Budget Logic check at each WBS level allowing 10% tolerance and the project level budget to remain constant
The project structure or the project hierarchy is not fixed. The requirement is that the  released budget should be allowed 10% above the present released budget.  Also despite this change the budget at the project level should remain constant. The 10% surplus has to be adjusted from the other WBS if they have spare budget and if thereu2019s no surplus budget in any WBS then the system should throw an error. Available budget has to be checked against the PR/ PO creation each time so ensure that Purchase is not made in excess to the budget allocated. Procurement happens thru MM/PS both
Please advice

You can activate Budget availibility control aginst Overall Budget / Released Budget.
Infact,  Budget availability control functionality is designed at WBS level only.
All you need to do is create required Budget profile  and assign the same to your project profile.
For detail please refer  this link
http://help.sap.com/erp2005_ehp_04/helpdata/EN/e0/c4a637f39a6a66e10000009b38f889/frameset.htm
http://help.sap.com/erp2005_ehp_04/helpdata/EN/d5/74a9371c726343e10000009b38f842/frameset.htm
Regards
Nitin

Similar Messages

  • Function modules to get wbs level budgets and activity level cost

    hai gurus can any one tell me the function modules or any other bapis to get the wbs level budgets and activity level costs
    thanx in advance
    afzal

    ok

  • How to get cost at wbs level

    hai gurus can any one tell is there any one tell is there any funciton module to get the cost at wbs level or any other method
    thanx in advacne
    azfal

    Hi
    Use the table <b>BPEJ</b> to Get the Full Year budget costs of all WBS elements
    and actual costs by using the fun module
    <b>K_CO_OBJECT_BALANCE_GET</b>
    <b>Reward points for useful Answers</b>
    Regards
    Anji

  • Raw Materail Quantity blockage on wbs level

    HI Guru's
    I am currently on the ETO based project where in on a particular WBS i may have no of production orders. Now client want the quantilty blockage for the raw material consumption in the order.
    I know through availabilty control i can block the cost consumption.
    Over here client want for a particuler production order the raw material quantity as well as the cost shud be blocked at wbs level.
    ex raw material-- 2000kg and budget for production order -
    5000000
    so do we have any concept for the same?
    Regards,
    Kamal Rana

    Wrong forum - this is the Basis forum here.
    Please close here and create a new forum entry in the MM area
    Markus

  • Logical design to implementation & vise versa?

    Does Designer support transfering logical design to implementation...and vise versa?
    Does Designer support transfering logical design to implementation...and vise versa?
    Is Oracle Designer a pure modeling tool doesn't support transferring logical design to implementation...and vise versa?
    Or there's a way to pull existing oracle database table structure into Oracle Designer and shown as diagram? The database and designer are same version 9i.
    And the other way around...to make the design of table structure from Designer model diagram becomes the real tables in database?
    I've asked this question in Meta link, funny they never reply.
    Thanks,
    Jess

    Designer supports transferring logical design to technical design to implementation and retrofitting implementation (an existing database structure) to technical design and retrofitting technical design to logcal design.
    So the answer to all your questions is YES.

  • Reg: Capturing Cost at WBS Level

    Hi
    I have create two activities(one internal and other External) under one WBS Element.
    I have complete the process of confirmation(for Internal activity) and Purchase process for external activity.
    Now i can see both the planned and actual costs of those activities.
    Now i want the see the costs at WBS Level, which is now happening.
    pl guide me, where i can see and what will be the process.
    Thanks & regards
    pavan

    Hi Pawan !
    You can see all the Reports in project system under-
    Logistic->Project System->Information System->Financial->Varius reports are given there
    you can use Report-
    S_ALR_87013533 - Plan/Actual/Commitment/Rem.Plan/Assigned
    Thanks
    Rewards Point if helpful
    Regards
    Smith

