Budget exceeding error message coming up at the time of GRN

Dear Guru's
I am facing a problem at the time of GRN, When i am going to create GRN to purchase order then message is coming up budgut exceed.
Regards,
Vishal Kr. Sharma

In Customising
PS-> costs-> budget-> define tolerance limit
you specify availability control activity groups.
Here you specify which groups you want to include for budget checking.
If you specify '++' all activity groups, budget will be cheked for all including Purchase requsition.
SSanjay

Similar Messages

  • Budget exceeded error message

    Hi,
    We are in SRM 5.0 ECS, with support pack 11.
    When a PO is created with account assignment category project statistical (WBS element), with value exactly matching the budget availability, PO gets created, however if tried doing any changes to the PO, it gives an error message - WBS element budget exceeded.
    How it can be avoided.
    Rgds,
    Madhan

    Hi Madhan,
    Have a look at the following OSS Notes:
    Note 1068860 - Extended classic:Budget check errors on trying to change PO
    Note 1292419 - Budget exceeded error while changing a SRM purchase order
    Thanks,
    Pradeep

  • IO Budget exceeded  error message BP603

    Dear Gurus,
    I need to make the Error message to Warning relate  Internal Order Budget exceeded.
    Is there  any SAP note suggesting to add Error message BP603 to table T100s.
    Application area BP is already given in T100SA. But the message BP603 is not given in T100S.
    Now I need a new entry in T100S.
    Before doing this I should support from SAP note if any.
    Request to you if any inputs.
    Thanks in Advance
    Aravind

    Hi,
    Requirement is not incrase the limits. Just RFC user should post with warning message. Manual entry means Error message.
    In this Case I should add in OBA5 as Warning message.
    To add this entry I need supporting  OSS note.
    Thanks & Regards
    Aravind

  • BP603 Budget exceed error message customization

    Hi,
    I have set the error message BP603 from error to warning in Tcode OBA5, still i am getting the error message.
    Can somebody provide input on this.
    regards,
    Khan

    Hi,
    Please select the following path in your customizing transaction SPRO:-
    Controlling
      Internal Orders
        Budgeting and Availability Control
          Define Tolerance Limits for Availability Control
    Here you can see the Controlling Area and Profile information, you will also be able to see a column called 'Actn' in which you probably have a value of '1' or '2' which represents 'Warning' or 'Warning with MAIL to the person responsible' respectively, the third option here is '3' 'Error message', these are usually set depending on the Usage percentage that is defined.
    regards
    Waman

  • TS1544 "keychain not found" error messages pop up all the time, please help!

    Hi, Ive been constantly getting "keychain not found" error messages ever since i updated to OS X and cant sync messages, facetime, calendars etc. i've tried keychain first aid and get this message:
    Verification started
    Checking keychain configuration for Lee (user ID=501)
    Home directory is /Users/Lee
    Checked login keychain
    Error: login keychain not found
    Unable to get info for ~/Library/Keychains/login.keychain, reason: The operation couldn’t be completed. No such file or directory
    Checked default keychain
    Checked keychain search list
    Problems were found; you should choose the Repair option to fix them
    Verification failed
    Can anyone help?
    Thanks

    Is there a login.keychain in /Users/username/Library/Keychains/? The message says not. If not, create a new one or restore the one residing in your bootable backup/clone or Time  Machine backup.

  • HT4863 I have an error message coming up when trying to send an email which says 'sending the message failed because you're exceeding the limit' can anyone help me to resolve this please

    I have an error message coming up when trying to send an email which says 'sending the message failed because you're exceeding the limit' can anyone help me to resolve this please

    Try reentering the password in your iCloud mail settings.

  • Budget Exceeded error with message No BP 602

    Hi Experts,
    I am facing a budget exceeding error: Ntwk actvty 6000001 0020 budget exceded year 2009.
    following is the settings
    Availability control against: Overall                        
    Availability control against: Budget                         
    Availability Control in the Controlling Area Currency:       
    Activation type: Automatic activation during budget allocation
    Usage level in %:  0,00
    The project is P.0001
    Top lvl P.0001
    WBS P.0001.1
    Network Activity (External services) 6000001 0010 PR-($40000) PO($20000) & Service entery done with same amount($20000).
    Network Activity (External services) 6000001 0020 PR-($1)
    Actual   $20000
    Commitment 20001
    Assigned 40001
    Available $49
    Now we updated the budget as below:
    The original budget was 40050 in IM then modified to 45050 and distributed in CJ30.
    When we try to update the Service PR with 49 or more dollars, gives error in commitments and when the log checked, the budget exceeding message is there, if the PR updated with 48 USD, it gives the budge is exhausted.
    40050(Old Budget)-40001 (assigned) = 49 USD. Which means, the supplement of the  5000USD is not considered.
    Run the CJEN and CJBN to reconstruct the project but no use.
    Please help me out where to check and what went wrong. its in client prd.
    Regards,
    Ganesh

