Bug While Conversion 4m Prd ord to PlndOrd.

Hi Saper's,
I got the belowed error while i enter Ordertype in MD04
You cannot make an assignment to make-to-order Stock
i am using PP01 order type for MTS and MTO,while MTS there is no error displaying but in MTO it is throwing me this error.
Please help me in this regard.
Regards,
Kumar.S

Hi Kumar,
I read thru' that note, it says
component 'sales order' is not active in Customizing of the controlling area
as the reason for this message, so check with your CO consultant to make the necessary CO customizing & it should work fine.
Good luck.
Regards,
Vivek

Similar Messages

  • Variant config in PLD/PRD ORD

    Hi guys,
              I have configured variant for my finished product. i can select variants through sales order for MTO. My requirement is to have variant selection for MTS also that is during PIR. Guide me if its possible how to proceed..
    Requirement is urgent,
    Thanks in Advance,
    S.Suresh.

    Hi Guys,
             I have 4 assemblies i want select 3 assemblies when converting pld ord to prd ord,how to proceed, pls any one guide me.
    For EX:
              Cnc machine is finished product.
              Assemblies are:
              1. Zaxis
              2. Xaxis
              3.Head Stock
              4.Tail Stock
    While converting pld ord to prd ord i should select only 1,2,3 no need of 4th...how to proceed pls guide me.
    One more option is we can delete 4th item in prd ord..But i want while converting pld ord to prd ord itself i should select.
    Thanks in Advance,
    S.suresh.

  • BUG in  Conversion of Planned order to Production Order.

    Dear all,
    I got an error while conversion of planned order to production order are as follows,
    No Default values maintained for op.generation for order type ZFT1(matlPILSF002).
    Can anyone please guide me to proceed further.
    Kumar.

    Hi,
    Root cause behind this problem is, no Routing found.
    First complete below settings.
    - Go to OPJG And create defult Operation creation in case of no Routing found.This setting will generate the default Operation incase of no routing found during Order creation.
    - In T.code OPJF Create automatic selection parameters (Selection ID) for Routing.
    - In T.Code OPL8 Maintain Selection ID for Routing and also maintain type of Routing selection (3 - Automatic Routing selection)
    Regards,
    Dhaval

  • Error while conversion

    hi,
    my scenario is conversion of file to xml where the input is a fixed length file.while conversion im getting the following error.Can anyone help me identify what is it.
    the i/p structure is
    datetype
         datainp
                header0
                           key0
                           value1
                header1
                           key1
                          value1
    My file content conversion parameters are
    HEADER0.fieldFixedLengths     2,6,13,13,7
    HEADER0.keyFieldValue     00
    HEADER0.fieldNames     KEY0,VALUE1,VALUE2,VALUE3,VALUE4
    HEADER0.endSeperator     ' '
    HEADER1.fieldFixedLengths     2,7,8,4
    HEADER1.keyFieldValue     01
    HEADER1.fieldNames     KEY1,VALUE1,VALUE2,VALUE3
    HEADER1.endSeperator     ' '
    ignoreRecordsetName     true
    But im getting the following error:
    Conversion of complete file content to XML format failed around position 0: Exception: ERROR consistency check in recordset structure validation (line no. 1: missing structure(s) in last recordset
    Can anyone help me with this.Its very urgent
    thanks,
    srinadh

    Hi Bhargav,
    this might be the error...as in ur parameters
    HEADER0.fieldFixedLengths 2,6,13,13,7
    HEADER0.keyFieldValue 00
    HEADER0.fieldNames KEY0,VALUE1,VALUE2,VALUE3,VALUE4
    HEADER0.endSeperator ' '
    HEADER1.fieldFixedLengths 2,7,8,4
    HEADER1.keyFieldValue 01
    HEADER1.fieldNames KEY1,VALUE1,VALUE2,VALUE3
    HEADER1.endSeperator ' '
    The Spelling of Separator is wrong...
    Try using
    HEADER0.<b>endSeparator</b>
    Sachin

  • Bug in Conversion 4m Planned Order to Production Order.

