BOM selection issues

Dear Friends
For one FG material i have not maintained BOM/Routing was maitained..MRP type is V1
I carried out MD02, Planned order is created with exception mesage 52 -No bom selected.
But i can able to convert Planned order to Production order,
Production order created, in BOM components screen there are no items.
I can able to do confirm/GR.
what are config settings i missed.
How can i restrict if BOM does not exists, user cannot convert  Planned order to Prodcution order.
Thanks ,
M.Srihari.

Can you explode BOM via t-code CS12 using application PP01 with quantity and valid date on basic start data of the planned order?
Please check configuration OPPQ - in BOM/Routing Selection.  It should contain entry 01.
BOM should have the right status (should be 1 in standard config) and valid on the basic start date.  Please also check the lot size from and to in BOM Header.  Please also check the selection method.  If it is 2 then check whether your production version is maintained properly with valid BOM.
Regards,

Similar Messages

  • BOM selection in sales order

    hello, friends.
    when selecting the BOM in the sales order, the selection screen displays alternative BOMs for 1 usage type only, and will show the other usages one at a time only if the first type does not exist.  the sequence depends on the priorities (access sequence) set in IMG, and settings in item category. 
    my questions are:
    1.  does the 'next page' button in the selection screen refer to additional BOMs of the only same usage type?
    2.  is it possible to show other usage types in the same selection screen? if yes, where do we configure this
    many thanks for your inputs.

    hello, Rags.
    actually, BOM selection is working fine for us.  my question was more of a theoretical one.  to clarify the issue, let me cite an example:
    1.  for material A001, i create 5 alternative BOMs. 
    2.  of these 5 BOMs, 3 have usage type SD, and 2 have usage type Production.
    3.  when you enter your BOM header material in the sales order, a selection screen will appear.  because of the priorities set in IMG, it will show you only the 3 alternate BOMs of the SD usage type.
    3.  the system will display the 2 other production BOMs only if there are no SD usage BOMs or if these have been deactivated, or if you change the order of priority in IMG. 
    4.  you cannot change the usage type in the BOM selection screen because this field is not available for input.  there are "next page" buttons, and i'm wondering if this is or is not just for long lists of alternate BOMs with a single usage type.
    my question:  is it possible to show all 5 BOMs regardless of usage in the same list, or in different pages?
    many thanks.
    Edited by: jonathan y on Apr 3, 2009 7:55 PM

  • Manual BOM selection at the time of order creation

    Dear Experts,
    Could you help me to understand if there is any provision to select BOM by user at the time of order creation without the help of production version.Is there any configuration required to make BOM selected manually.
    Regards,
    Krishna Mohan

    Hi karishna,
    Please go to T-code OPL8 and in production version use( 1 )Manual selection of production version. Then user can select manually instead of automatic selection.
    Regards
    Muhammad Umar

  • Exception Error Message (52) No Bom selected

    Hi
    a) I have created a simple 2 layer BOM ( level 0,1,2)
    When I execute MRP run, I get the expection message - NO BOM SELECTED ( 52) for the 2nd level material.
    Please advise.
    Parthasarathy

    Hi All,
    Checked following before I posted this question and there are no problems with them:
    BOM usage: 1
    BOM status: 1
    Valid from: September 2011
    Lot Size for BOM and routing: 1
    No deletion flags are turned on for BOM, material and components
    BOM item Production relevant: yes
    BOM materials are of same plant
    Rerun MRP: yes... does not help. quantity of VSEB and plan orders can change but the message 52 still remains and does not explode.
    This is only happening in my QAS system... production system with same material and information is ok.

  • *URGENT -Alternate BOM selection in MRP*

    Dear gurus
    I have an urgent requirement regarding alternate bom selection.
    our scenarion is complete subcontracting and no production versions are maintained and for suppose i have a product X which has 3 alternative boms during the sales order creation iam able to select the required alternative but during the mrp run the system is selecting the alternative "1" by default.I want that during the mrp run also the system should explode the bom which  i have selected during the sales order creation not the alternate "1".
    please reply.
    regards
    Kumar

    Dear Dharma
    in my previous post I havent got suitable reply from my previous post so i have posted again waiting for answers.
    regards
    Kumar

  • Automatic BOM Selection as per Stock availability

    Hi...
    I have a query.....How can i set an Automatic BOM selection as per stock availability
    Problem is that the client is having more than 1 type of raw material which can be used, so the user needs to consume the ROH as per the stock availability, in that case he has to manualy check and amend the Production Order accordingly.
    Hence, i want to set a system wherein the system would do the checking of the ROH material and then select that material and execute the production order accordinly.
    Requesting your valuable inputs.
    Thanks in advance,
    Harris

    Harris,
    Please explore the possibility of defining "Alternative Item Group", in the BOM Item level details(Basic data tab).
    From Application help for your referance,
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Regards,
    Prasobh

  • Exception message"no BOM selected"

    Hi Experts,
                      In what circumstances is the above error message i.e. "no BOM selected" thrown ? When I am running MD02 for a FG, I am getting this message. This FG has only one SFG as it's component in the BOM. Production version for FG exists. The SFG has no BOM/production version. How can i avoid this message and what all does it imply? Please suggest.
    Regards
    Sm.

