BOM REVISION LEVEL UPDATE!!

Hi Experts
i need a program to update Bom Revision Level.My requirement is It should have 2 functionalities.
One radio button should be there which takes care of single BOM update
· Second radio button takes care of mass BOM updates.
So is there any Bapi  avaulable for it??please i need it urgently....
Thanks&Regards
Neha

Moderator message - Welcome to SCN.
Please do not use all caps. It is hard to read and is considered shouting.
Do not use words like "urgently". Everyone's problems' are important.
Do not ask the forum to do you work for you.
Thread locked.
Also, Please read Please read "The Forum Rules of Engagement" before posting!  HOT NEWS!! and How to post code in SCN, and some things NOT to do... and [Asking Good Questions in the Forums to get Good Answers|/people/rob.burbank/blog/2010/05/12/asking-good-questions-in-the-forums-to-get-good-answers] before posting again.
Rob

Similar Messages

  • BOM Revision Level

    Hi,
    We are uploading the BOMs into server. While manual creation of BOM I am able to update the revision level of the BOM. But we are unable to update it while uploading through LSMW. Please suggest me in this regard.
    Thanks
    Ramakanth

    We have ECM in our project. 
    We have to take all the BOMs from the previous version of SAP and upload to the new all of them to the new version.
    All the BOMs have revision levels w.r.t. to a change number.
    While manually changing the BOM the revision level can be updated by entering the BOM w.r.t. a change number and then in the menu --> extras --> new revision level.
    Now we have to upload the BOMs through LSMW. It is not picking up the revision level while uploading.
    Please give your suggestions.

  • Automatic revision level in CS01 on initial create

    Hi, I have a task to find out about BOM revision levels and if they can be automatically created when the BOM is created in CS01.  Our users are imaging that the step of choosing extras, next revision level will be too much for them to remember.  This would be for the rev level to automatically be created based on auth group and change master, but for the initial create and also the subsequent revsions.  They just don't want to manually choose the next revision level.  Is this a configurable option?  I have looked at OS54 and we have it set to automatc revision levels, but that is not what is happening with this.
    Thanks in advance.

    Hello,
    The automatic revision level assignment is not meant for this purpose.
    I think there is no standard functionality to automatically assign revision levels to BOMs, it can be done through development.
    Regards
    Prasad K

  • Update BOM revision no,date field automatically

    Hi all,
    My client requirement is this.
    Whenever bom is changed using a change nomber ,Revision no,revision date field in BOM header should get  updated automatically.
    This is very urgent.Please guide me how to do the settings.
    Thanks and Regards
    Skumar

    Dear,
    Whenever a BOM is Changed,use a new Change number and against that Change number give the Reason for Change as some Revision level.
    As for a material ,revision level can be made directly using T code CC11,but for a BOM , there is no direct T code for this.
    Please refer this also,
    Re: Revision Levels
    Regards,
    R.Brahmankar

  • BOM explosion in subcontracting order according to revision level

    Hello experts
    I have different revision levels available for a subcontracted material, e.g. the BOM of this material has different versions depending on the validity date.
    When a BOM explosion is carried out in the subcontracting order (either in the purchase request or in the purchase order) the selected version of the BOM is done accordingly to the delivery date. It does NOT take into account the revision level even when I change it manually.
    Do you have any idea if it is possible to force SAP to consider the revision level instead of the delivery date for the BOM explosion ? (custo, user exit, BAdI, ...)
    Many thanks
    Amaury

    Hi
    BOM explosion in Subcon PO will be carried out automatically when you select the item category L.
    If you want to control the BOM selection based on the Alternative then you can go with Production version option and get the help from PP consultant to create the production version.
    Assign the production version in Subcontracting Inforecord.
    Click the BOM explosion button the switch to alternative BOM during the PO creation.
    Hope it helps
    Thanks/Karthik

  • Updating Revision level in purchase contract

    Hi All,
    I want to update the Revision level field (EKPO-REVLV) in a Purchase contract. The BAPI_CONTRACT_CHANGE is not updating the field. Please suggest me some options to update the same. 
    Thanks in Advance.
    Senthil J

    Hi Senthil,
    Have you seen  the documentation of this bapi .Please check
    Notes
    Master conditions
    When creating outline agreements, you can specify only one period per variable key. This means that just one period can be specified for the document header (i.e. condition table A019). The same applies to each item (i.e. condition table A016) and to each item/plant combination (i.e. condition table A068).
    You can use any periods. However they must not overlap for a variable key.
    When conditions are changed, new condition records are nevertheless written.
    Because volume rebate conditions are not taken into account in outline agreements, they are not processed.
    No subitems (e.g. inclusive/exclusive bonus quantities, display, etc.) are taken into account.
    The control key for quality management in procurement (EKPO-SSQSS) and the certificate category (EKPO-ZGTYP) are only taken into account to a certain extent. These two items of information are copied from the reference contract or material master, but cannot be changed; neither are any checks carried out for these two fields.
    The revision level (EKPO-REVLV) cannot be changed because various quality management routines were not implemented.
    Version management (Document Change Management) is not supported.
    External services (planned or unplanned) are not supported.
    The creation or changing of configurations is not supported.
    Post if need help here.
    Regards,
    Madhu.

