Budget/Actual/Commitment report-S_ALR_87013558

Hello Experts,
                      Is it possible to get the get this report (S_ALR_87013558) on day basis? I mean to say if i want to see the balances between two particular dates WBS/Project wise, so can i get the same?
Please suggest..
Thanks
Ankur

Hi,
Use CJI3 or go to Call Up report from S_ALR_87013558 and filter the report as per Date.
Regards,
Nitin

Similar Messages

  • Abap report for budget/actual/commitment

    Hi Guru..
    Please help me.
    Im in urgent
    I wanna write an abap program for budget/actual/commitment.
    I try to trace prgram s_alr_87013019, but only one table found.
    Please let me know which table is using for budget/actual/commitment
    report..
    Please guru..

    Hello Mohd,
    The actual,budget and commitment values are stored in the one table COSP.
    The values differentiate with field <b>VRGNG</b> - "CO Business Transaction".
    If the record has in this field text '<b>COIN</b>' it means that values are "actual".
    For example:
    OBJNR     PR00000101
    GJAHR     2005
    KSTAR   101101
    VRGNG     <b>COIN</b>
    TWEAR   USD
    WTG001     100,00
    WTG002  200,00
    It means that the element PR0000101 has the '<b>actual'</b> operations refering
    the cost element 101101, with values: 100,00 USD in january 2005 and
    200,00 USD in february 2005.
    The next row in the table COSP, clould look like this:
    OBJNR     PR00000101
    GJAHR     2005
    KSTAR   101101
    VRGNG     <b>RMBA</b>
    TWEAR   USD
    WTG001     100,00
    WTG002  0,00
    This means that there was a <b>'Purchase requisition'</b> in january 2005
    with decretation on object PR0000101.
    And the next row, could be:
    OBJNR     PR00000101
    GJAHR     2005
    KSTAR   101101
    VRGNG     <b>RMBE</b>
    TWEAR   USD
    WTG001     0,00
    WTG002  150,00
    And that means that in february 2005 there was a <b>'Purchase order'</b>
    with value 150,00 USD decretated on this object.
    I hope, that my explanation is now clear and accurate.
    - Marta

  • Budget Commitment Report - S_ALR_87013558

    We have an issue with the Budget Commitment Report S_ALR_8701355 as explained below.
    Org Structure:
    A* Projects are separate small Projects to track Capital and Operating Expenses
    But all the Capital Purchases are done only through C* WBS. And accordingly Capex budget is maintained only for C* WBS. So AWBS has been linked to 3 CWBS ( SW, HW & Dev SW)  in one of the user field of C*WBS.
    Shopping Cart will be raised using CWBS in SRM. But once PR has been created it replaces the account assignment field with AWBS. And later even the Asset posting happens only with A*WBS
    Issue:
    While using Budget Commitment Report - S_ALR_87013558, CWBS is giving Budget and A WBS is giving Actual cost. This Actual Cost pertains to 3 C* WBS Elements (SW, HW & Dev SW). So now Business requires to merge the cost of A* WBS with respective C*WBS Element.
    We are able ascertain the cost of AWBS but not able find a logic to distribute this cost across respective C WBS.
    Current Logic of the Program:
    Any document posted using WBS Element will update table RSPCO with just Amount, Period & Value Type (Actual/ Budget / Plan) . So Budget Commitment Report S_ALR_87013558 will fetch the details from this table alone.
    Could any of you please let us know how to deal with this problem without altering the existing Org structure .

    Hi Rajesh,
    I think the report is showing correctly as per the logic. But please elobrate us why the PR created with account assignment C* WBSE is replacing by A* WBSE.
    If the account assignment in PR and PO is replacing by A* WBSE then obviously actual cost will book against A* WBSE and report S_ALR_8701355 will display the same.
    you can post cost from AWBSE to C WBSE uisng KB15N.
    Regards,
    Nag.