    Hi guys,
    While conversion of Planned order to Production Order i got the below error,
    "YOU CANNOT MAKE AN ASSIGNMENT TO MAKE-TO-ORDER STOCK"
    Message # CO684
    Settings i ve done,
    MRP3 View for this particular Material i have selected Stratergy as 20.
    Please help me to resolve this issue,and what are the settings i need to do.
    Awaiting a positive reply.
    Regards,
    Kumar.S

    Resolved Sucessfully
    Kumar.S

  • Bug while editing and compiling the procedure

    Bug while editing and compiling the procedure in Sql Developer 1.5.4
    the error is
    ora -00904 "ATTRIBUTE" Invalid Identifier
    Edited by: user4448643 on Mar 16, 2009 5:09 AM

    I'm not trying to be snippy but this is the answer I got from you in another thread about the same issue:
    +"I'm not sure I said it's being worked on - the bug is logged and in the queue.+
    +Support will tell you to move to a supported version of the database, this is true. The same is true for the forum, if you are on an unsupported database version you're encouraged to move to a supported release.+
    +If you need to work with 9i, then use SQL Developer 1.5.3, the error is not in that release."+
    When I read that I got that I should not assume the bug was being worked on and that the SQL Developer team sees 9i as having a short remaining life.
    JB

  • Translation problem , While conversion from English to Poland

    Hello Gurus
    Pl suggest  Translation problem , While conversion from English to Poland  getting message
    "Code page not found for Poland "
    Code page 1401 exits in system
    SAP version 4.6C
    Best regards
    Krish

    Dear Vamsi,
    Please check the below lonk may be it heps.
    Translation to different languages. How??????
    Regards
    Pranay

  • Batch determination while prd. ord. confirmation

    Dear Experts,
         We have got batch management system for raw material in our organisation.  Here, we are selecting the batch number to the material while releasing the production order ( order will not be relesed if we are not selecting batch number).  I do not want to assign batch number during order release but I want to select the batch number while confirming the order.  Is it possible? If so how?
    Regards,
    K.V.Manikandan

    Dear K.V.Manikandan
    this completly depends on your requirements and I cannot know this requirements. Select the key combination for which your batch search strategie should be valid and then add the characteristics you want to use for selection.
    For the first step I cannot give you a recommendation as I don't know if you want to create a strategie Please check documentation under for further assistance:
    http://help.sap.com/erp2005_ehp_04/helpdata/en/25/283b894f7811d18a150000e816ae6e/frameset.htm
    Regards,
    Sabine

  • Timeline Bug while dragging, trimming, moving a clip

    Hello,
    I have a huge problem with Adobe Premiere Elements 11 on a Mac, OSX Lion - only in the expert mode:
    If I want to drag a clip in my timeline or reposition it or trimm it, the normal background of the timeline is replace with a copy of the preview-part above. So I could not see where to place my clip exactly. I see only the duplicated preview area - see my screenshots:
    Insert a clip:
    Remove a clip:
    Normal view, while doing nothing:
    How can I fix this problem? Has anyone the same bug?
    Best regards
    Tom

    Bob
    No I am not affiliated with Adobe in any way. Just an Elements user, and an Elements Windows user at that. But I have an over active troubleshooting gene.
    The issue symptoms that you present surely do fit the profile intended for that Adobe issue and its fix. Since Adobe did offer the fix, I assumed that it had insider information on cause and its relationship to the fix.
    Even if you do not act on updating display driver for your new computer, for troubleshooting purposes, I would identify the display driver that you have, go to the web site of the display driver card's manufacturer, and verify that the display driver is up to date to rule that factor in or out. In troubleshooting,take nothing for granted. If you verify that the display driver is up to date, then I would go back to Adobe Technical Service, update it on your details, and then learn "what next".
    Several months ago elsewhere I was working with a Premiere Elements 11 Mac user, dealing with this same issue. Last I heard from him, nothing worked.
    We will be watching for your progress.
    Thanks.
    ATR

  • Foreign Currency rounding off while conversion

    Hi All,
    I am experiencing a scenario while foreign currency conversion.
    I have searched for a solultion but i am unlucky to find one regarding this problem.
    The scenario:
    Example:
    Foreign Curr      |    Value    |       Rate     |     SAP converted Local Curr(Yen)   |    Act Con Value(Y)
    Euro                 |    1210Eur|       127.99Y|     154868Y                                   |   154867(-veRound Off)
    Is there any setting where you can round off the converted amount to its negative whole amount?
    I have searched all the setting in Foreign Currency transactions(OB52,OB59) but couldnt find.
    Hope i can get a solution.
    Regards
    Andrew

