Business scenarios for the Steel industry

Dear All,
I need the various business scenarios used in the steel industry for the procurement and inventory management. In case anyone have worked on an implementation project for Steel industry can you please guide me which are the major scenarios common to all steel industries?
Thanks.

Hi,
Here are a few scenarios which I have worked:
1.Steel is usually procured in the form of plates of different dimensions (length, width & thickness).
To capture this, you can activate material class (class 001) for material master.
You can create your own class and have these dimensions as characteristics.
While creating material codes, you can capture the dimensions as characteristic values..
This way, you can maintain the uniqueness of material codes in the system.
2. Steel is usually procured in bulk from various sources, both domestic and imports.
As such, the price of the same material may vary depending upon the source and also when it was procured.
Hence, it becomes a necessity to manage the different lots separately.
You can activate batch management in inventory or better still, Split valuation by batch to handle this.
3. If steel is procured for specific project, then the purchase requisition/purchase order will be for specific Project (WBS element).
   This means you will be working with a/c assign.categ "Q"
4. You can have Order unit that is different from base unit (Stock keeping unit.)
    you can maintain suitable conversion factors for the same.
5. While issuing steel to Production, the big steel plates may be cut into smaller pieces and issued.
    So, you can have a different unit of issue in material master along with conversion factors.
6. If your client is having tender system for procurement, then you can have the RFQ to handle this.
    You can have different loading factors to assign different weightages for vendors while maintaining Quotations.
     You can go for an enhancement to RFQ screen to capture extra fields relating to tender.
    You can have a Z form to output tender comparative statement as per client requirement.
Hope the above info is useful to you.
Regards
Prabhu

Similar Messages

  • Business scenarios for variables

    can anyone tell me the business scenarios for the  replacement path n customer exit variables........using SD data......
    regards
    gyandeep

    Hi,
    Please search the forum. You'll get a lot of good material on Production Support activities. This topic has been discussed in detail on the forums.
    Cheers,
    Kedar

  • Which scenario u will suggest for Iron & Steel industry & why?

    Which scenario u will suggest for Iron & Steel industry & why?
    Product - Galvanised Plain/ Galvanised Corrugated Sheets
    Process- Pickling-Cold Rolling -Galavanizing- Cutting /Corrugation
    Kindly suggest manufacturing scenario Discrete / Repetitve ?
    Madan

    Hi
    Please clear the following doubts:
    1. Is it working on Make to order scenario or Make to stock scenario?
    2. Will the sheets that come out are of different sizes and shapes?
    if so the final operation will be different for different sizes.
    Chandra

  • Business scenarios for daily, weekly and nightly loads!!

    Can any body tell some Business scenarios for daily, weekly and nightly loads where we monitor the loads in Production support.
    Regards
    srikanth.ch

    Hi,
    It all depends on your business needs. In general on daily basis you will load the SD and MM which will cover all the stock and sales done for day. Generally most of the clients use Lo Cockpit extraction for both the modules. FI chains will run on month end for example the AP(Accounts Payable),AR(Accounts Receivable) chains will be run on the month end.
    Some SD datasources : 2lis_13_vdhdr, 2lis_13_vditm, 2lis_13_vdkon - all these to pull billing related data
    Some MM Datasource : 2lis_03_bx and 2lis_03_bf.
    Regards,
    Harish Raju

  • Business scenarios for Production support !!!

    Dear experts,
    i have conceptual knowledge on Production support so can any body tell about some Business scenarios for Production support like frequent failures of infopackages, loads..etc.
    can any body tell the regular activities of Production support people.
    Thanks
    Regards,
    srikanth.ch

    Hi,
    Please search the forum. You'll get a lot of good material on Production Support activities. This topic has been discussed in detail on the forums.
    Cheers,
    Kedar

  • Defining business scenarios for tha master data components

    Hi Friends
    How to define business scenarios and rules for each of the master data components?
    plz reply me
    thanks in advance

    Hi Venkata Ramana
    Good question...
    You can use standart mdm business scenario for master data(and business process) management
    For mdm 5.5
    https://websmp201.sap-ag.de/~sapidb/011000358700001119842007E
    https://websmp201.sap-ag.de/~sapidb/011000358700001119482007E
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1035773
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1252846
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1252884
    https://websmp201.sap-ag.de/~sapidb/011000358700001119642007E
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1252883
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1255401
    https://service.sap.com/~form/handler?_APP=01100107900000000342&_EVENT=REDIR&_NNUM=1268212
    For mdm 7.1
    SAP MDM Business Content
    moreover you can use standart business scenarios as basis for build business process management in your company
    Regards
    Kanstantsin