  • S_ALR_87013019 -List: Budget/Actual/Commitments Report Error

    Dear All
    I would like to bring your kind information that while executing the
    SAP standard T.code: S_ALR_87013019 - List:Budget/Actual/Commitments,we are not able to get the report based on the year wise.
    As in the SAP release 4.7, when we run the said transaction, we can able to see the report budget/actual/commitment as per year wise. Where in ECC 6.0, we could not able to see the report as per year wise and instead it shows the order report budget/actual/commitment output totally as "not dependent on year".
    It does not bring the budget/actual/commitment values per year wise(1-S-GJAHR-BUD-ALL Overall budget) and giving output as total values for Individual Order and or Order Group.
    I request you to all kindly provide your suggestion which would be very much appreciated.
    Regards,
    Ran.

    To solve the problem, please follow:                                                                               
    1.  Call transaction GRCT and select the row RWCOOM.                                                                               
    2.  Choose Special Characteristics in the left tree.                                                                               
    3.  Double-click the row containing GJAHR.                                                                               
    4.  In the field Filler routine, enter the routine E03_FILL_GJAHR.                                                                               
    5.  In the field Conversion routine, enter the routine E03_CHANGE_GJAHR
        and save the change.                                                                               
    6.  Regenerate all report groups for the table RWCOOM via transaction  
        GR5G.                                                              
    regards from Berlin
    Mathias

  • ABAP Program to List: Budget/Actual/Commitment

    Hello ABAP Gurus,
    I have a very urgent requirement to write a report to list Budget/Actual/Commitment of all the internal orders related to a given company code. I am using ECC 5.0.
    I found very usefull information in this thread.
    Re: Abap report for budget/actual/commitment
    Could any one please send me the logic of your program . .. Please.. It will really help me..
    Thanks in advance.
    Helen.

    hi
    Please reply with the fields for your selection screen. i assume company code is one field. is fiscal year, period etc., are also part of the selection screen?
    Based on the fields that you choose a report can be done.
    looking forward for the update.
    Thanks.

  • Staff Budget / Actual Variance report

    Hi,
    What is 'Staff Budget / Actual Variance report'.
    Is there any Business Content Reports avaliable for this purpose.
    Please provide me information on Which Data Target 9Technical Name) i can do this report.
    Thanks

