BPM correlation and Sync-Asyn Bridge....
Regarding Sync-Asyn ,I have gone thru these blogs...
Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
I am not able to do a end to end scenario...using this ....So could any one give me a step by step guide for the syn-asyn Bridge.
And also step by step for correlation...
Please help me in this regard....
Hi,
Defining Sync/Async Communication
To enable the communication between a synchronously calling business system (synchronous outbound interface) and an asynchronously called business system (asynchronous inbound and outbound interface), you can define a sync/async bridge in an integration process. You can only define one sync/async bridge for each integration process.
You can also achieve sync/async communication by using the JMS adapter. If you do not have any particular demand for monitoring or for troubleshooting, SAP recommends that you use sync/async communication in the JMS adapter instead. The advantage of using the JMS adapter over synch/async communication using an integration process is a significant increase in system performance.
See: Async/Sync and Sync/Async Bridge in JMS Adapter
Structure of a Sync/Async Bridge
The following table outlines the minimum components of a sync/async bridge:
Step
Use
Receive step to open the sync/async bridge
Receives the message request from the synchronously calling business system and opens the sync/async bridge
Asynchronous send step
Sends the received message asynchronously to the asynchronously called business system
Receive step
Receives the message from the asynchronously called business system
Send step to close the sync/async bridge
Sends, for example, the response from the asynchronously called business system to the synchronously calling business system
Performance Considerations
If you insert additional steps in the sync/async bridge, the synchronous time is increased correspondingly. If the time that elapses before the sync/async bridge is closed is too long, this can lead to problems.
Fault Messages
It is currently not possible to send fault messages back to the synchronously calling business system. If you want to return error statuses to the synchronously calling business system, you can define a field for an error indicator in the message that is sent to the synchronous interface.
Procedure
Define a Receive Step to Open the Sync/Async Bridge
1. Insert the receive step to open the sync/async bridge in the integration process.
You can do this at the following points:
○ Directly after the start marker
○ As the first step in a block if the block is the first step of the integration process and if it has the mode Standard
○ As the first step in a fork. If the fork already contains some starting receive steps, the Start Process indicator is automatically reset for these steps.
2. In the object area, define the container element that receives the synchronously sent message.
Specify an asynchronous, abstract interface in the container element. The message must correspond to the request message of the synchronous interface used to receive the message.
3. Select this container element in the Message field in the properties area of the receive step.
4. In the Mode field, select Open S/A Bridge.
5. Select the Start Process field.
The receive step to open the sync/async bridge must start the integration process. There must be no other receive steps to start the integration process.
6. Specify the synchronous interface for receiving the message from the synchronously calling business system. The message type of the message to be received and the request message from the synchronous interface must be identical.
Define an Asynchronous Send Step
7. Insert a send step that sends the received message asynchronously to the asynchronously called business system.
See also: Sending Messages from Integration Processes Asynchronously
Define a Receive Step
8. Insert a receive step that receives the message from the asynchronously called business system.
Define a Send Step to Close the Sync/Async Bridge
9. Insert the send step at the required position in the process definition.
Do not insert the send step in a loop, block, or fork.
10. In the Mode field, select Close S/A Bridge.
The integration process must not contain any further send steps to close a sync/async bridge.
11. In the Opened By field, specify the receive step that opened the sync/async bridge.
12. In the message field, specify the message that is sent to the synchronous interface.
This message must be of the same type as the response message from the synchronous interface that you specified in the opening receive step.
Example
You can find an example of a sync/async bridge in the Integration Repository under SAP Basis à SAP Basis 6.40, namespace http://sap.com/xi/XI/System/Patterns under BpmPatternSyncAsyncBridge.
For a description of the example, see Example: Sync/Async Communication.
Reg,
suresh
Similar Messages
-
Correlation and Sync Asyn Bridge
Regarding Sync-Asyn ,I have gone thru these blogs...
Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
I am not able to do a end to end scenario...using this ....So could any one give me a step by step guide for the syn-asyn Bridge.
And also step by step for correlation...
Please help me in this regard....
<Moderator note: thread locked. I moved your last post to XI, please do not post duplicate questions>
Edited by: Mike Pokraka on Jul 7, 2008 1:00 PMRegarding Sync-Asyn ,I have gone thru these blogs...
Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
I am not able to do a end to end scenario...using this ....So could any one give me a step by step guide for the syn-asyn Bridge.
And also step by step for correlation...
Please help me in this regard....
<Moderator note: thread locked. I moved your last post to XI, please do not post duplicate questions>
Edited by: Mike Pokraka on Jul 7, 2008 1:00 PM -
Usage of sync-asyn bridge problem in BPM in particular scenario
scenario is to send a Stock availability check from one suboffice to other suboffice which does not involve any R/3 activities.
I need to send SOAP request to XI, BPM receives request through synchronous interface.
BPM has to send request to DB through synchronous interface and gets response
Questions:
1) whether sync-async bridge comes into picture in BPM or not
2) i am really confused how many Data types,Message types and message interfaces i have to create.
3) what are all the message interfaces i have to create
4) abt Integration Directory activities.
Its would be appreciated if u tell step by step.
Its urgent..
Thanks & Regards.,
Pushparaju.BI have created these things as of now , but problem in interface mapping
<u>Interface Objects</u>
Data Types
1)DT_Soap_request
2)DT_Soap_response
3)DT_Jdbc_request
4)DT_Jdbc_response
corresponding message types
1)MT_Soap_request
2)MT_Soap_response
3)MT_Jdbc_request
4)MT_Jdbc_request_response
Message Interfaces
1)MI_SOAP (inbound asynchronous) MT_Soap_Response and MT_Soap_Request input message
2)MI_JDBC (outbound asynchronous) MT_Jdbc_response output message and MT_Jdbc_request input message
<u>Mapping Objects</u>
Message mappings
1) MM_Jdbc_Response_Soap_Response where MT_Jdbc_request_response and target message is MT_Soap_response
2) MM_Soap_Request_Jdbc_Request where source message is MT_Soap_request and target message is MT_Jdbc_request
Error in interface mapping is
IM_Soap_Request_Jdbc_Request has interfaces source is MI_JDBC and target is MI_SOAP
<b> No object found for message mapping in request tab</b>
can anyone help me please its urgent.
why its not detecting the message mapping in request tab
Thanks & Regards.,
Pushparaju.B. -
How to realize a Sync-Asyn Bridge
Hey Folks,
I was trying to 'decode' whatever is written in the How to guide (Realize a sync - async and async - sync bridge in the adapter framework). Thanks to Bhavesh he posted the thread on the Async - Sync part and so i thought i would figure out the Sync - Async part.
Ok so here is what i have done till now (with no success);
its a HTTP <-> XI <-> File
So;
2 DT/MT for HTTP, 2 DT/MT for file
1 MI outbound sync -> http
1 MI inbound sync -> File
the 2 mappings and the 1 IM
In configuration;
1 rec. file adapter and 1 sender file adapter
the configuration is as usual for a sync scenario; except for the sender agreement for the sender file adapter, i configure a dummy sender agreement with dummy interface and dummy namespace but the original CC created.
In the Recv. file channel module part;
1 AF_Modules/RequestOnewayBean Local Enterprise Bean 2
2 CallSapAdapter Local Enterprise Bean 0
3 AF_Modules/WaitResponseBean Local Enterprise Bean 1
2 passThrough true
in the sender file channel;
1 AF_Modules/NotifyResponseBean Local Enterprise Bean 1
So any of you guys who did something on that document, i hope can throw some light
Cos i am sure i am missing something here !!!
~~ShaBZHI,
Are you using BPM or not??
Can you plz tell me the SP number/version.
I hope Sync - Asyn without BPM is possible with latest SP.
Please see the below links
/people/community.user/blog/2006/12/12/http-to-rfc--a-starter-kit
Searching for a BPM scenario
With BPM
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] [original link is broken]
Regards
Chilla.. -
Hello friends,
Could any one give information or blog on Synch -Asyn Bridge used in HTTP --> RFC scenarioHi,
Refer this..
https://www.sdn.sap.com/sdn/weblogs.sdn?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken]
BPM Sync- Async Bridge
Pipeline timeout error
/people/pooja.pandey/blog/2005/07/27/idocs-multiple-types-collection-in-bpm
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e3d59c90-0201-0010-ac83-cfd0071f095a
Who to manage TimeOut in BPM ?