    Hi,
    You said in reports and in CJ31 , it is showing 60049 as available. I am confused here......including additional budget , total budget you gave is 45000. Then how it can show 60049 which more than Original Budget ?
    Have you distributed additional budget to the WBSE for which Service P.R is being raised ?
    What is distributable budget at the level of the WBSE for which P.R is being created in CJ30 ?
    What Is available budget against the WBSE for which P.R is being created in S_ALR_87013558. ?
    May be it will be of saome help for you.
    Thanks
    Saikishore.Ganga

  • Internal Order Budget exceeded error at the time of MIRO

    Internal Order 45000147 having total budget 1036144.57   and Payment done so far is 73640.00
    There are service purchase orders (66003816 & 17 only MIRO no MIGO)exists for same internal order of Rs 9, 25,000.
    We want to book  MIRO  against internal order of values approx 525000 but system is showing budget is exceeded as error message and we configured the tolerence as 100% if it cross 100 % then ti should give error message.

    Hi,
    is the amount 73640.00 shown as the assigned value in the active availability control? You could check this with the report BPFCTRA1 in SE38. If you enter '=SUM' in the OK-Code and press enter after execution of the report, a pop-up will appear if there are inconsisitent values. If no pop-up appears the assigned value displayed in BPFCTRA1 is correct.
    178837 explains how the assigned value for internal orders is calculated.
    Regards,
    Greta

  • "Budget Exceeded" error not appearing at the time of changing PR but appearing at the time of PO change.

    Dear All,
    At the time of PR value change after creation of PO budget exceeded error is not appearing even though the PR value exceeds the budget. But at the time of changing the same value in PO, budget exceeded error is appearing.
    List of steps:
    PR created.
    PR released
    PO created with reference to PR and released.
    PR value changed to a value more than the available budget - No budget exceeded error.
    PO value changed in accordance with the PR - System throwing the budget exceeded error.
    Now the issue is why the system bypassed the budget exceeded error at the time of PR value change and only giving the error at the time of PO value change. Also, we observed that while changing the quantity in PR which results in exceeding budget, system is giving the error. But while changing the value system is not giving the budget exceeded error.
    Your inputs will be highly appreciated. Thanks in advance.

    Hello Saurabh,
    Thank you for your inputs. Below is the output of CJI5.
    Ref,Doc Category  Debit Date     Oty       Object    Cost Elem.   Val/CO Area Crcy   Total Qty.     UM
    PREQ                  28.05.2014    WBS     XXXXXX    XXXXXX           0.00                         0            EA
    POrd                    28.05.2014    WBS                                       14,000.00                1000          EA
    From the above output i think system is not capturing the PR commitment. I'm not sure as i'm basically into MM and  dont know much about PS.
    Why the system is stopping with budget exceeded error at the time of PR creation and not giving any error while changing the PR value after PO creation. System is giving budget exceeded error if quantity is changed in PR. Please explain the standard system behavior and suggest how to enable control at the time of PR value change.
    Thanks in advance.

  • Budget exceed error while unreleasing the service entry.

    Hi experts,
    My problem is the systm generating budget exceed error while unreleasing the entry sheet in current fiscal year.
    Entry sheet is released in privious fiscal year. User want to reverse this in current year. All budget(actual/commitment) are carryforwarded to current year. While unreleasing the entry sheet, system throwing the budget exceed error. There is suficent budget in current fiscal year.
    Request you to pl suggest what might be the cause of problem.
    Regards
    shrikant

    Hi
    Thanks for reply
    For WBS element A-101.01
    For year 2009
    current budget is  100000
    Distrubutable budget is 100000
    Assigned budget is  100000
    For year 2010
    current budget is  300000
    Distrubutable budget is 300000
    Assigned budget is  200000
    Service PO created in 2009 year for amount 20000/-. Service Entry sheet created  and released in 2009 .Vendor invoice has not be generated. Error budget exceed is raised for year 2009 while reversing the service entry sheet in current posting date.(privious posting period /year closed).