    The possible reasons for " No BOM Selected " Exception M,essage 52  could be
    1. Validity period of BOM
    2. BOM Status (should be active for MRP.)
    3. BOM Components should be relevant to production.
    4. Check whether you have defined the selection ID for the priority of BOM Usage in SPRO define order of priority of
    BOM Usage.
    Thanks,
    nandha

  • MD04 message 52: No BOM selected

    In MD04 I get this
    52: No BOM selected   (S2)
    Message no. MD408
    What could be the problem?
    This is a E 50 material. I checked the BOM structure and validity. No problem with those.

    Hi All,
    Checked following before I posted this question and there are no problems with them:
    BOM usage: 1
    BOM status: 1
    Valid from: September 2011
    Lot Size for BOM and routing: 1
    No deletion flags are turned on for BOM, material and components
    BOM item Production relevant: yes
    BOM materials are of same plant
    Rerun MRP: yes... does not help. quantity of VSEB and plan orders can change but the message 52 still remains and does not explode.
    This is only happening in my QAS system... production system with same material and information is ok.

  • BOM selection in the MRP

    Hello Gurus
       when MRP runs , what is the process of BOM selection. Are there any user exits to control the BOM selection.

    Dear Vidyadhar Reddy,
    For BOM selection you will assign the selection ID in T Code OPPQ --> under planning run -->
    BOM/Routing selection.Say suppose if you are assigning an ID 01and for this ID you can have many
    options using priority.
    Say SelID     SelPr     Usage     Usage text
            01     1     1     Production
         2     3     Universal
         3     2     Engineering/design
    So in This case the system seraches for a BOM with usage 1 production,if there's no BOM with this
    usage for production,then it seraches the BOM with the next priority say universal BOM and then the
    next priority for Engineering Design BOM.
    This priority can be configured as per your business requirement in T Code OS31.
    So the above is from configuration side and from the front end,
    1. Using BOM status - Active(01) and Inactive(02).
    2.Using Lot size and validity dates you can control the selection.
    So check with this and revert back still if you have more queries.
    Regards
    Mangalraj.S

  • Menu selection issues in Flash CS4 for Mac

    I'm having a few menu selection issues in Flash. It seems some fields are de-selecting automatically (and quickly). For instance:
    1) When I double-click a layer to change it's name, it highlights then immediately de-selects. I can only rename by right-clicking and bringing up the Properties dialog.
    2) Fields highlight briefly then immediately de-select in the Properties menu when using the Tab button to advance or cycle thru fields. I have to click on each field individually to enter dimensions/characters.
    Possibly related...
    On occasion, I'm having an issue in Photoshop where the tools are off by 30 pixels or so. Examples:
    - Paint brush affects an area approximately 30px to the right and down from the brush head.
    - Selection tool selects an area approximately 30px to the right and down from the arrow head.
    This only happens on occasion and can be fixed by restarting Photoshop. I have not had any luck fixing the problems experienced within Flash.
    I'm experiencing this on two different machines that have CS4 installed. My only guess is a conflict with a Logitech driver OR a Wacom driver, but I have uninstalled the software and unplugged the Logitech mouse and Wacom tablet to no avail.
    Long time Flash/Photoshop user.... never had a problem like this.
    Anyone else have these issues or know a fix?
    Mac OS X 10.5.7
    Macbook Pro & iMac
    Logitech Control Center 2.7.0
    Wacom Driver 6.1.1-2(RC) for Mac OS X v. 10.4 & 10.5

    Hi there,
    This is a known issue, however we have not been able to reproduce it internally. The way to fix it (assuming it's the same problem) is to change your workspace (such as resetting to a default shipping layout, and then modifying from there), as it seems as though something about the workspace is causing the problem. It could be very specific to where its layed out on your monitor(s), some exact pixel size of a panel and/or grouping - and so on. However, we haven't been able to reproduce this internally yet - only reproed and fixed similar problems - so I cannot say for sure, however changing the workspace has fixed it for the other users I've talked to seeing this one.
    If you are able to share the following about one or both of your computers and send it to jdh (at) adobe, greatly appreciated:
    * workspace XML file from the Configuration directory (before changing the workspace!)
    * description monitor layout (ie: primary on left, secondary on right... or "one" )
    * monitor resolution(s)
    * screenshot(s) of your layout exhibiting the problem
    Thanks!

  • Datagrid select issue

    I am using flex builder 2.01 and have been using datagrids
    for a while now. I have recently ran into a weird situation where I
    have one datagrid out of three that just will not allow a manual
    selection. If I set the index to 0 for instance, the initial view
    of the datagrid shows the first item selected. If I go to select a
    different item, the first item becomes unselected and no other item
    can be selected. If I leave the initial state to be no item
    selected, I can never select an item. All other datagrids are
    working fine. I have tried to set selectable to true but that
    didn't help. This is really odd, any assistance would be greatly
    appreciated.