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/eb5cc090-0201-0010-5284-fd5376b01934
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi - Use of Synch - Asynch bridge in ccBPM
regards,
vasanth. -
BPM Design using sync-async bridge
Hi Arpit,
Below mentioned is an overview of the process flow which we are trying to implement.
1. A synchronous interface takes in the request
2. After the mapping, a file is created
3. Another file adapter reads this file and sends a message back to the sync interface. This step is to make sure that the file is created
I'm using a sync-async bridge for this process, since file creation and reading processes are asynchronous and the request/response is synchronous.
Can somebody help me by telling how to design the BPM. How many send and receive steps are required etc?
Thanks,
Sandeep
| Request | | | | | | | |
|--------->| | | | | | |File |
HTTP| |Sync|--->|Mapping|--->|Async|--->|Adapter|
|<---------|I/f |<- | | |I/f | |(write)|
| Response | | | | | | | |_______|
| |
| |
| ____|___
|| | | | | |
-|Async |<--|File Adp|<---|Folder |
| I/f | |(read) | |________|Hi
<i>>>I have to map the incoming xml from HTTP to another format before creating the file.</i>
Ya then u can use the transform Step in between the
sync Recv ---> Transform ---> Send to File System
<i>>>Once a file is read, that interface has to send an acknowledgement message telling the status.</i>
Wht type of acknowledgement msg telling the status.
I think u can add another element in ur created file payload like <b>Status</b>: Created (ConstanT)
Then u can map the payload of the readed file with tis payload having Ststus init.Fo this u need a <b>Transformation</b> Step.
BTW i was searching some previous blogs and i got this and it is bit related to ur scenario.Go thru this
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi
Hope it helps.
Regards
Arpit Seth -
Need help with scenario BPM Http-RFC Sync/async bridge
hi all!
i've got the following scenario: HTTP-BPM(XI)-RFC synchronous both of them. for that, i'm using S/A bridge in the BPM, but i'm getting the error 'Timeout condition of pipeline reached'. i think the problem is that the process gets lost in the sync/async communication, because in the trace level shows CL_XMS_PLSRV_CALL_BPE-ENTER_PLSRV" and after that every message are 'wait time starting'.
don't know the reason of the error. Maybe I missed something to configure?
the BPM is like this:
Receiver(Open Sync/Async bridge) -> Transformation (mapping from http request to RFC request) -> SyncSend (RFC request and response) -> Transformation (mapping from rfc response to http response) -> Send (Close S/A Bridge)
the IR is configured like this:
Message Types u2013 External Definitions u2013 Imported Objects
mt_cxml_request -> contains xsd of xcml request template.
mt_cxml_response -> contains xsd of xcml response template.
zintegracion_pedidos -> imported RFC from R/3
zintegracion_pedidos.response -> imported RFC from R/3
Message Interfaces
mi_cxml_request_async_abs
mi_cxml_request_sync_abs
mi_cxml_request_sync_out
mi_xcml_response_async
mi_rfc_request_asyn_abs
mi_rfc_request_sync_abs
mi_rfc_request_sync_in
mi_rfc_response_async_abs
Message Mappings
mm_cxml_request_to_rfc_request -> mapping from http request (cxml) to rfc request.
mm_rfc_response_to_cxml_response -> mapping from rfc response to http response (cxml).
