save component qty is equal to STPO-MENGE.  Base quantity of 1 is assigned to the KMAT (configurable material).
Since Current Component Qty =
      (required qty/base qty) * saved component qty
by substitution -->
    84 = (1000/1) * saved component qty
saved component qty = (84/1000)
saved component qty = .084
Issue/Problem:
I have the above calculations correct in Variant Configuration.  To run a check, I do a production order simulation (CO01S) for a Total order qty of 1000 with today's Finish date.  When I click for components overview, it gives me a Requirements qty of the component of 83 and NOT 84.
I'm not sure how SAP does the calculation in the background, but I was thinking; maybe, by increasing the number of decimals from 3 (.083) to 6 (.083333) would give me the 84 that I needed.
Roberto

Similar Messages

  • Posting change quantity less than quantity already posted

    Hello,
    Our customer have a problem on Live system. On transaction LU04 have a
    posting change notice impossible to display, because system provide the
    message number L2 145 'Posting change quantity less than quantity
    already posted'. The Posting Change Number XXXXXX and the
    transfer order is XXXX Is there any way to cancel this TO??It is impossible to do something with that.
    The history is: 321 movement from quality for 5040 un. 3 TO, 2 with 2160 are fine, and the 3rd to sap have generated 2160 un instead of 720 pending.
    Any one had this problem in the past?We are forbidden to change status for PCN from 'T' to 'U'.
    Thanks

    Hi,
    I think you have posted the question in the wrong forum. This is MDM forum.
    Thanks and Regards
    Nitin Jain

  • Create TO for a quantity less than the delivery quantity

    If we have created an inbound delivery in MB1C, 561 movement to post an initial entry of stocks, and then packed the HU in Vl32N. Now, we want to create a TO for a quantity less than the delivery quantity.
    In LT03 I cant see any option to change the TO quantity. How can we actually change the TO quantity to be less than the Delivery quantity.
    Thanks
    -Mike

    Mike,
    I dont think that's going to be possible.  The TO gets data from the del qty which is in your embedded HU since you have packed the qty in the del in the HU,
    so if you are trying to create a TO with less qty means that you want a qty less that the HU in the del and this is not possible.
    Alternatively : 
    1) You can receive it in your warehouse.
    2) Move it in a re-packaging area
    3) break the HU and re-create a new HU.
    4) Pack the desired qty
    5) Move the 2 HU's back to their desired bins.
    Hope this helps and works!
    thanks'

  • SALE ORDER QUANTITY LESS THAN DELIVERY QUANTITY ? NO CECK IN SAP ??

    Hello friends,
            I created a sales order of quantity  10 , having two material codes each having quantity 4 and 6 . i created delivery for the one by putting delivered quantity 4 and save , then i created delivery for second and put delivered quantity 8 which was greater than the sale order quantity left ,system saved the delivery and didn't popped any error message.  
                                     Does SAP have options to over come this mistake by end users.
    regards

    Dear Joshi,
                      Please get in touch with your abap er as there user exits which can be written to avoid this situation.
                      Let me explain you further one more situation.
    First one, Your query is if for  item A ord qty is 6 the system saved the delivery with 8 qty which is greater than ordered quantity.  I know the gives a warning doing this.
    Second Situation :
    Say item A ordered qty is 5, and i made a delivery for 3 and saved it. Now the open quantity on the order is only 2. (5 -3 =2).  But one of our users reduced the ordered quantity to 2 despite saving a delivery with quantity 3.
    so the situation is ord qty is 2 and delivered is 3 qty. which is again wrong. But while reducing the ordered quantity less than the delivered quantity the system gives a warning message telling "  ORDERED QUANTITY IS LESS THAN DELIVERED QUANTITY ".
    Also just imagine we made delivery for qty 5 and invoiced it.After which you reduced the delivered quantity to say 3. So delivered is 3 but invoiced is 5.
    Hence for these kinds of practical problems we have addressed them through user exits with the help of our ABAP'ers by turning those warning messages into error messages by selecting the suitable message class.
    Hope the explanation helps you. And thanks for all your patient reading.
    Reward points if useful.
    Thanks & Regards
    Sadhu Kishore

  • Message-4F181 :Credit Quantity less than Excise invoice Qty

    HI,
    I have done migo with part 1 entery,WHLE DOING J1IEX .I AM GETTING A WARNNING MESSAGE 4F181 :Credit Quantity less than Excise invoice Qty
    Please suggest
    Regards
    SAM

    Hii,
    Did u reduce the Quantity of the Excise Invoice??
    Regards,
    Kumar

  • My iphone 5s has no signal. I already tried the reset. but no change. I bought it less than 2 months. What can I do?

