Hi,
Do you have the reference of Bidding Engine for direct material sourcing?
Especially in Automotive industry, there seems to be the case RFx has BOM-structured lines of assy.
In SRM Bidding Engine, we can use the "outline" function, but I have never heard this function is used in direct material sourcing in manufacturing industry.
If you have any idea to handle BOM-structured RFx, please share it.
regards,
Tadasuke

Hi Tadasuke,
Outlining functionality is useful if you want to source a set of products from a single supplier. In this case you can bundle all the items into one lot called as outline and create a bid invitation for that.
But, for bidding for matrials in a BOM, SAP xApp Cost & Quote management is more suitable. You can find information on xCQM at https://websmp208.sap-ag.de/xapps
Rgds,
RRK

Similar Messages

  • Subcontracing charges and BOM structure.

    Dear All,
    In the subcontracting scenaro , Subcontracting charges does't depends neither on  UOM of the material nor conversion factor is fixed of Material Base UOM with Pricing unit .
    for example , price depends upon the operation performd on sheet. If sheet is to be cutted into many peices , so on this sheet 5 operations has to be performed and price is fixed operation wise.
    Now confusion is
    1.)how to give  price in the subcontracting PO.
    2.) and what should be BOM structure in this scenario.
    Please suggest.
    Thanks & Regards
    Nitin Chhabra

    I assume from your question that you do not know the subcontractor price when you place the purchase order.  Based on this your subcontractor info record and BOM should reflect "typical values".  On placing the order you will need to find out the exact amount of material to be issued and manually adjust the purchase order BOM, then allow enough tolerance to except the variance in quantity received and invoice value.

  • Importing Non BOM Structure to OCD

    Hi All,
    I am aware that there are import tables like CZ_IMP_DEVL_PROJECT, CZ_IMP_PS_NODES to import the flat file data and run the procedure import_generic from cz_modeloperations_pub API (or Run Populate Configuration Models concurrent program) so that the data is inserted into base tables for CZ Structure.
    I would like to know if anyone has imported Non BOM Structure from a flat file into CZ Structure in OCD in this way? If Yes, how was the experience importing in this way?
    Is it a suggested approach or is it better to follow the approach of building the Non BOM structure manually?
    (Note: The case here is adding the Non BOM nodes directly under the BOM Model nodes imported already).
    Any suggestions are appreciated.
    Madhu Sudhan.

    I cannot speak for Murali, but from my experience...this information is not available in particular manual or documentation. These table names are known over the course of working with the product over a period of time, seeing SQL statements inside working code, working on bugs alongside Oracle Support and Development, etc. However, there is some information available in the following locations to help you out:
    * CZ Implementation Guide - Section D - CZ Subschemas (http://docs.oracle.com/cd/E18727_01/doc.121/e14322/T440679CHDJBBFB.htm). This part of the manual lists the key tables used for various activities (product structure, publishing, UI, etc.)
    * ETRM (http://etrm.oracle.com) also has some useful information. Not every table is described, but many of them are. As an example, here is what you might find as a description of the CZ_PS_NODES table:
    +"The CZ_PS_NODES table contains the entire structure of a product model. Data can be imported from Oracle Bill of Materials. Each project has a root (product) node. When the project structure is imported, project structure nodes mirror the imported BOM structure. Nodes of type REFERENCE are used to include a separate project ("model") into another psnode project tree."+
    Thanks,
    Jason

  • BOM-Structure in service notification

    Dear Fnds,
    I have some BOM iwith usage 4 and 3...i have deliverd the Product to Customer.
    now it came for service ...i have ented in Service notification.....If user wants to see the Bill of material by Clicking Object info...and by clicking hierachy in pop-up screen ...BOM is not comming....
    Even i maintained Eq BOM also...
    What is configuration to Display the BOM structure.
    Thansk in Advance
    Regards
    raj.

    Dear Sir,
    Can U tell me is It Right method to adopt the BOM to Order ?
    In order- components tab - list is there, when i click on that, the particular BOM - materials are Viewed, and  i double click  , the materials are transported to the order . is it right method.,
    In pp order all materials in BOM are Transfered to Production order.In maintenance order is not that such scenario?
    Regards
    SMC

  • How to export and Import BOM structure?

