BW Extractors During ECC Upgrade

All, We are moving from 46B to ECC. One of the open questions we have is what needs to be done during the upgrade prepare phase with the extractors from our BW system.
We are using the downtime minimized approach, so the prepare phase will start several days prior to the start of upgrade downtime. Here is the question: We have 50+ delta extractors running that pull data from the ECC system to BW. SAP has told us that during the prepare phase (this is during system uptime) we will need to turn off the extractors and clear the delta queues prior to the prepare phase running. But they are also telling us that we COULD turn them back on after prepare is complete but before the downtime starts but that they do not recommend it.
Any experience with BW extractors and an ECC upgrade? Since we are starting the ECC prepare phase several days prior to the start of downtime for the upgrade, we are trying to determine whether we will be without BW feeds for that entire time or only during the downtime.
Thanks!

> Thanks for the reply. So you see no reason to have
> the extrators off the entire time between when
> RSVBCHK is run during prepare and when it is run
> during the downtime?
No - I don't see it. We used that procedure when we went from 4.6 to 4.7 and it worked - we didn't have any data loss.
> We will have approximately 48 hours between the
> prepare and the start of downtime and obviously the
> business would prefer to have the extracts available
> during this time.
RSVBCHK doesn't just check for the BI deltas but for cancelled update tasks too and some more things.
You must though make sure that nobody creates any more deltas (thus no more production) after you passed RSVBCHK during UPGRADE OR make sure, someone is around at a later point before you shutdown the system and load the data out of the R/3 system. You must make sure that all deltas are loaded before you enter MODPROF_TRANS, if you still have delta there, it will be lost.
Markus

Similar Messages

  • MDMP Unicode Conversion problem during ECC upgrade

    hi Experts,
    I met a problem when upgrade from 4.6c to ecc 6.
    in 4.6c, some key users made some chinese written entries in table field while he/she was logon as English, so, the language field in this entry is "EN" although the actual language was written by chinese, after upgrade to ECC6, we found the chinese words became messy code, maybe it was due to the chinese were encoded by english codepage during conversion, my question is, how can I avoid this? I really don't want this happen in our PRD upgrade.
    The second question is: if a field contains both chinese and english, then, which language should it be assigned? english or chinese? I'm afraid if we assign this word as "EN" in vocabulary, then, after upgrade, the chinese part will be messy code.
    Thank you for your kind suggestions.
    Freshman

    Hi,
    you can either use transaction SUMG (manually) to repair the entries ( you have to add the according table - please check unicode conversion guide for details) or you need to change the language key in the table to Chinese if you want the Unicode conversion to convert the data correctly.
    To your second question: If the English texts are restricted to US7ASCII characters ("normal" English without special characters) those texts containing Chinese and English words can (and must !)  be assigned to ZH, as US7ASCII characters are included in the Chinese code page.
    Best regards,
    Nilsn Buerckel

  • Outbound Queue got deleted during ECC upgrade

    Hi,
    After ECC EHP6 Upgrade Outbound Queue in SMQ1 got deleted for data source 0F_GL_14 in ECC, but delta queue exists under RSA7.
    how to re-generate outbound Queue which got deleted during Upgrade?
    Santhosh

    Hi Shantosh,
    In this case, please follow the below steps -
    1. Delete the delta for your info package, and do init without data transfer.
    2. After this first fill your setup tables with SBIW tcode,
    3. And run your Info Package with Repair full request the data will come to PSA now, anyway ur DSO will overwrite all the existing records and add only the fresh records.
    4. Later enable your delta for the Info Package. This will absolutely go fine.
    Thanks..!!
    Regards,
    Harish. K

  • Can UCCHECK be performed on already UNICODE migrated system during ECC upgr

    Hi there,
    Can UCCHECK be performed on already UNICODE migrated system during ECC upgrade?
    If NO, why? What is the technical reason?
    Prakash

    Hi,
    first unicode means
    Unicode is a 16-bit code to represent universal character set, which is used to facilitate a better exchange of data between different systems.
    for uncheck
    The transaction UCCHECK is used to find Unicode related issues. You can use transaction UCCHECK to examine a Unicode program set for syntax errors without having to set the program attribute "Unicode checks active" for every individual program. From the list of Unicode syntax errors, you can go directly to the affected programs and remove the errors. It is also possible to automatically create transport requests and set the Unicode program attribute for a program set.
    why you are checking second time.
    Regards,
    Madhu

  • SAP ECC Upgrade : Userexit or Related Enhancement been Overwriten

    Hi All,
    Is that anyone get explanation from SAP why during ECC upgrade most of the enhancement been overwritten and need to re-do.
    Thank in advance on your knowledge sharing.
    Trevor Wong.

