BPM: Permanent error in BPE inbound processing

Hi guys...
i am having a problem in my scenario which is involving BPM.
The problem is when i execute the interface it is showing green flag aginst PE in sxmb_moni and in smq2 one queue is showing with sysfail and BPM: Permanent error in BPE inbound processing  error.
yes..i searched on SDN and found resources like Note number 1126656
i checked al the steps which were earlier mentioned posts like:
SWWL:  there are no entries existing
SMQ2: cleared the queues ,regenerated but still no luck.
My undertsanding is no work is being generated at all .
I checked BPM with F7 : its correct no errors
BPM has return code of 0 in sxi_cache
In ID BPM is latest and refreshed.
Is there any way i can overcome this problem.
Your inputs will be of real help.
Thanks in advance.
Regards,
Kiran.

My undertsanding is no work is being generated at all .
If you are getting the error for Source ---> BPM  flow then there is a possibility that the ID objects (RD, Interface determination) are to be blamed.
1) Recreate these particular ID objects/ make some dummy changes
2) Activate and ensure that Cache is refreshed
3) Delete the entry in the queue (or delete the queue)....do this only if the XI system is not of Quality, production
4) some times the BPM cannot be triggered from sending a test message from RWB .... so make a testing from the source application .... this particular case has heppened to me and hence suggesting to you.
Regards,
Abhishek.

Similar Messages

  • IDoc to Soap, with BPM - Permanent error in BPE inbound processing

    Hi Experts,
    IDoc to Soap, with BPM - > Permanent error in BPE inbound processing
    How to rectify this any issue???
    Thanks-
    sk

    Hi,
    The inbound processing encountered a permanent error and the queue therefore stopped.
    The error message "Permanent error in BPE inbound processing" may be caused by the following:
    - At the start or when you process a process instance, the inbound processing encounters an exception that was not handled. This exception is triggered, for example, by a transformation step, a synchronous send step or a control step but it was not caught in an exception handler branch. If the exception that was not handled occurs in the first transaction of the started process instance, the system does not write the process instance to the database but it sets the queue that has this error message to the error status.
    Refer to the help in Note 1082099
    - The inbound processing triggers this error if the correlation evaluation shows that a message should be delivered to a process instance that has the status "error". Since delivery to process instances that contain errors is not permitted, the queue is stopped.
    Use the simulation of the message delivery in the detail view of the relevant queue LUW to determine the relevant process instance for the affected message and use transaction SXMB_MONI_BPE "Continue Process Following Error" (or transaction SWF_XI_SWPR) to continue. If you cannot continue the process instance, check whether you can logically delete the instance. In this case, use the method that is described in Note 807906 to logically delete a process instance.
    Check whether your system contains other process instances that have errors in order to detect similar problems. Use transaction SXMB_MONI_BPE "Continue Process Following Error" or transaction SWF_XI_SWPR.
    Use the report RSWF_CRL_MAINTAIN to check all of the correlation instances in question or the relevant process instances that you can reach using "Display Work Item".
    - Messages that cannot be delivered because no correlation instance can be found may lead to the error that is mentioned here. Check whether the causes that are outlined in Note 1094028 affect your case.
    Hope this will help you.
    Regards
    Aashish Sinha
    PS : reward points if helpful.

  • Permanent error in BPE inbound processing error

    Hi guys...
    i am having a problem in my scenario which is involving BPM.
    The problem is when i execute the interface it is showing green flag aginst PE in sxmb_moni and in smq2 one queue is showing with sysfail and BPM: Permanent error in BPE inbound processing error.
    yes..i searched on SDN and found resources like Note number 1126656
    i checked al the steps which were earlier mentioned posts like:
    SWWL: there are no entries existing
    SMQ2: cleared the queues ,regenerated but still no luck.
    My undertsanding is no work is being generated at all .
    I checked BPM with F7 : its correct no errors
    BPM has return code of 0 in sxi_cache
    In ID BPM is latest and refreshed.
    Is there any way i can overcome this problem.
    Your inputs will be of real help.
    Thanks in advance.
    Regards,
    Seshagiri.

