Buttons Keep Moving In Finished Product

Every time I open a particular project the buttons move to places other than where I placed them when I saved the project. I marked the "free positioning" button before I saved the project. How do I stop them from doing that?

iDVD is a consumer application. Maybe even a Prosumer app. But it is not a professional application. For this one would need DVDSP or Final Cut Studio.
Consumer apps tend to work with assumed calculations and/or settings. Professional apps like FCP and DVDSP won't assume much of anything. You need to tell it what it is you wish to do. And you have much greater control of all aspects of authoring a DVD.
My suggestion is to look into DVDSP / Final Cut Studio for more precise control over all of these features.

Similar Messages

  • Why does the bookmark button keeps moving from navigation to bookmark toolbar when I don't put it there; how to solve this?

    Because my screen isn't that big, I want my bookmark-toolbar-items (the item for the special bookmarks folder) to take all width, and I want the bookmarks button on the navigation toolbar (because I don't need such a long url field).
    As you can edit the toolbars and their buttons, I did change it to what I want, but whenever saving & closing the edit-window the bookmarks button (with the drop-down menu) moves down one toolbar automatically. This is very, very annoying, not the least because in the editing mode it is ok (it also is saved correctly).
    Any way to overcome this problem?

    When the Bookmarks Toolbar is displayed, the Bookmarks button automatically moves from the Navigation Toolbar to the Bookmarks Toolbar. This is intended behavior. I can't tell you ''why'' though, as it doesn't make any sense to me either and I likely find it twice as annoying as you do.
    Install the following extension.
    * [https://addons.mozilla.org/firefox/addon/bug582139/ Allow full customize bookmarks button]

  • Ipad mini screen keeps moving around and switching screens as though someone else is using it? any ideas what is going on?

    Ipad mini screen keeps moving around as though someone else is fiddling with it while I am using it. Any ideas what is goi g on?

    Hi Deeveeay,
    Try resetting the device (nothing will be lost): Hold down the Home and Power buttons at the same time and continue to hold them down until the Apple appears (up to 30 seconds). When the Home screen redisplays, see if the issue has resolved itself.
    Cheers,
    GB

  • MIC's of finished product should get transferred to Semi-finished product

    Hi all,
    I have the following requirement
    Based on the Customer requirement, sales order will be created. Two line items will be created in the sales order.
    First item: 100kg
    Second item: 5 kg (this will be the sample to be sent to the customer for approval)
    first item and second item will have different material codes.
    Now the process order will be created,released and confirmed. 04 inspection type will be activated for the material.
    The MIC's of the finished product ( A) should get transferred to the semi-finished product (A1)
    For X customer the MIC's for finished product (A) is a1, a2 and a3 and same should get transferred to semi finished product (A1 )
    For Y customer the MIC's for finished product (B) is b1, b2 and b3 and same should get transferred to semi finished product (A1 )
    The material code for the finished product will be different, but the semi-finished product (A1) will be same always.
    When ever inspection lot gets generated the MIC's of the finished material should get transferred to semi finished product
    Kindly provide your valuable inputs to address this scenario
    Regards
    Hari

    I think I understand what you are attempting to do.  The bottom line is that you are trying to use one material number to serve as the "sample material" for all your products.  Lets call the sample material mrtrl# 9000122.
    You have a make to order process so you first create a process order for the product and inspect it according to the customer's requirements.  You make the UD.
    Now when you make product A, you want those characteristic MIC values to copy to the sample material 9000122 inspection lot which is created from a separate process order using product A as the raw material.
    When you make product B, you want those MIC charcteristic values to copy to the same sample material 9000122  to an inspection lot created from a separate process order using product B as the raw material.
    I am guessing the intent is to keep the batch number the same between the FERT product batch number and the sample material.
    I would like to suggest to you two other alternatives which I'm not sure will work for your design but I think it is worth a try and might save some work. 
    1)  Have you looked at setting up your sample product as a by-product of the first process order?  You can confirm the finished qty and the sample qty from the same original process order.  This will then create your two 04 inspection lots.  You would recrod results on the first primary product. Then enter results recording and I think you'll be able to have that set up to copy over the resutls from the primary product.  If you can't with the standard SAP, I beleive you'll find the ability in copy inspection results to add your own custom FM that would do the copy for you that you are looking for.
    Of course the inspection plan for the by-product sample will have to have all the characteristics in the plan that could ever be expected from any primary product using this process.
    2) The other possibility would be to just have the person making the UD on the primary inspection products inspection lot, to post a sample qty "to other quantity".  They would always of course post to the sample material.  If the characteristics in the lot match up to general characteristics in the batch class for the sample, the resutls will be transferred to the batch.  Report your sample reuslts from the batch record and the specs from the inspection lot in the COA.
    FF

