Business process Engien shows RED in RWB

Hi Guys,
I have successfully run few scenarios in a freshly installed PI server..
How ever I get  RED in the Business process Engine...
can u pls let m eknow why this occurs?

Hi Ravindra,
Please ensure below items,
1) your CPA Cache refresh is upto date.
2) ensure both 'Maintain Definition Environment and Maintain Runtime Environment' in SWF_XI_CUSTOMIZING has green check
    mark.
3) Click on 'Cache Connectivity Test' in RWB - check if everything shows you green there?
Regards
Sekhar

Similar Messages

  • FILE TO IDOC SCENARIO-Receiver Business system ECC showing Red

    HI
         In File-idoc scenario Business system showing red status in RWB .And i have given the role for the business system as application server and configure related integrated server . But the error in a RWB  for the ping and self-test is as follows
         Unable to log on to system buss_ecc_200 in language en with user PIRWBUSER .
    I thing from XI side every thing is ok. But for bussiness system side ECC might miss some configuration .
           could any help in this issue:
    regards..

    Hi
    Please try one of the followings:
    1) In Configuration --> Business service --> Service --> Adapter specific identifiers. Give logical system name for the sender system (e.g XI_00_800)
    2) In Design --> mapping objects. Give all information of sender n receiver in EDIDC40 segment and
       In configuration --> receiver communication channel in that enable the checkbox take sender from payload.
    3) In configuration --> Receiver Agreement --> Header mapping --> Sender Service (Give XI1 i.e ur sender system).
    Also check the RFC destination that is the major problem with idoc...

  • Business Process Engine is showing Red Led in RWB

    Hello to All,       I installed PI7.1 and after client copy - Business Process Engine is showing Red Led in RWB. 
    When I click on BPE, the message at bottom of screen (in Yellow Status) indicates " Schedule background job for clearing report".  Please let me know if any one has the solution with details.
    I gone thru the link in SDN, but no resolution yet.
    Re: Business Process Engine is  showing Red Led in RWB
    thanks, Srini

    Hi Mark,  All the nodes are green under "Maintain Runtime Environment" and "Maintain Definition Environment".
    In RWB, component monitoring --> Display -- Business process engine is RED with message as
    "Schedule background job for clearing report" in Yellow.
    I looked under batch jobs "SWWCLEAR" and it is already ran successfully.
    Please let me know how can i make BPE green.
    thanks, Srini
    Edited by: Srinivas Chatrati on Apr 20, 2009 11:51 PM

  • BPE in RWB is showing Red LED.

    Hello Experts,
    In RWB --> Component Monitoring --> Display -- Business process engine is showing RED LED.The message
    "Schedule background job for clearing report" is in Yellow.
    In transaction swf_xi_customizing all the nodes are green under "Maintain Runtime Environment" and "Maintain Definition Environment".
    I cannot change the "Schedule background job for clearing report". It gives message "Customizing Already Carried Out"
    Please help.
    Thanks in advance,
    Regards,
    Suraj

    Hi Suraj,
    Is this hindering the execution of your BPM. I dont think it should create any problems. I have often seen the adapter engine and integration engine showing Red LED but that does not hinder the execution of messages.
    Regards,
    Sarvesh

  • RED the flag of the Business Process Engine

    Hello!:
    If we access "http://srvprubpoem:50200/rwb",
    Component Monitoring-Components- the option Business Process Engine is in RED. There is an "JCO request failed".
    Otherwise, if we execute transaction SWF_XI_CUSTOMIZING (to see the problems), there is one DUMP with the text "CHECK_FAILED".
    The transaction SWF_XI_CUSTOMIZING calls the transaction SWFC using the variable SWF_XI_BPM, and here is the other problem.
    Do you know the problem?
    Thanks.

    Hi Alfredo,
    Check out SAP note 1052604 - <i>RAISE_EXCEPTION in CHECK_FAILED exception</i>. It seems to give the solution (either a correction or installation of SP13).
    Regards,
    Thorsten

  • Business Area not showing during MIGO line item process

    Hi,
    We are doing the MIGO process w.r.t. PO....there in Line item...Business Area not showing in its Field.
    If we create another MIGO document with other PO, BA is showing...
    What should be the issue...