  • Registration of Business system for the Integration Engine Java in the SLD issue

    Hi,
    We have completed the installation of PI-AEX 7.4 SR1 then we ran the below wizards successfully.
    - Configuration Wizard: PI-AEX initial setup
    - Configuration Wizard: PI Self Test for AEX
    However when we were Checking the AEX Configuration as per help.sap.com
    Check the registration of a business system for the Integration Engine Java in the SLD:
        Enter https://<host>:<port>/sld .
        Choose Start of the navigation path Business System Next navigation step Integration Engine Java <SID> Next navigation step Integration End of the navigation path.
        The pipeline URL must be: http://<host_fully_qualified>:<port>/XISOAPAdapter/MessageServlet?ximessage=true .
    More information: SAP Note 1435392
    for us the Pipeline URL is as below
    http://<host_fully_qualified>:<port>/XISOAPAdapter/MessageServlet
    and the rest " ?ximessage=true "  is not there.
    Also we ran the below wizard
    Configuration Wizard: PI Self Test for AEX
    and it finished successfully without any issue.
    Any Suggestions what could be missing.
    Thanks,
    Regard
    Ahmed Mohammed

    Hi,
    I found the below SAPNOTE which confirms that the Pipeline URL should be
    http://<host_fully_qualified>:<port>/XISOAPAdapter/MessageServlet
    1564449 - PI CTC Wrong Pipeline Url after AEX Initial Setup
    However on help.sap.com it is different.
    Any one experienced the same ?
    Regards
    Ahmed Mohammed

  • Advanced Planning for the retail industry

    Hi,
    First, I would like to know the best solutions for planning in the retail industry and if you can share with me more detail about these solutions.
    Second, I want to understand the SCM menu....I know that under the point Advanced Planner and Optimzer are the DP, SNP, PPDS and GATP solutions......but I want to understand the point Forecasting and Replenishment, is it for the retail industry or what it is for?....how does it interact with SAP-Retail or the solutions that you explained in the first point?
    Thanks a lot!

    SAP has avoided making any recommendations. I specifically asked one of their architects a similar question a couple of weeks ago.
    In general the X12 and EDIFACT standards are king within the retail industry. Within the United States X12 has been the default standard for many years and is used by all the giants. Within the European Union EDIFACT is the default standard and is used by the vast majority of retailers. However the UK has a standard which is called Tradacoms. In my experience UK retailers have, when pushed, also offered EDIFACT messaging. It should be noted that these formats are not XML. However many XML convertors exist for them. X12, EDIFACT and Tradacoms are what are commonly referred to as Traditional EDI.
    The GS1 standard called eCOM is being increasingly adopted. I do know that Accenture and CapGemini have recently been heavily involved in promoting GS1 and eCOM. This is because eCOM standard is realistically the most heavily backed replacement for the Traditional EDI standards. The several of the largest US and European retailers and manufactures are now throwing their weight behind eCOM.

  • Industry Standards for the Retail Industry

    I want to know " SAP recommends which of these Industry Standards for the Retail Industry?
    1.GS1
    2.ANSI ASC X12  
    3.eCOM 
    4.GSMP  
    5.EPCglobal  
    6.GDSN 
    7.GCI
    8.VICS

    SAP has avoided making any recommendations. I specifically asked one of their architects a similar question a couple of weeks ago.
    In general the X12 and EDIFACT standards are king within the retail industry. Within the United States X12 has been the default standard for many years and is used by all the giants. Within the European Union EDIFACT is the default standard and is used by the vast majority of retailers. However the UK has a standard which is called Tradacoms. In my experience UK retailers have, when pushed, also offered EDIFACT messaging. It should be noted that these formats are not XML. However many XML convertors exist for them. X12, EDIFACT and Tradacoms are what are commonly referred to as Traditional EDI.
    The GS1 standard called eCOM is being increasingly adopted. I do know that Accenture and CapGemini have recently been heavily involved in promoting GS1 and eCOM. This is because eCOM standard is realistically the most heavily backed replacement for the Traditional EDI standards. The several of the largest US and European retailers and manufactures are now throwing their weight behind eCOM.