    Mmmm... Well the good news is I fixed it. The bad news is I
    have no clue why it fixed it. This particular datagrid is in a
    different tab in a tabnavigator panel. Attached is the expanded
    working code. On the line:
    <mx:Canvas label="Archived" width="100%" height="100%"
    id="ArchiveTab">
    I had a click="{GetPropertyArchive()}" to refresh the data on
    tab selection. This was old code that was made unnecessary at a
    later date but I did not remove the code. My guess is the datagrid
    assumed the characteristics of the parent tabnavigator and instead
    of ... wait that can't be right. If that was the case then changing
    the datasource would not have fixed the select issue because the
    'click' definition on the tabnavigator still existed. I would
    really like to understand why this mattered so I could avoid this
    issue in the future. Any ideas??

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • Bom Selection

    Hi Friends
    I am working on a Long Term Planning Scenario, while simulating the client will use various BOMs to check the costing during Annual Planning run and also for Planning run for a Quarter, how can I select the BOM as required during LTP-MRP Run? Also plz let me how to configure the BOM selection ID??
    Jade

    Hi,
    BOM selection will be done by automatically, manually not possible. In material master MRP4 view BOM selection option given by,
    1. Lot size
    2. Date
    3. By production version
    4. Only by prod version.
    System will select according to that only.
    Before configuring BOM selection ID, we have to configure Order of priority b ytcode OS31. In this create selection ID no by priority wise respect to BOM usage.
    Use this BOM selection ID in BOM application as required.
    Regards,
    Dharma

  • Alternative bom selection

    hello,
    i want solution for alternative bom selection.
    for eg.
    i have material say X00100 which has two alternative components
                                A00100
                                B00100
    now, i have to mapped the scinario that .the product pick the material   A00100
    first & if there is no stock then it will pick the material   B00100
    please give the solution
    marks are sure
    regards,
    mangesh

    Hi,
    Try using this concept.
    In BOM alternative items are assigned to alternative item group on the general
    data.
    In the production order in the general data tab page.
    We can define the alternative items based on priority , strategy and usage probability.
    Priority:
    This defines the priority of the item within the alternative item group.
    This determines the priority of planned withdrawls of items.
    EX Two items are assigned to alternative item group
    item A Priority 1
    item B Priority 2
    The system reads the item A first.
    Strategy:
    use the strategy to determine how the planned withdrawl is controlled
    within the alternative item group.
    The strategy should be same for all alternative items within a alternative
    item group.
    If the value 2( 100% check) is defined for the strategy the first material in
    the defined priority sequence for which sufficient quantities are available
    are reserved.
    If value 1 is used( manual maintainence/ usage probability) depending upon the
    availability you can manually with draw components.
    Usage Probability:
    MRP Plans these alternative material components according to probability
    of use.Material requirements for BOM Components are planned according
    to usage probability.
    The planned withdrawls for the production order are based on the
    reservation lists.These lists are based on the priority and strategy.
    Regards,
    nandha

  • LTP with BOM selection ID

    Hi
    I have created LTP scenarios by using the BOM selection id with usage 6. The two alternate BOM 7 and 8 are assigned with the above usage. Alternate 7 BOM having active status till 31.12.2007 and alternate BOM 8 is active from 01.01.2008 till 31.12.9999.
    Means for year 2007 I want to use alternate 7 and alternate 8 will be use for Year 2008.
    After running the LTP the planned orders are exploding the BOM for 2007 only but for 2008 there is no BOM selected. I have checked the material master, BOM selection is 1 (by explosion date).
    Kindly help me to get the alternate BOM 8 for year 2008.
    Thanks and Regards
    Vinay Thakre

    Hi nanda
    In OS32 I have maintain 2 line one for alternate 7 with effective from 01.01.2007 and for alternate 8 is from 01.01.2008.
    After running the LTP alternate 7 exploded for period 2007 but for period 2008 No BOM explosion.
    Thanks adn Regards
    Vinay Thakre
    Message was edited by:
            Vinay Thakre

Maybe you are looking for

  • Error while saving to ekpo table

    sir, PO was created with currency japanese YEN using Tcode ME21N . The net price was showing 142502300 (in JPY). My problem is when checked in EKPO table , it saved with a value 1425023.00      So this is decimal value error. what can be done to corr

  • How can I get SessionID from SOAP Header in MessageMapping

    Hello experts, I've got a Abap Proxy --> PI --> WebService scenario. I do the call to the web service and it returns me the data and a SessionID in the SOAP header. I've got a message mapping for the response, and in this message mapping I need to ge

  • Repair disk greyed out?

    this may be a no-brainer, but i'm stumped. i recently installed Tiger onto one of my disk partitions (i'll refer to the partition as 'B") so that i could use DiskWarrior to repair the startup disk ("A"). Prior to this, when I was running DW off the C

  • REVERSE ENGINEERING SOAP XML TO SVO

    Hi We are using Oracle Integration Repository for webservices development . We have following soap xml . That soap xml needs to be processed by a webservice . For that I believe we have to generate the SVOs and AM looking at the SOAP xml . But my onl

  • TS3274 Background apps. How to close apps running in the background.

    I just down loaded iOS 7.1. Background apps closer problem. Double clicking home button no longer opens all my running apps. How will I close running background apps? Thank you.