    Hi,
    is this an account assigned PO ? Please check the PO document for the acct asst Tab .
    whather the BA is populated .?
    Please reenter the detials of GL account and try again for the PO.Please check whather the co object is properly assigned or not ?
    Regards,

  • Business Process Engine Error and Adapor Monitor JPR error in PI 7.0 Server

    Hello,
    I have installed PI7.0 Server on windows server. When I use SXMB_IFR tcode I got RWB screen and RWB Business Process Engine is in red. though I have configured automatic workflow customizing through SWF_XI_CUSTOMIZING tcode. Still i am getting BPE is showing Red.
    The Second Error :
    Adaptor Monitor area also I am getting JPR is in Red .
    Could some one please help me what to done on my PI server and how to fix?
    Regards,
    Sankaranarayanan.G
    SapBasisConsultant.

    Hello,
    Thanks for your reply. http://XIHost:Port/ProxyServer/jprselftest   this url what is the Proxy server? Here I am accessing net through some script.  I have maintained Business system also.
    What to be done? SLD is working fine..
    Regards,
    Sankaranarayanan.G
    SAP BASIS CONSULTANT.

  • Snapshot agent showing red mark in replication monitor!!!(Merge replication)

    few days before snapshot agent showing red mark in replication monitor without any changes...
    synchronizing from publisher to subscribe working fine...
    and how to clean up snapshot agent job history...
    plz give me a solution...
    Thanks in advance.......

    error:
    The replication agent has not logged a progress message in 5 minutes. This might indicate an unresponsive agent or high system activity. Verify that records are being replicated to the destination and that connections to the Subscriber, Publisher, and Distributor
    are still active.
    snapshot agent showing red mark...
    Hi Baraiya Kirit,
    According to the error message, the issue could be caused by that the agent is busy or the agent cannot log in to one of the computers in the topology.
    To troubleshoot this issue, please perform the following steps. For more details, please review this article:
    MSSQL_ENG020554.
    • If the agent has stopped, please restart it and check if the error still occurs.
    • If this error is raised frequently because the agent is busy:
    You might need to redesign your application so that the agent spends less time processing.
    You can increase the interval at which agent status is checked using the Job Properties dialog box.
    • If an agent cannot log in to one of the computers in the topology:
    We recommend that the -LoginTimeOut value be set lower than the interval at which the replication agent checkup job runs.
    There is also a similar blog for your reference.
    http://maginaumova.com/the-replication-agent-has-not-logged-a-progress-message-in-10-minutes/
    Thanks,
    Lydia Zhang

  • Error Business Process Engine

    Good afternoon, first of all thank you very much for the support they can provide. I have developed a JDBC interface -> BPM (Multimapping) which works well. Modify a Message Mapping in the BPM that I use for an RFC Lookup, I have added the Configurable Parameters in the BPM and Integration Directory and everything works fine at design time. But when running the interface at run time the message reaches the BPM and the error "error in BPE inbound Permanent processing".
    I have reviewed the Business Process Engine in the RWB and the item is Red Schedule Background Job for Reorganization and detail reads: "Background Job for Reorganization = Not Scheduled".
    As I can solve this problem. Thank you very much.

    Hello,
    Please go to trx SWF_XI_CUSTOMIZING and check if all nodes are green.
    You can run the Automatic Customizing there to schedule the job for reorganization.
    Kind regards,
    Sarah

  • Business process check-in/check-out - who has checked out and when?

    We have been using the business process check-in/check-out functionality for 18 months and there are an increasing number of process's that have been checked out to the maintenance project and never checked in again. Is there a straight forward way in the system to see who had checked out a business process and when? When using the SOLMAN_DIRECTORY transaction it is easy to see which process's are checked out as they are marked the red OUT symbol and have check-out status = checked out - but no other information about the check-out seems to be available either in this transaction or on a separate report.