    Hello Experts,
    How can I export my BOM structure into xls, ms-project etc..?
    How can I import into SAP BOM?
    Pls point me any doc or link
    Regards
    Shital

    Hi Shital,
    >How can I export my BOM structure into xls, ms-project etc..?
    Go to trx CS15 and it will give you your BOM in ALV format from where you can down load it in excel.
    Or go to print preview in CS15 and then Export the same.
    >How can I import into SAP BOM?
    Use can the Wrok Bench CEWB.
    But the best option is LSMW.
    Regards,
    Shyamal

  • BOM Structure

    Hi Guys,
    I will have 80% of technical specs available(for the product X at the time of Sale order creation)
    Based on the technical specs product can be broadly classified as X,Y,Z but inturn in the assembly they have variants
    I will know how much & what to make for next 3 months
    The remaining technical Specs will be received during the course of production execution
    Products X,Y,Z has 6-8 assembly stages
    We are going to maintain only production BOM ,no Sale order BOM
    Now how can I maintain my BOM structure?
    What i have thought is maintain a basic bom structure & in the production order manually i will add the necessarybom
    But that seems not pragmatic as i have to also add the routing manually for the bom's which i will add,How best can i approach & maintain master bom?

    Vijai,
    As discussed earlier your sub-assembles can be manufactured based on forecast using strategy 70. There is no problem in this.
    For the FG you say thre could be variations. Since you are not implementing variant configuration you could consider creating production versions each of which presents the BoM and the related routing. At the time of actual orders receipt before prod execution choose the required prod version. Yes this will become very complicated if many variants are there. The ideal situation in that case would be variant confuguration.
    But going by prod version would be better than manual maintenance.
    Hope this makes some sense.
    regards
    Ram

  • Configured Item BOM Structure..

    Dear Techies,
    I am facing a big issue for getting the bom structure for a configured item (configured thr the sales order form)..
    when i use the hierarchial query in this case i get the correct result..
    but my requirement is such that i hve to use the query below..
    however it returns all the options in option class BOM..
    However the ideal thing is that it shld only return the option selected.
    That is i want only the related child items of the configured item (ie the ordered item in our case)
    my query looks as below..
    select a1.a1_item ordered_item, c1.c1_item,c1.c_desc1,c1_type, c2.c2_item,c2.c_desc2,c2.c2_type,c3.c3_item,c3.c_desc3,c3.c3_type
    from
    (select msi.segment1 a1_item,bbom.assembly_item_id a1_asb_id,
    bbom.bill_sequence_id a1_seq_id
    from mtl_system_items_b msi,bom_bill_of_materials bbom
    where bbom.assembly_item_id = msi.inventory_item_id
    and bbom.organization_id = msi.organization_id
    and msi.segment1 like 'XX'
    and msi.ENABLED_FLAG = 'Y'
    and msi.organization_id =123) a1, --returns the configured item details
    (select msi.segment1 c1_item, msi.description c_desc1,msi.item_type c1_type,bic.component_item_id c1_comp_id,
    bic.bill_sequence_id c1_seq_id
    from mtl_system_items_b msi,bom_inventory_components bic
    where bic.component_item_id = msi.inventory_item_id
    and nvl(bic.disable_date,sysdate+1) > sysdate
    and msi.organization_id =123) c1,
    (select msi.segment1 a2_item,bbom.assembly_item_id a2_asb_id,
    bbom.bill_sequence_id a2_seq_id
    from mtl_system_items_b msi,bom_bill_of_materials bbom
    where bbom.assembly_item_id = msi.inventory_item_id
    and bbom.organization_id = msi.organization_id
    and msi.organization_id =123) a2,
    (select msi.segment1 c2_item,msi.description c_desc2,msi.item_type c2_type,bic.component_item_id c2_comp_id, msi.description c2_desc,
    bic.bill_sequence_id c2_seq_id
    from mtl_system_items_b msi,bom_inventory_components bic
    where bic.component_item_id = msi.inventory_item_id
    and nvl(bic.disable_date,sysdate+1) > sysdate
    and msi.organization_id =123) c2, --returns the first level child ie the Option Class BOM
    (select msi.segment1 a3_item,bbom.assembly_item_id a3_asb_id,
    bbom.bill_sequence_id a3_seq_id
    from mtl_system_items_b msi,bom_bill_of_materials bbom
    where bbom.assembly_item_id = msi.inventory_item_id
    and bbom.organization_id = msi.organization_id
    and msi.organization_id =123) a3,
    (select msi.segment1 c3_item,msi.description c_desc3,msi.item_type c3_type,bic.component_item_id c3_comp_id, msi.description c3_desc,
    bic.bill_sequence_id c3_seq_id
    from mtl_system_items_b msi,bom_inventory_components bic
    where bic.component_item_id = msi.inventory_item_id
    and nvl(bic.disable_date,sysdate+1) > sysdate
    and msi.organization_id =123) c3 -- here it returns all the options for bom while it shld return only the related option in respect to the configured item
    where
    a1.a1_seq_id = c1.c1_seq_id(+)
    and c1.c1_comp_id = a2.a2_asb_id(+)
    and a2.a2_seq_id = c2.c2_seq_id(+)
    --and c1.c1_type not like 'ATO'
    --and c2_item not like '%WARRANTY'
    --and c2_type not like 'AOC'
    --and c2_type not like 'PH'
    and c2.c2_comp_id = a3.a3_asb_id(+)
    and a3.a3_seq_id = c3.c3_seq_id(+)
    --and c3_item not like '%WARRANTY')
    --and c3_type not like 'AOC'
    --and c2_type not like 'PH'
    is there any field which can control this unrelated child items to the configured item 'XX'
    Thanks in advance
    Rajesh

