BPM integration with BRM step by step
Hi All,
I am looking for a blog for complete scenario which includes business rules used in BPM,that is ,complete STEP BY STEP blog for BPM integration with BRM.Searched a lot but finding either BPM or BRM or BRM already created without mentioning steps and imported in BPM process.
Can you help me with a complete blog for BPM integration with BRM STEP BY STEP blog?
Thanks in advance
Hi,
Please check if the below articles are useful
http://scn.sap.com/thread/3446620
http://scn.sap.com/docs/DOC-47066
http://scn.sap.com/docs/DOC-4588
Regards,
Sriram
Similar Messages
-
Hi All,
I am looking for a blog for complete scenario which includes business rules used in BPM,that is ,complete STEP BY STEP blog for BPM integration with BRM.Searched a lot but finding either BPM or BRM or BRM already created without mentioning steps and imported in BPM process.
Can you help me with a complete blog for BPM integration with BRM STEP BY STEP blog?
Thanks in advanceHi,
Please check if the below articles are useful
http://scn.sap.com/thread/3446620
http://scn.sap.com/docs/DOC-47066
http://scn.sap.com/docs/DOC-4588
Regards,
Sriram -
How to test whether AIA got integrated with BRM system successfully
Is there a procedure to test whether AIA got integrated with BRM system successfully.How can i test whether BRM Adapter is able to connect to BRM system.
Thanks well in advance
SantoshHi Santhosh,
I hope you are using AIA 2.0/2.0.1 for Comms and trying to integrate BRM with Siebel.
1. To check BRM & Siebel integration using AIA. (BRM is the Product master gets synched with Siebel.)
a) Create a new Product in BRM pricing center(Provide product name, Service type)
b) Select Event(Single time purchase event)
c) Provide rating for the product
d) Commit after product creation(Check in BPEL process, whether all the instances are went through successfully)
e) Check Siebel Catalog, whether product got synched from BRM
2. To check whether BRM Adapter connected to BRM,
a) Login into Oracle Application server
b) Select OC4J instance, where your AIA is running
c) Select Applications
d) In view drop down select "StandAlone Resource Adapters"
e) Check the status (green or red) in the installed BRM adapter
If you haven't deployed BRM Adapter read the installation guide to deploy it.
Regards,
Ziaur Rahuman -
ORACLE BPM - Integration with BI
We have to integrate Oracle BPM with SAP-BI. Does Oracle BPM provide any adapters to connect to staging tables.
ThankYou!before importing delete / rename PublicReportService under business services, and also delete/rename all the IO for project XMLP Integration. Make sure there are no other Siebel repositories existing except Siebel Repository (no backups). Then import the WSDL.
-
BPM integration with UCM(universel Content Mgmt)
Hi,
I'm working with BPM , in my project there is a requirement.
to the human task there is a need to attach more than 2mb file.
i came to know that which is possible by integrating bpm with UCM repository.
could any one help me to integrate BPM with UCM.
Thanks and Regards,
Rajendar.Hi Rajendar,
You can increase the maximum UCM file upload size and temporary storage size to 5mb by adding these additional parameters in your web.xml file:
<context-param>
<!-- Maximum memory per request (in bytes) -->
<param-name>oracle.adf.view.faces.UPLOAD_MAX_MEMORY</param-name>
<!-- Use 500K -->
<param-value>512000</param-value>
</context-param>
<context-param>
<!-- Maximum disk space per request (in bytes) -->
<param-name>oracle.adf.view.faces.UPLOAD_MAX_DISK_SPACE</param-name>
<!-- Use 5mb -->
<param-value>5120000</param-value>
</context-param>
<context-param>
<!-- directory to store temporary files -->
<param-name>oracle.adf.view.faces.UPLOAD_TEMP_DIR</param-name>
<!-- Use an ADFUploads subdirectory of /tmp -->
<param-value>/tmp/ADFUploads/</param-value>
</context-param>Dan -
Hi,
Can any one suggest me how to integrate BPM with UCM.
My requirement is with a human task in BPM i should able to attach a file or document and that particular file should be stored in UCM.
