Business Scenarios in Consumer Products Industry -- need help

Hello Experts,
I need Scenarios in Consumer Products Industry say for example --P&G what are the practical scenarios available.
Can anybody help on this. I really appreciate the help.
Thanks
Regards
Mahesh

Hi Nilson,
The business processes mentioned can be used for any industry. There is not restriction as such.
These business processes are more relevant for those industry.
e.g. Outsourced Manufacturing / WO Collaboration is extensively used by High-Tech companies. Even the recent enhancement requirements have come from High-Tech companies.
Similarly, Kanban / SMI is extensively used by Automotive. But SMI is also popular with High-Tech.
CP industry is biggest consumer of Responsive Replenishment process.
Regards,
Sandeep

Similar Messages

  • Consumer products industry

    Dear Experts ,
    What exactly is process flow of  Consumer Products (fmcg industry ) Can any body give me cycle of Consumer products  industry ??
    Regards
    Senthilkumar N.K.

    Hi,
    FMCG is not as simple - I don't think anyone can explain this in one reply at the forum.
    What FMCG stands for is FAST MOVING CONSUMER GOODS, because it is fast moving there are improved SAP functionality to address this specific business requirement.
    I suggest you read the help files on help.sap.com SAP Retail for example.

  • Business scenarios for the Steel industry

    Dear All,
    I need the various business scenarios used in the steel industry for the procurement and inventory management. In case anyone have worked on an implementation project for Steel industry can you please guide me which are the major scenarios common to all steel industries?
    Thanks.

    Hi,
    Here are a few scenarios which I have worked:
    1.Steel is usually procured in the form of plates of different dimensions (length, width & thickness).
    To capture this, you can activate material class (class 001) for material master.
    You can create your own class and have these dimensions as characteristics.
    While creating material codes, you can capture the dimensions as characteristic values..
    This way, you can maintain the uniqueness of material codes in the system.
    2. Steel is usually procured in bulk from various sources, both domestic and imports.
    As such, the price of the same material may vary depending upon the source and also when it was procured.
    Hence, it becomes a necessity to manage the different lots separately.
    You can activate batch management in inventory or better still, Split valuation by batch to handle this.
    3. If steel is procured for specific project, then the purchase requisition/purchase order will be for specific Project (WBS element).
       This means you will be working with a/c assign.categ "Q"
    4. You can have Order unit that is different from base unit (Stock keeping unit.)
        you can maintain suitable conversion factors for the same.
    5. While issuing steel to Production, the big steel plates may be cut into smaller pieces and issued.
        So, you can have a different unit of issue in material master along with conversion factors.
    6. If your client is having tender system for procurement, then you can have the RFQ to handle this.
        You can have different loading factors to assign different weightages for vendors while maintaining Quotations.
         You can go for an enhancement to RFQ screen to capture extra fields relating to tender.
        You can have a Z form to output tender comparative statement as per client requirement.
    Hope the above info is useful to you.
    Regards
    Prabhu

  • What are the business scenarios used in plastic industry

    Hi Experts,
    Could you guys please tell me what are the business scenarios (in sap sd) i should use while implementing in plastic industry (as if someone already worked on implementation project at plastic industry).....
    As per my knowledge i would use:
    MTS
    Batch management
    Third party etc....
    but in addition to these (if anyone already worked on the implementation project in plastic industry...then what are the business scenario used for......please suggest.....)
    If have any idea please suggest........ would be a great help.......
    Thank you in advance...........

    it depends which part of the value chain you are working at e.g. your company is B2B, supplying ingredients to Plastic industry manufacturer or you sell to wholesellers.
    Below are the processes you - may - do in Plastic industry -
    - Inter-company stock transfer
    - Subcontracting
    - Contracts
    - QM inspection during delivery process
    If you require business scenario descriptions (in brief) for the above processes, then please convey.
    Edited by: Typewriter on Jul 11, 2011 11:30 AM