    Hello Steve,
    What Peter neglected to tell you is once you enable history on the Solution a history log will begin to populate.
    It will show as the standard "Log" icon for HISTORY. Every change will be logged at each level of the structure.
    Here is an example of a History log line....while it is not a check-in.out change it will give you an idea
    Name             Date             Time              Change                               Object                           Old Value           New Value
    I809573     24.01.2011     22:33:32     Process Availability     Material Management          7 x 24 h
    What you can do is filter the report on the values that will give you the check-in/check out against the objects you want to track.
    This is how you can use the "Enable History" to get the information you are interested it.
    Just two things to be aware of : 1) The history will not be retro active (unless it was already enabled), so it will start from the day you enable logging (history), and logs take up space, which at some point maintenance will likely be required, however I don't see these logs having high disk usuage.
    If it were documents that you wanted a report on check-in/check-out for, you likely could use the transaction Solar_Eval under Documents, but there are no standard reports for this...and filtering the History log file accordingly is about the best reporting
    that would give a result. This log file can be printed, or you could capture the printoutput to a file and there is your Electronic version of the report.
    I hope this has helped.
    Regards,
    Paul

  • Business process function " LOG_PP_SRN_CONF"

    Hello experts,
    I have tried to activate business process function " LOG_PP_SRN_CONF"  it is showing a message no need to activate.
    Reason why I am doing this because it gives me to enter the shift data in the confirmation screen.
    please guide me
    Thanks
    Satya

    Hi,
    Refer to the link below:
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/c0fa9a04-376a-2c10-c396-86d32ac80614?quicklink=index&overridelayout=true
    Follow the steps, if it does not resolve the issue, then do upload some screenshots of OPK0, OPK4 to get a clear picture.
    Regards,
    Vivek
    Added
    Am sorry i am unable to access rapidshare portal, if possible upload to another portal eg: picasaweb.com

  • Business Process: Final Demand Plan Key Figure in the past for APO DP

    Hello APO process experts,
    I have a BPX question for APO DP process owners, consultants or gurus:
    1.- Have you ever seen in any SAP APO customer, that in their APO DP planning books, they chose or designed to update the Final Demand Plan key Figure in the past closed historical buckets with the Actual Sales?
    Meaning that that in the Past closed historical Buckets, Actual Sales and Final Demand Plan, look exactily the same.
    Meaning that they create a dynamic Final Demand Plan key figure so to speak, yet they did not choose to create a key figure that also keeps the Final Demand Plan as originally entered.
    2.- Would you think that doing the above, without keeping any keyfigure in the planning book that actually shows what the Final Demand Plan was in the Past, is a good practice?
         The Demand Planner could still retreive the Final Demand Plan from BI reports, yet, dynamically they could never really see it in the planning book.
    3.- Do you think the above dynamic key figure would bias the Demand Planner's behaviour to manipulate the future open Final Demand Plan buckets to enter volumes in order sum to a monthly total, independently of what were the over and underachievements in the past (since they are not really visible to him) ?
    I would really like your feedback,
    thanks in advance!
    JD Loera

    Hello Thanks for your feedback.
    I agree with your point, and I hope that i still get more feedback from other Business Process Experts.
    I am trying to build a case for my client, to challenge the decision of their initial design as this practice is going to hurt the Demand Management process, if what they intend to achieve is a true "unconstrained demand plan"
    Much appreciated
    JD Loera

  • Why PSA data show red status when opened but green on PSA page?

    Run RSA1 -> click PSA to open PSA page, locate one infosource and find the PSA under it, find the status column shows it's green, but when opening it, find the 1st column shows red for each row.  How does the inconsitance occur?
    BTW, if we open the infopackage monitor for the above one, find a weird thing is that each request get two consecutive processes running with a circle of red ball and green ball in the left frame.  Double click one of them, in the right frame and click the monitor Status tab, the msg window is as following (in between two dashed lines below):
    Incorrect data records - error requests (total status GREEN)
    Diagnosis
    Data records were recognized as incorrect.
    System response
    The valid records were updated in the data target and can be used in reporting.
    The incorrect records were not written to the data target, but were posted retractively under a new request number in the PSA.
    Procedure
    Check the data in the error requests, correct the errors, and post the error requests.
    Sounds like the data failed to uploaded to data target due to error in PSA, but why the status show green in somewhere?   And if clicking the Details tab, all show green!  Weird!
    Thanks

    Hi Kevin,
    In your InfoPackage Update tab, click the Error Handling button. It seems that the Valid records update, request green option is chosen. This is why you see the green request and some error records.
    This means that the corect reocrds were loaded and are available for reporting, but the incorrect ones were left behind. This is used to check the erro records separatelt so that they do not disrupt the entire data load.
    Hope this helps...

