Bouncing multiple projects to one CD

Maybe I'm missing something obvious here but can anyone tell me how to go about bouncing more than one song to the same CD in CDDA format so it will play on any regular CD player?
Thanks!

OK, I tried bouncing using the multiple sessions enabled and using a CDRW. The attempt to write a second file to the same CD would not work. I got the message I was trying to burn to a media that was not accessible (or something to that affect). So I tried bouncing in the "simulate only" mode and then took several files and burned them all to one CD at the same time. That CD would not play in a standard CD player.
What am I missing here? Can someone explain step by step? Thanks!

Similar Messages

  • Making multiple projects into one SCORM

    I have made multiple Captivate 5 projects that need to transform into one SCORM Module on my moodle LMS website, and count as one SCORM Quiz/Test. I've tried to even load multiple projects in one zip, but it failed to jump to the other projects when I had them all linked together leaving only this: "loading..." when I click the button to open project on the SCORM package. Please Help... Thanks...

    I'm assuming here that your questions are related to the fields in the Quiz Preferences in Captivate.
    The Objective ID is the same for all reporting elements in a given module. The Interaction ID Prefix just helps to distinguish which particular module your question data came from if you happen to be viewing it on drilldown inside your LMS.  As long as it's not the same prefix as for other modules, it should be fine.
    In the Multi-SCORM Packager dialog, the information you add to the fields will be written to the imsmanifest.xml file for the overall package:
    Identifier is to provide an ID for your course that will be unique in your LMS. This will also be used to generate the filename of the final zip file.
    Title is the name of the course.
    Description may or may not be required by your LMS.  Test and see.  In some LMSs this info gets displayed to the user when viewing a synopsis of the course.
    Version is the version of the package.  I actually use the date reversed for my versioning (20110520a) with a letter on the end in case I output more than one version on a given day.
    Duration is important to add. Some LMSs won't regard your package as compliant without this.
    Subject is not something I've generally worried about, but it doesn't hurt to put a brief phrase on what the course topic material is about (e.g. Health and Safety)

  • Multiple projects in one web role using Azure cloud?

    How to run One webrole with multiple projects using azure?
    In my solution One WCF service and ane website i want run both on one solution,
    How to run both in one domain?
    anilbabu

    Thanks for replying,
    I want to this type of output,
    In my project one solution two projects(one website and one WCF service)
    what i am asking is 
    this type 
    running both projects single service
    http://postimg.org/image/oijwkbn7h/
    After
    i a hosting into azure that url's like this
    How can i get this type of output
    EX: http://multliplehos.cloudapp.net/ 
    Service url: http://multliplehos.cloudapp.net/Service1.svc
    anilbabu

  • VS2013 Community Edition : How to add multiple projects in one solution?

    I am an experienced .Net developer. I am using Visual Studio since 2005.
    Yesterday, I just installed “Visual Studio 2013 Community Edition”. Suddenly I came to know that I can’t add multiple projects to a solution. Even a project does not have
    solution !!
    I had also tried to create a blank Visual Studio solution and then tried to add projects to that solution. But after creation of project, it will not be added to that solution.
    Infact it even doesn’t have solution !!
    How can I add multiple projects to a solution in VS2013 Community Edition?

    Glad to see the problem was resolved. Thank you for sharing the solution here.
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Combining multiple projects into one?

    from a recent vacation i have imovie projects for each city, 6 in all, each being between 2:45 and 5 minutes long. i did each in its own project to keep clips organized better, but when the final project plays, i want the cities to run one after the other, without kicking out to the menu everytime. basically what im asking is is there a way to merge these seperate projects into one, or do i have to compress each and then make a totally new imovie from that?

    welcome phiphika to the  board…
    in terms of convenience, I would indeed export/share all 6 movies.
    to tape, or as Quicktime/FullQuality…
    both methods create a lossless copy of your final movie(s).
    in step II, import all 6 project into a new iM project, as said above, you don't loose ay quality with that back'n forth copying... only some time ;-)… you can set then chapter markers etc....
    besides, your workflow is as mine on larger projects: not 678 clips into one monstrous project of some dozends Gigabytes, just segments…

  • Multiple projects, yet one flash file launched from browser

    Hello everyone, I glad to be a part of this wonderful community.  I have a really sticky Captivate 4 problem, and I wanted to get my feelers out there now before I really need to get this done before the end of the week.  This question has to do with publishing.  I have 7 project files, and I created a "menu" slide at the end of each of them that look exactly the same.  In this particular slide, there are 7 'click boxes' spread throughout the page that launch all the other projects.  If you are wondering why I did this, it's because I'm trying to cut back on load time when a user click on any individual project.  Now, my programmer can only launch one .swf file from our webpage to get the first project started.  So, does this mean Captivate will dynamically handle launching all of the other projects(assuming multiple flash files are created) when they are launched from these "menu" slides?  I'm a bit confused.  I'm likely confusing some of you as well.  It is hard to put the problem into writing.  Please help!