    Hi Praveen,
    If the BPM goes in error due to "The incoming payload structure is incorrect (not matching message type structure of abstract interface)" , is there any work around?
    Currently in my scenario BPM goes into error due to incorrect structure , error show up in SMQ2 . And the subsequent message also get stuck. What I have to do is to delete the queue in error and reactivate the queue manually.
    Is there any way we can avoid this situation.
    Thanks,
    Pankaj

  • BPM Error Permanent Error in BPE inbound processing

    Hi
    I require some urgent help on this BPM issue.
    We are trying to integrate SRM PO being directly sent to Vendors using HTTP. We are getting an error saying ‘Permanent Error in BPE inbound processing’. The scenario works like this.
    SRM system would sent PO using the SRM Standard interface PurchaseOrderRequest_Out. We need to transform the message into cXML format and send it to the vendors using HTTP adapter. Using the HTTP response we need to trigger an email to the business process team.
    The SRM interface is under the software component SAP SRM Server 5.5 and our mapping is being done in a common software component and for the vendor interface we have another software component. We have created a relationship in the SLD by making the common SWC as dependent software component to SAP SRM Server and Vendor Software Component. So in the integration repository we are able to get the interfaces for the SAP SRM Server and Vendor Software Component under the common software component. The receive step for this BPM is a copy of the standard SRM interface PurchaseOrderRequest_Out(as the standard interface is an asynchronous interface) and we would require an abstract interface for the BPM. We have checked the semantics for the BPM and its fine. The related ID development is in place. When the message is being triggered, it gives us this above mentioned error. When we go to the QRFC monitor we are able to check the details.
    Regards,
    Indranil

    Hi Indranil,
         You don't see you BPM....
    First go to SXI_CACHE and check that your BPM is listed there and that the compilation has been completed succesfully.
    Is this the first time the BPM is being used? If so check if has been configured. For example, go to RWB->Component Monitoring->BPE in <SYSID>
    and check if any error is listed there.
    In order to check what is going on in your BPM you can trace it:
                      SXMB_MONI_BPE->Diagnosis Processes with Errors
                      SXMB_MONI->Process, get your msg and click on 'PE'. You should see the workitems and see if there is any error.
             Hope this helps you....
             Regards,
                Encinas.

  • Permanent error in BPE inbound processing for BPM Mesg Split

    Hi Friends,
    i have done the below scenario. i had done everything what theys mentioned in the blog but i am getting the error in smq2 as "Permanent error in BPE inbound processing" sysfail please helpme on this issue.
    Illustration of Multi-Mapping and Message Split using BPM in SAP Exchange Infrastructure

    Hi Uday,
    Please check this blog for your error, This is really interesting. Permanent solution for your question.
    Delivery Modes in BPM.
    Thanks!

  • BPM workflow "In Process"-Queue "Permanent error in BPE inbound processing"

    Hi All,
    I am trying to collect messages from 2 different interfaces into BPM( Integration Process).
    when I checked in sxmb_moni  , i found the error on outbound status & BPM workflow has stuck with status  "In Process".
    it is not showing any error in Workflow, how to solve the issue.
    due to the above error, other messages are stuck in Queue stating "Permanent error in BPE inbound processing".
    Please help.
    -Jyoti

    Hi Jyoti,
    Goto T.Code swwl, in that clear all fields and choose from date as 1 month ago and try to execute. Then, delete all entries there. And re-execute your scenario.
    In this case, please see SAP Note 1126656.
    Please see the below blog, it might be helpful to you.
    /people/henrike.kaiser/blog/2009/02/03/how-to-analyze-stopped-queues-in-xi-ccbpm
    Regards,
    Rajesh

  • Permanent error in BPE inbound processing

    Hi all,
    We have recently migrated are XI scenarios to a new server.
    In one of the file to rfc scenario whenver a file is processed i get the error in smq2: Permanent error in BPE inbound processing.
    The chances of BPM and mapping error  are less as the BPM is working live in another server.
    What could be the other problems.
    REgards
    Edited by: Vinithra Iyangar on Feb 26, 2009 10:36 AM

    Dear Vinithra,
    Its highly improbable for this error to occur because of transports going wrong. There is one more case which i am sure is the cause why you are getting this error.
    "This behavior is when we place the files in the respective folders both the files are picked up by the file adapter. Process instance is generated for BPM. First receive step is encountered and the file is received by it. But due to the wait step the second receive step is not open and hence the second file cannot be delivered to it. Unlike the first case, in this case as the buffering is deactivated the file is not buffered and hence the inbound processing of BPM fails for the second receive step."
    Please check if something like this is happening.
    Refer : /people/milan.thaker/blog/2008/07/04/delivery-modes-in-bpm
    Rgds
    joel

  • BPM error "Permanent error in BPE inbound processing " for 1.3 MB file ?

    Hi
    I have scenario that using ccBPM (file -
    > IDOC). this scenario is working fine for small file but it will error stuck at SMQ2 Queue for big file around 1.3 MB.
    I think 1.3 MB file is no that big file, why ccBPM cannot handle this transaction, Please advise
    Thank you and Best Regards
    Fernand

    Hi Fernad,
    Check the detail error in workflow engine.
    There is a possibility that error is in data and hence mapping step must be throwing the error.
    -Supriya.

