Bom Selection

Hi Friends
I am working on a Long Term Planning Scenario, while simulating the client will use various BOMs to check the costing during Annual Planning run and also for Planning run for a Quarter, how can I select the BOM as required during LTP-MRP Run? Also plz let me how to configure the BOM selection ID??
Jade

Hi,
BOM selection will be done by automatically, manually not possible. In material master MRP4 view BOM selection option given by,
1. Lot size
2. Date
3. By production version
4. Only by prod version.
System will select according to that only.
Before configuring BOM selection ID, we have to configure Order of priority b ytcode OS31. In this create selection ID no by priority wise respect to BOM usage.
Use this BOM selection ID in BOM application as required.
Regards,
Dharma

Similar Messages

  • Manual BOM selection at the time of order creation

    Dear Experts,
    Could you help me to understand if there is any provision to select BOM by user at the time of order creation without the help of production version.Is there any configuration required to make BOM selected manually.
    Regards,
    Krishna Mohan

    Hi karishna,
    Please go to T-code OPL8 and in production version use( 1 )Manual selection of production version. Then user can select manually instead of automatic selection.
    Regards
    Muhammad Umar

  • Exception Error Message (52) No Bom selected

    Hi
    a) I have created a simple 2 layer BOM ( level 0,1,2)
    When I execute MRP run, I get the expection message - NO BOM SELECTED ( 52) for the 2nd level material.
    Please advise.
    Parthasarathy

    Hi All,
    Checked following before I posted this question and there are no problems with them:
    BOM usage: 1
    BOM status: 1
    Valid from: September 2011
    Lot Size for BOM and routing: 1
    No deletion flags are turned on for BOM, material and components
    BOM item Production relevant: yes
    BOM materials are of same plant
    Rerun MRP: yes... does not help. quantity of VSEB and plan orders can change but the message 52 still remains and does not explode.
    This is only happening in my QAS system... production system with same material and information is ok.

  • BOM selection in sales order

    hello, friends.
    when selecting the BOM in the sales order, the selection screen displays alternative BOMs for 1 usage type only, and will show the other usages one at a time only if the first type does not exist.  the sequence depends on the priorities (access sequence) set in IMG, and settings in item category. 
    my questions are:
    1.  does the 'next page' button in the selection screen refer to additional BOMs of the only same usage type?
    2.  is it possible to show other usage types in the same selection screen? if yes, where do we configure this
    many thanks for your inputs.

    hello, Rags.
    actually, BOM selection is working fine for us.  my question was more of a theoretical one.  to clarify the issue, let me cite an example:
    1.  for material A001, i create 5 alternative BOMs. 
    2.  of these 5 BOMs, 3 have usage type SD, and 2 have usage type Production.
    3.  when you enter your BOM header material in the sales order, a selection screen will appear.  because of the priorities set in IMG, it will show you only the 3 alternate BOMs of the SD usage type.
    3.  the system will display the 2 other production BOMs only if there are no SD usage BOMs or if these have been deactivated, or if you change the order of priority in IMG. 
    4.  you cannot change the usage type in the BOM selection screen because this field is not available for input.  there are "next page" buttons, and i'm wondering if this is or is not just for long lists of alternate BOMs with a single usage type.
    my question:  is it possible to show all 5 BOMs regardless of usage in the same list, or in different pages?
    many thanks.
    Edited by: jonathan y on Apr 3, 2009 7:55 PM

  • *URGENT -Alternate BOM selection in MRP*

    Dear gurus
    I have an urgent requirement regarding alternate bom selection.
    our scenarion is complete subcontracting and no production versions are maintained and for suppose i have a product X which has 3 alternative boms during the sales order creation iam able to select the required alternative but during the mrp run the system is selecting the alternative "1" by default.I want that during the mrp run also the system should explode the bom which  i have selected during the sales order creation not the alternate "1".
    please reply.
    regards
    Kumar

    Dear Dharma
    in my previous post I havent got suitable reply from my previous post so i have posted again waiting for answers.
    regards
    Kumar

  • Automatic BOM Selection as per Stock availability

    Hi...
    I have a query.....How can i set an Automatic BOM selection as per stock availability
    Problem is that the client is having more than 1 type of raw material which can be used, so the user needs to consume the ROH as per the stock availability, in that case he has to manualy check and amend the Production Order accordingly.
    Hence, i want to set a system wherein the system would do the checking of the ROH material and then select that material and execute the production order accordinly.
    Requesting your valuable inputs.
    Thanks in advance,
    Harris

    Harris,
    Please explore the possibility of defining "Alternative Item Group", in the BOM Item level details(Basic data tab).
    From Application help for your referance,
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Regards,
    Prasobh

  • Exception message"no BOM selected"

    Hi Experts,
                      In what circumstances is the above error message i.e. "no BOM selected" thrown ? When I am running MD02 for a FG, I am getting this message. This FG has only one SFG as it's component in the BOM. Production version for FG exists. The SFG has no BOM/production version. How can i avoid this message and what all does it imply? Please suggest.
    Regards
    Sm.