  • Still stuck with the same old producer consumer weight problem need help

    Hello All,
    This is the problem I am stuck with right now.
    I have two array lists one producer array list and one consumer array list denoted by a and b
    P1 P2 P3 P4 P5
    5 6 7 8 9
    C1 C2 C3 C4 C5
    2 3 4 5 6
    Now we find all those producer consumer pairs which satisfy the criteria Pi>=Ci
    We have the following sets
    (5,2)(6,2)(7,2),(8,2),(9,2)
    (5,3)(6,3)(7,3),(8,3),(9,3)
    (5,4)(6,4)(7,4),(8,4),(9,4)
    (5,5)(6,5)(7,5),(8,5),(9,5)
    (6,6)(7,6)(8,6),(9,6)
    Let us done each of them with Si
    so we have S1,S2,S3,S4,S5
    we assign a third parameter called weight to each element in Si which has satisfied the condition Pi>=Ci;
    so we we will have
    (5,2,ai),(6,2,bi),(7,2,ci)....etc for S1
    similarly for S2 and so on.
    We need to find in each set Si the the pair which has the smallest weight.
    if we have (5,2,3) and (6,2,4) then 5,2,3 should be chosen.We should make sure that there is only one pair in every set which is finally chosen on the basis of weight.
    Suppose we get a pair (5,2,3) in S1 and (5,2,3) in S2 we should see that (5,2,3) is not used to compare to compare with any other elements in the same set S2,
    Finally we should arrive at the best element pair in each set.They should be non repeating in other sets.
    Given a problem
    P0 P1 P2 P3 P4
    9 5 2 2 8
    6 5 4 5 3
    C0 C1 C2 C3 C4
    we have So as (P0,C0) and (P4,C0)
    assuming that the one with the smaller index has lesser weight PO is selected.In the program I have used random weights.from set S1 we select the pair PO,CO
    S1 =(P0,C1),(P1,C1) and (P4,C1)
    since P0 and P4 are already used in previous set we dont use them for checking in S1 so we have (P1,C1) as best.
    S2=(P0,C2),(P1,C2) and (P4,C2) so we dont use P0,C2 and P1 and C2 because PO and P1 are already used in S1.
    So we choose P4,C2
    in S3 and S4 ae have (P0,C3),(P1,C3),(P4,C3) so we dont choose anything
    and same in S4 also.
    So answer is
    (P0,C0),(P1,C1) and (P4,C2).
    My program is trying to assign weights and I am trying to print the weights along with the sets.It doesnt work fine.I need help to write this program to do this.
    Thanks.
    Regards.
    NP
    What I have tried till now.
    I have one more question could you help me with this.
    I have an array list of this form.
    package mypackage1;
    import java.util.*;
    public class DD
    private  int P;
    private  int C;
    private int weight;
    public void set_p(int P1)
    P=P1;
    public void set_c(int C1)
    C=C1;
    public void set_weight(int W1)
    weight=W1;
    public int get_p()
    return P;
    public int get_c()
    return C;
    public int get_x()
    return weight;
    public static void main(String args[])
    ArrayList a=new ArrayList();
    ArrayList min_weights_int=new ArrayList();
    ArrayList rows=new ArrayList();
    ArrayList temp=new ArrayList();
    Hashtable h=new Hashtable();
    String v;
    int o=0;
    DD[] d=new DD[5];
    for(int i=0;i<4;i++)
    d=new DD();
    for(int i=0;i<4;i++)
    d[i].set_p(((int)(StrictMath.random()*10 + 1)));
    d[i].set_c((int)(StrictMath.random()*10 + 1));
    d[i].set_weight(0);
    System.out.println("Producers");
    for(int i=0;i<4;i++)
    System.out.println(d[i].get_p());
    System.out.println("Consumers");
    for(int i=0;i<4;i++)
    System.out.println(d[i].get_c());
    System.out.println("Weights");
    for(int i=0;i<4;i++)
    System.out.println(d[i].get_x());
    for(int i=0;i<4;i++ )
    int bi =d[i].get_c();
    ArrayList row=new ArrayList();
    for(int j=0;j<4;j++)
    if( d[j].get_p() >=bi)
    d[j].set_weight((int)(StrictMath.random()*10 + 1));
    row.add("(" + bi + "," + d[j].get_p() + "," +d[j].get_x() + ")");
    else
    d[j].set_weight(0);
    row.add("null");
    rows.add(row);
    System.out.println(rows);
    int f=0;
    for(Iterator p=rows.iterator();p.hasNext();)
    temp=(ArrayList)p.next();
    String S="S" +f;
    h.put(S,temp);
    String tt=new String();
    for(int j=0;j<4;j++)
    if(temp.get(j).toString() !="null")
    // System.out.println("In if loop");
    //System.out.println(temp.get(j).toString());
    String l=temp.get(j).toString();
    System.out.println(l);
    //System.out.println("Comma matches" + l.lastIndexOf(","));
    //System.out.println(min_weights);
    f++;
    for(Enumeration e=h.keys();e.hasMoreElements();)
    //System.out.println("I am here");
    int ii=0;
    int smallest=0;
    String key=(String)e.nextElement();
    System.out.println("key=" + key);
    temp=(ArrayList)h.get(key);
    System.out.println("Array List" + temp);
    for( int j=0;j<4;j++)
    String l=(temp.get(j).toString());
    if(l!="null")
    System.out.println("l=" +l);
    [\code]