Interface Mappings
im_cxml_request_async_abs_to_rfc_request_async_abs
im_rfc_response_async_abs_to_cxml_response_async_abs
and the ID is configured like this:
Business system DES -> created business system for RFC adapter with interface mi_rfc_request_sync_in as receiver. Comunication channel u2018RFC Receiveru2019
Businnes service VW -> created businnes service for HTTP adapter with interface mi_cxml_request_sync_out as sender. Comunication channel u2018HTTP Senderu2019
Receiver Determination
two receiver determinations. One for BPM and the other one for RFC(R/3):
|VW| mi_cxml_request_sync_out:
|BPM_PO| mi_rfc_request_sync_abs:
Interface Determination
two interface determinations:
|VW| mi_cxml_request_sync_out | | BPM_PO:
|BPM_PO| mi_rfc_request_sync_abs | * | * :
Sender Agreement
VW
mi_cxml_request_sync_out
Receiver Agreement
|BPM_PO| |DES| mi_rfc_request_sync_inhi all,
i've removed the transformations from the BPM, and i've created:
in IR:
- interface mapping: im_xcml_request_to_rfc_request_sync_abs
source interface: mi_cxml_request-sync_abs
target interface: mi_rfc_request_sync_abs
in ID:
- receiver determination: |VW| mi_cxml_request_sync_abs
sender service: VW
interface: mi_cxml_request_sync_abs
receiver: DES
interface mapping:im_xcml_request_to_rfc_request_sync_abs
- interface determination: |VW| mi_cxml_erquest_sync_abs ||
sender service: VW
interface: mi_cxml_request_sync_abs
inbound interface: mi_rfc_request_sync_abs
interface mapping: im_xcml_request_to_rfc_request_sync_abs
- receiver agreement: |VW| |DES| mi_rfc_request_sync_abs
sender service: VW
receiver service: DES
receiver interface: mi_rfc_request_sync_abs
not sure these are the steps i had to do for mapping xml to rfc. but the result is the same error as before, the timeout.
i couldn't test with RTW because i'm getting an error 401 unauthorized.
i'd do it without BPM but the issue is that i wanted to add another step that would be to send the response from rfc to mail too once i got this BPM running. i mean, the response from RFC would be sent to http response and mail both.
the only way i can imagine to do it is with BPM but i'm really fed up with it.
thank u very much folks -
Exercise for sync/async bridge scenario
Hi,
Can anybody send me exercise scenario or link for sync/async bridge scenario?
Thanks
NarayanaHi Balaji,
pls check this weblogs
/people/venkataramanan.parameswaran/blog/2007/01/18/syncasync-communication-in-jms-adapter-without-bpm-sp19
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi
/people/dmitry.govberg/blog/2006/12/20/mainframe-and-sap-integration--the-synchronous-case
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] [original link is broken]
conversations
Sync - Async Bridge
BPM Sync/Async Problem
BPM Design using sync-async bridge
Regards,
Ram -
Correlation and Async/Sync Communication using JMS adapter without BPM
Hello
1. Pls explain with simple example docs/links --- Correlation
2. Async/Sync Communication using JMS adapter without BPM
If i see blog --- If I go with blog --- /people/sudheer.babu2/blog/2007/01/18/asyncsync-communication-using-jms-adapter-without-bpm-sp-19
Pls explain --- Correlation Settings, select JMSMessageID for the XI Conversation ID.
Pls explain -- Correlation Settings, select XI Conversation ID as jMSCorrelationID.
Can you pls explain me this example with JMSMessageID and JMSCorrelationID context
RegardsHi Henry,
For Correlation, please go through the below link.
/people/sravya.talanki2/blog/2005/08/24/do-you-like-to-understand-147correlation148-in-xi
Sync / Async Bridge communication using JMS : http://help.sap.com/saphelp_nw04s/helpdata/en/45/20d251c20a0732e10000000a155369/frameset.htm
Sync / Async communication without BPM in JMS : /people/venkataramanan.parameswaran/blog/2007/01/18/syncasync-communication-in-jms-adapter-without-bpm-sp19
/people/henrique.pinto/blog/2007/08/02/syncasync-scenarios-without-bpm
Hope these help
Regards
Kiran.. -
Syn-Asyn Bridge and correlation
Regarding Sync-Asyn ,I have gone thru these blogs...
Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
I am not able to do a end to end scenario...using this ....So could any one give me a step by step guide for the syn-asyn Bridge.
And also step by step for correlation...
Please help me in this regard....
<Moderator note: Moved to more appropriate XI forum>
Edited by: Mike Pokraka on Jul 7, 2008 10:09 AMRegarding Sync-Asyn ,I have gone thru these blogs...
Demonstrating Use of Synchronous-Asynchronous Bridge to Integrate Synchronous and Asynchronous systems using ccBPM in SAP Xi - Use of Synch - Asynch bridge in ccBPM
https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1403 [original link is broken] [original link is broken] [original link is broken] - Use of Synch - Asynch bridge in ccBPM
I am not able to do a end to end scenario...using this ....So could any one give me a step by step guide for the syn-asyn Bridge.