    Ok. There might be need to do "adjustmens" in case of upgrade conflict, or just simple confirmations of code enhancements in transactions SPAU + SPAU_ENH.
    I think you should find all missing code enhancements there, waiting for adjustment.

  • PKUNRE field not getting populated in 2LIS_13_VDITM after ECC upgrade

    Hi,
    We are seeing blank values for PKUNRE / 0BILLTOPARTY during extraction from 2LIS_13_VDITM.
    We are experiencing this issue after ECC upgrade which went live recently.
    We have applied note 580694  to correct missing fields in the billing extractor.
    This field is sourced from VBPA/VBRP.
    Our functional teams confirmed that VBPA/VBRP are updated properly and there seems to be no timing issue.
    However, the record is landing in PSA with blank BILLTOPARTY.
    Where could the problem be?
    Is there any thing we missed?
    Can any one throw some light if you have experienced this kind of an issue after upgrade.
    Thanks a ton in advance,
    Sandy.

    Hi Sandy:
        In my system I didn't find the Field PKUNRE on the VBPA / VBRP Tables, so my guess is that you're dealing with a Custom Enhancement, if this is the case the SAP Note 576886 - "Change to user-defined fields not extracted" might help you in solving this issue.
    Regards,
    Francisco Milán.
    ***Follow up note:
    I double checked and found the Field PKUNRE on the Extract Structure for 2LIS_13_VDITM (using Transaction Code LBWE) so now I know that you're working with a Standard field and not with a custom ehnancement, the SAP Notes below address a similar issue to yours but they are related to Applications 11 and 12, not for App 13. I apologize for the confusion.
    Note 621684 - "Fields PKUNRE and PKUNRG are not filled from delivery"
    Note 379237 - "BW Content LE-SHP: missing partners in 2LIS_12_VCITM"
    Edited by: Francisco Milan on Jan 28, 2011 12:54 PM

  • Error during the upgrade phase "start_shdi_first"