  • Bom- Multiple Revision level

    Hi,
    How to create and maintain a BOM with mulitple revision level.
    Thanks in Advance

    Dear Madhan,
    Do you mean to say you want alternative BOM's or else
    simple BOM,that's at one moment or one fixed point it should
    be having only one BOM ,with a revision level?
    See for deleting or modiying the BOM with revision level you
    need to use ECN - Engineering Change number.
    So whenever you are using an ECN for modifying the
    BOM,enter the revision level - in the field reason for change
    while creating the Change number in CC01 or using change -
    CC02.
    So this is one way of handling this issue.
    Please check & revert back if anymore help is needed.
    Regards
    Mangal

  • Revision level not updated in Delivery inspection

    Dear QM friends
    I am facing the below issue when implementing delivery inspection.
    We are maintaining Engineering Change Number concept and it is applicable for Material Master, BOM and Task lists. So our inspection Plan will always maintained with Change Number for all inspection type.
    This Change number concept works fine in GR inspection (Inspection type 01) in following way. Revision number was maintained in Schedule Agreement Line Item, additional Data screen (In administration BOX). When GR was made inspection lot generated and shows the Revision number for the material in inspection lot display QA03 (Header). If plan having same change number system assigns the Plan and releases. Also this revision number can be viewed in QA32 screen itself.
    This is failing when creating inspection lot for a delivery. Origin 10 and inspection type used was 10. Inspection plan maintained with change number. Schedule agreement (Sale order) having revision number in the same tab of above said. Even though in lot display QA03 it was not appearing. So the same is not coming in QA32 screen. But inspection plan was attached automatically.
    We need same change number (Revision level) concept for Delivery inspection also. Kindly help us, i have missed any masters, or config or any steps i have to do to solve this issue.
    Thanks n Regards
    Madhan

    Any one kindly help us to resolve the issue.
    Thanks & Regards
    Madhan

  • Revision level in BOM

    Dear All,
    I want to bring the column of the revision level in Bill of material display screen
    Regards,

    Going a little farther with this concept:
    If I have a material planned through MRP and there are multiple revision levels for the item, will the reservation for the material reflect the revision level at the time the reservation was made or the revision level at the time the material is required?  
    For example, material A has a change record which creates a new revision level a month from today.  Today, MRP creates a reservation for that item due for production in six weeks.  Does MRP create RESB with the revision level as of today or as of the new change record?  What does MRP use for the revision level determination date?

  • Open PR Material Master Revision Level

    Hi,
    I am working on upgrade from 4.5b to ecc6.0.In this Project Material Revision Level and Change Number is assigned with Z Program.
    The Requirement is the Program has to check the Open PR 's and that particular Material  needs to be updated with Change Number and Revision Level.
    Now the Functional Specification to be prepared for the Technical Team -Based on the Open PR condition  -Now what are the fields to be specified in EBAN table in order to fullfill the open PR.
    As per my understanding Open PR means PO is not created and PO is created means that PR is closed.
    Or any other fields are to taken into consideration for preparing Functional Specification
    Please reply me ..
    Thanks for the reply.

    It is very much possible. You can try this use case. It's pretty simple. But Vice-versa is not possible.
    ~ Guru

  • Revision level in purchase order

    Hello all,
    when creating a purchase order for a material, the revision level from the material master will be automatically added to the Item-Material Data-Revision Level field.
    But what happens if in the meantime the revision level is updated on the material master, I guess the PO will not be updated on that field?
    The problem is, I need the updated revision level field on the output of the PO, currently I am using the field EKPO-REVLV in the sapscript which refers to the revision level data from the PO.
    Any suggestions?
    Thanks
    Anne

    Hi Prakash,
    I have tried to use this field in the form: AEOI-REVLV
    This should be the original table.
    I am using the standard print program for POs: SAPFM06P
    Unfortunatelly, somehow the value does not come up for AEOI-REVLV, but it does come up for EKPO-REVLV.
    Thanks,
    Anne

  • Cannot find the Revision Level field in the item details

    Hi All,
    1) I have created a PR with 2 items in the R/3 Backend using the me51n transaction in which for one of the items i have updated the Revision Level field.
    2) To transfer the purchase requisitions created in the above step to the SRM system(sourcing cockpit) i executed  the report BBP_EXTREQ_TRANSFER with transaction SE38.
    3) Now when i go to the SRM portal and navigate to find the external requirement in the sourcing cockpit, I am not able to find the Revision Level field entered in the backend.
    Can some one help.
    Regards
    Sam