    Hi
    Reason and Prerequisites
    u2022Your tax country is Slovakia
    u2022You billed an order with several items in foreign currency,
    u2022where the exchange rate factor between foreign currency and local
    u2022currency is very large or very small.
    u2022The accounting document created during the billing has a tax line item that contains incorrect amounts in local currency
    Solution
    The solution is using the same solution as note 832477 and 32477 with the difference that the country is Slovakia. For other countries you should put the variable L_LAND1 to the string that represent the country.
    Limitations:
    The solution will NOT lead to a recalculation of taxes in local
    currency. However, it will serve to minimise any rounding differences
    which may arise from converting the individual tax lines which are
    transferred from SD to FI. In most practical cases, this should fulfill
    the legal requirements, even though rounding differences may occur for
    individual documents in special cases.
    Regards
    uday

  • Remove .00 from string while conversion

    How do i remove .00, .01 from the string while converting that string to int
    i tried to do this
    Select REPLACE(CONVERT(varchar(15), [Cases], 1), '.00', '') from table
    UPDATE table
    SET [CASES_d] = CAST(REPLACE(CONVERT(varchar(15), [Cases], 1), '.00', '') AS INT)
    I get the error
    Conversion failed when converting the varchar value '1.10' to data type int.
    can somebody help
    Thanks

    Sorry, in that code I missed intermediate conversion into decimal(10,2). I forgot we can not convert directly.
    So, try:
    update table set cases_id = case when cases like '%[^0-9.]%' then 0 else cast(cast(Cases as decimal(10,2)) as int) end
    where cases not like '%[^0-9.]%' -- exclude updating bad rows
    For every expert, there is an equal and opposite expert. - Becker's Law
    My blog
    My TechNet articles

  • Possible bug while a popup is open

    I noticed a strange behavior for popup windows in CVI 2009: when a popup is open, and I click on a button on the caller panel (that I think should be completely inacitve) the EVENT_LEFT_CLICK_UP is generated.
    I attached a simple application to show this behavior: in the textbox I append every event generated for the "Click" button. Before opening the popup you can see a lot of events (EVENT_MOUSE_POINTER_MOVE, EVENT_LEFT_CLICK, ...) when you click on this button.
    If you click on "Open" a popup is opened; if you click on the "Click" button while the popup is open you will see that the EVENT_LEFT_CLICK_UP is generated.
    Could you confirm this is a bug?
    The same behaviour is shown for MessagePopup( ), ConfirmPopup( ) and InstallPopup( ).
    Vix
    In claris non fit interpretatio
    Using LV 2013 SP1 on Win 7 64bit
    Using LV 8.2.1 on WinXP SP3
    Using CVI 2012 SP1 on Win 7 64bit, WinXP and WinXP Embedded
    Using CVI 6.0 on Win2k, WinXP and WinXP Embedded
    Attachments:
    test_popup.zip ‏5 KB

    Hi Vix,
    Thank you for your posting.
    I tested your example project and seen that you seem to be right.
    The event EVENT_LEFT_CLICK_UP should not happen when a Modal dialog box is opened.
    Now I'm sending a request to R&D in order to let them verify and take the right actions.
    I'll let you know if they tell me that this is not a bug but a somehow expected behaviour.
    Thanks again
    Best Regards
    Luca Gallo
    Sales Engineer

  • Conversion of Proc Ord in APO

    Hi Gurus,
    We have a customized logic (special batch numbering) on conversion of planned orders to process orders.  In the ECC side, if we convert planned orders to process orders, this logic is being applied.  But if we convert the planned orders to proc ord at the APO side, this logic is not applied.
    Which program/transaction does it use when converting planned ord to proc ord?  Any suggestion?  Thanks
    Kumar

    hi
    the customized logic is in R/3 not in APO.
    better post the issue in APO forum
    -ashok

  • CC bug while loading jvm?