    Okay, so lets look at the problem, shall we?
    You created seven projects. But you later asked:
    So, does this mean Captivate will dynamically handle launching all of the other projects (assuming multiple flash files are created) when they are launched from these "menu" slides?
    First off, with seven different projects, you end up with seven different outputs. Assuming you are using Captivate in the basic form, you will end up with seven different SWF files and seven different HTM files that need to be factored into things. You may have more files than that, depending on your options used.
    When you create the links using the Click Boxes, hopefully you used the option: Open other project. This means that when the user clicks, the other SWF/HTM or EXE (depending on output) will be launched.
    I'm sure you will have other questions. So just post back either in threads of their own or by replying to this thread.
    Cheers... Rick
    Helpful and Handy Links
    Captivate Wish Form/Bug Reporting Form
    Adobe Certified Captivate Training
    SorcerStone Blog
    Captivate eBooks

  • Combining multiple projects into one larger project?

    If I have multiple separate projects and now want to combine them, edits, titles and all into a larger project, is it possible? I expected that it might be possible to drag one project into another and place it intact onto the timeline for the new project. Since every combination of dragging a project around has evidently failed to accomplish what I'm expecting... is there a way to do this?

    welcome phiphika to the  board…
    in terms of convenience, I would indeed export/share all 6 movies.
    to tape, or as Quicktime/FullQuality…
    both methods create a lossless copy of your final movie(s).
    in step II, import all 6 project into a new iM project, as said above, you don't loose ay quality with that back'n forth copying... only some time ;-)… you can set then chapter markers etc....
    besides, your workflow is as mine on larger projects: not 678 clips into one monstrous project of some dozends Gigabytes, just segments…

  • Advice on "merging" multiple projects into one

    RH9 webhelp.
    We currently run as merged help, but for maintenance and other reasons, I would like to merge these into a single project. This is mostly due to the variety of style sheets and folder structures that resulted from many of our older topics being added using the import Word feature in earlier versions of RH. I've done this in the past with a few smaller projects, but it ended up requiring a fair amount of manual per-topic work that I'd like to avoid if possible, give the # of these that would be affected by this.
    My initial questions are:
    1. Is it recommended to use the import feature to add the child files into the parent? Or create a brand new project and add both parent and children files into that? Or to use some other method of adding/recreating the current files into an existing/new single project? Especially in terms of the questions below (i.e. folder structures, old/new styles, associated image files, etc.).
    2. Is there a way of importing that won't replicate the original folder structure? For example, in the projects I've created from scratch, all topics are under the basic folder for that project, while in older ones - which were mostly updated by importing Word documents - many topics reside in their own sub-folders, or in what were apparently early attempts to organize topics by subject. I would like to get rid of these sub-folders and have all topics in the same basic folder.
    3. Is there a way of importing images that can auto-update image file names if an existing one already uses it? Many of our older images were created using simple numbering (e.g. 1.jpg, 2.jpg, etc.). Between the various projects and the various subfolders in each project, we have a lot of shared file names, and in my initial experimenting it required a lot of manual work to avoid overwriting. Is there a way in RH (or even outside, I guess) to somehow automate renaming these images during the import process?
    4. Is there advice on mass-updating styles via style-sheets? I'm noticing a lot of weird display and control issues if I import a bunch of old topics and then try to apply our current style sheet to them. For example, RH will show that the new style is now associated with them, but they continue to display using the old style, or the wrong options (usually font styles and font sizes) are enforced with the update (for example RH seems to always default to want to use Times New Roman, even when neither the old nor new styles uses this font), or options (most commonly the font styles we use in the new style) will disappear from drop downs and the like. It just feels very buggy and not consistent or correct in being applied, and I'm worried about having to manually update or recreate a lot of individual topics because of this. Given we have some very ancient topics that have 'survived' 4 or 5 (or more) versions of RH, I guess I'm wondering if there's any old html code or similar that might be the culprit, and if so, how best to sort it out.
    Essentially, we're kind of unique perhaps in that we don't really want to retain the existing folder structures or style guides, but my experience with the previous go-through was that RH did what it could to retain those. Which is understandable, but for us it'd be nice to avoid that and especially if there's a way of doing so without having to manually move and edit each topic and image file as they're imported into the target project.
    Thanks for any tips or suggestions!