    shivjhan,
    You can add sub-ATO to a parent ATO and if the supply type != Phantom, then you can generate indented ATO Item BOM.
    However, the OC does not form a level.
    So if your ATO model is
    Computer ATO
      - Hard Disk OC
          - 250GB
          - 320 GB
    The * BOM looks like this
    Computer ATO*12345
       -- Hard Disk OC
       -- 250GB
    But you can do the following
    Computer ATO
       - Hard Disk ATO
         - Hard Disk OC
             - 250GB
             - 320 GB
    Now the * ATO will look like this
    Computer ATO*12345
    -- Hard Disk ATO*12346
       -- Hard Disk OC
       -- 250GB
      Hope this helps,
    Sandeep Gandhi

  • BOM Structure Uniqueness

    Hello guys i have a question BOM structure.
    A(top_Item_Id) B(top_item_id)
    A1 A1
    A11 A11
    A12 A12
    this are my BOM structures and this data gets populated in Bom_small_implosion_temp table after doing implosion. How can i pull only record with B(top_item_id )from the Bom_small_implosions_temp table since both BOM's have same structure except top item id.
    please help me in getting this
    Edited by: user12190757 on Apr 18, 2010 11:06 AM
    Edited by: user12190757 on Apr 18, 2010 11:07 AM
    Edited by: user12190757 on Apr 18, 2010 11:07 AM

    Hi,
    can you be more clear about what you want to find?
    If you have all the 3 records (B1-A1, A1-A11 and A11-A12) in the table then you can use connect by root clause functionality and the desired result.
    If you have only two records (A1-A11 and A11-A12) then you have to look at the BOM_INVENTORY_COMPONENTS table with component_item_id = A1 Item_ID and assembly_item_id = B1 Item_ID

  • Please help....BOM structure in CRM without plant

    We have the BOM structures downloaded into the CRM system from the R/3 system, but have an issue with the plant data.  
    When we enter the product into the sales order, it explodes, but brings in all components,not just the ones related to a specific plant.   the issue is that because plant doesn't exist in the CRM system, it cannot determine only the componet parts for that plant in crm.
    Has anyone else encountered this issue and can help?
    Thanks,
    Darcie

    Hello Experts,
    I have not found the solution yet.
    Can anyone provide some insight??
    BR,
    Nisha Verma

  • BOM structures in large projects. Use Collective?

    Hello All,
    I am a little new with this forum.  I was a super user in a high volume high mix industry where we used collective production orders quite frequently. 
    I am now working with highly engineered long term capitol projects.
    It looks like a lot of the BOM's are flat and ties to a WBS project number.  This makes planning very arduous since we are essentually building components into the routing. 
    Collective orders since it seems to give order and structure for materials and planning.
    I am wondering what similar industries do in this environment.  I would welcome any comment regarding the pro's and con's of pushing to change toward using collective more.
    Thank You

    Hi Richard,
    please go through the document it may help you little COLLECTIVE ORDER OR DIRECT PRODCUTION - A scenario overview .
    Regards,
    Venkat.

  • BOM structuring for multiple location manufacturing

    Hi,
    One of the product is manufactured in multiple locations (US and India). Some of the components are different when manufactured in these two locations.
    Ex: Steel rod is one of the component of this product and "Brand A" steel rod is used when manufactured in India and "Brand B" steel rod is used when manufactured in US.
    This product is highly configurable, so we need to use configurator to arrive at the final bill.
    Now question is how do I setup my bill structure (what should be set up in each org and which bill is commoned to Item Validation Org) and how should the configurator be built to get correct BOM, based on where the product is manufactured?
    Thanks and Regards,
    Mutthu

    Without R12's option dependent sourcing, you may have an issue.
    When you configure a sales order, it will look at the BOM in the item validation org so no matter which org you are in, it will look at the same bill.
    You may have to add ROD A and ROD B as optional components of an OC and write rules that will disable RodAif the Org=US and disable RodB when org=India.