    The possible reasons for " No BOM Selected " Exception M,essage 52  could be
    1. Validity period of BOM
    2. BOM Status (should be active for MRP.)
    3. BOM Components should be relevant to production.
    4. Check whether you have defined the selection ID for the priority of BOM Usage in SPRO define order of priority of
    BOM Usage.
    Thanks,
    nandha

  • MD04 message 52: No BOM selected

    In MD04 I get this
    52: No BOM selected   (S2)
    Message no. MD408
    What could be the problem?
    This is a E 50 material. I checked the BOM structure and validity. No problem with those.

    Hi All,
    Checked following before I posted this question and there are no problems with them:
    BOM usage: 1
    BOM status: 1
    Valid from: September 2011
    Lot Size for BOM and routing: 1
    No deletion flags are turned on for BOM, material and components
    BOM item Production relevant: yes
    BOM materials are of same plant
    Rerun MRP: yes... does not help. quantity of VSEB and plan orders can change but the message 52 still remains and does not explode.
    This is only happening in my QAS system... production system with same material and information is ok.

  • BOM selection in the MRP

    Hello Gurus
       when MRP runs , what is the process of BOM selection. Are there any user exits to control the BOM selection.

    Dear Vidyadhar Reddy,
    For BOM selection you will assign the selection ID in T Code OPPQ --> under planning run -->
    BOM/Routing selection.Say suppose if you are assigning an ID 01and for this ID you can have many
    options using priority.
    Say SelID     SelPr     Usage     Usage text
            01     1     1     Production
         2     3     Universal
         3     2     Engineering/design
    So in This case the system seraches for a BOM with usage 1 production,if there's no BOM with this
    usage for production,then it seraches the BOM with the next priority say universal BOM and then the
    next priority for Engineering Design BOM.
    This priority can be configured as per your business requirement in T Code OS31.
    So the above is from configuration side and from the front end,
    1. Using BOM status - Active(01) and Inactive(02).
    2.Using Lot size and validity dates you can control the selection.
    So check with this and revert back still if you have more queries.
    Regards
    Mangalraj.S

  • BOM selection during MRP running

    Hi,
       I have a question about BOM selection during MRP running...
       I have three production version and all of them are valid at the same time..I get a problem "no BOM data seletion" during MRP
    running..I suspect it is due to that I have three production version and MRP didn't know take which one..Can anyone tell me
    where can i config it or what's wrong with it in my situation?
       btw,BOM usage and stats are correct .so is the router data..since MRP is running well if i only have one PV..thanks..

    Hi Monst,
    Looking at the screenshots you uploaded, it seems that the validity of each of the production version is from 7.12.2011 to 1.12.2012.
    Please check whether for Planned order no. 36659 alternative BOM no. 1 is getting selected (Since BOM selection ID is 2).
    For planned order nos. 36660, 36661 and 36662, the start date is perhaps before 7.12.2011 and end date as we can see lies in the validity period of production version. Hence, neither of the alternatives of the BOM is getting selected.
    For verifying the above logic, please make the BOM selection method as 3 (selection only by production version) and run the MRP. I think MRP will get terminated in this case since no BOM will be chosen for first planned order.
    Just in case u need to select the BOM for planned orders, you can manually enter the production version no. in the planned order change mode.
    Please tell if this helps and revert back.
    Regards,
    Chetan.

  • Alternative bom selection

    hello,
    i want solution for alternative bom selection.
    for eg.
    i have material say X00100 which has two alternative components
                                A00100
                                B00100
    now, i have to mapped the scinario that .the product pick the material   A00100
    first & if there is no stock then it will pick the material   B00100
    please give the solution
    marks are sure
    regards,
    mangesh

    Hi,
    Try using this concept.
    In BOM alternative items are assigned to alternative item group on the general
    data.
    In the production order in the general data tab page.
    We can define the alternative items based on priority , strategy and usage probability.
    Priority:
    This defines the priority of the item within the alternative item group.
    This determines the priority of planned withdrawls of items.
    EX Two items are assigned to alternative item group
    item A Priority 1
    item B Priority 2
    The system reads the item A first.
    Strategy:
    use the strategy to determine how the planned withdrawl is controlled
    within the alternative item group.
    The strategy should be same for all alternative items within a alternative
    item group.
    If the value 2( 100% check) is defined for the strategy the first material in
    the defined priority sequence for which sufficient quantities are available
    are reserved.
    If value 1 is used( manual maintainence/ usage probability) depending upon the
    availability you can manually with draw components.
    Usage Probability:
    MRP Plans these alternative material components according to probability
    of use.Material requirements for BOM Components are planned according
    to usage probability.
    The planned withdrawls for the production order are based on the
    reservation lists.These lists are based on the priority and strategy.
    Regards,
    nandha

  • BOM selection issues

    Dear Friends
    For one FG material i have not maintained BOM/Routing was maitained..MRP type is V1
    I carried out MD02, Planned order is created with exception mesage 52 -No bom selected.
    But i can able to convert Planned order to Production order,
    Production order created, in BOM components screen there are no items.
    I can able to do confirm/GR.
    what are config settings i missed.
    How can i restrict if BOM does not exists, user cannot convert  Planned order to Prodcution order.
    Thanks ,
    M.Srihari.