    The following code generates a segmentation fault while it's compile with CC and not with gcc.
    The crash only occurs if the jvm is loaded and if the buffer size is 100000. (I tried with 50000 and there's no crash).
    I assume that the crash occurs because of a corruption of the stack pointer but I don't know exactly what happens for the moment. Does anyone have an idea?
    #include <stdio.h>
    #include "jni.h"
    #define BUFFER_SIZE 100000
    typedef struct
    char sz[BUFFER_SIZE];
    } my_struct;
    void bar(my_struct s)
    return;
    void foo()
    my_struct s;
    bar(s);
    bar(s);
    bar(s);
    bar(s);
    return;
    void useJVM()
    JavaVMOption options[2];
    JavaVMInitArgs vm_args;
    JavaVM *jvm;
    JNIEnv *env;
    long result;
    jclass cls;
    options[0].optionString = ".";
    options[1].optionString = "-Djava.compiler=NONE";
    vm_args.version = JNI_VERSION_1_2;
    vm_args.options = options;
    vm_args.nOptions = 2;
    vm_args.ignoreUnrecognized = JNI_TRUE;
    result = JNI_CreateJavaVM*(&jvm,(*void* **)&env, &vm_args);
    if (result == JNI_ERR ) {
    fprintf(stdout,"Error invoking the JVM");
    return;
    return;
    int main( int argc,
    char **argv)
    if (argc != 1)
    useJVM();
    foo();
    fprintf(stdout,"OK\n");
    return 0;
    } {noformat}
    Built like this :
    CC -mt -PIC -compat=4 -c -g -I/usr/j2sdk1.4.2/include/ -I/usr/j2sdk1.4.2/include/solaris/ mainjni.c
    CC -mt -PIC -compat=4 -z allextract -o bugsun mainjni.o -L/usr/j2sdk1.4.2/jre/lib/sparc/ -ljvm -lthread -lcthe program exits with a segmentation fault.
    Built like this :
    gcc -c -g -I/usr/j2sdk1.4.2/include/ -I/usr/j2sdk1.4.2/include/solaris/ mainjni.c
    gcc -o bugsun mainjni.o -L/usr/j2sdk1.4.2/jre/lib/sparc/ -ljvm -lthread -lcthe program works. Is it a CC bug?
    Edited by: gude on May 30, 2008 9:02 AM
    Edited by: gude on May 30, 2008 9:04 AM

    My code :
    #include <stdio.h>
    #include "jni.h"
    #define BUFFER_SIZE                     100000
    typedef struct
            char sz[BUFFER_SIZE];
    } my_struct;
    void bar(my_struct s)
            return;
    void foo()
            my_struct s;
            bar(s);
            bar(s);
            bar(s);
            bar(s);
            return;
    void useJVM()
            JavaVMOption options[2];
            JavaVMInitArgs vm_args;
            JavaVM *jvm;
            JNIEnv *env;
            long result;
            jclass cls;
            options[0].optionString = ".";
            options[1].optionString = "-Djava.compiler=NONE";
            vm_args.version = JNI_VERSION_1_2;
            vm_args.options = options;
            vm_args.nOptions = 2;
            vm_args.ignoreUnrecognized = JNI_TRUE;
            result = JNI_CreateJavaVM(&jvm,(void **)&env, &vm_args);
            if(result == JNI_ERR ) {
              fprintf(stdout,"Error invoking the JVM");
              return;
            return;
    int main(       int argc,
                            char **argv)
            if (argc != 1)
                    useJVM();
            foo();
            fprintf(stdout,"OK\n");
            return 0;
    }To compile with CC:
    CC -mt -PIC -compat=4 -c -g  -I/usr/j2sdk1.4.2/include/ -I/usr/j2sdk1.4.2/include/solaris/  mainjni.c
    CC -mt -PIC -compat=4 -z allextract -o bugsun mainjni.o -L/usr/j2sdk1.4.2/jre/lib/sparc/ -ljvm -lthread -lcTo compile with gcc:
    gcc -c -g  -I/usr/j2sdk1.4.2/include/ -I/usr/j2sdk1.4.2/include/solaris/  mainjni.c
    gcc -o bugsun mainjni.o -L/usr/j2sdk1.4.2/jre/lib/sparc/ -ljvm -lthread -lcI noticed that if I only call the function bar() three times in the function foo(), it works...

