Broken Links between Premiere and Encore

OK, Here goes.  I'm running CS4 with all of the latest updates (no beta versions here).
I tranfer a video sequence from premiere to encore, which work just fine.
I build my dvd project and when done for the day, I shut down my system for startup the next day.
The next day when I startup the system and open both Premiere & encore, the files
are still linked (verified by the pink timeline in encore) but when I make a change to
the sequence in Premiere, none of the changes show up in Encore.  So in fact, the two
are no longer linked once you either shutdown the system system or exit the program
(I tried both examples).
SO, does anyone know who to re-establish the links to be active and not passive?
If it's linked, it should stay linked!
Jeff Bellume, any ideas?
Thanks!

Jeff,
Thanks and sorry for my typing.  After 20 straight hours at the computer both my sight and my typing is a little out of sync.
I ran a spell checker but it didn't pick up the error in the spelling of your last name.
But while we're here, why doesn't any of the chapter markers created in premiere show up in Encore when you use the
Adobe Media Encoder.  It worked perfectly in CS4 but doesn't seem to work in CS4.  Premiere creates the files (xmpes & xmp)
but nothing appears (chapter markets & metadata) upon importing them into Encore.
Is there some hidden switch that I haven't tuned on in premiere ?
Please advise.

Similar Messages

  • Broken Link between Base and Target document in 'Copy To' option

    Hi Folks,
    One of our client has been facing a peculiar issue. When the 'Copy To'  function is used to Copy document from Sales Order to Delivery and recently one instance of 'Copy To' from Delivery to A/R Invoice ,the base document got copied to the target document in each case but there was no trace of any Base Ref. left in the Target document( either in row level or Remarks), thereby the link between the Base and Target document got broken.The Base document remains with status as open.The same base document when tried again to 'Copy To', it creates the link between Base and new Target document.
    This instance had occurred recently 3- 4 times in a span of 3 months or so. In normal circumstance this never happens. The client is pretty sure they have used 'Copy To' option to copy the document from Base to Target.
    Any hints or possible reasons if one can highlight would be appreciable.
    The current version used is SAP B1 8.82 PL11 and it was upgraded more than a year back.
    Regards,
    Bharath

    Hi,
    All the data in Sales Order and Delivery are matching one to one in terms of row details,
    and Document header level.
    The missing data was Base Ref. data and Del.Date didn't get copied from base to target as shown in screen shot.
    Also i have checked it earlier regarding change of target document row details like changing item, but this will only remove the link of that particular row and remaining row link remains intact, but in this case there are many items and it doesn't seem user will have changed in all the rows.
    Regards,
    Bharath

  • Best workflow between Premiere and Encore for subtitling...

    Hello All,
    I switched from FCP and DVDS Pro to Premiere and Encore but having trouble to get the same workflow for the type of work we do here,
    We deal with lots of foreign films that will be distributed on DVDs and streamed via places like Xbox, PSN and such.
    We tried by starting by laying the final edit of the film in Premiere and placing subs.  We found out that there was no easy way to export the video track as an stl or compatible format so we outputted the film and used subrip to create an srt which worked ok when we brought it over to DVDSP but subrip always generates lots of bad text which has to be manually fixed.  I than decided lets try Encore cause it must be more compatible with Premiere for transferring info between the two but have not found a good way to do this yet. 
    What would be the best work flow between the two programs so you can create a DVD with subs and also have movie with a sub track that can be outputted for VOD besides having to do the work twice?  I am sure many production houses have this need.
    Thank you all for reading and look forward to some ideas.  We are using CS6.
    -john

    To the best of my knowledge, you will have to use a non-Adobe app for creating the subtitle file.  Once created, you'd bring that into Encore for disk creation.  I'm not sure you can create a file for VOD with subtitles using Adobe tools.  Encore can create Flash output, but that's probably not the best choice here.