  • What are the business scenarios used in plastic industry

    Hi Experts,
    Could you guys please tell me what are the business scenarios (in sap sd) i should use while implementing in plastic industry (as if someone already worked on implementation project at plastic industry).....
    As per my knowledge i would use:
    MTS
    Batch management
    Third party etc....
    but in addition to these (if anyone already worked on the implementation project in plastic industry...then what are the business scenario used for......please suggest.....)
    If have any idea please suggest........ would be a great help.......
    Thank you in advance...........

    it depends which part of the value chain you are working at e.g. your company is B2B, supplying ingredients to Plastic industry manufacturer or you sell to wholesellers.
    Below are the processes you - may - do in Plastic industry -
    - Inter-company stock transfer
    - Subcontracting
    - Contracts
    - QM inspection during delivery process
    If you require business scenario descriptions (in brief) for the above processes, then please convey.
    Edited by: Typewriter on Jul 11, 2011 11:30 AM

  • How to Add the business scenario for BPC by Using BPR

    Hi All,
    We want to Use Solution Manager BPR for Mapping of Business Processes for BPC and for this we checked and tried the same consisting of Solution Manager 7.0, "SAP Business Objects Business Planning and Consolidation" but it shows an  product version as for "SAP BPC 7.0 FOR MICROSOFT, " Only
    But in Solution Manager 7.1 System it is showing for both ""SAP BPC 7.0 FOR MICROSOFT,SAP BPC 7.0 FOR SAP NET WEAVER".
    Need to understand why it is not showing Netweaver in Solman 7.0 System and also for mapping this BPC in to Solution manager what are to be taken in to considerations.
    Please suggest on this, your help is highly appreciated.
    Thanks & Regards,

    Hello Hazira,
    do you have the same supportpackage level of component ST-ICO in both systems?
    The BPR content is always delivered with the ST-ICO component.
    Regards,
    Thomas

  • SAP crm implementation business scenario for crm  marketing project

    Dear guru's
    Can any body will help me to know about one sap CRM  marketing implantation project business scenario.
    Like one full process of marketing project and the integration of the other modules like r/3,
    Like what end users do if we implanted the marketing project for one company,
    Any industry but please give me detailed with the documentation if possible.
    I practice with the best practice but iam not able to the comparison to the business process of the company.
    No need to tell about company details I want  to know only the process.
    Like which type of company it is suet or which type of company it is not sute.
    If there is any document like this type of company sauté for the marketing and like this type of company suites for the service modules like that.
    this  is sivaanjith this is my  please help me to come out of this confusion.
    Reards.
    siva anjith

    hi
    well talking about the implementation project in CRM
    let us assume we are implementing it in BANKING industry
    here the requirement is in improvement in the field processing and all the effeciency of the sales or feet on street
    so we implement the CRM marketing with CIC
    what it will do that we start with first the readiness document that what all are the requirement of the bank and how the company can cope it with the help of CRM
    then we prepare the BLUEPRINT to state that the data to be processed will be strucutured in CRM in how many phases or the timely schedule of the roll over of CRM in bank
    next up we start with the configuration ,like we have to start campaigns and generate leads for the banks which may get converted into the opportunities
    so have to do all the configuration of CRM according to the requirements being given
    one thin g i forgot which is very imp is that we do requirement gathering,its pretty imp part of entire process
    after getting these only we can do whatever we want with CRm
    so after that we realise the configuration in realisation phase then we do those UATs and SITs
    this way we phase out the CRM in any sector
    just a gist of everything
    hope i cleared some air
    best regards
    ashish

  • Business Scenarios in Consumer Products Industry -- need help

    Hello Experts,
    I need Scenarios in Consumer Products Industry say for example --P&G what are the practical scenarios available.
    Can anybody help on this. I really appreciate the help.
    Thanks
    Regards
    Mahesh

    Hi Nilson,
    The business processes mentioned can be used for any industry. There is not restriction as such.
    These business processes are more relevant for those industry.
    e.g. Outsourced Manufacturing / WO Collaboration is extensively used by High-Tech companies. Even the recent enhancement requirements have come from High-Tech companies.
    Similarly, Kanban / SMI is extensively used by Automotive. But SMI is also popular with High-Tech.
    CP industry is biggest consumer of Responsive Replenishment process.
    Regards,
    Sandeep

  • New business scenario for reapir from customer and sending them to vendor.