  • Additive cost not seen in production order and while settling hits PRD

    I am using additive costs for my product costing via CK74n.
    Cost estimate looks good since I have the valuation variants setup to include additive costs.
    But when I see the production order that is being created, all others costs are being considered except additive costs. They are recognized but not as a line item instead as a variance. When I settle the order the costs actually hit price difference account and not even the GL account that I had assigned for the additive cost. SAP did not consider the cost as variance even if it was showing up as variance initially. This as I understood is partly because of the settlement rule that I have in place which tells SAP to go and settle on the material (which is standard SAP to do since I want all the costs from the production order to settle on the eventual material going into stock) so SAP went on to settling on the material. Since the material is set as standard price the variance is being booked as a price difference entry.
    Ideally I would have expected the additive cost getting debited to the order and credited to the gl account that I assigned for the additive cost. The eventual cost (incl. additive cost) should hit the inventory.
    Am I missing a step?

    Hi Sapluver,
    Appreciate your prompt response..Please see my response in italics
    Few queries related to your post.
    1. So your standard cost got two part, one with quantity structure ( materials, labor, OSC etc) which the system cost automatically and one manual part, which is your additive cost. While costing system picks up this manual part from CK74N.
    I hope this part you got correct. Yes, the cost estimate is reading from both the qty structure and the additive costs and the cost roll-up is coming up correctly
    2. Now in actual cost controlling, i think System is not sure how to valuate your additive cost actual part.I agree, the additive cost does appear in the cost analysis section of the production order but does not show up as a line item initially. Instead it comes up as a difference item right in the bottom of the screen after totals have been displayed without any line item reference. As if the system is not sure how to display the line item. Once I have done the material issuance confirmation to the order, the additive cost got picked up correctly as I have set it up in the cost component structure as material overhead but again shows up only as variance
    Which method you used to debit your production order with additive cost, is it a normal journal entry or through some automatic posting through routing ( example OSC through Purchase order/Good Receipt).I probably need to understand your point more clearly? I am not manually debiting the production order at all for the additive cost. I was expecting SAP to debit the order the same way it does for overheads. Overheads too initially show up as variance but then when we run the overhead calculation KGI2 the overheads costs get debited to the production order. Was expecting similar behavior for additive costs. I am receiving the finished product from the production order into stock via MIGO goods receipt movement type 101. I was expecting the debit to happen perhaps at the time of settlement via CO88 but here the system posted it to the price difference account via account key PRD. This I understand the system did because the settlement rule is set to post all the costs on the material and the material has the valuation control as standard price; so the system is seeing the additive cost as a price difference hence posting it to the price difference account.
    System is unaware of the additive cost from actual cost point of view, there is no specification to additive cost from costing variant for actual cost. So you have to debit the order with the additive cost part.So do I manually debit the order with the additive cost? What about the price difference additive cost sitting on the order? Would appreciate if you can tell me the process steps for posting this correctly
    regards
    Sapluver

Maybe you are looking for

  • AR Aging vs. GL

    Hello all, At March 31, 2009 our Year End, we ran an aging report, the report did not match our GL. The report was out by (29.60)usd and no trace of that amount in the report. After running the report today it balances and we have found the USD curre

  • Not enough memory (RAM) error. Can't open TIFF file.

    I can't open a 74MB TIFF file in CS5 photoshop.   I get error message: Could not complete your request because there is not enough memory (RAM).  I have 16GB of RAM and 55.5 GB of scratch disk. I am using my recently installed copy of Photoshop CS5 6

  • ACE Configuration Check

    VIP : 10.10.10.10:8000 rserver server1 ip address 10.10.10.1 serverfarm SFARM1 rserver server1 8001 probe Probe_8001 rserver server2 8002 probe Probe_8002 rserver server3 8003 probe Probe_8003 rserver server4 8004 probe Probe_8004 I would like to loa

  • Storage Location field not appearing in Mat Doc.

    Dear All, While doing GR 105 for PO, the Storage Location Field is not appearing in Mat Doc. Moreover, the TO is not getting created immediately while saving the Mat Doc. I don't know why this is happening? The material has both Qty/Value Updation ti

  • Short dump - Unable to interpret "USD " as a number

    Hi, I am trying to pass 'price unit' to BAPI -> BAPI_PO_CREATE1 But while executing below statement, i got a short dump -> Unable to interpret "USD " as a number wa_poitem-price_unit    = wa_data-peinh here wa_poitem of type BAPIMEPOITEM-PRICE_UNIT,