    In your example you selected the pair with the greatest
    distance from the first set, and the pair with the least
    distance from the second. I don't see how the distance
    function was used.
    Also it's not clear to me that there is always a solution,
    and, if there is, whether consistently choosing the
    furthest or the closest pairs will always work.
    The most obvious approach is to systematically try
    all possibilities until the answer is reached, or there
    are no possibilities left. This means backtracking whenever
    a point is reached where you cannot continue. In this case
    backtrack one step and try another possibility at this
    step. After all possible choices of the previous step,
    backtrack one more step and so on.
    This seems rather involved, and it probably is.
    Interestingly, if you know Prolog, it is ridiculously
    easy because Prolog does all the backtracking for you.
    In Java, you can implement the algorithm in much the same
    way as Prolog implementations do it--keep a list of all the
    choice points and work through them until success or there
    are none left.
    If you do know Prolog, you could generate lots of random
    problems and see if there is always a solution.

  • CMS and Parallel GC consumes high CPU-Need Help

    Hi,
    We are using Hot Spot 64 bit JVM(java.runtime.version=1.6.0_26-b03,java.vm.version=20.1-b02),And in production we are facing a issue with long pause time during GC.While monitoring we also observed that CPU consumption(Almost >90%) during GC was very high.
    Currently we use three 8 core 32 GB RHEL server each having total of 4 JVM with following config
    Box(Server) 1:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-CMS,initialoccupationfrequency=50%
    2)2 batch JVM with xmx=4GB,xms=512MB,GC-parallelGC
    Box(Server) 2:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-CMS,initialoccupationfrequency=50%
    2)2 batch JVM with xmx=4GB,xms=512MB ,GC-parallelGC
    Box(Server) 3:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-parallelGC
    2)2 batch JVM with xmx=4GB,xms=512MB GC-parallelGC
    We are facing similar issue in all the three servers,At first we had CMS for all the online JVM's.We suspected CMS as the reason for CPU consumption so we swapped to ParallelGC on one box but still facing the same issue.We have a dependency from an external system,if the GC is more than 60 sec the extrenal system will disconnect.thisi is hampering our daily activities a lot.This issue is occuring during less load on the system with less network utilization Can any one help on this.
    My quesstions
    1)How much resource normally CMS or Parallel GC consumes?
    2)Does having 4 JVM in a server causes this problem?What is the optimum to have?
    3)What will happen if all the four JVM triggers GC