  • How to implement Bursting(Row level security) in Xcelsius

    Hi,
    We are using Xcelsius 2008. We have created xcelsius dashboard using Qaaws but for authentication in qaaws we are suing enterprise authentication and default user.
    Now in my dashboard i have one combo box wich gives data fro diffrent states, now i need to restrict the user to see the state values. I implement the row level security in universe, when i create webi report and view that reprot in infoview, the row level security works. But when i publish the dashboard to infoview the row level security doesn't work.
    We are uisng XO 3.1 with SSO on IIS. So how and what are the diffrent option available to implement the row level security in Xcelsius Dashboard.
    Thanks for the help in advance.
    Thanks,
    Nimesh.

    Nimesh,
    Were you able to implement ? I have a requirement to use the same dashboard for 5 regional users.
    Row level security works.
    combo box intial value is Global , when I login as North America user, combo still shows Global but it will have the value of North America.
    i am curious to know how you implemeted this?
    Thanks
    Pushpa

  • Copy project description (defined in WBS Level 2) automatically to activity

    Hi Gurus,
    How to copy project description (defined in WBS Level 2) automatically to activity name/description?
    For example:
    WBS element (Level 2): "Telephone System Replacement"
    When create a new Activity, the description will be: "Telephone System - xxxxxxxx"
    The first 16 characters "Telephone System" from the WBS Level 2 are automatically populated to Activity Short Text field.
    How to realize that?
    Thanks.
    JM

    >
    Virendra Pal wrote:
    > you can use substitution rule
    > transaction OPSN
    > check out the standard substitution fields available
    > if not you can always use an exit in substitution
    >
    > In the project profile enter this substitution and check the auto box
    >
    > This then on save will carry out substitution - use Intermediate save button and then add or replace the xxxxxxx
    >
    > Edited by: Virendra Pal on Nov 27, 2009 12:26 PM
    Thanks Virendra!
    I am new to PS, could you please explain in more detail?
    In OPSN, I am not sure which one to choose: Network Header or Network Activity, for my case. Looks like there are no standard substitution fields available. Could you please check it out for me? If no, how to use an exit? Is this exit the same as a user exit used for enhancement?
    Sorry, so many question marks. You help will be greatly appreciated!
    JM

  • The budget is consumed two times of WBS element

    Hi
    My probem is that The budget is consumed two times of WBS element . The
    first consumption is purcharse requesition (ME51N) and before the
    second consumption is funds precommitment .
    For us the wbs elements WBS are statistical budget .
    how do we consume one times ?
    Thank you for attention .
    Best regards

    Hi ,
    check this link as it may help you :
    http://help.sap.com/saphelp_45b/helpdata/en/86/98853478616434e10000009b38f83b/frameset.htm
    Thanks,
    Dhruv Kumar Malhotra

  • Settlement profile WBS level 3 to level 2

    Good Day All,
    Please advice, is there any configuration to automatically create settlement receiver to WBS to WBS .
    We have requirement which is to make automatically generate settlement receiver from WBS level 3 to WBS level 2.
    Our structure for example :
    Proj Definition
    WBS level 1
    WBS level 2
    WBS level 3 (automatically generate WBS level 2)
    Is there any configuration in settlement profile or default rule?
    Cheers,
    Nies

    I found the answer in another thread.
    https://supportforums.cisco.com/thread/2144096

  • Write authorization of ACL at WBS level

    Dear All,
    We activated ACL (No inheri.) at WBS level.
    According to my understanding in "write" authorization, we can just change the PS object but we can't delete the object.
    We assigned "Write" Authorization to one user, but he is able to delete the object.
    Please guide for the same.
    Regards.