Thanks & Regards :
PRAMEELA PADAMHi Nomado,
yes i configured the UCM.
I didn't enable any accounts. Please tell me how to enable the accounts.
This is my Config.cfg file.
<?cfg jcharset="Cp1252"?>
#Server System Properties
IDC_Name=idc
IdcProductName=idccs
InstanceMenuLabel=i
InstanceDescription=Instance 8QDYMV1appsahydcom16200
SocketHostAddressSecurityFilter=127.0.0.1|0:0:0:0:0:0:0:1|172.16.5.111|*.*.*.*
#Database Variables
SystemDatabase:DataSource=CSDS
SystemDatabase:UseDataSource=true
#Internet Variables
HttpServerAddress=172.16.5.209:16200
MailServer=mail
SysAdminAddress=[email protected]
HttpRelativeWebRoot=/cs/
UseSSL=No
#General Option Variables
IsAutoNumber=Yes
AutoNumberPrefix=8QDYMV1appsahy
UseAccounts=1
#Additional Variables
AllowUpdateForGenwww=1
registerStartMenuActions=1
FileEncoding=UTF8
WebServer=javaAppServer
IntradocServerPort=4444
Thanks & Regards
Pramila Padam
Edited by: Pramila Padam on Feb 14, 2013 9:39 AM -
BPM Integration with Java webdynpro
Hi All,
I am new in BPM forum . I want to integrate one JWD DC to anather JWD (Java webdynpro) so i need to pass one value to anather Dc using BPM .
My Scenario is..
I want to pass one unique value from one component (person who is created the unique value l) to anther component (to fetch that value from second level in portal ) and showing in Portal work flow task as LEAVE Request or approval scenario .
Thanks
SudhirHi Sudhir,
from your explanations it is not completely clear which of the following scenarios applies to you:
1) Both WebDynpro Components are connected to each other via WebDynpro Component dependencies. This would mean that a user is able to directly navigate from one to the other. A BPM process is not involved at all. In this case, you might consider to use WebDynpro context mapping or passing an URL parameter.
2) Each WebDynpro Component is assigned to a dedicated BPM Task which again is integrated into a BPM process. Users would open the WebDynpro Components as Tasks from the UWL without a direct navigation between the components. In this case, you have to use a process context and context mapping in BPM to transfer the value between the WebDynpro components.
Best regards,
Stefan -
BPM Integration with SQL Authenticator Provider in WebLogic
Hi Gurus,
Related to the explanation from this blog : http://orasoa.blogspot.com/2010/06/sqlauthenticator-and-human-worklist.html
I have followed this review, I can see all user and groups from sql authenticator provider.
And also I can assign bpm application roles to users from sql authenticator provider.
But when I try to assign bpm application roles to groups from sql authenticator provider, the bpm application is not show from bpm workspace.
Is there any clue to solve this problem?
Cheers,
Agus WHi All,
Found the reason for the exception. I was implementing the generated the CustomAuthenticatorImpl class (generated through WebLogic MBeanMaker utility) as the provider class by implementing the AuthenticationProvider interface. Keeping them separate solved the issue.
Able to create the jar without any issues and also no error or exception after restart.
Thanks. -
BPM Integration with Teamcenter and PRIMAVERA
Hi,
Did anyone integrate between Oracle BPM and Teamcenter or Oracle BPM and Oracle PRIMAVERA ?
Do we got a reference of such anywhere?
Thanks,Hi,
Please check if the below articles are useful
http://scn.sap.com/thread/3446620
http://scn.sap.com/docs/DOC-47066
http://scn.sap.com/docs/DOC-4588
Regards,
Sriram -
BPM Integration with Lotus Notes
Hello Experts,
Can you please let me know how do I go about integerating Lotus Notes in BPM?
My requirement is send mails from BPM to Lotus notes to approve?
I am using SAP PO BPM version 7.31.
Thanks,
Ami BhuvaHi Tobias,
We are having both the functionality, we also need to send notifications on Lotus Notes and also get approvals from the user on Lotus Notes.