    Hi,
    This InfoCube contains all costs and quantities on WBS elements (plan and actual using delta extraction, commitment, budget, accruals) that were transferred from the source system(s).
    You can also use this InfoCube to access your own fields. For more information, see Customer-Defined Fields.
    For background information on the concept of InfoCubes, see InfoCubes in Controlling.
    Higher-Level Objects
    Queries
    The following queries can access this InfoCube:
    ·         0WBS_C11_Q0001: WBS Element (Detail): Plan/Actual
    ·         0WBS_C11_Q0002: WBS Elements (List): Budget/Actual/Commitment
    ·         0WBS_C11_Q0003: WBS Elements (List): Overall Planning/Actual/Commitment
    ·         0WBS_C11_Q0301: PSM: WBS Element (Detail): Plan/Actual
    ·         0WBS_C11_Q0002: PSM: WBS Elements (List): Budget/Actual/Commitment
    Notes on Query Definition
    If you attempt to sum across different valuation views and currency types, your query results will be incorrect. Summing across different values of these characteristics does not provide useful information.
    InfoSources
    ·         0CO_OM_WBS_1: WBS Elements: Costs
    ·         0CO_OM_WBS_2: WBS Elements: Budget
    ·         0CO_OM_WBS_3: WBS Elements: Overall Plan
    ·         0CO_OM_WBS_6: WBS Elements: Actual Costs Using Delta Extraction
    Characteristics
    InfoObject
    Description
    0WBS_ELEMT
    PSP element
    0COSTELMNT
    Cost element
    0CO_AREA
    Controlling area
    0CURTYPE
    Currency type
    0PIOBJSV
    Partner object type
    0PIOVALUE
    Partner object
    0METYPE
    Key figure category
    0VERSION
    Version
    0VTDETAIL
    Details of value type
    0VTYPE
    Value type for reporting
    0DB_CR_IND
    Sender/receiver indicator
    0VALUATION
    Valuation view
    0VTSTAT
    Statistics indicator for value type
    0FM_AREA
    FM area
    0FUND
    Fund
    0FUNC_AREA
    Functional area
    0GRANT_NBR
    Grant
    0PFUND
    Partner fund
    0PFUNC_AREA
    Partner functional area
    0PGRANT_NBR
    Partner grant
    Navigation Attributes
    The following navigation attributes have been activated. This is a sample selection. You are free to activate additional attributes, or deactivate attributes to improve performance.
    InfoObject
    Description
    0WBS_ELEMT__0CO_AREA
    Controlling area
    0WBS_ELEMT__0PROFIT_CTR
    Profit center
    Time Characteristics
    InfoObject
    Description
    0FISCPER
    Fiscal year/period
    0FISCVARNT
    Fiscal year variant
    0FISCPER3
    Posting period
    0FISCYEAR
    Fiscal year
    ·        The characteristics fiscal year (0FISCYEAR) and posting period (0FISCPER3) are filled by the fiscal year period field (0FISCPER) in the InfoSource.
    ·        The characteristics and the cost element are not filled for overall budgets or overall plan values. The posting period and the cost element characteristic are not filled for annual budgets or annual plan values. This provides values with the format 000.YYYY (where YYYY is the fiscal year), particularly for the 0FISCPER characteristic.
    Key Figures
    InfoObject
    Description
    0AMOUNT
    Amount
    0QUANTITY
    Consumption quantity
    Restricted Key Figures
    The restricted key figures are divided into several groups.
    The basic key figures cannot be used without restricting some of the characteristics. For this reason you should use only the supplied restricted key figures in queries you have defined yourself, or analyze the supplied restricted key figures and modify them to suit your requirements.
    InfoObject
    Restriction
    “Costs” Group
    Data for all restricted key figures of the group
    Key figure category = 1000 (costs and associated quantities)
    Valuation view = 0 (legal valuation)
    Version = 0 (current variant)
    Key figure = 0AMOUNT (amount)
    0WBS_C11_RK0002 Actual costs
    Sender/receiver = S (debit posting or receiver debit)
    Value type = 10 (actual)
    0WBS_C11_RK0001 Planned costs
    Sender/receiver = S (debit posting or receiver debit)
    Value type = 20 (plan)
    0WBS_C11_RK0006 Settled costs
    Sender/receiver = H (credit posting or sender debit)
    Value type = 10 (actual)
    0WBS_C11_RK0003 Commitments
    Sender/receiver = S (debit posting or receiver debit)
    Value type = 40 (commitment)
    0WBS_C11_RK0004 Budget (per fiscal year)
    Value type = 50 (budget)
    0WBS_C11_RK0005 overall planning (per fiscal year)
    Value type = 20 (plan)
    “Revenues” Group
    Data for all restricted key figures of the group
    Sender/receiver = H (credit posting or sender debit)
    Key figure category = 1001 (costs and associated quantities)
    Valuation view = 0 (legal valuation)
    Version = 0 (current variant)
    Key figure = 0QUANTITY (quantity)
    0WBS_C11_RK0008 Actual revenue
    Value type = 10 (actual)
    0WBS_C11_RK0007 Planned revenue
    Value type = 20 (plan)
    “Quantities” Group
    Data for all restricted key figures of the group
    Sender/receiver = S (debit posting or receiver debit)
    Key figure category = 1000 (costs and associated quantities)
    Valuation view = 0 (legal valuation)
    Version = 0 (current variant)
    Key figure = 0QUANTITY (quantity)
    0WBS_C11_RK0021 Actual consumption quantity
    Value type = 10 (actual)
    0WBS_C11_RK0022 Plan consumption quantity
    Value type = 20 (plan)
    “WIP” Group
    Data for all restricted key figures of the group
    Sender/receiver = S (debit posting or receiver debit)
    Key figure category = 1410 (inventory (WIP))
    Valuation view = 0 (legal valuation), version = results analysis version
    Value type = 80 (results analysis)
    Key figure = 0AMOUNT (amount)
    0WBS_C11_RK0011 WIP: Revenue in excess of billings
    Detail for value type = 10
    0WBS_C11_RK0009 WIP: Work in process
    Detail for value type = 1, 2
    0WBS_C11_RK0010 WIP: Cannot be activated
    Detail for value type = 3
    “Results” Group
    Data for all restricted key figures of the group
    Sender/receiver = S (debit posting or receiver debit)
    Key figure category = 1400 (accrual calculation)
    Valuation view = 0 (legal valuation)
    Version = accrual version
    Value type = 80 (results analysis)
    Key figure = 0QUANTITY (quantity)
    0WBS_C11_RK0018 Revenue affecting net income
    Detail for value type = 12
    0WBS_C11_RK0014 Cost of sales
    Detail for value type = 3, 4
    0WBS_C11_RK0015 Cost of sales (cannot be capitalized)
    Detail for value type = 5
    0WBS_C11_RK0017 Realized loss
    Detail for value type = 11
    0WBS_C11_RK0012 Reserves for imminent losses
    Detail for value type = 1
    0WBS_C11_RK0013 Reserves for imminent losses - inclusion cannot be capitalized
    Detail for value type = 2
    0WBS_C11_RK0016 Loss
    Detail for value type = 10
    “Reserves” Group
    Data for all restricted key figures of the group
    Sender/receiver = S (debit posting or receiver debit)
    Key figure category = 1420 (reserves)
    Valuation view = 0 (legal valuation), version = results analysis version
    Value type = 80 (results analysis)
    Key figure = 0AMOUNT (amount)
    0WBS_C11_RK0019 Reserve: unrealized costs
    Detail for value type = 1, 2
    0WBS_C11_RK0020 Reserve: unrealized costs, not capitalized
    Detail for value type = 3
    Units
    InfoObject
    Description
    0CURRENCY
    Currency key
    0UNIT
    Unit of measure
    Hareesh