    Hello,
    We are having issue with upgrading r/3 4.7 enterprise extension set to ECC 6.0
    Here the error message goes....
    starting system failed rc=0
    to analyse the error during start of shadow instance
    view files 'Startsfi.log' and 'devtrace.log'
    in directory usr\..put
    repeat phase until shadow instance is started
    and u can logon instance no '01'"
    We have changed the DDIC password during upgrade.after that we ran the initphase to update the password.
    I think sapup is referring the old password which was entered initially during the upgrade and we dont remember the old password also.
    Appreciate your response
    Startsfi.log
    1 ETQ201XEntering upgrade-phase "START_SHDI_FIRST" ("20080218175653")
    2 ETQ366 Connect variables are set for shadow instance access
    4 ETQ399 System-nr = '01', GwService = 'sapgw01'
    4 ETQ399 Environment variables:
    4 ETQ399   dbs_mss_schema=de4
    4 ETQ399   auth_shadow_upgrade=1
    4 ETQ399 Set environment for shadow connect:
    4 ETQ399 ENV: dbs_mss_schema=de4
    4 ETQ399 ENV: auth_shadow_upgrade=1
    4 ETQ399 Set RFC variables for shadow connect:
    4 ETQ399 System-nr = '01', GwService = 'sapgw01'
    4 ETQ399 Set tool parameters for shadow connect:
    4 ETQ380 computing toolpath for request "TP_SHADOW_CONNECT"
    4 ETQ381 request "TP_SHADOW_CONNECT" means "tp needs to connect to shadow system"
    4 ETQ382 translates to group "R3UP_TOOL_GROUP_NEW"
    4 ETQ383 translates to path "exe"
    4 ETQ383 translates to path "exe"
    4 ETQ399   default TPPARAM: SHADOW.TPP
    4 ETQ380 computing toolpath for request "TP_ALWAYS_NEW"
    4 ETQ381 request "TP_ALWAYS_NEW" means "always tp from DIR_PUT/exe, for phase KX_SWITCH"
    4 ETQ382 translates to group "R3UP_TOOL_GROUP_NEW"
    4 ETQ383 translates to path "exe"
    4 ETQ383 translates to path "exe"
    2 ETQ399 Starting shadow instance
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2 ETQ353 Starting system
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2 ETQ370 starting test RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    4 ETQ233 Calling function module "UPG_IS_SHADOW_SYSTEM" by RFC
    4 ETQ359 RFC Login to: System="DE4", Nr="01", GwHost="MTW02SDEC01", GwService="sapgw01"
    4 ETQ232 RFC Login succeeded
    2EETQ235 Call of function module "UPG_IS_SHADOW_SYSTEM" by RFC failed (error-status "-3")
    4 ETQ239 Logging off from SAP system
    2WETQ372 test RFC failed, rc="-3"
    2EETQ399 Starting shadow instance failed
    2EETQ399 Test RFC failed finally
    2EETQ399 Dialogue: ERROR
    2EETQ399 Starting system failed, rc=0
    DEVTRACE:
    trc file: "dev_disp", trc level: 1, release: "700"
    sysno      01
    sid        DE4
    systemid   560 (PC with Windows NT)
    relno      7000
    patchlevel 0
    patchno    111
    intno      20050900
    make:      multithreaded, ASCII, optimized
    pid        2272
    Mon Feb 18 16:08:40 2008
    kernel runs with dp version 229(ext=109) (@(#) DPLIB-INT-VERSION-229)
    length of sys_adm_ext is 364 bytes
    SWITCH TRC-HIDE on ***
    ***LOG Q00=> DpSapEnvInit, DPStart (01 2272) [dpxxdisp.c   1239]
         shared lib "dw_xml.dll" version 111 successfully loaded
         shared lib "dw_xtc.dll" version 111 successfully loaded
         shared lib "dw_stl.dll" version 111 successfully loaded
         shared lib "dw_gui.dll" version 111 successfully loaded
         shared lib "dw_mdm.dll" version 111 successfully loaded
    rdisp/softcancel_sequence :  -> 0,5,-1
    Mon Feb 18 16:08:52 2008
    WARNING => DpNetCheck: NiHostToAddr(www.doesnotexist0065.qqq.nxst) took 12 seconds
    Mon Feb 18 16:09:10 2008
    WARNING => DpNetCheck: NiAddrToHost(1.0.0.0) took 18 seconds
    ***LOG GZZ=> 2 possible network problems detected - check tracefile and adjust the DNS settings [dpxxtool2.c  5361]
    MtxInit: 30000 0 0
    DpSysAdmExtInit: ABAP is active
    DpSysAdmExtInit: VMC (JAVA VM in WP) is not active
    DpIPCInit2: start server >MTW02SDEC01_DE4_01                      <
    DpShMCreate: sizeof(wp_adm)          19976     (908)
    DpShMCreate: sizeof(tm_adm)          3605136     (17936)
    DpShMCreate: sizeof(wp_ca_adm)          18000     (60)
    DpShMCreate: sizeof(appc_ca_adm)     6000     (60)
    DpCommTableSize: max/headSize/ftSize/tableSize=500/8/528040/528048
    DpShMCreate: sizeof(comm_adm)          528048     (1048)
    DpSlockTableSize: max/headSize/ftSize/fiSize/tableSize=0/0/0/0/0
    DpShMCreate: sizeof(slock_adm)          0     (96)
    DpFileTableSize: max/headSize/ftSize/tableSize=0/0/0/0
    DpShMCreate: sizeof(file_adm)          0     (72)
    DpShMCreate: sizeof(vmc_adm)          0     (1296)
    DpShMCreate: sizeof(wall_adm)          (22440/34344/56/100)
    DpShMCreate: sizeof(gw_adm)     48
    DpShMCreate: SHM_DP_ADM_KEY          (addr: 065C0040, size: 4241064)
    DpShMCreate: allocated sys_adm at 065C0040
    DpShMCreate: allocated wp_adm at 065C1B30
    DpShMCreate: allocated tm_adm_list at 065C6938
    DpShMCreate: allocated tm_adm at 065C6968
    DpShMCreate: allocated wp_ca_adm at 06936BF8