  • Finished Products At Real Real Cost

    Hello Gurus,
    I'm working on a requierement where the cost of all finished products need to be calculated according to:
    1) Real material price of all components (raw materials and only raw materials of semifinished products)
    2) Real material consumption of all components (raw materials and raw materials of semifinished products)
    The actual costing structure is configured to calculate costs on the material list and operations. Also, the system is configured with the standard price control for semifinished and finished products and MAP for raw materials. We haven't activate the material ledger yet.
    Standard cost cannot be modified.
    In resume:
    Standar costing and all the process is working fine, but we need to calculate real raw material consumption and real raw material consumption of the semifinished product that is being used in the finished product at real prices.
    Thanks in advance.
    Regards, Agustin

    Change the material masters to be moving average.
    But make sure your invoice and other administration is up to date...

  • Poor video quality of finished product

    Hi all,
    I have produced an mp4 file using imovie 08, in which I changed the MP4 settings in various ways such as setting the frame rate to 59.94 fps (as used by my Sanyo Xacti camcorder) the resolution to 640 x 480 and the data rate to 10,000 kbps. Some of the footage I used is from a Canon ixus stills digital camera - 640 x 480 30 fps, the rest is from the xacti - 640 x 480 59.94 fps. I produced the mp4 file for the edited video in PAL format, and I believe that means 25 fps.
    When viewed with Quicktime on the mac, it looks great. However, when burned, (and I have ensured that encoding is set to professional quality) I have played it on both the mac and my TV's DVD player and in both instances the video does not flow smoothly (it seems as if there is a problem with the frame per second rate??). It is lovely and smooth however when viewed as an mp4 file in Quicktime. Also, this does not only apply to the 60 fps footage from the xacti but also to the 30 fps footage from the Canon. AGHHHH Very annoying!
    Can anyone help??!!

    Don't know if this will help or not, but have you tried going into Expert Settings when exporting to Quicktime? It's Share>Quicktime and then when it asks to Compress Movie, select Expert Settings from the dropdown menu, then hit the Share button, then in the next window that opens (Save Exported File As..) choose Options, and a whole range of alternatives opens up. Maybe you've been there.
    My personal hang-up is the titles. No matter what you do, they always seem to end up as low resolution with ragged edges on the finished product.

  • Dismantling of a Finished Product

    Hi Gurus,
    I am facing a Problem
    My client sends a finished product 'A' to his customer.
    It is returned back as customer return and Quality people does quality inspection and keep it in the block stock.
    Now my client wants to dismantle the finished product 'A' and
    use the component which he got by dismantling the finished product 'A' in the new production order.
    For that after dismantling of the material 'A', The BOM of Component of finished material 'A' has to be updated in the stock.
    How can I map this Senario.
    Please guide me.
    Thanx and Regards,
    Praveen Kumar.S

    Dear Praveenkumar,
    Checkout this procedure,
    1.A production order without material using CO07 will be created .
    2.And in the BOM components will be entered in - ve quantity,so that their stock will get uploaded using 531 movement as a By-
    Product.And enter the header material in + quantity so,that its getting issued using 261 movement.
    3.But for this ,the same has to finalised with FICO & MM consultants as accoutn determination for 531 movement should be
    configured.
    Regards
    Mangalraj.S

  • Can SAP stop UD of finished product if UD for component is not taken ?