  • Budget/Actual/Commitments Report in PM Order

    Dear Experts,
                  I am using the scenario of PM and PS integration. In which i am creating a project with WBS elements. & each WBS is having some budget and is also released. I am using one of the WBS in PM order in additional data tab page. After that i am releasing the order and doing the time confirmation. In the cost tab of PM order the actual cost is coming . Now i am trying to see the report  Budget/Actual/Commitments  by clicking on Rep.Budget/Commit. button.
                    Here in a report no budget is appearing only actual cost is coming.
    Kindly let me know why budget is not appearing in the report , even though the budget has been assigned to WBS which has been used in PM Order and released.
    Regards
    Amar

    Hi,
    Note that WBS element used here is for rolling up cost to WBS element from work order.When you define WBS element that will act as settlement receiver for work order.There is no other connection between WBS and work order to budget/actual report on cost tab of work order.Hence, you can see only costs related to order on order cost reports and no budget from WBS.
    If you want to see budget/actual cost report on order then you need to activate budgeting functionality for work order object.This is done by assigning budget profile to order type which will act many times as internal order in FI area.Then you need to use budget functionality on order level by supplement/availability control functionality.Then only you can see budget/actual/committment cost report as it is relevant to order as an object.
    So dont get confused with this budget cost report with WBS budget.
    Reports on WBS/project objects are seen in respective PS cost reports.
    regds,
    atul

  • List: Budget / Actual / Commitments Report Breakup

    Dear All,
    Report Writer:
    Library: 6O2
    Report  6OBU-001.
    Report: 6O2-6OBU-001.
    In the report List: Budget / Actual / Commitments Report Breakup, We need to breakup the Actual Amount into period wise.
    I assume the tables COEP, BPJA, COOI have the details to sum up this above report.
    Can some one give me a light, on logic  to sum up the amounts from these tables as I find some negative amount as well.
    (I need it in Controling Area Currency)
    Also I need to pick up the opening balnace of the budget as well.  Please tell me the table name that stores the opening balance for the budget.
    Regards,
    Venkat
    Edited by: iyeve01 on Oct 14, 2010 9:10 AM