And also step by step for correlation...
Please help me in this regard....
<Moderator note: Moved to more appropriate XI forum>
Edited by: Mike Pokraka on Jul 7, 2008 10:09 AM -
Sync / Async Bridge without BPM
Hi All,
I was trying to implement the Sync / Async Bridge without the BPM. I am trying a HTTP to JMS Sync / Async Bridge. I have followed the following link and done exactly the same as shown in the document
http://help.sap.com/saphelp_nw04/helpdata/EN/45/20d2b4c20a0732e10000000a155369/content.htm
I have used a Java application which will poll the request queue and then place the message in the response queue with the same correlation ID frm the request queue.
After following the above link the response message was not appearing, the message were going to deilvering status and after some time i found that they were cancelled without errors
I searched in the forums for many solutions but what i found was this thread which stated that since the XI message ID is 32 bytes and Correlation ID is only 24 bytes its difficult for Modules to identify the response since the correlation is truncated.
JMS: Synch/Async bridge - how to configure
I tried changing the configuration in the reciver JMS channel to XI Conversion ID instead of Message ID and this also doesnt give me fruitfull results. The message was not being placed in the request queue, it gave an error saying that the conversion id was null. Though in the thread it seems to have worked for him.
After this i planned to dynamically generate a Correlation ID (a dummy one) of 24bytes and i sent it to the request queue this time the message was retrived from the response queue only to find that the correlation ID this time has been converted to some other format
Corrletion ID sent to the request queue: ABCDEFGHIJKLMNOPQRSTUVWX
Corrlation ID coming in the response queue : 4142434445464748494a4b4c4d4e4f505152535455565758
Can anyone put some light on what i exactly need to do or tell me why the conversion ID worked for Daneil in the thread and it gave me an error saying that the Conversion id is null
Rgds
AdityaHi Prateek,
This is what was tried in my first case. I did exactly what was given in that link.But since the Message id being 32 bytes and length of correlation id is 24 bytes id is getting truncated.
So its not working fine.
@ke i am having a look at the note will update you on this
Thanks for your response
Rgds
Aditya -
Correlation issue due to async receive with sync/async bridge
Hi,
I have an Integration process (PI 7.0), which consists of sync/async bridge.
One of the step in the process is async receive.
To avoid any issue with correlation, i placed the whole process (except start and end) into a block and assigned a local correlation to it.
The Sync receive in sync/async bridge will activate the correlation and one of the async receive step in the process will use that correlation.
Normally it worked fine. But during one execution (just for testing), the async receive step did not take input to the process, and so the process execution replied "Timeout in Pipeline". But thereafter i cannot execute the process successfully, even when async takes the input.
And in the BPE monitoring, in workflow log, the process Instances are still "In Progress".
Do we have any way to stop these processes and unlink any possible correlation related to them?Hi,
A local correlation is only valid for the block for which it is defined. Once the block has been processed, the correlation is no longer active.
If the validity of a correlation is not restricted correctly, the following problems can occur:
¡ Messages that satisfy an active correlation are continued to be assigned to a running integration process. The integration process no longer processes the messages because no processing steps are waiting for the messages.
¡ Messages that satisfy an active correlation are continued to be assigned to a running integration process, instead of starting a new integration process.
You can avoid these problems and make it easier to follow how messages are processed by restricting correlations correctly to the required block.
Please check the local correlations for it
With SXMB_MONI_BPE you can monitor these instances.
But to kill it you need to use tcode SWWL. You can go to SXMB_ADM_BPE to check the BPM related settings.
Thanks
swarup
Edited by: Swarup Sawant on May 31, 2008 1:40 AM -
BPM - Receive Sync/ASync Bridge Problem
Hi,
I am creating a scenario for an inbound Synch request to be serviced by a BPM process.
Here is the problem that I am facing while trying to configure the Receive Step
- I created a Message Interface defined as Abstract Synchronous.
- I created a process model and put in a Receive Step: Mode - Opens S/A Bridge, Synchronous Interface - defined as above.