I want to know how do I integrate Lotus Notes on SAP BPM so that norifications and approval tasks can be sent on Lotus Notes.
Also, is there any config on NWA needs to be done?
Thanks,
Ami -
Weblogic SOA 12.1.3: Integration with Oracle 9i Database
All,
We have a client who currently adopt BPEL 10g (10.1.3.4). Currently we are looking to updrade the client to SOA Suite 12.1.3. As part of their existing architecture, there are a number of Oracle 9i databases that the BPEL components integrate with via DB Adapters. The clients current road map is to upgrade / migrate to the 12c SOA platform but not upgrade any of their legacy applications running on top of a Oracle 9i Database.
Please note I have observed and reviewed the Certification Matrix for supported platforms at http://www.oracle.com/technetwork/middleware/fusion-middleware/documentation/fmw-1213certmatrix-2226694.xls
As part of initial investigations, we have identified that the JDBC drivers that are integrated with 12.1.3. Weblogic are not compatable with Oracle 9i. You are able to create and test data source conections with success. However at runtime when querying the database a number of issues manifest. These incude:
VARCHAR2 columns are not returned via a select. Date columns and number columns are returned
Errors when executing adapters which implement the Pure SQL feature.The error returned involves the "ora-01460: unimplemented or unreasonable conversion requested" error.
Similair design time issues are also envountered in JDeveloper (as per JDeveloper 12.1.3 (SOA / BPM) Integration with Oracle 9i Database)
Looking at the default configuration in 12c, it is to utilise OJDBC7 drivers supplied which support JDBC 4.1specification.
Has anyone had experience of using an Oracle 9i Database with Weblogic 12.1.3.? or have any viable options / views for how this could be achieved?
Regards DaveI wrongly mentioned to change to change the font format. In that document they mention to add the lines.
Thanks
Guna -
Step by Step procedure for Integration of B0 with BI 7.0, Portal
Hi,
My key concerns include integration with SAP Portal, which I did not find in instalaltion guide.
Please advice on step by by Procedure for BO with BI 7.0 starting with the right version of BO to be installed.
1. Which version compatible with BI 7.0 SP 12, LATER TO BE UPGRADED TO sp 16
2. Source of data will be BI and reports will be using BO.
3. What are components to be installed
4. Prerequisites for Integration with BI AND SAP Portal.
5.Steps for Integration with BI 7.0
6. Steps for Integration with SAP Portal- Where to get the sample iviews. What to do for connction between Portal and BO - this i didnt find in installation guide
Thanks,
HarishHI,
here the items:
SAP Side:
- all machines have to be in the same domain
- BI has to trust the portal
- BI has to accept SSO tickets
- EP has to generate SSO tickets
BusinessObjects:
- SAP Authentication has to be configured
- BI system should be configured has default system in the options of the SAP authentication
- authentication.default parameter in the web.xml for InfoView has to be set to secSAPR3
- BusinessObjects has to be in the same domain
EP side:
- in the system landscape configure the Crystal Enterprise Server Properties for your BI system
- import the portal iview template that is part of the SAP Integration Kit
- create a new iView
Ingo -
Integration with Lotus Notes 8.5 - Room Reservation System to Add Approval Steps
I have implemented several LiveCycle Forms with Some Workflow all
based on XML and .NET. All working fine.
Now, I have a new project (yet to be approved) which is to add
Workflow and Approval Steps for Lotus Notes Room Reservation System.
The current system on Lotus Notes, is out-of-the-box from Lotus, and
it is working very well, and it has great repeat option to setup the
required schedule to make the needed room reservation system.
The user now requested to add some new features like add 2 more
approval steps, and some new fields.
I can modify the application in Lotus Notes, but this will creat a new
problem. If there is new version coming for this system from Lotus
Notes, then I will have to sync the modifications I did, and it will
be a problem.
I have put some screen shots to help understand what we are talking
about:
https://docs.google.com/leaf?id=0B97clwYte2SHYmUyZTRiZDEtZWRjZS00YmQ3LTg1MDUtM2MxNmYyYTIzM 2Ix&hl=en
I have developed several programs in the past, I was able to connect
to Lotus Notes Database from .NET.