  • Organizer links between Premiere and Photoshop Elements 7.0

    Has anyone experienced that Organizer in Premiere is using the data in the Organizer of Photoshop Elements?  I loaded over 15,000 photos in PSE and now they are showing up in Premiere where I don't want them and it is really gumming it up.  Very Slow and with memory issues.  Called Adobe and after the tech researched it he said the two programs are linked and there wasn't anything I could do about that and suggested I not use the Organizer, just go straight to Edit and New Project.  Anyone had problems from this lame Adobe programming?

    Has anyone experienced that Organizer in Premiere is using the data in the Organizer of Photoshop Elements?  I loaded over 15,000 photos in PSE and now they are showing up in Premiere where I don't want them and it is really gumming it up.  Very Slow and with memory issues.  Called Adobe and after the tech researched it he said the two programs are linked and there wasn't anything I could do about that and suggested I not use the Organizer, just go straight to Edit and New Project.  Anyone had problems from this lame Adobe programming?
    I have a well maintained computer and I saw the same slugishness with the Organizer.
    I always use a different catalog in PRE than I do in PSE.
    You will need to create a new catalog in the PSE Organizer. Then when you open PRE, from the file menu you can choose to select a differnet catalog. Find the one you just created. PRE will need to restart and when it does you will have a blank organizer, which will get filed as you add media.

  • Problems with Dinamic Link between Premiere pro CC and After Effects CC

    I'm having serious problems with dinamic link between premiere pro and after effects, really serious problems that have 2 big projects in trouble (a documentary and a video clip) and I had to redo all the work pipeline to the consumer.
    The documentary for a spanish TV was made on CC 2014 and a video clip was made on CC. Both of them with a lot of after effects composition in the premiere pro timeline. Render freeze, a lot of playback issues, and many more problems... Until I decided to remove these links between premiere and after effects and render out all the after effects compositions one by one and insert as clips in premiere pro. 1 week working away with back and fourth.
    I've got a huge workstation:
    i7 4990
    32Gb ram
    GTX780 3gb
    256 gb system ssd
    2 Tb project storage
    *All my hardware and software are update.
    I know that a lot of folks are on the same huge problem and I want to ask everyone:
    How do you save this?
    What is your pipeline?
    Are there any solution?
    Best practice to use dinamic link in a huge project?
    Thanks,
    Ruben Gimenez.
    R&D iceblink.es
    www.rambot.es

    Thank You, Jim -
    Unfortunately that specifically did not work.
    Based on another comment sent to me, here is what did.
    In PProCC
    File > Adobe Dynamic Link > New After Effects Composition
    In AECC
    From that composition created from PPro, I imported the project (aep) initially created in AECC from another team member. Saved the file.
    Back in PProCC
    File > Adobe Dynamic Link > Import After Effects Composition
    Magic.

  • Adobe premiere and encore dynamic link

    When I tried to go from Adobe Premiere 5.5 to Encore by Dynamic Link from Premiere to Encore I found it NOT Working and
    Also in Encore when I go File> Adobe Dynamic Link > Import Premiere Sequence it does not work?

    Hi Stan,
       Thank you very much for your help and quick reply and I have to buy you a free drink now. Ha…Ha….
    I spent about 6 hrs. try to searching for the fix but I could not find anything except a few people stated that you could fix this Dynamic Link by going to help/deactivate the activate but I did not to try it
    Encase I lose all Premiere. Do you think it will work?
    The problem started after I had chat with Adobe support team to help me to reinstall Production Premium and after that the link did not work.
    On my user account in premiere when I click on DL it does nothing and in Encore when I try to import the sequence I can see the window with disk activity but I cannot select any item.
    I can open premiere and encore separately but I cannot link them?
    I create a new user account  and also I cannot send Premiere project to Encore But I can import Premiere’s sequence without any problem?
    Any Idea how to fix this by repair not by uninstall because I had a lot of problem when I had to reinstall them. Is easy to repair them?
    You also stated to me it is better to export from premiere to Encore directly without losing any quality, What is the best setting for this and I will buy 2 drinks.
    Thank you again.