    Can you explode BOM via t-code CS12 using application PP01 with quantity and valid date on basic start data of the planned order?
    Please check configuration OPPQ - in BOM/Routing Selection.  It should contain entry 01.
    BOM should have the right status (should be 1 in standard config) and valid on the basic start date.  Please also check the lot size from and to in BOM Header.  Please also check the selection method.  If it is 2 then check whether your production version is maintained properly with valid BOM.
    Regards,

  • LTP with BOM selection ID

    Hi
    I have created LTP scenarios by using the BOM selection id with usage 6. The two alternate BOM 7 and 8 are assigned with the above usage. Alternate 7 BOM having active status till 31.12.2007 and alternate BOM 8 is active from 01.01.2008 till 31.12.9999.
    Means for year 2007 I want to use alternate 7 and alternate 8 will be use for Year 2008.
    After running the LTP the planned orders are exploding the BOM for 2007 only but for 2008 there is no BOM selected. I have checked the material master, BOM selection is 1 (by explosion date).
    Kindly help me to get the alternate BOM 8 for year 2008.
    Thanks and Regards
    Vinay Thakre

    Hi nanda
    In OS32 I have maintain 2 line one for alternate 7 with effective from 01.01.2007 and for alternate 8 is from 01.01.2008.
    After running the LTP alternate 7 exploded for period 2007 but for period 2008 No BOM explosion.
    Thanks adn Regards
    Vinay Thakre
    Message was edited by:
            Vinay Thakre

  • Alt BOM Selection at the time of order creation

    Hi Friends,
    For one of our FERT We Have 4 Alt BOMS and Fore Production Lines
    My requirement here is while creating The Production Order In co01 I Need to select The Required Alt BOM. How to configure this spro
    However the System Is asking for The Production Lines(as Pop UP Massage)
    Suggestu2026u2026
    Hari

    Hi,
    For that you need to maintain the production Version in material master MRP4 view in that maintain all your BOM and routing.
    Then MRP4 view of material master there is option selection method here you need to select 3-Selection only by production version.
    After that in OPL8 for your order type and plant maintain
    Production version-1     Manual selection of production version
    Please try and come back.
    Regards,
    R.Brahmankar

  • BOM SELECTION DURING CREATION OF JOB WORK PO

    Dear All,
    In my scenario we are not running MRP so my problem is if i maintain two BOM for a halb material say ALT 1(for inhse prdn.) AND ALT 2(job work) .Now if i make a job work PO for this item the system by default picks the ALT1 always and i want to pick the ALT 2.There is no LOT size funda the item can anytime be produced inhse OR subcontracting.
    R sehgal

    Hi sehgal ,
    i am giving one solution, but it works fine if you run MRP, same you can try with your case.
    The right Bom can be selected by creating production version.
    1. create two production versions for your HALB material, then assign your inhouse BOM for first production version, and assign Job work Bom to second production version. (MM01)
    2. select Bom explosion indicator = 2  (selection by prodution version) in MRP view  (MM01)
    3.Then lock the first production version manually if you want do outside job work.
    then create PO and check that correct BOM is selected as per your requirement.(MM01 - MRP view)
    4 if you want  to do inhouse prodution then unlock the first version, system will select first active version by default.
    i hope this will solve your problem , otherwise ignore
    regards
    pardeep

Maybe you are looking for

  • Error executing sequence in Planning

    We are using Hyperion Planning and have been for years, and all of a sudden started having an issue. We did have a database corruption issue last week and had to recreate the databases, but other than that, nothing has changed. Here is what is occurr

  • In Visual Composer Can we Pass a whole Table to a Bapi

    I have a Bapi which takes a table as input and stores the values in SAP-Database. But in Visual Composer i am not able to do it.When i fetching the Bapi into Storyboard its not showing the Input field for passing the table. Is it a limitation of Visu

  • Hi. I need urgent help with Adobe Premiere Pro CS3

    Hello there. I am new to using Adobe Premiere CS3. As I have given up on Vegas. But I am stuck at the first hurdle! Please help. When I load up Premiere, I select new project. Once I click that it asks me to load a preset. And I have no idea what to

  • Homogeneous system copy db-specific procedure,  Incorrect Migration Export?

    Hello, I am still attempting to perform a homogeneous system copy of a NW2004s WebAS Java EP portal system using database-specific system copy with Oracle. OS is Suze 9 Linux. I am on the very last step of sapinst on the target system and I have the

  • IBook (Dual USB) Sound Problem

    The item: iBook Dual USB, 800MHz, 32 VRAM, CD-ROM, partitioned HD with OS 9.2.2 & Tiger. I have installed OS 9.2.2 on the smaller partition via FireWire using Apple's OS 9.2.1 install CD + OS 9.2.2 Updater from Apple's website. Sound works perfectly