    Hi,
    We are using Hot Spot 64 bit JVM(java.runtime.version=1.6.0_26-b03,java.vm.version=20.1-b02),And in production we are facing a issue with long pause time during GC.While monitoring we also observed that CPU consumption(Almost >90%) during GC was very high.
    Currently we use three 8 core 32 GB RHEL server each having total of 4 JVM with following config
    Box(Server) 1:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-CMS,initialoccupationfrequency=50%
    2)2 batch JVM with xmx=4GB,xms=512MB,GC-parallelGC
    Box(Server) 2:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-CMS,initialoccupationfrequency=50%
    2)2 batch JVM with xmx=4GB,xms=512MB ,GC-parallelGC
    Box(Server) 3:
    1)2 online JVM with xms=xmx=4g and xmn=1g,GC-parallelGC
    2)2 batch JVM with xmx=4GB,xms=512MB GC-parallelGC
    We are facing similar issue in all the three servers,At first we had CMS for all the online JVM's.We suspected CMS as the reason for CPU consumption so we swapped to ParallelGC on one box but still facing the same issue.We have a dependency from an external system,if the GC is more than 60 sec the extrenal system will disconnect.thisi is hampering our daily activities a lot.This issue is occuring during less load on the system with less network utilization Can any one help on this.
    My quesstions
    1)How much resource normally CMS or Parallel GC consumes?
    2)Does having 4 JVM in a server causes this problem?What is the optimum to have?
    3)What will happen if all the four JVM triggers GC

  • Backup failure in production plz need help

    Hi Gurus,
    My back failed in prod i need your help plz help here is the log
    RMAN-00571: ===========================================================
    RMAN-00569: =============== ERROR MESSAGE STACK FOLLOWS ===============
    RMAN-00571: ===========================================================
    RMAN-12001: could not open channel t1
    RMAN-10008: could not create channel context
    RMAN-10003: unable to connect to target database
    ORA-00020: maximum number of processes (%s) exceeded
    RMAN>
    starting full resync of recovery catalog
    full resync complete
    RMAN>
    RMAN retention policy will be applied to the command
    RMAN retention policy is set to recovery window of 7 days
    RMAN-00571: ===========================================================
    RMAN-00569: =============== ERROR MESSAGE STACK FOLLOWS ===============
    RMAN-00571: ===========================================================
    RMAN-03002: failure of delete command at 01/21/2009 04:06:16
    RMAN-12001: could not open channel ORA_SBT_TAPE_1
    RMAN-10008: could not create channel context
    RMAN-10003: unable to connect to target database
    ORA-00020: maximum number of processes (%s) exceeded
    RMAN>
    Recovery Manager complete.
    what i need to do now plz guide.

    ORA-00020: maximum number of processes (%s) exceededYou either need to increases the processes parameter or check from where the additional sessions are coming from. I would advise you to address the additional processes issue in first place.

  • Opportuntity Product Revenue --- need help fo find field "Account"

    Dear Gurus!
    i have tried to build a simple report on level "Opportuntiy Product Revenue" like
    Product Name, Account Name, Product Expected Revenue, Product Closed Revenue.
    but i can´find the field "Account Name" ?
    Is it really not available on Opportunity Product REvenue level, i only can use Account from the Opportunity, but as we have the constellation:
    1 Opportunity -- multiple Opporunity Revenue records, which may be assigned to different Accounts this is not the way i can go...
    Can you confirm that it is not possible to report on this level ?
    Thanks in advance, Juergen

    Ok..found it

  • Outbound Certificate with following business scenario

    Hi
    My client (components industry) has the following business scenario:
    1)     Quality Inspection at Goods-In for raw material
    2)     Quality Inspection at Goods-In for semi-finish products
    3)     Quality Inspection during Production (first and last PP operation with MIC)
    4)     Quality Inspection at Delivery to the customer for the Finished product*
    *Finish product contains raw material and semi-finish product inspected in process 1 and 2.
    A Certificate Of Conformaty is required to be attached on the delivery with following information:
    u2022     Results of point 1
    u2022     Results of point 2
    u2022     Results of point 3
    u2022     Results of point 4
    My question is, what is the SAP solution to cope above business scenario taking into account the batch management and serial number are not implemented? or more precisely how the system track and tight the MIC recorded in each stage (goods-in, production, delivery) described above and put together on COC with the corresponding results?
    Possibly this topic has been broadly discussed but I am getting hardly confused. Not sure if the batch management is mandatory for this business scenario. If it is needed further details please let me know.
    Thank you

    Batch managemnet would be required.
    You will want to report the results from the batch for point 3, (finished goods inspection), use the certificate functionality of resutls from the production chain to pick up data from points 1, & 2, and report the data from master inspection characteristics from the type 10 inspection lot, (delivery inspection).
    FF