    Hi,
    The situation is as follows :
    1. UD for a batch of raw material is pending
    2. This raw material is issued for manufacturing a finished product
    3. The UD for the finished product is taken and the batch is approved
    Is there any provision in standard SAP where in the above mentioned situation the system can give a error/warning message to the user to tell him that the UD for some of the components is pending ?
    Regards,
    Manish.

    HI
    goto SMOD t-code
    enter this  QEVA0006 and select the radio button documentation an dclik on disaplay.
    check the document wether it will be usefull or not
    click on functional module also to see the data
    -ashok

  • Purchase requisition generate for alternative bom use for finished product

    i hav alternative BOM for finished product in which different raw material component in both BOM of same finished product.But when i RUN MRP that time only one raw material requisition generate another alternative bom raw material requision not generate.
       Is there any option when i RUN MRP that time we select one of the alternative bom component of  raw material for generation purchase requisition.
    Thnaks in Advance

    Dear ,
    MRP will select the BOM based on the MRP4-BOM Explosion tab -Selection Indicator .It can eitehr of these ways :
    1.Maintain Production Version with  different Alternative BOM  and keep Selection Indicator -3 .So sysetm will look into only the Valaidty  and lot size of the Production version and select the correct BOM to explode  and generate PR for depednts based on stock situation
    2.If you maintain Blank -then it will look into order qty and select the BOM according ly
    As in your case , selection methods 3 will fit  and you need to maintain PV with correct validity and lot size in MMR-MRP4-PV option .
    Try in sand box with different lot size and validity with indicator-3 .Create Order and run MRP-MD02-1,,3,3,3,2
    Check and revert
    Regards
    JH

  • Offseting entry to inven posting for finished product in sub  contracting

    When we post goods receipt in subcontracting inventory account is debited with finished product.What is the account name to which offsetting entry is made & how to configure this in automatic account determination.
    1) Same question was already asked and moved to T&P form.
    2) Basic question.
    3) Points will be unassigned.
    Edited by: Csaba Szommer on Apr 16, 2011 7:58 AM

    Hi,
    If Material has Price Control as "V" (MAP)
    (BSX) Stock A/c of Assembly - Dr
    (BSV) Change in Subcon Stock - Cr
    (FRL) Subcontracting Charges - Dr
    (WRX) GR/IR Clearing A/c - Cr
    (BSX) Stock A/c of Components - Cr
    (GBB-VBO) Consumption A/c of Components - Dr
    If Material has Price Control as "S" (Std. Price)
    If Material is having Price Control as "S" then Price Difference A/c will also in picture.
    This depends on configuration; SPRO > MM > Inventory Management and Physical Inventory > Goods Receipt > Price Differences for Subcontract Orders at Goods Receipt
    Price Differences for Subcontract Orders at Goods Receipt
    In this step, you configure for each valuation area whether price differences are generated for a Subcontract order at the time of a goods receipt if the manufactured material is managed at standard price and the standard price varies from the receipt value (externally performed service + value of components + delivery costs).
    Example
    Finished product: $400 (value at standard price)
    Subcontract order:
    o Ext. service : $250
    o Components : $100
    Posting schema without price differences:
    Stock account FERT : 400 +
    Stock change : 400 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    Posting schema with price differences:
    Stock account FERT : 400 +
    Stock change : 350 -
    Price difference : 50 -
    GR/IR clearing acct : 250 -
    External service acct : 250 +
    Compon. stock account : 100 -
    Consumption account : 100 +
    And cost center is mandatory for subcontracting process
    the accounts for the BSX FRL and GBB-VOB needs the cost elements
    Thanks
    Diwakar

  • Stocking Level- Two levels below the finished product

    Hi all,
    I want to maintain stock two levels below the finished product in MTO environment...How can i acheive this in SAP...Also i want to maintain forecast one level below the finished product..Please give ur expert opinion in order to achieve this requirement..
    Actually scenario is Packed liquid is my finished material and forecast is given at liquid level and both these levels are not produced until a sales order arrives...i am taking liquid as SFG, please suggest otherwise if i m not moving in right direction.
    Thx
    Shah