  • Trying to install iOS 7.1.2 error message coming up

    TRying to install iOS 7.1.2 to iPad error message coming so won't install

    Just to make sure are you connected to WiFi?
    Try a reset:
    - Hold the home button and sleep/wake button down at the same time. When the Apple logo appears release both buttons.
    If issue remains try another WiFi network. Alternatively you can try the steps below to update with iTunes on a computer:
    First back up: iOS: Back up and restore your iOS device with iCloud or iTunes
    Then Update iOS with iTunes: Update your iPhone, iPad, or iPod touch

  • Error is coming when executing the report in bex

    hai experts,
    any body help me in this matter.
    when i execute the qurey in bex its showing error message coming with popup box.
    Error is showing like this.
    "no value found"
    " Exception 1 when calling WB_HTML_HELP_URL_GEToccured"
    but when i click on "OK"  button its showing result.can any body tell  me why its showing error  message like this .
    regards
    mahesh

    you default method is WEB so its useing URl to open the results, change the setting to use analyzer(XLS) and update your GUI Front End patch.

  • Budget Exceed Error during creating of Purchase order in reference to PR

    Hi,
    I am getting the subject error (Budget Exceed Error) every time when I want to create a purchase order related to purchase requisition of my project.
    Issue is that after release the project when the purchase requisition has created for non stock item under activity I found in transaction CJ31 the assign value has already updated.
    Let say my budget is 400 US$, and the purchase requisition has created for 380 US$. Now when I check with CJ31I found the assigned value is 380. Now If I create a purchase order it throws an error that budget exceed.
    The tolerance limits are following:
    SA     ZSA01     Budget Profile Overall AVAC     ++     1     90,00
    SA     ZSA01     Budget Profile Overall AVAC     ++     3     100,00
    SA     ZSA01     Budget Profile Overall AVAC     01     1     90,00
    SA     ZSA01     Budget Profile Overall AVAC     01     3     100,00
    Please advice what will be the proposed solution for the above issue.
    Thanks in advance.
    With Regards,

    Your budget is 400$ and PR value is 380$ but you have not mentiond what is the tax value ?
    when u r creating PO at that time system will check the budget against PO value considering taxes also.
    eg. 380$+tax value.
    after considering taxes your total PO value imay be getting updated more that 400$.
    Explre you error by clicking on error information you get the exact diffrence in budget and PO value.
    Hope this will sove your problem, reply after doing this.

  • Budget exceeded error when reversing down payment request via FB08

    Hi Experts,
          I am trying to reverse a down payment request via FB08 but unfortunately its throwing a budget exceeded error, is this normal behaviour?
    Regards,
    Lewis

    Hi,
    Please find the below link it will help full for you,........
    Order Value will be exceeded Msg No. F5373
    Naresh

  • Budget Exceed error while settlement in PS T-Code CJ88

    Hi Guru's,
    I have created structure upto 6 level and i have done planning and budgeting at 6th level only, and actual cost is also posted at 6th level.
    When i am setteling that amount  at 5th level WBS using T-Code CJ88 then it is giving Budget exceed error of that particular amount as budget is also available at higher level WBS as accumalation of budget at 6th level is going to higher level WBS as i am following buttom-up approach.
    Please suggest.
    Regards,
    Ambuj

    Hi Rajesh,
    When you distribute budget to lower level WBS, the budget is only available at the lower level (availability is checked as: Budget - Distributed Budget - Assigned) regardless of whether it is shown at the superior level or not.
    AVAC status is activated automatically on WBS where budget is distirbuted and released (provide you have maintained Activation Type 1 in Budget Profile OPS9). Please check if AVAC status is active on your 5th level WBS. If it is active then the system will throw the error as SAP standard behavior. You can remove this status from 5th level WBS via CJBW.
    You may need to look at your budget configuration accordingly.
    Regards,
    Ammar

Maybe you are looking for

  • Problem with implement BI_cont_ TX

    Hi all; After I add Bi-cont 5.0 om my bi installation. I treid to implement Bi_cont ext on SAINT as add-on. But I get this massages: caution upgrade or prepare is still running import not permitted I did run report RSUPGRES on client 000 by DDIC user

  • Passing an import parameter to a F.M

    Hi Experts, Could anyone resolve the issue below listed . I was passing a string consisting of both upper case and lower case letters as an input parameter to a function module, but the FM is taking the import value in upper case letter rather than m

  • How to automate task in jsp?

    I want to create an sms messaging website using jsp. The sms i believe would be ez, i would just have to use sockets in a bean. However there is a specific functionality i want to implement where my website would send a dummy sms message every 5 minu

  • CFHTTP GET using non-standard ports

    I have an application which goes out and checks links on various servers to verify that the link still exists, however I have a few links on servers that use non-standard ports (ie 8001, 7072, 8080, etc). When I dump CFHTTP I get the following: struc

  • Viewing dimensions for images stored on NAS drive

    Hi I have a problem with seeing dimensions for any images stored on my NAS drive. I can see the info for the folder contents under each, so that's clearly working, just not the image dimensions. 'Get Info' doesn't have this information either. Any id