    Hi Praddy,
    Please check if the group to which this user belongs to doesn't have superior authorization. Refer to the below thread for more details.
    Access Control List - Project System (PS) - SAP Library
    Cheers
    Sammar

  • How to load Cj01 create project for WBS level 1,2 and 3

    Dear All
    I want to load the project for WBS element.I had used IDOC project01 for the same but I am getting error as 'SaveReplica'method was not called up via ALE.I am presently trying with LSMW recording for tcode CJ01 in order to populate the
    wbs levels 1 ,2 and 3 since the hierachy is not fixed i:e there is no limit as to how many 2 or 3 wbs levels are there so how shall i proceed with recording.If any body has migrated Projects for WBS elements please do share me.In my recording i am getting error 'Do not enter a level greater than 2'.is it that i have to carry t recording for each level seperately.
                        Tried with Bapi Bapi_project_maintain and all Bapis related to it most of the cases i am getting
    error as to no initialization created though having executed Bapi_Ps_Initialization.
    Regards
    Somnath

    Hi Somnath,
    The BAPI, BAPI_PROJECT_MAINTAIN should work for any levels of requirement..and you dont need to initialize it. First, go through the documentation given in the SE37 transaction code. It will explain all. Just concentrate on the reference number. If you see in the example given there, two wbs elements are being created.
    Then you have to use methods like create,save...unlike other BAPI's.
    Just go through the documentation once.
    Regards,
    Vishwa.

  • Functional area change at WBS level

    Hi Experts,
    I just want know the possibility of functional area change at WBS level.
    If we assign Functional area at project level, can we change functional area of WBS?
    if it is possible then is it possible to assign/change functional area of WBS after releasing the same?
    Please update me.
    Thanks & Regards
    Suresh. J

    Hi Surej,
    FA in project is in Basic tab and FA in WBS is in Assignement tab. Both functional area for Project or WBSes could be different. All this functional area could be changed. However, please note if you changed the FA once the data is posted into the WBS, the system will give a warning message not to change the FA. This FA in master data is to ease data entry. The FA will be copied over to FA area field during data entry. In fact, you can change the FA during data entry.
    Hope this explains your query.
    Thanks.
    Regards
    Fauzi

  • Resource Assignment at WBS level

    Hello everyone,
    I am a new user in Primavera.So I am having a lot of questions....Please see one of them........
    Is there anyway in Primavera that we can assign resources at WBS level..If I can do that it could save my lot of time rather than assigning all the resources at the activity level...........
    Any kind of help will be appreciated..
    Thanks in advance

    Thanks Akhtar & Michael,
    I am agreed with your answer but when we looking at WBS window at the bottom you can see the tab called "Planning Resources" . Can anybody will suggest me what is a use of that funcnality & how we can use that (Note:- There is no option for assignment in that tab)
    Thanks Guys. All your answers is appreciated
    Regards
    Nirav