    My iphone 5s has no signal. I already tried the reset. but no change. I bought it less than 2 months. What can I do?

    I will. thanks

  • ERROR: PGI in delivery with picked quantity less than delivery quantity

    Hi Friends!
    I need your help, i have the following situation:
    Outbound Delivery with batch position:
    90001  Mat DD3450 Picked Delivery Quantity=98 and Picked quantity=84
    Overall Pick Status = "B"
    Overall WM Status = "C"
    The outbound delivery was posted completely and the following documents was generated:
    WMS transfer order:  With 84 UN in quantity
    Material document:  With 98 UN in quantity
    Invoice: With 98 UN billed
    The question is how was posible to generated the PGI for the outbound delivery when the picked quantity was less than delivery quantity? is a SAP program error?
    Thanks
    Best regards
    Enrique

    benito,
    Check your Picking Confirmation config. as you are using WM/Lean WM, then your Shipping Point should have a mandatory requirement to confirm all TO's. The confirmation should update the Picking Status and the Overall GI Status to 'C' (with any relevant changes to the picked qty). Give that a go.
    Cheers,
    Paul...

  • Delivery quantity less than PO quantity

    Hi
    I have created an inter-company Purchase Order (NB type PO) which has a delivery quantity of 100 (example). Now I am creating an Outbound Delivery through VL10B. The delivery (NLCC type delivery) but the issue I am facing is that the delivery quanity is less than the PO quantity 70 (example). Why did this happen?
    I checked MD04 and I can see that there is sufficient available stock on the delivery date againt that particular delivery.
    Please advise.
    Thanks
    Suro

    I am assuming that by "confirmed qty in PO Delivery schedule tab" you mean the "Delivered" column. I think this gets populated ONLY once the delivery is created which is for the reduced qty, The HELP on this field shows "The Quantity delivered field shows you the quantity delivered against this schedule line via an outbound delivery (or possibly several such deliveries). This enables you to check whether the supplying plant will deliver the desired quantity of the material as scheduled.". Thus I do not think this get populated on PO creation autmatically and as such I could not see and confirmed qty field on the delivery schedule tab.
    By the way we also have a Inbound delivery as part of CONFIRMATION key where we have confirmed full qty on the inbound delivery.
    Regarding MD04, yes I am looking at that closely as well since that gives oen deliveries and I am trying to figure out available stock on that delivery date and the open delivery quantity for all the deliveries.......
    Any other inputs are welcome...
    thanks

  • Changing web server refresh to less than one second

    I just set up another PC on our network to display our engine test VI.  Is there any way to increase the refresh rate to less than one second.  I tried entering .5 sec on the config screen, but it changed back to one second.  I'm using LabVIEW 8.5.1.
    Thanks,
    Todd Munsell
    Wood Group Pratt & Whitney Industrial Turbine Services
    Todd Munsell
    Turbine Engine Test Technician/IT Tech
    Wood Group Pratt & Whitney Industrial Turbine Services, LLC
    Plattsburgh, NY

    Thanks again.  I'll try that.
    BTW, I just spoke with out rep from Daytronic Corp. who was testing the comm cards with his System 10 and PC.  They worked fine for him.  The only difference is that he is using LabVIEW 7.0 and we are using 8.5.1.  They don't have any subVIs written for the newer LV versions.  That may be the cause the the issue we're having with using the comm cards to access the DAQ.  They do not have the time or money to update their subVIs for the newer LV versions, but I'd have to think that there is a way to change them myself to make them work.  Ideally, I want to use a modified version of the app I'm using on another PC without having to bother with the network to pass the data.  I already have a cable made to connect the other PC to the System 10.
    I almost forgot something.... I found a version 8 System 10 subVI package using the NI search, but it didn't work either.
    Do you know what might have changed in the newer LV versions that could cause this issue?  I've attached a zip file of their subVIs.  Like I mentioned earlier, LV works fine using the main (built-in) comm port on the System 10 DAQ.  It's just the additional cards that do not work correctly.  They seem to establish the comm link OK, but the binary data that the System 10 sends is not interpreted and displayed correctly.  It's usually all gibberish on the screen.
    Of the Daytronic subVIs, the subVI that I use to test with is the "example.vi", which is used for binary data.
    The "simple terminal" subVI works fine, but I can't use it to test the data link since it's configured differently.
    When I use the main System 10 comm port, the simple terminal doens't work and the example.vi does.  Why wouldn't it work with the other ports/cards?
    Could you please check these out when you have the time and see if you can find something that isn't configured correctly?  I may be overlooking something obvious, since I'm still learning LV.
    Thanks
    Message Edited by tmunsell on 07-28-2008 09:18 PM
    Todd Munsell
    Turbine Engine Test Technician/IT Tech
    Wood Group Pratt & Whitney Industrial Turbine Services, LLC
    Plattsburgh, NY
    Attachments:
    labvdr7.zip ‏891 KB