    Hi,
    Kindly follow the steps mentioned below, I hope it addresses your query.
    Warm regards,
    Umesh
    Process Scenario & the BOM structure
    Level 1: ZURP_PKG_LIQUID <Sales order received here>
    Level 2: ZURP_LIQUID        < Forecast done here to plan lower level materials, this material is planned on the receipt of sale order at higher level>
    Level 3: ZURP_RM_LIQUID  < Procured/Produced and kept in inventory>
    Step no 1: OMP0  use Requirement class u2018103u2019 or create a copy u2018Z70u2019
    Step no 2: OMP1  create a new requirement type u2018Z70u2019 and assign the Requirement class u2018103u2019 to it.
    Step no 3: SPRO  define a new strategy u20187Tu2019 and assign requirement type u2018Z70u2019
    Step 4: SPRO  create strategy group u20187Tu2019 & assign the strategy u20187Tu2019
    Step 5: MM02 u2013 MRP3 view  Assign this strategy to material code ZURP_LIQUID at which forecast is done
    In MRP4 view leave the individual/collective indicator blank
    For Material ZURP_PKG_LIQUID  maintain strategy group as u201820u2019
    For Material ZURP_RM_LIQUID  maintain strategy group as u201810u2019 & individual/collective indicator as u20182u2019
    Step 6: MD61  Create Planned independent requirement for ZURP_LIQUID
    Step 7: MD02  Execute MRP for ZURP_LIQUID
    Note: Planned orders for ZURP_LIQUID are created, but they cannot be converted into Production order, but this triggers requirement down the line triggering procurement/production for material ZURP_RM_LIQUID
    Step 8: VA01  Create a sales order for ZURP_PKG_LIQUID
                MD02  Execute MRP for ZURP_PKG_LIQUID
    Note: The MRP run triggers the procurement proposal for ZURP_LIQUID, which can be converted to production order & simultaneously reduces the created PIR

  • Can CC subscribers install LR CC for evaluation and keep LR5.7 for production use?

    I'd like to evaluate LR CC, but have plugins that aren't yet compatible with it. Therefore, I want to keep LR5.7 for production use. Is this possible?

    Yes, LR 6 will convert (by making a copy) your catalog, and you can then edit in the new version.  You must take some caution, e.g. in operations that change your actual images (such as writing metadata or moving images around). 
    The safest thing would be to NOT convert your catalog but rather build a whole separate work area of images and catalog that is disposable, but it is certainly possible to test LR6 in place if you are careful and aware of what operations you take.
    Note you can run LR 5.7.1 and LR 6 (aka CC) from Creative Cloud at the same time as well -- you can even go back and install prior versions from the CC app.

  • I have to keep moving mouse for items to upload to photobucket

    When I list an item on Etsy and upload the photos or upload photos to photo bucket I have to keep moving the mouse or the upload stops. This was not an issue before the new version 4.

    if you want to, i can also try to guide you through it. it shouldn't be that difficult, but will require a bit of time.
    * first you'd have to download and install (confirm all setup steps & click close once the process is completed) the the tool from http://ftp.mozilla.org/pub/mozilla.org/mozilla/libraries/win32/MozillaBuildSetup-Latest.exe
    * then open windows explorer and navigate to your C:-drive and then the ''mozilla-build'' folder. in there you'll find a file named ''start-l10n.bat'' - just double-click on that.
    *in the black terminal window that opens, type in: ''easy_install mozregression'' & hit enter
    *once this process is finished, enter ''mozregression --good=2013-06-24 --bad=2013-08-05'' into the same window.
    *now the process will automatically download browser builds from the time the error first occurred - just wait until a firefox "nightly" window opens and test if you can reproduce the bug there. then close the browser windows and enter ''good'' or ''bad'' into the terminal depending on if you got the error this time.
    *this process will continue automatically until the exact date is found when the bug was introduced in the browser - the window will then display a so called regression window and a pushlog. this is the critical piece of information we'd need, so developers can take over and start fixing what's going wrong...
    *you can then close the terminal window and delete the ''C:\mozilla-build'' folder again

  • Does apple replace my phone if the home button keeps falling off?

    does apple replace my phone if the home button keeps falling off?