  • How to implement copy paste functionality with IE

    Hi Experts,
    I am working on jdev 11.1.1.6.0, I have requirement to implement copy & paste functionality with IE Browser in ADF table. I have followed below link to implement the functionality.
    http://one-size-doesnt-fit-all.blogspot.com/2011/04/aftable-restoring-basic-browser-copy.html
    But copy&functionality is working fine, but when table loading I lost vertical/horizontal scroll bar. Can any one suggest me what is wrong here/what i am missing here.
    My logic:
    <?xml version='1.0' encoding='UTF-8'?>
    <jsp:root xmlns:jsp="http://java.sun.com/JSP/Page" version="2.1"
              xmlns:af="http://xmlns.oracle.com/adf/faces/rich"
              xmlns:f="http://java.sun.com/jsf/core"
              xmlns:h="http://java.sun.com/jsf/html"
              xmlns:c="http://java.sun.com/jsp/jstl/core"
              xmlns:sni="/SNIDeclarativeComponentLib">
      <c:set var="tumuiBundle" value="#{adfBundle['sni.tum.view.TestUIBundle']}"/>
      <af:resource type="javascript">
        var globalLastVisitedField = null;
        function captureTableFieldName()
          return function (evt)
            evt.cancel();
            globalLastVisitedField = evt.getSource();
        function copyMenu(evt)
          if (globalLastVisitedField == null)
            alert("copyMenu() Error: No field could be
                                     identified to be in focus");
          else if (navigator.appName != "Microsoft Internet
                                     Explorer")
            alert("Copy function is only
                                     supported in Microsoft Internet Explorer");
          else
            var txt = globalLastVisitedField.getProperty("ItemValue");
            window.clipboardData.setData('Text', "" + txt);
          evt.cancel();
      </af:resource>
      <af:subform id="f1" defaultCommand="srchcb">
        <af:panelStretchLayout id="psl1" topHeight="auto" bottomHeight="auto"
                               styleClass="AFStretchWidth">
          <f:facet name="center">
            <af:panelCollection id="tab" styleClass="AFStretchWidth">
              <af:table value="#{bindings.TestVO.collectionModel}"
                        var="row"
                        rows="#{bindings.TestVO.rangeSize}"
                        emptyText="#{bindings.TestVO.viewable ? 'No data to display.' : 'Access Denied.'}"
                        fetchSize="#{bindings.TestVO.rangeSize}"
                        rowBandingInterval="1"
                        selectionListener="#{bindings.TestVO.collectionModel.makeCurrent}"
                        rowSelection="multiple"
                        id="Table" styleClass="AFStretchWidth"
                        contentDelivery="immediate">
                <f:facet name="contextMenu">
                  <af:popup id="pMenu" contentDelivery="lazyUncached">
                    <af:menu id="mMenu">
                      <af:commandMenuItem text="Copy" id="cmiCopy">
                        <af:clientListener method="copyMenu" type="action"/>
                      </af:commandMenuItem>
                    </af:menu>
                  </af:popup>
                </f:facet>
                <af:column sortProperty="Name" sortable="true"
                           headerText="#{bindings.TestVO.hints.Name.label}"
                           id="c33">
                  <af:outputText value="#{row.Name}" id="Nam">
                    <af:clientListener method="captureTableFieldName()"
                                       type="contextMenu"></af:clientListener>
                    <af:clientAttribute name="ItemValue"
                                        value="#{row.Name}"></af:clientAttribute>
                  </af:outputText>
       </af:column?
       </af:Table>
    -Thanks.

    Hi,
    I can't tell. What I can tell is that the code in the sample you reference for sure doesn't cause this - but it doesn't help you I guess.
    Btw.: Here is a solution that works on all browsers. The solution in the blog (Chris - please forgive me) is a bit awkward to be honest.
    http://www.oracle.com/technetwork/developer-tools/adf/learnmore/012-copy-table-cell-values-169137.pdf
    http://www.oracle.com/technetwork/developer-tools/adf/learnmore/tablecellcopypaste-168499.zip
    Frank

Maybe you are looking for

  • CD ROM/Blu-Ray player now missing in Windows Explorer for HP HDX18

    I currently have a: HP HDX X18T-1100 CTO Premium Notebook PC, product number: FJ927AV All of a sudden, I can no longer see the  CD player in windows explorer. If I put a CD in nothing plays, no blu-ray, no DVD, no music CD. If I look at the device in

  • Purchase order using balance sheet accounts

    Hi there, We have a need to create purchase orders using balance sheet accounts instead of expense or cost of sales accounts.  Any pointers will be greatly appreciated. Thanks in advance

  • My computer keeps telling me that i need quicktime to run itunes.

    I have quicktime and have tried unistalling and reinstalling itunes, what do i do?

  • Size and rotate a background image

    I would like to have a background image that rotates different images when the page is refreshed and sizes with my page. I believe I have a handle on the sizing part but I can't figure out how to make the images rotate. I would like the images to go

  • Lenovo G 560 display driver problem

    The problem that I have: in 5 or 6 days my display goes black and after 2-3 seconds everything is OK again. When that happens I get a message from the system:" DISPLAY DRIVER STOPPED RESPONDING AND HAS RECOVERED" "Display driver NVIDIA Windows Kernel