    DpShMCreate: allocated appc_ca_adm at 0693B248
    DpShMCreate: allocated comm_adm at 0693C9B8
    DpShMCreate: system runs without slock table
    DpShMCreate: system runs without file table
    DpShMCreate: allocated vmc_adm_list at 069BD868
    DpShMCreate: allocated gw_adm at 069BD8A8
    DpShMCreate: system runs without vmc_adm
    DpShMCreate: allocated ca_info at 069BD8D8
    DpShMCreate: allocated wall_adm at 069BD8E0
    MBUF state OFF
    DpCommInitTable: init table for 500 entries
    EmInit: MmSetImplementation( 2 ).
    MM global diagnostic options set: 0
    <ES> client 0 initializing ....
    <ES> InitFreeList
    <ES> block size is 1024 kByte.
    Using implementation view
    <EsNT> Using memory model view.
    <EsNT> Memory Reset disabled as NT default
    <ES> 2046 blocks reserved for free list.
    ES initialized.
    WARNING => System running without ICM - check rdisp/start_icman [dpxxdisp.c   12437]
    rdisp/http_min_wait_dia_wp : 1 -> 1
    ***LOG Q0K=> DpMsAttach, mscon ( MTW02SDEC01) [dpxxdisp.c   11753]
    DpStartStopMsg: send start message (myname is >MTW02SDEC01_DE4_01                      <)
    DpStartStopMsg: start msg sent
    CCMS: AlInitGlobals : alert/use_sema_lock = TRUE.
    CCMS: start to initalize 3.X shared alert area (first segment).
    DpMsgAdmin: Set release to 7000, patchlevel 0
    MBUF state PREPARED
    MBUF component UP
    DpMBufHwIdSet: set Hardware-ID
    ***LOG Q1C=> DpMBufHwIdSet [dpxxmbuf.c   1050]
    DpMsgAdmin: Set patchno for this platform to 111
    Release check o.K.
    Mon Feb 18 16:09:13 2008
    MBUF state ACTIVE
    DpModState: change server state from STARTING to ACTIVE
    trc file: "dev_ms", trc level: 1, release: "700"
    [Thr 4724] Mon Feb 18 16:08:40 2008
    [Thr 4724] MsSSetTrcLog: trc logging active, max size = 20971520 bytes
    systemid   560 (PC with Windows NT)
    relno      7000
    patchlevel 0
    patchno    110
    intno      20050900
    make:      multithreaded, ASCII, optimized
    pid        5420
    [Thr 4724] ***LOG Q01=> MsSInit, MSStart (Msg Server 1 5420) [msxxserv.c   1824]
    [Thr 4724] MsInitAclInfo: acl file D:\usr\sap\put\DE4\SYS\global\ms_acl_info.DAT not found, unrestricted access
    [Thr 4724] MsGetOwnIpAddr: my host addresses are :
    [Thr 4724]   1 : [172.20.28.159] MTW02SDEC01.mindsap.com (HOSTNAME)
    [Thr 4724]   2 : [127.0.0.1] MTW02SDEC01.mindsap.com (LOCALHOST)
    [Thr 4724] MsHttpInit: full qualified hostname = MTW02SDEC01.mindsap.com
    [Thr 4724] HTTP logging is switch off
    [Thr 4724] MsHttpOwnDomain: own domain[1] = mindsap.com
    [Thr 4724] ms/icf_info_server : deleted
    [Thr 4724] *** I listen to port sapmsSHDDE4 (3601) ***
    [Thr 4724] CUSTOMER KEY: >J1537289841<
    trc file: "dev_rd", trc level: 1, release: "700"
    Mon Feb 18 16:09:10 2008
    ***LOG S00=> GwInitReader, gateway started ( 2344) [gwxxrd.c     1694]
    systemid   560 (PC with Windows NT)
    relno      7000
    patchlevel 0
    patchno    110
    intno      20050900
    make:      multithreaded, ASCII, optimized
    pid        2344
    gateway runs with dp version 229(ext=109) (@(#) DPLIB-INT-VERSION-229)
    gw/local_addr : 0.0.0.0
    CCMS: AlInitGlobals : alert/use_sema_lock = TRUE.
    CCMS: Initalizing shared memory of size 40000000 for monitoring segment.
    Bind service sapgw01 (socket) to port 3301
    GwPrintMyHostAddr: my host addresses are :
      1 : [172.20.28.159] MTW02SDEC01.mindsap.com (HOSTNAME)
      2 : [127.0.0.1] MTW02SDEC01.mindsap.com (LOCALHOST)
    DpSysAdmExtCreate: ABAP is active
    DpSysAdmExtCreate: VMC (JAVA VM in WP) is not active
    DpShMCreate: sizeof(wp_adm)          19976     (908)
    DpShMCreate: sizeof(tm_adm)          3605136     (17936)
    DpShMCreate: sizeof(wp_ca_adm)          18000     (60)
    DpShMCreate: sizeof(appc_ca_adm)     6000     (60)
    DpCommTableSize: max/headSize/ftSize/tableSize=500/8/528040/528048
    DpShMCreate: sizeof(comm_adm)          528048     (1048)
    DpSlockTableSize: max/headSize/ftSize/fiSize/tableSize=0/0/0/0/0
    DpShMCreate: sizeof(slock_adm)          0     (96)
    DpFileTableSize: max/headSize/ftSize/tableSize=0/0/0/0
    DpShMCreate: sizeof(file_adm)          0     (72)
    DpShMCreate: sizeof(vmc_adm)          0     (1296)
    DpShMCreate: sizeof(wall_adm)          (22440/34344/56/100)
    DpShMCreate: sizeof(gw_adm)     48
    DpShMCreate: SHM_DP_ADM_KEY          (addr: 06110040, size: 4241064)
    DpShMCreate: allocated sys_adm at 06110040
    DpShMCreate: allocated wp_adm at 06111B30
    DpShMCreate: allocated tm_adm_list at 06116938
    DpShMCreate: allocated tm_adm at 06116968
    DpShMCreate: allocated appc_ca_adm at 0648B248
    DpShMCreate: allocated comm_adm at 0648C9B8
    DpShMCreate: system runs without slock table
    DpShMCreate: system runs without file table
    DpShMCreate: allocated vmc_adm_list at 0650D868
    DpShMCreate: allocated gw_adm at 0650D8A8
    DpShMCreate: system runs without vmc_adm
    DpShMCreate: allocated ca_info at 0650D8D8
    MtxInit: -2 0 0
    Mon Feb 18 16:09:14 2008
    GwDpInit: attached to gw_adm at 0650D8A8
    Thanks,
    Vadi