  • Error while converting BPMN to BPEL in Business Process Architect

    Hey,
    I am using Business Process Architect 11gR1 where I have modeled my process. Now that I have to move this model to BPM, I am using the option SOA -> share blueprint with IT in BPA. A dialog appears that asks to validate the model. I confim with "Yes" and it shows the conversion progress bar but after the while an error appears (a java exception). A report opens in my browser that has the following message
    Validation of a service-oriented BPMN model in Oracle BPA Suite
    Structure rules for BPMN in Oracle BPA Suite
    Rules for a service-oriented BPMN model in Oracle BPA Suite
    String not found: RULEKIND_NAMEd89733d0-d605-11db-0505-000fb0c4ad32
    The java exception is "Error while creating report:
    report: oraclebpmn2bpel, line 632
    Type error: cannot find function getErrNo in object.java.lang.IllegalArgumentException. (oraclebpmn2bpel#632)
    can anyone please help me as to why this happens and how it can be sorted out?
    Edited by: user10303310 on Dec 13, 2011 3:10 AM

    Hi Julika,
    The error message might not be related to the activities itself. I assume your model is not well structured. Consider that the following points aren't disregarded:
    * Never "jump" out of a particular branch into a different part of the model or into another branch
    * All functions/events have only one incoming/outgoing connection
    * Process parallel flows should be specified by splitting and joining AND/XOR rules, or they should contain either one splitting AND/XOR rule only for which there is no other connection between their paths, or one joining AND/XOR rule only that is met by all connections.
    Let me know if it did not help to fix your problem.
    Best regards,
    Danilo

  • Error in actual template allocation for Business Process

    Gurus,
    I am facing a strange problem in actual template allocation for business process (T-code: CPAS). When I am doing a test run, the system gives the result with a message "Processing completed with no errors", However when I have unchecked the test run and ran the allocation, system shows me the result, however no posting takes place. The message I am getting is:
    "Data not updated due to errors". The details of this error message are:
    No information was found
    Message no. GU444
    Diagnosis
    The system could not find the necessary information.
    I am absolutely clueless and have no idea where things have gone wrong. I have maintained the activity and cost center properly. The template I am using is also ok.
      Request your help on this. Any suggestion would be highly appreciated.
    Thanks in advance!
    Snigdho.

    Hi ,
    With such kind of error " "Data not updated due to errors". " its very difficult so determine the exact cause of the issue .
    Did your selection parameters in CPAS has a tick on detailed list . Please tick the detailed list icon and run KPAS again and let me know if you are getting more detailed error from SAP.
    Regards
    Sarada

Maybe you are looking for

  • Error while previewing in Word 2007

    I am using word 2007 and have xml publisher template builder for word version 5.6 build 45 in stalled on my system. I have installed MS .NET 2.0 patch also. When i select for preview after loading the data, every time i hit the same error. the error

  • Code placement for drop down menu within an animated button

    I have a main menu comprised of 7 buttons; 6 of which are all straight forward with an animation. (The animation is that when the buttons are rolled over the button extends itself out to the right. On the rollout the button returns to its original st

  • IE 6 and 7 issues.  Stumped.

    Hi There, On this page, there is a large space between the menu and text for some  reason. -  only in IE 7.  I think it has something to do with the menu  class, as when I remove the div the space is fine, but I've tried  several things to modify it

  • Error launching AIR application, Debug works

    Hello! I just tried to develop an air application that grabs current actions from our local intranet. While developing with aptana everything worked fine. Then i created the .air package and installed the new program. But everytime i want to start th

  • PL/SQL Callback to Dequeue

    I have a procedure that automatically dequeues from a PL/SQL callback (9iR2) in a single consumer queue within the same instance. The same procedure functions when manually called agaist a propogated queue in a separate instance, but it will not work