My plan is to develop the new Form in Adobe LC Desinger, with all the
new required features, and connect to what ever existing functions/
data to Lotus Notes (in both directions).
The only thing I need help for is how to capture the Repeating
Calendar Entry. I think this will take some effort. Becuase, once I
capture all input parameters, I have to call a Web Service (in .NET)
to get a list of Free Rooms to choose from.
Here are my questions:
1. Do you have any feedback on the above ?
2. Any one has done any work to capture a repeating calendar entry in
a PDF Form ?Hi Anil
For Lotus notes integration with SAP solutions, pl check the following links:
http://www.redbooks.ibm.com/redpieces/pdfs/redp4215.pdf
http://www-306.ibm.com/software/info/ecatalog/en_US/products/Z262246B25186K14.html
Best regards
Ramki -
Plz send step by step process for Outlook integration with SAP
Hi Basis experts
Plz send step by step process for Outlookexpress integration with SAP.
plz send if anybody have at the earliest.
advance Thanks& regards to all
SupriyaDear Supriya,
If it is in SAP then please go through the below mentioed site
http://www.duet.com/
please tell me where in you want to integrate?
Outlook Configuration with SAP-EP is a PPT file.
please mail me your id i will send it accross. -
Integration SD doc with FICA - Require step by step configuration
Dear All,
I am configuring the integration of SD billing with FICA, but as of the steps giving in the SAP DOC material some of the customizing menus are not there in SPRO like
As an alternative, you can make these settings in Customizing for Sales and Distribution under Billing -> Billing Documents _->{ Integration with Contract Accounts Receivable and Payable (FI-CA)-> Define Posting to FI-CA for Customer Account Group} is not there
Cold you please provide the details setups, you followed for this configuration.
Thanks in advance,
With RegardsHi Sunil,
You need to perform the following steps for integrating SD doc with FICA-
(a) Define posting to FICA for customer account group- Inhere, you need to check the relevant account group that you want to post to FICA. FM FKK_FICA_FOR_SD_ACTIVE determines the activation of customer account group to FICA.
(b) Derivation of Main sub transaction for SD information-Based on the account assingment, you derive the main and the sub transaction
(c) Derivation of Document Type from SD-Here, you define the type of document that would be posted in FICA.
You will find these steps in the following SPRO config-
IMG->Financial Accounting (New)->Contract Accounts Receivable and Payable->Integration->Sales and Distribution
After performing the above activities, you also need to maintain the account assignment under the following configurations-
IMG->Financial Accounting (New)->Sales and Distribution->Basic Functions->Account Assignment/Costing
Morover, if you want that the SD document will be posted with the ISU invoice, then you need to code it in event 4000.
Hope it helps......
Thanks,
Amlan
Maybe you are looking for
-
Disabling RDP Compression on Windows Server 2012 R2
Hi On Windows 2008 R2, we could disable RDP compression via GPO by configuring "Do not use an RDP compression algorithm" in the following GPO Computer Configuration\Administrative Templates\Windows Components\Remote Desktop Services\Remote Desktop Se
-
Sync, restore, and issue with Google Calendar
I have several problems: I somehow lost my data prior to Jan1, 08 on my BB 8703 sometime after syncing with Google Calendar (may be completely coincidental). Now I have a dilemma I have a backup from a couple of weeks ago but I don't want to lose all
-
Previously, Firefox was correctly displaying information that was in bold font; and for some inexplicable reason it stopped displaying the bold print. Instead, it was displayed in non-bold print. I wish to restore the bold print. Internet Explorer co
-
Return to ALV from function module
Hi to all, I'm new in this forum. My name is Guido and I'm working with Abap from 6 months ago and I whish to greet all of you. Now I have a problem that I try to explain simply. I have created a report with 2 screens: the first one is a selction scr
-
Hi, Guys: I have a snippet of code here as attached. The problem is that it appears that even though my nameHolder variable returns me with the right values, I still get all the nodes instead of one that has @name parameter set up. Could anyone pleas