    To solve the problem, please follow:                                                                               
    1.  Call transaction GRCT and select the row RWCOOM.                                                                               
    2.  Choose Special Characteristics in the left tree.                                                                               
    3.  Double-click the row containing GJAHR.                                                                               
    4.  In the field Filler routine, enter the routine E03_FILL_GJAHR.                                                                               
    5.  In the field Conversion routine, enter the routine E03_CHANGE_GJAHR
        and save the change.                                                                               
    6.  Regenerate all report groups for the table RWCOOM via transaction  
        GR5G.                                                              
    regards from Berlin
    Mathias

  • Mismatch of Assigned Budget in CJ33 & Report S_ALR_87013558

    Hi,
    I would like to inform there is an issue in mismatch of assigned budget value in CJ33 wrt hierarchical report(S_ALR_87013558). Request you to suggest to fix the issue.
    Thank you for your coopearation.
    Regards,
    Ranjan

    Ranjan,
    removing a column in a report will not affect at all at the values observed. Therefore,
    it is unuseful to do it.
    If there are inconsistencies in the assigned value, i suggest you to take the following steps:
    1. Excute the report BPDIST03 via SE38 for the project in question. 
    2. Excute the tnrx CJEN.(Reconstruction of project information DB)  
    3. Excute the trnx CJBW.(Deactivate the availability control)      
    4. Excute the trnx CJBN.(Reconstruction of availability control)   
    5. Excute the trnx CJBV.(Activate the availability control again)  
    Hope this helps
    Regards
    Martina

  • Plan, Actual & Commitment Report in Multiple Currency

    Dear SAP gurs,
    Is there any report where I can see Plan, Actual & Commitments in Multiple currency (see below format). In standard SLAR reports, values are displayed in one currency at a time either I can see in INR or USD.
    Here each WBS is planed in USD as well as in INR. If PO is raised in USD, then actual value should be shown against planning done in USD.
    WBS Elem     Plan          Actual          Commitment     
         USD     INR     USD     INR     USD     INR
    WBS1.1     3000$     1000INR     500$               500INR
    WBS2.2          50000INR          10000INR          300INR
    Thanks,
    Venkat

    Dear Venkat
    Each of the views in the hierarchy reports (such as 12KST1C) can       
    only contain values for one currency at a time (because totals for    
    multiple currencies would not make sense).     
    Since only one currency can be displayed at a time, the Trans.currency view is not meant to show values in multiple currencies; rather, the Trans.currency view only provides a reference to the user of the currency involved in the Plan and        
    Actual postings. For example, if the actual postings had been in      
    mixed currencies like:                                                                               
    Doc. date  Cost elem.    Value COCurr  CO.Cr      Value TranCurr  TCrcy  
       01-07-2007 911010000                 800   XXX                        1700  YYY
       01-07-2007 911010000              3,000   XXX                        3,000  XXX
    Then the Trans.currency view would have contained:                                                                               
    Trans.currency         Plan             Actual                      
      YYY                            0             800                   
      XXX                         3,700           3,000
      Result                     3,700           3,800
    You can always switch between currencies in the report Settings ->    
    Currency, but only one will be displayed at once.                                                                               
    I hope this explanation helps you to understand the standard system   
    behaviour.                                                            
    Regards
    Martina

  • What is the meaning of Rem.Order Plan in the PS cost report S_ALR_87013558

    Hi,
    Does anyone know the meaning of "Rem. Order Plan" column in the PS Budget-related cost report-- S_ALR_87013558  Budget\actual\Commitment\Rem.Plan\Assigned? I understand all the other columns like budget, actuals, commitment and assigned, but I have no idea what the "Rem order plan' means?
    Thanks,