  • Need BOM related solution for Textile Industry (Weaving proces)

    HIi,
    Made to Order Strategy:
    Every times customer sends the specification of product. Specification format as given below:
    Ex. 80x100/154x80*3-118u201D 4/1 Twill
    Details of specifications:
         80: Count of EPI (Ends Per Inch)
         100: Count of PPI (Picks Per Inch)
         154: EPI
         80: PPI
         3: Insertation
         118u201D u2013 Width in Inch
         4/1 Twill : Design of Fabric
    Operations Details:
    1 Warping
    2. Sizing
    3. Weaving
    4. Quality Inspection
    5. Packing
    As Is Business Process:
    There are mainly four production lines viz. Warping, Sizing, Weaving and Quality Inspection. For all the production lines the individual machine work centers will be as listed below with brief description:
    1.     Sectional Warping:
    A kind of Warping specially used to prepare fabrics for shirting. In sectional warping dyed yarns are used to prepare warping beam. The end constraint of sectional warping is 720 ends at a time. The actual capacity of Sectional warping is 800 MTR/min.  This activity is job work for DEESAN group.
    2.     Direct warping:
    Direct warping process is used to prepare warping beam. The end constraint of warping is 1088 ends per beam. Machine width of the beam in 2200 mm, speed of warping varying from 300 MTR to 1200 MTR per minute depending upon the construction required. It has backup procedure for next round. Uploading speed   for single yarn is 8 yarn / min / person.
    3.      Sizing:
    Sizing process is used to prepare specific number of EPI/ beam as per the requirement of construction. A calculated no of warp beam used to prepare a single sizing beam. Speed of sizing 45 to 55 MTR / minute depending on the requirement of fabric.     
    4.     Preparation of Drawing:
    This process is used to preparation of new drawing for the loom machine. Drawing includes frame & reed. It will take 12 hr for 2 persons to prepare a single drawing i.e. 8000 ends per shift. This activity given as job work to some group of people.      
    5.     Weaving:
    Two types of weaving machines used are CAM and DOBBY. Fabric to fabric PPI is varying, the capacity of loom machine depends upon the PPI so the capacity of loom machines varying with the type of fabric. CAM is used specially for plain fabrics.
    6.     Quality Inspection:
    The beams of fabrics coming from looming machine are inspected on Inspection machine. 100% fabrics are inspected on QA machine for further grading, which is then bifurcated in Export, Local and chindi type.
    7.     Rolling:
    Rolling machine is used for rolling of inspected fabric on card board rolls according to the quality of fabric. A roll contain of maximum 350 MTR of fabric. Which are then packed with LDPE followed by HDPE with appropriate coding on rolls.
    Material Requirement:
    For ex. 80x100/154x90*3-118u201D 4/1 Twill
    Order Qty.: 20000 M
    Currently they are using single level BOM.
    Formulas for calculate raw material requirements as given below:
    Warp wt / mtr = (EPIWidthCrimp) /(1693*Count of EPI)
              = (154 * 118 * 1.025)/(1693 * 80)
              = 0.137524
              = 0.138 Kg/Mtr
    Weft wt / mtr  = (PPIInsertationWidth * Crimp) /(1693*Count of PPI)
              = (9031181.025)/(1693100)
              = 0.192891
              = 0.193 Kg/Mtr
    Total Qty req:
    Warp = 0.138 * 20000 + add 5% loss
         = 2898 KG
    Weft = 0.193 * 20000 + add 4% loss
         = 4014 KG
    Packaging material requirement :
    1. Paper tube = Total order qty / approximately for 300 m 1 paper tube required + 5% loss
              = 20000 / 300 *1.05
              = 70
    2. HDPE sheet = No. of paper tube * 0.4 KG
          = 70 * 0.4
         = 28 KG
    3. LDPE sheet = No. of paper tubes * 0.15 KG
              = 70 * 0.15
              = 10.5 KG
    Chemical consumption in terms of yarn on KG basis. Its combination of 4-6 chemicals depends on construction to construction also material availability.
    Note: We will consume chemicals against cost center.
    Production planning at execution time:
    Sizing and warping calculation:
    1.     Sizing :
    EPI per inch = 154
    On loom will be = 154 * 1.025
               = 157.85
    Total no of ends for 118u201D width = 157.85 * 118
                        = 18626
    Add one more ends per 1000 ends = 18626 / 1000
                        = 19 ends
    Total no of ends  = 18626 + 19
              = 18645 for  sizing
    Warping :
    Warping m/c capacity of output is 1088 Ends per set/beam.
    Speed of machine 300-1200 MPM.
    So for sizing we need 18645 ends. Now we want to calculate no warp set required for sizing & no. of ends per warp set.
    Ends required per set = 18645 / 18 = 1036
         i.e. 18 * 1036 = 1 Sizing set
    We need total yarn on KG basis
    Issue related to BOM:
    1.     How We can feet below 2 issues in BOM
    a.     we want to calculate RM(Yarn) material requirement in Unit of  u201CENDu201D
    NOTE: Procurement of Raw material Unit- KG as well as it depends no. of ends required for warp set / beam. i.e. its multiple of yarn cone required for 1 warp set.
    As per Bom of Raw Martial Unit- Ends (EA)
    b.     Also we want to calculate no of warp set required for sizing and no of ends required for warping process.