    Dear All,
    The issue has been resolved by changing the DDIC password to what it was when we have started the upgrade.The password was "welcome" when we have started with upgrade after that it has been changed to
    "basis05" during upgrade.we changed it back to welcome and it started working fine.
    Here it took long time to find out what was the password when we have starte upgrade.Resetting to standard ddic password also ddint help out in our case.
    Thanks for all your replies.

  • ECC UPGRADE R/3 4.7 EXT 1.1 to ECC 6.0 EHP5

    Hello Experts
    We are performing an R/3 upgrade from 4.7 ext 1.1 to ECC 6.0 EHP5 for one of our clients. The Landscape includes 3 tier systems DEV, QAS and PRD (Based MSCS). For initial dry run we are planning to upgarde sandbox (SBX) which is a copy of PRD system. The R/3 4.7 system is based on "Windows NT 5.2" and "MSSQL (8.00.2040)" which we are planning to copy to new hardware which would be based on "WINDOWS 2008 Server" and "MSSQL SERVER 2008".
    Also the upgarde would be of type CUUC as the current R/3 system is a non-unicode system. We also plan to include chinese language for the new systems.
    P.S :- All the 4 systems  (SBX, DEV,QAS, PRD (Based on MSCS)) would be first copied to new hardware and then upgarded to ECC 6.0 EHP5. The DB is appx 450 GB in size and we also need to setup a Solman system from scratch.
    So the question that i would like to pose to all you  subject matter experts is ....
    What is the time frame that we should keep to perform the complete Upgrade preoject with all the above activities with possible issues arising during the upgrade phase.
    Waiting for your quick replies.
    Best Regards
    Pritish

    Hi,
    There are no standard timeliness for the upgrade project. It depends upon number of factors like number of background processes, no of R3trans processes defined in configuration phase, Memory parameters etc. So, it is really difficult to give you an estimate for this. Best option is do the test upgrade, so that you will get an idea how much time it will take.
    Also, If you want to migrate your existing system to new hardware then I would suggest you to install your system as unicode system on new hardware as a result you can save a lot of time because of unicode conversion in CUUC.
    Thanks
    Sunny

  • SAP HR ECC upgrade

    Hi,
    Could someone tell me what will be the role of SAP HR abap developer in SAP ECC upgrade.
    Specially Payroll programming.
    and after the upgrade  is done what kind of development support is required.
    Many thanks
    Swetha