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • 'Is there a link between OLM and iProcurement'

    I have been asked 'Is there a link between OLM and iProcurement'? The person posing the question is wanting to create trainers as suppliers and I know that the supplier information is shared between OLM and the A/P, A/R and G/L modules and I presume that the link to iProcurement will be via one of these modules however is there a more direct vanilla link between OLM and iprocurement?
    Any help would be great
    Thanks
    DM

    I am afraid there is no link between the iProc and OLM.
    The closest that apps can offer you is that your learner/delegates can be of type external i.e. being an Organization or a Customer. Hence there exists a link for your delegate to be a customer(hz_parties).
    However this might be a future integration i.e. Trainers being suppliers. I am saying so because in 11.5.10 there is a table named OTA_VENDOR_SUPPLIES that has reference to vendor_id. Currently this table is not being used by OLM.
    You may look into the code of packages OTA_VSP_API, OTA_TEA_BUS & OTA_PLE_BUS and see if Oracle's future functionality will converge towards your business requirement.
    Thanks,
    Anil Passi
    http://oracle.anilpassi.com

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • Link between Item and delivery

    Hi ,
    I want to know the link between item and deliveyr. Like for example, an sales order item ( no. 10) containing 10 quantities can be delviered 5 times( each containing 2 quantities) and line item ( no. 20) can contain one single delivery. I am working on a report where i have to link all the line item to its delivery number. I am trying to achieve this through GENIl but i am not able to indetify as to how to differentiate the different deliveyr numbers. In other words, can some one help me as to how to link the delivery number to its corresponding items?

    Document flow is stored in the table VBFA in ECC.
    VBELV fied is the sales order number and in POSNV specify the line item number and speicfy VBTYP_N = J (Delivery).
    Regards,
    Bhanu

  • Link between GTM and FSCM (sales or purchase order hedging)

    Hi all,
    I am trying for a few days to have SAP GTM working (I am in an IDES ECC6 system, and as far as I know in EhP4 version). The main goal in fact is to test the currency hedging, and therefore to the link GTM and FSCM, either single-sided purchase or sales order, or two-sided . The flow I want is the following :
    -     I buy or sell a product, in GTM, through a trading contract which generates a purchase or sales order.
    -     Automatically a currency hedge is generated to cover the risk, in FSCM, I guess in exposure management.
    -     And then the financial products (derivatives) are generated as well.
    No problem to create the trading contract, no problem to generate the sales or purchase order. But in spite of the (very little) customizing I found in u201CSAP GTM => currency hedgesu201D, and some in FSCM, in u201Ctreasury and risk managementu201D, no way to have this link between GTM and FSCM, no additional document is generated like a Forward Exchange Transaction (I guess I should have this, and then a risk exposure in FSCM).
    Would you have an idea ? Is this customizing, or an additional Business Functions or Extension Set not activated ? SAP says : u201Cit worksu201D, but canu2019t find the way.
    Thank you very much for your help, I am quite looking for this link for a few days now u2026
    Best regards
    Patrick

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • What is the link between PO and Requisition in database side

    hello friends,
    please can any one tell me that what is the link between PO and Requisition in database side. means after creating the requisition we will go for create the PO based on that requisition.
    want to know that what is the link between both in database side.
    Thanks in advance
    krish.

    Hi,
    The link is at distribution level, between:
    PO_DISTRIBUTIONS_ALL.REQ_DISTRIBUTION_ID
    and
    PO_REQ_DISTRIBUTIONS_ALL.DISTRIBUTION_ID
    Hope it helps.