  • Auto delete sysfail (Permanent error in BPE inbound processing)

    Hi,
    We have a few BPE processes that get stuck in the queues for various reasons.  Since these are only sent EOIO, they will be stuck in the queue.  We would like to be able to delete these automatically and reactivate/unlock the queue so these errors can be fixed the next business day.  We are monitoring the queue and receive a page when it gets stuck, but this requires manual intervention.  We really would like a way to handle this automatically.
    Any suggestions will be greatly appreciated.
    Best Regards,
    Rick

    Hi Rick,
    This scenario could to fixed using Archive/Delete functionality. If all corresponding jobs are successfully running, then i would suggest to go through below SAP notes
    1042379 "BPE-HT: Deleting messages that are no longer used" (each step of the description has to be executed)
    Also you should implement the following notes
    1147377 "BPE-RUN: Messages not picked up by reorganisation"
    1157044 "BPE-RUN: All message proxies set as deletable"
    1421003 "BPE-RUN: Synchronous message proxies cannot be deleted"
    You may refer to below SAP link that helps in checking if you have setup all required periodic jobs
    http://help.sap.com/saphelp_nwpi71/helpdata/EN/cd/20bc3ff6beeb0ce10000000a114084/frameset.htm
    Regards
    Sekhar

  • "Permanent Error in BPE inboubd Processing" if payload is incomplete

    hi all,
    I have an BPM scenario and when payload is wrong or some field in the payload is missing i am getting "Permanent Error in BPE inboubd Processing" error. I have searched on SDN for same and found two blogs which might be helpful
    /people/henrike.kaiser/blog/2009/02/03/how-to-analyze-stopped-queues-in-xi-ccbpm
    /people/shabarish.vijayakumar/blog/2005/12/07/transformation-error-and-still-stuck
    As per blog : /people/henrike.kaiser/blog/2009/02/03/how-to-analyze-stopped-queues-in-xi-ccbpm,
    when i execute the function u2018Display Traceu2019
    Data is coming as: 16     31     21.04.2010 - 12:06:37.0810000     DATA     SWF_INB     EXCEPTIONS      WF-BATCH     X     Error during start of process of type WS90100001 by message 0050569F4A4E1DDF93A20375C360F54F     WS90100001     XBQO$PE_WS90100001     0050569F4A4E1DDF93A20375C360F54F
    when i execute the function u2018Simulate Message Delivery' it is coming as: Result of simulation: Message starts a new process
    What is the meaning of this?
    I have a transformation step in BPM only. Is there any validation of data performed before message is passed to BPM?
    Thanks,
    Mayank

    Hi Maynak,
    Whenever you will put incorrect data or missed any mandatory field to be created on target side then this error will occur .
    Take the input and chek in the mapping test of IR and correct your source message.
    In this situation we can do these two things if we are not in Production server.
    1. Delete the errored queue and re trigger the message after correcting the source XML
    2. Even if correcting the mapping error  also again its not working then go to SWWL and delete all the process instaces and again re trigger the message .
    It will work. As per my knowledge in PI7.0 the XML validation option is not available .
    Regards,
    Saurabh

  • Permanent error in BPE

    Hi
    When I trigger messages using BPM, the sxmb_moni shows chequered flag for all the three sender files. BPM has to merge it. When I click on PE, it goes to queues and the queues are in " SYSFAIL ', with an error messsage " Permanent error in BPE inbound processing ".
    How do I find out why BPM is not triggering ?
    Harish

    Hi
    Go to SXMB_Moni_BPE  or click on the redflag at the outbound side in sxmb_moni . after going there you wwill have a work flow view  where in you will come to know which step has error say mapping or fork ..
    Go to transaction SWWL  delete  your process work item which is in error state . and then re run the scenario.
    Let  me know if this helps .
    Regards
    Ninad

  • Error in BPE Adapter Processing

    Hi Experts,
    I have a scenario in which data flow from JDBC => BPE => ECC.
    while sending data from JDBC to BPE adapter, faced below error in SXMB_MONI.
    "Error in BPE Adapter Processing"
    In SXMB_MONI, Overall status displays as "Manual Restart Possible" error as attached below.
    I completed the all configuration related to SWF_XI_CUSTOMIZING and SXI_CACHE.
    also my Integration process has return code 0 in SXI_CACHE.
    I also want to know what are the software's required in PI related to BPM for both JAVA and ABAP Stack. i have a SAP PI System with version 7.31.
    Please guide me to solve this error and also inform me if any configuration related to BPE adapter is missing or not.

    hi dear,
    Tried the reports which are mentioned in the notes and followed the link
    but we couldn't resolve the same. can u please help us to move ahead to resolve our issue.
    any corrections / suggestion regarding the same.
    Permanent error in BPE inbound processing