    Hi Swetha,
    ABAPer needs to check all of the user exits and BADIs implemented before in order to check whether any changes need to be done.
    Additionally, if there had been any repairs in the system, these need to be reimplemented after upgrade.
    For further reference please check the following links:
    Re: what are abaper tasks during upgrade to ECC 6.0?
    http://www.sapdev.co.uk/upgrade/ug_tasks.htm
    Regards,
    Dilek

  • HR Payroll Data Migration from 4.6C to ECC Upgrade

    Hi
    We are going to Upgrade our 4.6c R/3 system which includes HR to ECC6.
    After this upgrade we going to start the Data migration of all data inclduing HR payroll from 4.6c to ECC.
    1).Can anybody advise what are the options for loading Payroll data from 46c to ECC ..? After Payroll data migration we must be able to see all the Payroll results from the previous system.
    2) is there any standard programs availble for Payroll data migration  ..?
    Also if anybody have any info/links on Payroll/HR data migration please help to advise.
    Thanks a lot for your info/Time.,
    Edited by: Dp on Apr 3, 2008 11:41 PM

    Hi Somar,
    I could not find the mentioned post "HR Upgrade". Please let me know the details of the "HR Upgrade" details which need to be kept in mind during upgrading R/3 4.7 to ECC 6.0
    Yes, we have got the list of "Modification Objects" using the SPAU. Please confirm that during our upgrade, we just need to work on these objects which were changed/repaired by us according to our business need.
    And, apart from that, please let me know should I need to worry about any OSS notes specific to 4.7, which is not applied to our system and got released after the ECC 6.0 Enhancement Release 3.
    I understand that if we have a system that has the Patch and SP level as in our production system and do the upgrade to ECC 6.0 all the HR functionalities will be automatically taken care. Please confirm.
    Thanks in advance for your help.
    Regards,
    Vijay

  • Role of Time Mgmt functional consultant during SAP Upgrade from 4.7 to ECC6

    Hi,
    Could anyone explain the role of a time management functional consultant during SAP upgrade from R/3 4.7 to ECC6.0. Please provide me if you got any documentation.
    Thanks,
    Sunny

    "After you upgrade to SAP ERP 6.0, you can enhance the functionality of your application without performing a further
    upgrade thanks to a new deployment technology u2013 the SAP enhancement package for SAP ERP. The enhancement
    packages simplify the way you manage and deploy new software functions for SAP ERP." - that is the real benefit of ECC 6.0
    There aren't any major changes to PTM functionalities from 4.7 to 6.0. I hope your system is already using IT 2006 instead of IT 0005. Under functional role, you are required to configure/test any functional upgrade and manage data.
    Regards
    Yash

  • ECC upgrade and integration models

    Experts,
    We are upgrading our R3 system from 4.7 to ECC 6.0.  We currently use SCM 5.1.  During the upgrade from SCM 4.0 to 5.1, we had to do a re-initial transfer of our PDS integration models and a full curto_create, because the PDS tables had changed so much. 
    Is there a similar concern with an upgrade of R3 4.7 to ECC 6.0?  Should I be doing a re-initial transfer of my integration models after the new ECC 6.0 system is built and released?
    Thanks,
    Matthew Bruckner

    Hi Mathew,
    Thanks for input. We are going for upgrade from SCM 4.1 to 7.0.
    I never been upgrade of ECC. I think it is always better to do the initial transfer after upgrade.
    Any way initial transfer will not create any issues.
    Also check T.code SPAU to know the modification in the upgrade system from your old version.
    I hope this helps.
    Regards,
    Kishore Reddy.

  • Change in the behaviour of the value assignment type after the ECC upgrade

    Hello Team,
    We have recently upgraded our system to ECC 6.
    In the older version of SAP whenever we try to open a phrase related property (in a particular substance specification) it used to give a warning message upfront in case any of the phrases used is not assigned to the phrase set.
    But with the upgraded version this upfront warning message doesnot appear and we have to click on individual phrases to check if that phrase has any issue or not. This is quite time consuming in the case several phrases has been assigned to a property.
    Please let me know if we have any solution for this available.
    Regards,
    Anoop

    Hello Anoop
    during our upgrade project we did not have the same problem. I have never heard about a similar problem. May be check OSS (SAP marketplace). Depending on the release you started may be you missed yome customizing to be done (if you started with SAP enterprise 4.7 Ext 1.1 the change is "dramatic"; if you started with SAP enterprise 4.7 Ext 2.0 changes should only be minor; in case of ECC 5.0: I believe there is no change.
    a.) Do you have activated Enhancement Packages?
    b.) do you use the "exit" to prepare "dynamic phrase sets"?
    With best regards
    C.B.