- I define a container with Abstract type. But when I try to locate the above defined Abstract Synch message interface, I cannot find it.
- As a workaround, I create another Abstract Message Interface defined as Abstract ASynch.
- I create a container with this Abstract ASynch message type.
- I use this container in the Receive Step.
But activating the Business Process gives the error:
Message to be received and Synchronous Interface do not have identical types.
Can someone give me the correct procedure to configure the Sync / ASync Bridge ? thanks,
-ManishDan,
This is the link you are looking for?
http://help.sap.com/saphelp_nw04/helpdata/en/83/d2a84028c9e469e10000000a1550b0/frameset.htm -
Doc on Async and Sync using BPM
Hi all
Can anyone send some docs explaining the steps involved in bridging async and sync interface using BPM. The source adapter is JDBC and target is proxy. I've already checked one blog by krishna moorthy (File-File using BPM) and based on that i tried but coudnt get the expected result for my scenario.
ThkxHi PS,
in your Integration Repository go to:
Software Component: SAP BASIS
Namespace: http://sap.com/xi/XI/System/Patterns
Process: BpmPatternSyncAsyncBridge
This is a very good example!
Regards Mario -
Doubt on Sync-Async bridge using BPM
Hi Experts,
I had a doubt on Sync-Async bridge using BPM,
1. If sender system is SAP system and receiver system is non-sap system then while configuring in Integration Directory how many Receiver Determinations should be done ?
2.Plz explain if we have 2 receivers i.e one sender SAP system and 2 non-sap systems then what will be the no. of receiver determinations?
3.How we have to count no. of receiver determinations if we have 2 receivers and 1 receiver system? If so what is the no. of receiver determinations in case of 1 receiver syst and 2 receiver systems?
Plz clarify above questions good answers will be definetly rewarded.
Regards,
Vinod.vinod,
... Sync-Async bridge and Recievr determination are not related....
Sync-Async bridge means.. u r sending some request syncronously...and u r expecting the response also in synchronous way... but u r not getting the response directly...u r getting it via BPM..i.e asynchornously.....
see here what is the Use of Synch - Asynch bridge in ccBPM
/people/sriram.vasudevan3/blog/2005/01/11/demonstrating-use-of-synchronous-asynchronous-bridge-to-integrate-synchronous-and-asynchronous-systems-using-ccbpm-in-sap-xi
and here if u have 2 reciver... u have to create 2 receiver determination and ofcourse for BPM one reciver dtrmination is required.... since in BPM related scenario BPM will act as a reciver...BPM(IP) wil first recive the message then it will be forwarded to Receiver system!!! so total 3.
<b>3.How we have to count no. of receiver determinations if we have 2 receivers and 1 receiver system? If so what is the no. of receiver determinations in case of 1 receiver syst and 2 receiver systems?</b>
r u telling that u r having two recivers and each receiver is receiving messages using 2 interaces???
u have 2 use 2 receiver determination and 4 interface determination.
regards
biplab
Maybe you are looking for
-
Hi I want to use both credit cards and payment terms working in an order. For eg if the order value is 100 i want to received 10 from card and balance by instalement how can i acheive this.
-
Duplicate rows based upon condition
Oracle 11.2.0.1 Windows create table regsales (billno number,itemno number,paymode varchar2(10)); insert into regsales values (12345,10,'cash'); insert into regsales values (12345,11,'cash'); insert into regsales values (12346,11,'cash'); insert into
-
Cisco ISE and WLC Access-List Design/Scalability
Hi, I have a scenario whereby wireless clients are authenticated by the ISE and different ACLs are applied to it based on the rules on ISE. The problem I seems to be seeing is due to the limitation on the Cisco WLC which limit only 64 access-list ent
-
I am trying to uninstall an Acrobat XI trial. Will I be able to keep the PDF's that were created during the trial? All my PDF's are now in XI format. Will I be able to read them after I uninstall XI? Thanks
-
[root-tail] how to filter output?
With tail -f /some/file, you can apply a pattern to grep for. e.g. tail -f /some/file | egrep "some expression" This will only show lines with "some expression" in it. This is what I would like to do with root-tail. I've searched the net, but it does