  • Message Persistence in BPEL-Need Help Urgently

    Hi ,
    Hereby mentioned is the Business scenario&steps,for which we need the handle on message.
    1.BPEL Workflow dequeues the message from MQ Adapter.
    2.Then it invokes the external webservice,based on the dequeued message.
    3.When the external webservice is down/not active at the time of invocation,then we need to persist the complete dequeued message so that the respective transaction has to be repeated again(with the same message),once the External Webservice is UP/Active again.
    Note:BPEL Workflow is asynchronous.
    Do we need to do any extra coding from BPEL Perspective to achieve the above mentioned scenario?
    or
    is there any configuration that needs to be done so as to get the handle on such messages?
    We need a solution/approach as soon as possible because we need to take a design decision based on these.
    Thanks in advance for the solutions/approaches
    Regards
    Balaji.J

    No you can use the bpel fault hander have a look at the following doc. It will have a finite timeout though as it is not designed for persistance, I suggest the is the correct way to go.
    http://www.oracle.com/technology/products/ias/bpel/pdf/10133technotes.pdf
    cheers
    James

  • Anybody worked on the Sales Returns process - Consumer products

    Hi,
    I am looking for some information / guidance on customizing on the Sales Returns enhacement package of the Consumer product industry under ECC 6.0
    Apart from the SAP Help link which I have already gone through, does anyone have any kind of documentation available around.
    Thanks in advance.
    Vijay

    This functionality is part of SAP Enhancement packages for ECC. It was earlier part of the IS-BEV solution and the documentation pertaining to the same hasn't changed.

  • How do you differentiate business process and business scenario

    how do you differentiate business process and business scenario???
    pls help

    Google says;
    A <b>business scenario</b> is a description of a business problem, which enables requirements to be viewed in relation to one another in the context of the overall problem. Without such a description to serve as context, the business value of solving the problem is unclear; the relevance of potential solutions is unclear and there is a danger of the solution being based on an inadequate set of requirements. A key factor in the success of any other major project is the extent to which it is linked to business requirements, and demonstrably supporting and enabling the enterprise to achieve its business objectives. Business scenarios are an important technique to help identify and understand business needs.
    A business process -
    http://en.wikipedia.org/wiki/Business_process

  • Business scenario of Product Costing

    Hi all
    pls explain me about business scenario of product costing
    thanks in advance

    Hi:
    (From the link: https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/webcontent/uuid/4f0f6717-0b01-0010-949b-9ab68dd45fec [original link is broken])
    Identified Need: You need to accurately determine the costs incurred in producing the goods and services that your company provides.
    Business Process to Meet that Need: Product Costing
    Product Costing helps a company know the costs incurred by its products in order to successfully manage its product portfolio.The product cost accounting business process calculates cost of goods manufactured (COGM) or cost of goods sold (COGS) broken down by each step of the production process.
    For config:
    www.sap-topjobs.com/SpecialPP/samplepc.doc
    Assign points if info helps
    Vj

  • Product Hierarchy Change - Need help

    Hi,
    We have a CRM 4.0 ISA for e-commerce scenario. The Production environment is LIVE now and we have a Product Hierarchy (with more than 2400 categories in multiple levels). The Settypes assigned have both SAP standard as well as custom settypes. The catalog for webshop has been created with Automatic Assignment with categories transferred from the current Product Hierarchy.
    There has been a radical change in the business alignment because of which the categories are changing and the hierarchy is going to change completely.
    I need a solution where without shutting down the production (or with minimal week end shutdown), where we can create the new hierarchy and transfer the existing products to the new hierarchy. The problem that i am facing is that the SAP standard and Custom settypes that are currently assigned to the existing hierarchy does not allow me to assign to the new hierarchy that i am trying to create in the system in parallel. I would be good if i can some how create the new hierarchy and keep it ready before we can shut off the existing hierarchy.
    Also, do we have any way to transfer products in one hierarchy to another hierarchy? (We can recategorize within the same hieararchy, but need to know if we can do it inter-hierarchy)
    Also is it possible to bring the hierarchy and the assigned products  from DEV / QA system to PROD?
    Please help with your inputs.
    Shankar

    Hi
    As previously said, the changed product hierarchy value will beocme applicable only for the new documents you are going to create. For the old documents, the older PH levels exists, it wont get automatically change.
    Also, the infostructures also will hold the old values for the old transactions.
    So it will be better to archive /delete the data so far in those structures and hten enable it for hte new PH values. Else, you cannot arrive at a conclusion based on PH levels, as the same level will imply different things at different points of time.
    Hope this helps.
    Reward if this helps.