    Hi there TWnKC
    Personally, I'd copy the existing master, then begin importing the child topics in order to create a new project that is a combination of the former. And I do think it will be helpful moving forward to describe this as "Combining" as opposed to "Merging". Just so everyone is aware of the difference.
    As for the structure, it may be whatever you like and all you have to do is ensure you import the topics into the correct folder.
    Not sure about the images. That one will require a bit of testing. I might expect that if nothing is done you do run the risk of having them overwritten. So here is what I would probably do. Before importing, move images to a folder that is rather unique. That way they will be out of the way and won't get overwritten. By moving them inside RoboHelp, all references to them are updated as well.
    As for the style sheets, only picking apart what is happening will truly reveal the issues. My own guess here is that you are probably seeing some inline or embedded styling that is causing things to run amok. But once you sort what is happening, it shouldn't be a big deal to fix.
    I'm sure others will pop in and offer other additional advice.
    Best of luck to you! Rick
    Helpful and Handy Links
    RoboHelp Wish Form/Bug Reporting Form
    Begin learning RoboHelp HTML 7, 8 or 9 within the day!
    Adobe Certified RoboHelp HTML Training
    SorcerStone Blog
    RoboHelp eBooks

  • Creating Multiple Projects in One Workspace

    I've created a new workspace which has two new projects with
    their own packages. When I try to import the package from
    project2 into project1 JDeveloper can't find the class or source
    files. It seems to only see files in it's own directory and not
    one that aren't jar files. Is it possible to create two projects
    simultaneously and have one project import from the other?

    Thanks for replying,
    I want to this type of output,
    In my project one solution two projects(one website and one WCF service)
    what i am asking is 
    this type 
    running both projects single service
    http://postimg.org/image/oijwkbn7h/
    After
    i a hosting into azure that url's like this
    How can i get this type of output
    EX: http://multliplehos.cloudapp.net/ 
    Service url: http://multliplehos.cloudapp.net/Service1.svc
    anilbabu

  • How do I burn multiple projects onto one DVD?

    I have several projects saved that are small enough to fit on one DVD.  Not sure, though, if I burn project #2 after project 1 has been burned, whether the software is smart enough to keep them separate and not over-write project #1.

    Dave0518
    Once you have burned a Timeline content to DVD-VIDEO format on DVD-R disc, the disc is finalized and you cannot burn a second time on that same disc (no multisessions). Even if you use a DVD-RW disc, the program will erase what is on the disc before burning anything to it.
    Now, if you have 3 projects and you want to combine them to be part of one DVD-VIDEO on DVD, then you need to remember that you cannot import a project (project.prel) into another project.prel. So, you have going to have to export the Timeline of each of the projects to a file. The file type selected should be consistent with the goals of the project. To be discussed in more details if necessary.Then each file is brought into a new project (set with the appropriate project preset) which is burned to DVD VIDEO on DVD disc.
    Stop markers at the end of each of the first two files is done. But, never place a stop marker at the end of the last file on the Timeline. It is not needed and can cause problems in the project.
    Please consider and let us know if you need clarification on anything written.
    Thank you.
    ATR

  • How do I combine multiple projects into one project

    I have about 35 movie projects made in iMovie 11 that I want to combine into about 8 movie projects.  What's the best way to do this?

    If you want those Media Browser versions they are 'squirreled away' or 'hidden' should I say in the the .rcproject file I think. That project file is in the following location:
    Mac HD > Users > (your home folder) > Movies > iMovie Projects > <CTRL> + click on the project name then choose Show Package Contents. This will reveal the folders in thercproject container. The movies will be in the movies folder.

  • Best workflow to place multiple projects into one master project?

    Since FCP X seems to slow down with longer projects(this needs to be fixed soon) I am creating 4 15 minute projects for my  hour master. Should I copy and paste the shorter projects into the master or export them as self-contained QT files and re-import?
    Best.
    Tom

    Try copying and pasting into a new project first after rebooting and with nothing else running, not even networking.

  • What is the best way to combine multiple projects into one?

    My guess would be to turn them into compound clips and then make the transfer that way, but is that the only way?

    You can merge Events from the file menu.
    Select the Events,  File > Merge Events
    You could also convert project timlines into CC timlines which would be saved in an Event.
    Open project timeline, select all, copy and then paste into a CC timeline.

  • Deploy One Ear file for Multiples Projects

    Hi,
    I work with JDeveloper 9.0.3 and BC4J+UIXML+Jsp Pages and I organize my application in multiple projects, each one contain BC4J and UIXML programs.
    I have a problem in deploy my application with JDeveloper Deploy Profiles because I can't deploy multiples projects in on .ear or .war files.
    Today in development time, i build or rebuild my project and copy all executable files in manual mode to Oracle 9ias OC4J directory, into a deploy of one project, but i think that proccess is not correctly.
    What i need to do ?
    thanks.
    Danilo

    In order to include other projects in the EAR, you need to create deployment profiles (WAR,Jar..)in each project which will archive the contents of the project.
    After that you need to create an EAR deployment profile and edit the properties to include other deployment profiles created earlier.
    raghu
    JDev Team

  • Move multiple Web dynpro projects to one DC

    Hi all,
    I have got around twenty local web dynpro projects. Now i want to move them to a DC. I have created the domain,track,imported the Development Configuration and created the DC. Now i want to move the local projects which are there in the NWDS to the new DC. I could move one project. But how can i move multiple projects??
    regards
    Shyam.

    Hi,
    well though I would not recommend to move 20 projects into a single Dc you can still do it. Just create the DC and then goto the file navigator and copy everything from the src/packages folder from the local WD project to the src/package of the DC project. After that you should do a Reload on the DC project.
    rgds
    David

Maybe you are looking for