  • Error while creating inbound process code

    Hi gurus,Iam creating a custom idoc.
    800 -> sender
    810 -> Receiver
    i have completed outbound processing on 800.
    On 810, completed following steps for inbound processing.
    1.) I have added my Inbound FM in BD51.
    2 ) Assigned my FM to Message type and Idoc type in WE57.
    3 ) When adding my FM to process code in BD67, it is showing error that
    “Entry ZSATPC does not exist in TEDE2 - check your entry”.
    { zsatpc is my custom process code }.
    4) While Creating Process Code in WE42 with options [processing with ale service / Processing
    by FM] and saving it is giving error that
    " " is not a valid language.
    And when I saw help (?) regarding this error, the following text appeared in a window.
    Diagnosis
    A key with language "" "" was specified for table "EDE2T". This is not a valid language.
    This applies to field "LANGUA"
    System Response
    The system rejects the key.
    Procedure
    Enter a valid language. This is usually the language you logged on in.
    You logged on in language "EN".
    Table T002 contains a list of valid languages.
    Please solve this error. Give me steps to create inbound process code.
    thanx in advance. Hoping replies soon........
    Satish.

    Dear Satish,
    Very peculiar. The language should come from your log on language. Try to login into the system again. Call we42 again and see if it works.
    Regards, Rakesh

  • Partner profile not maintained error while testing inbound processing

    Hi gurus,
    I am trying to upload a customer master data using LSMW idoc method, I followed all the required steps and then I tried to test the inbound processing using T.code we19 and there i gave my basic type as debcor01 and I clicked on standard inbound test but it gives me an error which says partner profile is not maintained, but I have maintained the partner profile and assigned the same in LSMW. So anyone of you can please help me to solve this problem.
    thanks,
    Rajeev

    Rajeev,
    Check whether the Account  Category is mantained properly or not.
    K.Kiran.

  • ORA-24816 Error on EDI inbound processing

    We are encountering an issue for EDI X12  inbound data files which have extraneous characters. B2B initially failed throwing  “ Document Protocol Identification error “ .
    To resolve this, we enabled flag  “b2b.edi.enablePeprocess” to true , after which it started processing fine in DEV environment , however it throws below exception in QA environment .
    Internal Exception: java.sql.SQLException: ORA-24816: Expanded non LONG bind data supplied after actual LONG or LOB column
    Error Code: 24816
    Call: INSERT INTO B2B_WIRE_MESSAGE (ID, JOB_ID, ACKNOWLEDGEMENT_MODE, LABEL, ATTRIBUTE2, MESSAGE_DIGEST, ATTRIBUTE4, MESSAGE_ID, ATTRIBUTE3, ATTRIBUTE5, CPST_INST_CREATED_TIME, CREATED, LAST_RESUBMITTED_TIME_STAMP, MODIFIED, LAST_VIEWED_TIME_STAMP, MSG_SIZE, DELIVERED_ENDPOINT, PASSWORD, DIRECTION, PORT, ENCRYPTION_CERTIFICATE, PROTOCOL_COLLABORATION_ID, ERROR_CODE, PROTOCOL_MESSAGE_ID, ERROR_DESCRIPTION_CLOB, PROTOCOL_TRANSPORT_BINDING, ERROR_TEXT_CLOB, REFER_TO_PROTOCOL_MESSAGE_ID, EXCHANGE_REMAINING_RETRY, RESUBMIT_COUNT, FROM_ADDRESS, SIGNING_ALGORITHM, SIGNING_CERTIFICATE, MESSAGE_STATUS, SIGNING_PROTOCOL, LAST_VIEWED_USER_NAME, STATE, DIGEST_ALGORITHM, TO_ADDRESS, ENCRYPTION_PROTOCOL, TRANSPORT_CERTIFICATES, ERROR_TEXT, TRANSPORT_CORRELATION_ID, EXCHANGE_RETRY_INTERVAL, TRANSPORT_HEADERS, ATTRIBUTE1, TRANSPORT_PROTOCOL, CHANNEL_NAME, TRANSPORT_PROTOCOL_VERSION, ERROR_DESCRIPTION, TRANS_SECURITY_PROTOCOL, HOST_NAME, TRANS_SECURITY_PROT_VERSION, ENCRYPTION_ALGORITHM, URL, LAST_RESUBMITTED_USER_NAME, USER_NAME, EXCHANGE_ATTEMPT_COUNT, VERSION, PAYLOAD_STORAGE, PACKED_MESSAGE, RESUBMIT_REF_TO) VALUES (?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?, ?)
            bind => [A513532C140185965980000010261DFC, null, SYNC, null, null, rLdBG4pYQf76lQXJZdl43gE7QqE=^M
    We checked many options for the differences between Dev & QA , but could not find a root cause . 
    Version : 11.1.1.6

    Hi,
    I am getting the same error.
    Can u please help me on this.
    Thanks and Regards
    Neha Kapoor

Maybe you are looking for