  • ECC upgrade

    we are performing the ECC upgrade with unicode conversion from 620 system which has db size 7.24TB
    1. do any one performed this on similar huge database?if yes give details
    2. since db size is high do we need to go for CUUC or upgrade with unicode in two projects
    3. how to calculate the downtime apart from the OSS note provided by SAP which is purely theoritical
    4. what are the major challenges during export,import

    Hi,
    I'm going to do Productive Upgrade from 4.6C to ECC 6.0 next week with a 7.4 TB Oracle Database and I have already done 5 tests using a copy from Production database let me give answers your questions:
    1. do any one performed this on similar huge database?if yes give details
    Yes, R/3 4.6C to ECC 6.0 on HP/UX 11 and Oracle 10.2.0.2.
    You will find upgrade info that says the database size is not that critical and this is true as long as you do some fixes before the actual upgrades (of course after real live test upgrades with a PRD copy). The last Upgrade test we did we achieved 7 hours and 31 minutes of downtime not including post upgrade that will be the longest part of the whole process. In our downtime we had to include a lot of support packages and this system has some specific industry solutions that makes thinks harder. The first test run used 117 hours. SAP assesment service is really recomended in this kind landscapes and they helped us to do some cleanup of unused tables or unused data that let us move in the second test to 20 hours and with some other investigation and trials by our own we achieve the final 7:31 time and espect to get a lower time during Production Upgrade because the PRD server and DB server are more powerfull . Downtime depends a lot in Hardware and here the servers are running on servers with 8 1.6 Itanium CPU's and 32Gb of RAM, EVA system for DISKS.
    2. since db size is high do we need to go for CUUC or upgrade with unicode in two projects
    I will strongly recomend to do it in two projects unless you have a long time that you could use to achieve all this in one step or in case your post upgrade is really short.
    3. how to calculate the downtime apart from the OSS note provided by SAP which is purely theoritical
    The only way to calculate downtime is to actually doing a test upgrade on a PRD copy. This is also what SAP people will tell you.
    4. what are the major challenges during export,import
    I can´t answer this as we did not went to Unicode.
    Good Luck during your upgrades,

  • ABAP activities during EHP6 Upgrade

    Hi All,
    During EHP6, upgrade apart from SPDD, SPAU & UCCHECK adjustments, obsolete FMs - WS_UPLOAD, UPLOAD, WS_DOWNLOAD & DOWNLOAD should be replaced with the latest one from Z-programs.
    What are the other ABAP activities & obsolete FMs that should be taken care for Z-developments in the system during EHP6 upgarde?

    Dear Munish,
    PF the SS as below. It is asking to do the ASU/Upgrade. .......One more thing From where i can see what will be the minimum SP of ECC 6.0 to Upgrade to Ehp6 ..
    Regards
    RK

Maybe you are looking for

  • Creating Datasource and Extracting from SAP R/3 ECC 6.0

    Hello Gurus, I am very new in BI field, I am learning through notes provided in this Blog. Curretnly I need to know how we create Datasource at SAP R/3 ECC 6.0 (is there any difference b/t these?) and how we may extract data from R/3 ECC 6.0 Source S

  • Successful update on a 3G--here's what I did

    I read a lot of threads here before deciding to take the plunge to update my 3G to OS4. I was able to update successfully thanks to the things I learned here, so I thought my experience might be helpful to someone else. Here's what I did: 1. Installe

  • Download Hierarchial List ALV  to excel

    Hi all, Please provide me the solution on using download button in Hierarchial List ALV to download to excel.The output of excel need to be exacted as the output of ALV (All header and items details). Please suggest the solution and sample code ASAP.

  • Navigate report from detils level in hierarchy

    HI, I have requirement that i want to have only one report. which is applied for drill down. Ex: Year, Measure Year-->Quarter-->Month--> Day when i drill from year to day and i have to applied navigate to another from day. Is it possible. Regards, Ma

  • Exporting Data from one Server to Another server w/ Version Enabled Tables

    Hi, I'm currently having a problem with regards to Exporting data to another server. This is the Scenario: Source Server is Production Server with all of its Tables in the Schema are Version-Enabled. Destination Server is a Test Server. I exported da