  • IMovie 10.07 change clip duration default to less than 1s

    I have 100 picture stills to put on the time line.  I want each to appear less than 1 second, say 0.2s.  I can't use the clip slider to slide to less than 1 sec.  Is it doable?  Thanks.

    Try setting the frame count to less than that for a full second.

  • GR quantity less than Production Order quantity

    Hello all
    I am working at a client where they produce Make-To-Order items specific to a Sales Order by triggering an Assembly Order (Production Order).
    Now I am facing a tricky situation & hence want some advice from you guys.
    In a generac scenario when an order comes for a MTO material ABC, a Production Order is triggerred for that item.
    I can navigate to this Production Order from the Sales Order > Schedule Line tab (Just FYI)
    Now once the Production Order is confirmed for each Operation on the floor using CO11N, the material is receipted in the Inventory & the requirement gets fulfilled.
    Now sometimes the Production Order is Goods Receipted for a Lesser quantity as compared to the Production Order Quantity.
    e.g. Sales Order Quantity = Production Order Quantity = 3 EA & the Delivered Quantity (GR qty) = 1 EA
    In such a case, in MD04 the system still shows an open requirement for 2 EA on the same Production Order Number
    Is there a way to trigger another Production Order for the remaining quantity automatically ?
    If anyone can share their thoughts proposing possible solutions to handle such a scenario, it would be a great help.
    I am an SD consultant & hence cant think ways to handle the scenario & propose it to the Business.
    Any help will be appreciated
    Thanks
    Vin

    Hello
    Thanks for all your replies.
    As of now the 1st scenario is no more an issue. The business process is modified to fix the problem.
    Now my main problem is the 2nd scenario which I will explain better here.
    In our scenario MTO items when placed in a Sales Order triggers a Production Order.
    This Production Order needs to be confirmed for each operation & at the final step the MTO item is pushed into the inventory.
    The Production BOM & the operation overview for the MTO item is as shown below:
    E.g.
    Operation Overview:
    Operation            Work center                  Control key
      0010                    Prod                               PP01
      0020                    Pack                               PP01
      0070                    Confirm                          PP03
    Routing:
    Item                Material             QTY        Unit            Operation
    0010               ABC                  100         G                0010
    0020               XYZ                  10           G                0020
    Now as shown above, the business users who produce the MTO item will confirm operation 10 & consume raw material ABC at the Work Center = Prod.
    Then at the Work Center = Pack, the packaging material is used & operation 20 is confirmed.
    Finally after the packing is done, at the Work center = Confirm, the operation 70 is confirmed when the MTO item is receipted in the Inventory.
    Before it is receipted at the Confirm work center, a user monitors the quality of this produced item. If it is good only then it is receipted in the inventory.
    Now depending on when the Sales Order is fulfilled, this MTO item will be shipped.
    Issue:
    Now when the MTO item produced passes thru the high level quality check, it gets receipted in the inventory at operation 70.
    However in a case where the some or all the qty of the MTO item ordered doesn't pass the quality check, they will be scrapped physically.
    Thus my understanding is that e.g. 3 qty of the MTO was ordered & 1 got rejected, then the user confirming the step 70 will enter YIELD = 2 ea & Scrap = 1 ea and do the final confirmation.
    This means that the original demand of 3 ea is still incomplete. 1 Ea still need to be made as a Sales Order Stock.
    Now the function needed is that the system should automatically generate a Production order for the remaining 1 Ea as a Sales Order stock.
    I dont know if this can be achieved by receipting the 1 EA as REWORK on the CO11n screen at operation 70.
    Also I am not sure if Production Order Split case would work in this case.
    I would need some input from all the PP gurus. Any solution which be close to what functionality is needed will be greatly appreciated.
    Thanks
    Vin
    Edited by: vinit parkar on Mar 3, 2010 5:04 PM

  • Invoice verification quantity less than GR quantity

    Hi
    I got goods of 100 quantiy of Rs.1000 each
    But invoice was of Rs. 90 units
    I chnaged the quantity. But amount was not changed automatically. i need to change it manually?
    If i change it manually, i can put any amount. So there is no control. How to control this ?
    There is some net invoice facility. Is it useful. If yes, how to use net invoice facility?