    Hello team,
                          We have a scenario where we need to configure in the system -
    We  recieve a material from my customer for repair.We need to send this to my vendor who will repair  it and send them back to Us. On this we  recieve revenue from the customer and pay i pay half amount my vendor for the service.
    We are following above scenario in SAP as
    In the first step
    The production team create a serviece order in IW31 for the material that need to send to the vendor, which was recieved from the customer. When service order is created in the back end a Purchase requisition is created.
    In next step we  created a  PO w.r.f to the above PR and  we need to send this  to vendor on subcontracting so that we can track the material from him after the repair.
    The problem is --- When PR is created automatically during serviece order creation (iw31) we are unable to create Po with Item category L (subcontracting) because PR is not created with L.We are even unable to change L in  PR since it is created automatically at the background.We ried to change the field at document type in spro. But no luck.
    Pls let us know is there any other business process where we can handle this situation or any technical help to change the PR.
    Regards,
    L.chaitanya.

    Hi,
    please work out in this way...
    It can be done Using PM02 and PM03 control keys. Select the operation row select the External button in the bottom u will find Sub con check box u can click it .The prerequisities are create a material BOM in the bom as L item select a row and click the item which will be near to the header cap 2nd tab status/long text click it .Mat. Provision Ind select Lor X if it is not available go to IMG setting.Plant maintenance ->Master Data in Plant Maintenance and Customer Service->Bills of Material->Item Data->Define Material Provision Indicators, K&L will be standrad create S Rework Material,XRework Material from Subcontrmake a tick mark in Recursivity of Subcontracting Component and save it . while creating the material to the operation to be assigned from bom then in the component select the row go to the general button in the bottom then Mat. Prov. Ind will be there select rework material the system allows you to proceed further . save the order then check the PR it will be Account assignment will be F and Item categeory will be L selected automatically.
    Then create PO then do MB1b (prerequsitie the material should have stock)using PO reference( movement type 541) the it will be moved to the vendor stock (check with mmbe)
    Aganist PO Material sent to the vendor .While doing Goods Recipt do with MB01with movement type 101, now u can check the stock in mmbe it will be in storage location...
    Kuber

  • Standard WebClient UI business role for the CRM 7.0

    Hello Gurus
    where can we get the below mentioned thing....i tried in service market place but i did not get
    The predefined authorization roles are provided as attachment BP_CRM_ROLES.ZIP to the collective note of this SAP Best Practices version. Download and unzip the roles to your local directory
    after dowloading we need to uplaod in to PFCG roles
    (The purpose of this activity is to copy a standard WebClient UI business role and to assign a new authorization role to it. The WebClient UI business role is designed to centralize the authorizations, navigations, and content of the CRM WebClient UI.
    The business roles will be adapted to the Best Practices scenario scope)
    i am struck of ove here
    regards
    Sreeram

    Hi Sreeram,
    The roles you want to assign to the user you have to select for your scenario. The best practice role assigned to an user to navigate to the webclient. The other roles you assign to the user to give authoraization for your scenario. If you will go to C04 document you can get the standard roles which will be assigned to one particular user. For the standard user let sal SALES_MAN we assign the standard roles as peer the best practice as SAP_CRM_UIU_FRAMEWORK ,SAP_CRM_OR_ADMIN, SAP_CRM_OR_USER and BP_SLS_MANAGER. If you need other authorization for the user then copy the standard role and assign the authorization manually in transaction PFCG.
    Hope this will help you.
    Thanx
    Chinmaya

Maybe you are looking for

  • Passing object references to methods

    i got the Foo class a few minutes ago from the other forum, despite passing the object reference to the baz method, it prints "2" and not "3" at the end. but the Passer3 code seems to be different, "p" is passed to test() , and the changes to "pass"

  • Install SSL certificate - OS X Server 10.8.2

    Greeting All, I am using OS X Server 10.8.2 with Server.app 2.2 and self-signed SSL sertificate. And I try use CA form Verisign. I already success create CSR and get trial SSL certificate form Verisign. But I found I can't install SSL certificate cor

  • Could not connect to X11 windows server

    Hi All, I am using OVM Server 2.2.1. I am having one VM which has Oracle VM template 10.2.0.4. I want to start GUI and install another Database. I have export DISPLAY variable to localhost and then try to start DBCA but failed to start and giving err

  • Unhappy With Change To the Calendar With iOS7!

    I am very unhappy with the change to the calendar since I updated to iOS7! It took away the ability to change a previously entered all day event to a start & finish time! I am a single parent with three kids & live by my calendar! I put all day event

  • "networking error" w/itunes, software update

    This seems to be a problem I'm having throughout my system with iTunes, software update, etc. I CAN connect to the internet from the dock, but iTunes gives me "a networking error has occured (-1001.) Make sure you can connect to the internet, then tr