    Hi Pankaj,
    Hope you might have completed the project for Textile industry. I need to know implementation in Textile and some specific process. If you can share some documentation for Textile industry would be very helpful for me. My id k.anamika06 at gmail
    Thanks a lot
    Anamika

  • BOM creation for a sugar industry -reg

    Hi,
    in all otehr industries we fix the base quantity and then create BOM with its components and their quantities based on which planning for procurement and consumption of the child parts happen .
    but in the sugar industry the BOM headers quantity depends on the incoming sugar cane quality .
    if the sugar cane is of some quality you may get 1 ton out put , if it is of different quality you may get 0.8 ton
    it keeps changing continuously as sugar cane feeding keep continues ....
    in this type of cases how can be BOM created ?
    we dont know the base quantity of the BOM header ?
    any inputs and thoughts on this
    regards,
    Madhu Kiran.

    Hello,
    SAP explodes BOMs top-down not bottom-up hence this is diffcult to accomodate.
    Is there a way to know the likely output quantity in advance by classification information of an input batch? Then perhaps 'material quantity calculation' in PP-PI can help. If you are using that module that is.
    Cheers!

  • SAP MM Organization structure for the Utilities Industry

    Hi,
    Please let me know how does the typlical org structutre should look like for the Utilities company.
    Thanks in advance

    Hi,
    Material management organizational structure includes
    1. Purchasing Organization,
    2. Plant,
    3. Storage Location &
    4. Purchasing Group.
    Note:
    It depends how you project or design the purchasing group in the organization & purchase group can be created and represent as department .In general, company have many more departments & need to control & approval of all purchasing documents at department level & at the end to know cost incurred in each department with various activities( more then one& each GL represent one activity) .So in turn Purchasing group(department) is linked  to cost center and then different G/L accounts which represent various activities linked with the cost center.
    Regards,
    Biju K

  • Change WBS BOM Structure

    Dear Experts,
    I have a WBS BOM ( Copied from Material BOM) in which one common child level component is used for differernt Superior Assembleis. Now when i am deleting this component from one of the Superior Assembly, a POP UP is coming stating that the same compoenent is used for Other Assemblies tooDo you want to delete this component from there other superior assemblies too. When i am hitting YES-only the Component is getting deleted from the Supeior assembly for which it is selected for not from the others.
    Can anyone throw a light Whats the purpose of that POP UP then?
    Thanks in Advance
    Best Regards
    Rohit

    Hi
    Use CN33 to transfer the multilevel BOM to WBS element /Project.
    Which t.code r u using ?
    Thanks
    S.Murali

Maybe you are looking for

  • How can I delete photos from photo library on my Iphone 4s?

    Hello, Can someone please tell me (in easy step by step instructions) how to delete photos from my Photo Library on my Iphone 4s? I have moved some of the photos that i want ot keep in to sub folders by trip names etc but want to delete them from the

  • Computer died, need to transfer nano to another pc

    The computer my wifes ipod nano was authorized to died. How do I authorize it to a new pc (I can not get back on the old pc to deauthorize it). She also has all of our cds she ripped onto it with playlists set up, is there a way she can transfer this

  • Problem in retrieving value via ejb2.0 in stateless container managed bean

    -----------------------ejb-jar.xml--------------------------------- <session>           <description>Entity Bean</description>           <ejb-name>Stl</ejb-name>           <local-home>com.ejb.session.ejbeans.StlHome</local-home>           <local>com.

  • Modifying SQL used by ADF Business components

    How can we modify the query used by ADF Business components that are generated from database tables by dnd in JDeveloper?

  • Macbook Pro Graphics Problem?

    Hello everyone, So i have been having this problem recently where my Macbook Pro would flip out and the graphics would lag and go crazy. If i try to drag a window it would leave a trail behind. I was able to take a screen shot of it and you can actua