    Yes.
    If your iPod Touch, iPhone, or iPad is Broken
    Apple does not fix iDevices. Instead, they exchange yours for a refurbished or new replacement depending upon the age of your device and refurbished inventories. On rare occasions when there are no longer refurbished units for your older model, they may replace it with the next newer model.
    ATTN: Beginning July 2013 Apple Stores are now equipped to do screen repairs/replacements in-house on iPhone 5s. In some cases while you wait. According to Apple this is the beginning of equipping Apple Stores with the resources needed to do most repairs for iPhones, iPads, and iPod Touches that would not require major replacements. Later in the year the services may be extended as Apple Stores become equipped and staffed with the proper repair expertise. So, if you need a screen repaired or a broken screen replaced or have your stuck Home button fixed, call your local Apple Store to see if they are now doing these in-house.
    You may take your device to an Apple retailer for help or you may call Customer Service and arrange to send your device to Apple:
    Apple Store Customer Service at 1-800-676-2775 or visit online Help for more information.
    To contact product and tech support: Contacting Apple for support and service - this includes international calling numbers.
    You will find respective repair costs in the appropriate link:
    iPod Service Support and Costs
    iPhone Service Support and Costs
    iPad Service Support and Costs
    There are third-party firms that do repairs on iDevices, and there are places where you can order parts to DIY if you feel up to the task:
    1. iResq or Google for others.
    2. Buy and replace screen yourself: iFixit

  • RG1 - Excise Related things to care of before moving to the Production

    Dear Friends,
    1. Can somebody pl let me know the Excise Related things to care of before moving to the Production. Like the initial posting of the stock and RG1?
    2. Also pl help me to go through the various process related to Excise( Utilization and Excise Registers updation related to SD?
    Thanks
    Isaac

    Isaac wrote:Hi,
    >
    > Thanks Raja...yes, the details provided by Mr. Lakshmipathi is really a good one.
    > I have one doubt in this...with reference to the point#3..  " Also update the outward movements of finished goods ( IDH for Domestic Sales and IWE for Exports under Bond/ IDE for Exports against payment of Duty)."
    These are various classification for utilization purpose
    IDH Removal from factory on payment of duty for Home use
    IDE Removal on payment of duty for export under no bond
    and there are two or three more i dont remember exactly, but you can get that by searching.....
    >  1. Does IDE refers to the LoUT (Letter of Undertaking), if not what should be used for the LoUT?
    this is different from LoU,  IDE is Classification for Removal on payment of duty for export no bond
    >  2. Can u provide me some inputs on Utilization aspects as well.
    We have to make utilization determination based excise grp & series grp....
    SPRO>Logistics u2013 General>Tax on Goods Movements>India>Business Transactions--> Utilization -->Utilization Determination
    Detailed about this is already discussed previously also.
    [Utilization|Excise Utilization]
    thanks,
    Raja

Maybe you are looking for

  • Converting a pdf file to jpeg

    I want to copy some photographs currently held in pdf to another format such as jpeg. i tried copying a photograph from pdaf into a word document and it appeared with a full page black border line.  Copying photographs in jpeg I do not have this prob

  • Using Apple TV With Macbook Closed

    Hi, I have recently bought Apple TV and I know that the device has internal memory that it uses to load its content. My question is, once the content has been "loaded" into the Apple TV, can I then close the lid of my Macbook and start to watch or do

  • Retreving Image from Blob Columns in forms 6i

    Hi I inserted image into oracle database in an BLOB column Using Form6i. The table has only two columns, One is varchar2 and other is BLOB. The time it take for inserting image is very little, but retrieving from database to form is taking time. Can

  • AE CC 2014 - Using a Mask on a Collapsed Precomp destroy's it's properties??

    Hey all I am having a ridiculous problem. I have a normal precomp with a layer that has a multiply blending mode. Normally i would collapse the precomp in its parent comp, and the Multiply Blending mode would be preserved (which it is). The problem c

  • Lining some divs up, one with a fireworks html and another with a jQuery slideshow

    I am having an issue lining two divs up within a div.  One div has a fireworks html in it (by the way, I can't figure out why that the button states arent' working.  I inserted the code via the insert menu > image objects > fireworks html, but for so