  • Need help with Sync/Async BPM Scenario

    I have an R/3 RFC -> XI -> HTTP (to vendor A) scenario that is working fine.  It is a totally synchronous call event.  The Integration Directory pieces sit in a scenario named HotkeyOutbound.
    Now I need to create a process for RFC -> XI -> HTTP (to vendor Panduit).  The R/3 RFC is the same sender, but vendor Panduit only supports an asynchronous HTTP connection.  I followed the Sriram Vasudevan weblog on Sync/Async Bridge and created my BPM.  I am stuck on trying to determine what to set up in the Integration Directory. 
    First off, should I be able to use the same HotkeyOutbound scenario as with vendor A so all hotkey stuff can stay together?  Or do I have to create a new scenario with a copy of the R/3 business system for the sender?  I moved forward with a new scenario (PanduitHotkeyOutbound).
    I also need to know how many config Agreements and Determinations to use.  The image at http://webpages.charter.net/kpwendel/keith1.html shows what I have so far.  Which are not needed?  What is missing?
    And I tried setting up an HTTP communication channel for outbound async to vendor Panduit and another for inbound async from vendor Panduit.  XI won't let me set up a sender HTTP channel.  Why not?
    Thank you in advance.

    I have yet to figure this out, and probably need to go back to my Integration Repository setup since my problems may start there.  This screenshot shows my Repository objects.
    http://webpages.charter.net/kpwendel/intProcess.jpg
    HELP!  These are the steps I took, with questions embedded.
    (1) Created data type and message type for xml document (note that same format is used for request and reply).
    (2) Created PANRequestAbstractInterfaceSync (abstract and sync) for first part of Integration Process.  Should the input message be the RFC or XML message type?
    (3) Created PANRequestAbstractInterfaceAsync (abstract and async) for 2nd part of Integration Process.
    (4) Created PANResponseToBPM_MessageInterface (outbound async) for interface back into XI from partner. Is this needed?
    (5) Created PANHotkeySync_to_Async_IntProc Integration Process to handle sync to async bridge.
    - Wondering why PANRequestAbstractInterfaceAsync is the only message interface available when I make container object (PANMessage)?
    (6) Created two Message Mappings to handle RFC data to XML mappings (outbound RFC-> XML and inbound XML -> RFC).
    (7) Created Interface Mapping that includes both the Request and Response message mapping programs from step six.  Source is the RFC and Target is PANRequestAbstractInterfaceSync.
    - Do I need another interface mapping with Source being PANRequestAbstractInterfaceAsync and Target being the RFC?
    Link to these steps and app diagram:
    http://webpages.charter.net/kpwendel/PAN_Hotkey_Diagram.jpg
    Thank you very much for your time.

Maybe you are looking for

  • Red Bar on Bottom of Email

    A couple of days ago i noticed my email would not move side to side for further viewing. It still moves up and down. At the same time I noticed a red bar at the bottom of each email. Any ideas?

  • Timer In Web Dynpro ABAP

    Hello, Please help in creation of  Count Down Timer for Online Test Application in Web Dynpro ABAP. Thanks, Sandeep Bhati

  • Image displayed for link

    How can I control what image is displayed when posting the link on Facebook?

  • Oracle Memory utilization gradually increasing up to the max in short span

    Hi All, Our Oracle database running in windows 2000,having max sessions of 1500 attains it max_memory 850m once 1500 sessions reached. --Shared pool memory(SQL AREA,LIBRARY CACHE,SHAREDPOOL MISCELL.,) gradually increasing. Oracle database version:9.2

  • DVD Studio Pro Crash at Burn

    All of a sudden, DVD Studio Pro has started crashing after building a DVD right at the moment it starts to burn. I have successfully burnt many discs previously. I have tried using completely different assets in brand new projects, video and still, s