    Hi,
       Do not  you get another invoice for 10 unit.
            If the invoice is final,   you have to do TRC:MR11   for adjust.
    Regards,
       Gaito

  • FMAVCR01 Consumed Amt Drill down detail results show less than report total

    Our budget reports as well as FMAVCR01 show a consumed amount total of 18,000 for our 1st fiscal year in SAP. But when drilling down to the document journal only 15,750 total items are displayed. Why is that?
    Using FMRP_RFFMTO10X I can tell that the difference is in period 1 in which the Cmmts/act is 5,625 but when drilling down to the document journal only 3,375 is displayed.
    Period 1 is July. Note that we went live on SAP as of October... Period 4. Even after reinitializing our avc ledger, the discrepancy still exists. Any ideas why or how to narrow down the problem or get to the source of the extra 2,250 displayed in budget reports?

    Hi Will,
    Hmmm... That's a tough question without seeing the results of FMAF, at least. Sometimes, something goes wrong with the reassignment (if you did any) or the carry-forward. Sometimes, it's somehow connected to internal process which differs from SAP standard (again, if you have any). Could be really several reasons, but most of them are resulted from enhanced solutions in FM.
    Regards,
    Eli

  • Picking qty less than Delivery qty alert - Urg

    Hi Guys,
    We have done a configuration for order to cash scenario on ECC6.0 now we have one requirement that if picking quantity less than delivery quantity it should send an alert to customer representative.
    I have few questions below before start up configuration for that process.
    1. How do i configure to the system to send an alert when there is short pick in delivery document? 
    2. When customer representative receives the notification he or she make the necessary changes manually change in delivery document of delivery qty to picking qty.
    3. How do i say the logic to ABAPer to do a coding, I think there is no standard configuration to do that or if it is please write back to me.
    I posted few questions but none of the questions answered to me.
    Please go through and reply me back... Urgent.
    regards
    rc gopi

    Dear Senni.B,
    > I want to enter less picking qty than delivery qty during delivery process.
    As per the standard functionality picking quantity should be equal to the delivery quantity.
    And not advaisable less picking qty than delivery qty during delivery process.
    Can you plse give more details In which scenario you require this functionality and what is the use of that.
    I hope this will help you,
    Regards,
    Murali.

  • Unable to create the Variable icon which shows Less than or equal to

    Hi Experts,
    when we create a variable normally will get a icon of the variable which say equal to symbol on the varaible icon. Hope everybody know that.
    Now how can we change that variable icon to less than or equal.
    Please can you provide me that information.
    Thanks alot !

    hi,
    when you are trying to restrict the char select range values instead of variable.
    then select the operator type (less than, greate than etc) and in place of value select variable and then give the variable name.
    regards,
    Arvind.
    Edited by: Arvind Tekra on Jun 15, 2011 4:57 PM

Maybe you are looking for

  • What you suggest as a good summary of ADF Java classes? What about a detailed reference?

    Hi everyone, When I was a forms developer, I was quite familiar with the built-ins. Now that I am learning JDeveloper, I am trying to get acquainted with the various Java classes that support ADF development. A summary of classes for the model, contr

  • WebI Report using BW Query

    Hi, I am using WebI Report using BW Query. I don't see some Formulas in Universe which is there in BEx Query. Did anybody face the same problem before?

  • Create a view

    Hi I want to create a view with the latest start date Thanks in advance regards anna create table staff (staff_id number ,person_name varchar2(10) ,dept_id number ,start_date date insert into staff values (10, 'Alan', 100, '01-Dec-2000'); insert into

  • Extracting mpeg files from DVD studio pro burnt DVD

    I burnt a dvd with studio pro a while back and have scince deleted the mpeg file. I want to make and edit and burn a new dvd. Is there any way to get my mpeg file back off the dvd so I can edit it?

  • Can i send a fax from my 5800 or any other Nokia p...

    Hi, i want to send sms as a fax message ... in messege setting there is an option to send the sms message as a fax so if i used this oprion and enterd the landline fax number will the messeage will be deliverd or no ?? and how many charchters i can s