  • Premiere and Encore CS4 crashes and issues on Toshiba Laptop

    I have a Toshiba Qosmino Laptop, 4 GB ram, Windows XP Sev pac 3, Nvida Gforce 7300 video. new 7500 RPM Hard drive
    The two programs that crash all the time are Premiere and Encore CS4
    Premiere will start some times and sometimes not. I've tried a new projects, importing a CS3 project seems to make no difference. Takes approx 2-3 minuites to load. Click on a imported video clip or timeline and crash.
    Encore crashes "EVERYTIME"... tried to import from Premiere into Encore.. when the timeline is clicked in Encore it crashes everytime. Tried a new project in Encore same problem. Started Encore alone and same problem... first click and crash.
    I'm not getting a blue screen just the Adobe crash report screen asking me to send a report... have done that many times.
    Things that I have tried:
    Had CS3 (BTY it ran fine)
    Uninstalled CS3 and uninstalled CS4. Reinstalled CS4 same problems.
    Defrag hard drive....
    Reinstall CS4
    Updated video drivers to latest version
    Reloaded older video drivers
    Did MSCONFIG and stropped all unneeded processes
    All the rest of the CS4 programs open and run fine.
    Any help is appreciated!!

    Sounds like a problematic video driver or codec issue. You need to update all your drivers and try again. Also get rid of any unnecessary codecs. Try opening files in various formats and see if the same happens. Also you should search the KnowledgeBase, it contains a lot of information about this kind of problem.
    If all fails, call Adobe Tech Support...

  • Link Between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL

    Guys,
    I am new to Oracle Financials, can you please let me know if my understanding of link between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL is correct or not?
    SELECT ai.invoice_id
    , ai.invoice_num
    , aps.due_date
    , aip.accounting_date
    , aip.amount, aip.payment_num
    FROM ap_invoices_all ai
    , ap_invoice_payments_all aip
    , ap_payment_schedules_all aps
    WHERE aps.invoice_id = ai.invoice_id
    AND aip.invoice_id = aps.invoice_id
    AND aip.payment_num = aps.payment_num

    plz look at seeded view AP_DOCUMENTS_PAYABLE
    FROM
    ap_invoices_all ai,
            ap_invoice_payments_all aip,
            ap_payment_schedules_all aps,
    WHERE
    AND aip.invoice_id = ai.invoice_id
    AND ai.invoice_id = aps.invoice_id
          AND aps.payment_num = aip.payment_num
    ...your code a bit different by
    AND aip.invoice_id = aps.invoice_idbut it's ok
    >
    AND aip.payment_num = aps.payment_num
    Is this correct?
    >
    yes

Maybe you are looking for

  • Why does it say that the updated version of Firefox (which I am trying to download) is not compatible with my operating system when I have Mac OS X 10.5.8?

    Why does it say that the updated version of Firefox (which I am trying to download) is not compatible with my operating system when I have Mac OS X 10.5.8? I had an older version of Firefox and it said I needed to update it but that was the message t

  • Closing Stock of Plant at BPC level

    Hi Experts, I am very fresher to work on BI-BPC integration project for SAP ABAP. Requirement is like we have input of TIME, PLANT, MATERIAL for this we need to fetch closing stock of material in BPC reprot. Closing Stock will not come directly from

  • Ms-6367 (nforce) information please

    I am going to next buy the MSI 6367 Nforce 420D motherboard in a store by Internet. I wanted to know if MSI 6367 includes the TV-Out card (S-Video) and SPDIF bracket, or are component optional. I have looked for in MSI Web page but I have not found a

  • Wireless Headset for personal communicator

    Happy Monday --- Which brand/model headset is being used outthere for personal communicator/soft phone? I am using USB headset Logitech, but I have been asked to get wireless instead. Need to alert users to check their laptop for Bluetooth capabiliti

  • Why has "Myriad Pro Light" been removed?

    The font Myriad Pro Light has been shipped with all Master Collections (CS4, CS5, CS5.5), but since CS6 Master Collection as well as Creative Cloud it is not included anymore. Has anyone an idea, why Adobe has removed it? I have used the font with CS