    In this report it is "Planned Cost - (Actual + Commitment)"
    Venkat
    Edited by: VenkatSrinvas Konda on Oct 16, 2008 8:09 AM

  • Report s_alr_87013558 as at a date

    Dear all,
    On the report S_ALR_87013558: Execute Budget/Actual/Commitment/Rem.Plan/Assigned Overview, I would like to have the figures in the Actual column as at a date. As it is now, the report is giving me the whole figures from start of year up to current date.
    How can I get this?
    Thanks for ur help,
    Nas

    Nelmaz,
    Near the execute button their is a another button called Dynamic selection (shift + F4) click on it
    there you get a folder called data on dates defination from their  double click start date and finish date
    than choose your specific date for running above report
    If you get anws. plz assign point
    thanks
    Rink

  • Committment item not getting reflected in Report -S_ALR_87013558

    Dear ALL,
    I've made all the necessary conifg for Committment item ,but still when i create the PR from project and the same is converte to PO ,in the report S_ALR_87013558 - Budget/Actual/Commitment/Rem Plan/Assigned itz not reflecting.
    Are there any config to be done.
    plz help n guide
    itz urgent
    Thanks in advance
    Manohar

    Hi Sridhar,
    Thanks for the input.
    But still Budget is not appearing in the report, even after running CJBN & CJEN.
    I had a look into CJ30 but the overall Budget is available. Is there any change required in the report.
    Regards,
    Selva

  • S_ALR_87013019  - List: Budget/Actual/Commitments

    Dear All,
    In report S_ALR_87013019, required Profit center and Plant field.
    How can we get it. There is not something like Report layout etc.
    I want profit center and plant with same detail like Order No, Order description, Budget, Actual, Commitment,Alloted and Available Amount.
    Pl help me.
    Regards
    Swati Shah

    Thanx Srinivasa,
    For one Internal Order there cannot be multiple profit center.
    We are giving Profit center and plant  while creating New Internal Order and same profit center and plant is applicable for all line items. So there will one to one relationship for Internal Order and Profit center / Plant.
    Is it possible in same report ? OR isthere any other report with same Information like S_ALR_87013019 with Profit center  and Plant.
    Regards
    Swati Shah

  • List: Budget/Actual/Commitments

    Gurus,
    Good day!
    Seeking your assistance in finding the table for the <b>Budget, Actual, Commitment, and Alloted</b>. The list is displayed in t-code: <b>S_ALR_87013019</b> by entering the Internal Order.
    In which tables are they stored?

    The tables given are not exactly the ones reflected on the report.
    I'm getting the values for budget in table BPJA.
    How about for the Actual, Commitment, and Alloted?
    Thanks again

Maybe you are looking for

  • Nokia music activation error

    Hi, i just purchased a nokia Lumia 520 a few days back. Registered my nokia account, nd everything was flawless. But yesterday, i had to do a factory reset, nd ever since then nokia music app shows errors. Even after signing my Nokia ID, it keeps sho

  • Thumbnails in landscape appear black when expanded

    I can see all thumbnails, but when I click on an image it expands and then immediately dissapears. The screen in the iPhoto window remains black. The issue appears only with pictures in "landscape" orientation. Thanks for your ideas Cheers

  • How can I get Web Sharing to work?

    I am having trouble getting web sharing to work - the name for the folder is a NetBIOS name which I can't change - and that is the first part of the problem. Is this a known issue because I have tried it on several computers and it does not work like

  • Intercompany  STO PO pricing procedure setting

    Hi Dear Friends, Please help me how to configure pricing procedure Steps for Intercompany STO PO. Here my requirement is when I create INTSTOPO system should have automaticaly fetch material price from material matser price here we don't have any fri

  • Thumbnail vs list view resetting

    Every time I round trip from Premiere to Speedgrade my bins change views. If I'm in list view when I get back to Premiere it resets to thumbnail. If I start in thumbnails it shows up in list view after Speedgrade. Am I just lucky or does anyone else