    Hi
    Please go through this ->
    Version Management in R/3
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/60b43bb7492147e10000000a114084/frameset.htm
    Versioning in SRM
    http://help.sap.com/saphelp_srm50/helpdata/en/42/c92d6e3ed16babe10000000a1553f6/frameset.htm
    Prerequisites for Version Control in SRM
    I)        You have activated the version control so that the system creates historical versions.
    See the path in the IMG: SRM Server  ®  Cross-Application Basic Settings  ®  Switch On Version Control for Purchasing Documents
    II) You have set up and activated the workflow for the approval of changes to active purchasing documents. See also: Approval Workflows for Documents and Objects
    ( Related link -> http://help.sap.com/saphelp_srm50/helpdata/en/5a/af5efc85d011d2b42d006094b92d37/frameset.htm )
    Some related SAP OSS Notes ->
    Note 1030548 - Revision level in SRM 6.0 connected to ERP 2005
    Note 1026021 - EXTREQ interface: Data transfer structures
    Note 122105 - ME51, RM06BBI0: Revision level is not filled
    Hope this will definitely help.
    Regards
    - Atul

  • Problem with Revision level for a Material

    Hi All,
    I have a problem with Revision Levels for a Material.
    I want to know the Revision Level for a particular Material for BOM Creation.
    Can anyone please let me know from which Table or Funtion Module can I get the Rev Level, once I pass MATNR (Material) and AENNR (Change Number).
    <REMOVED BY MODERATOR>
    Thanks and Regards,
    Harish Kalla
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

    HI,
    You can use table AEOI.
    Hope this helps.
    <REMOVED BY MODERATOR>
    Regards,
    Sipra
    Edited by: Alvaro Tejada Galindo on Apr 14, 2008 4:30 PM

  • Inspection Plan/Revision level

    Hi PP Gurus,
    I have a Problem in Inspection Lot.The system is not reading the new Inspection Plan.
    The material is assigned to a Revision level with valid from date 10.12.2007 and the earlier Inspection Plan(Group 21) was also created on 10.12.2007.Now this inspection Plan( Group 21) is deleted and New Inspection Plan(Group 100) is created with the Valid from date 10.04.2008.
    I have created an Inspection Lot dated 12.04.2008, Now the system is not reading the new Inspection Plan(Group 100).And the system is giving error "No Insection Plan found" while recording result on the inspection lot.
    We cant change the material ECO revision date as this would contravene our traceability record and  since, the Revision Level is maintained at Global level so cant afford this to change for other Plants.
    Kindly help me to assign the new Inspection Plan to the Inspection Lot.
    Thx in Advance
    Regards,
    Rakesh wade

    Hi,
    I do not know the impact of rev&#305;s&#305;on level on &#304;nspaction lot.
    But, with reference to the Rev&#305;s&#305;on Level only the Conf&#305;rmation w&#305;ll work both in Descrete and aswell as in REM.
    Say &#305;f yor Reves&#305;on Level &#305;s AB, and the date &#305;s 01.03.2008, then during confirmat&#305;on the sytem will explode the BOM with referenec to this Date.
    It may be poss&#305;ble that there may not be any BOM available on that date then there w&#305;ll not be any Components suggested for GI or backflush.
    Probably you can corelate the same th&#305;ng to your &#305;nspect&#305;on lot... ( inspect&#305;on lot not available etc..)
    Hope th&#305;s helps..
    Regards,
    Siva

  • Bom Revision Changes with Same Day

    I have and issue when BOM items are changed using ECR control within the same day. ECR 5xxx001 is used to change item 0010 from part SKY123-A to SKY123-B. Later that same day, ECR 5xxx002 is used to change item 0010 from part SKY123-B to SKY123-C. When displaying BOM after ECR 5xxx002 change has been complete, I am unable to see all the changes. I typically only see the change from SKY123-A to SKY123-C. Has anyone ever seen this issue before? I suspect the issue is because table STAS and STPO allow for change on date only, without time stamp.

    Hi
    My further investigation has confirmed, BOM changes with ECR/Revision completed within the same working day cannot be separated in CS03 (display BOM) by date / time. For example, If you change something with ECN1 then you will see this
    changes valid also with ECN2 (same valid from date), because the changes are valid exactly from the same day.
    Entering the revision level in CS03/CS14 does not mean to have a different version of the BOM, but forcing the system to take the valid from date of the corresponding ECN.
    So to sum up: for one date there can be only one version of the BOM.
    Thank you everyone for you responses to the string, you have all been extremely helpful.

Maybe you are looking for

  • Setting events in iCal?

    I am trying to use iCal in 10.9 in the same manner as I did in the previous operating systems.  ICal does not work the same way.  Either the new iteration of iCal has some hidden feature that I have not yet found, or it is indeed badly designed. My p

  • Is it possible to play music videos on the Music App of my iPad 2? or it's only possible in the Video App?

    Is it possible to play music videos on the Music App of the iPad 2? Or create a playlist for the Video App? or sort the music videos by artist, genre, album, etc.?

  • Numeric value error

    hi, when i enter char data in numeric field i am getting frm40735,ora 06502 error in when validate item triger.how to give validation for this.

  • Error syslinux when I start Arch

    I have a problem after I installed Windows 8... Yes, bye bye syslinux... I'am reading many webs for learn how I can do solve this problem. The information for this problem is very poor and I'm doing differents methodes for resolve it. Someone know Ho

  • Need flag to be deactivate at installation level

    hi all, In my case,  At installation level one flag is active, this flag is basically a service which BP opt at the time of move-in, once the BP left that premise (means Move-out) than this flag should automatically become incative. but this thing is