BW Report requirement (Trend Analysis Report (Project Systems))
Hello, BW experts
I need some help
.
This requirement is for Trend Analysis Report (Project Systems)
I am loading data from ODS to Cube as a Delta Upload
ODS is getting data from R/3 data source as a full upload (no delta in the Datasource)
I added one custom field in the cube (0PS_C04) and that custom field (Date field) is going to pick current date (Sys date) through formula in the update rules.
When I am loading data from ODS to Cube, if the value is coming to the amount field, then the current date field is going to get the current date to the cube
If there is no record is updated in R/3, then delta is not going to update any record to the Cube.
If no record is updated to the cube to the particular project number, then Date field is not going to get any data from update rules.
But I need to see all dates in the cube even though there is no update in the R/3 for that project.
Example:
Proj---day1 2 3 4 5 6
-XYZ--- 10 5 -- 3 -- 2
In the report now I am able to see some thing like this
Project day1 2 4 6
XYZ 10 5 3 2
But I am expecting some thing like this
Project day1 2 3 4 5 6
XYZ 10 15 15 18 18 20
Can anyone please help me in this
..
Any input is strongly appreciated
Thanks,
Rajesh
Rajesh,
Exception aggregation with last value and reference characteristic as calday should solve the problem.
Cheers
Aneesh
Similar Messages
-
Result Analysis for Project Systems
Hi all
Does any1 have any documentation relating to Resut Analysis for Project Systems incl POC calculation and other basic concepts. Any help would be highly appreciated.
Regards
HrishiHi,
Please follow the link below: it has all the details for the POC methods:
http://help.sap.com/saphelp_46c/helpdata/en/90/ba6f37446711d189420000e829fbbd/content.htm
Hope its useful.
Reward points if found useful.
thanks.. -
Report-Report Interface from BW to Project Systems
I'd like to jump from BW reports based on 0PS_C04 into the corresponding R/3 line items. If I specify CJ74 as the transaction target then run the BW report and choose the corresponding option from the 'GoTo' menu the following message is displayed. I find this very confusing -- it seems to be saying that the report behind the transaction cannot be used in the report-report interface, but in the procedure says always use the program in the report-report interface.
Can anybody understand what the message is telling us? Can anyone tell me how to jump to an R/3 line item report from BW Project System cube?
Thanks
Robert Williams
You cannot use the report-report interface to call up report RKPEP000
Message no. HF 800
Diagnosis
Line item report RKPEP000 is not suitable for the report/report
interface.
Procedure
Always enter RKPEP000 as the receiver report for project line items in
the report/report interface. This program uses the transfer parameters
to determine which line item reports can be accessed.Hi
I dont know whether you have solved the problem or not yet
But i came up with the same issue....
Use interface program RKPBW000 instead of RKPEP000 in the RRI settings.
OSS Note : 356166
Thanks -
Service Level Reporting - Trend Analysis data missing in the report
Hi Experts,
I'm working with sap solution manager and Business Process Monitoring.
I can't get to know how to configure the system in order to get Service Level Reporting collecting data for "Trend analysis" related to business processes.
In fact, in my reports each trend analysis graph (last week/month six months) is empty, no matter which aggregation type (AVG, MAX or SUM) I use.
It seems like the BI within the Solution Manager doesn't collect the data, or doesn't provide them to SL reporting.
How can I check whether something is missing in my configuration?
Thanks in advance for your help!
Regards,
PaoloHi Paolo,
Did you check the followings notes:
1068944 EarlyWatch Alert: Various Smaller Corrections
1470008 EarlyWatch Alert - Issues in ST-SER 701_2010_1
If they do not help, what is your solution manager version?? (ST 400 and ST-SER component versions)
Regards,
Daniel. -
Vendor spend analysis report from ECC as source system
Hi Experts,
Currently am working on Functional Specification on a BI report "Vendor Spend Analysis".The source system is ECC.This report should give details about how much the company has spend on a vendor during a particular period along with payment terms , payment term days .
I have started with Datasource 0FI_AP_4.Please let me know which field(credit or debit field) in the Datasource gives amount spend.I have checked the table EKKO and BSAK .What are the other fields and table i have to take into consideration.Suggest...
Regards,
MeeraHi Experts,
Can anyone tell me the table which stores the data regarding the amount paid to a vendor.
Regards,
Meera -
BPMon alert reporting not showing any data for Trend Analysis
Hi,
I have setup BPMon and performed the initial setup for BW reporting. There are alerts being generated by the BPMon setup and the data has been transferred to the 0SM_BPM cube.
But when I start the Trend Analysis report I dont get any Solution for selection to generate the trend analysis chart.
I have followed all the steps mentioned in the setup guide. Please suggest any remedy.
Regards,
VishalHi ,
If your query is on multiprovider , then makesure to check there are no restrictions/filters on cubes.
Also inlcude any keyfigure from the cube,where other characteristics are being assigned from or where u r seeing data, in the query.
If you dont want to see the Keyfigure, u can hide it using keyfigure display properties in the query designer.
Hope this helps,
Aparna Duvvuri -
Question with web analysis reporting
Hi,Experts..
Here is a criitcal situation for me..
we are using web analysis as a reporting tool.In generatin one report..the "Rate difference must be calculated".
The importatnt thing is rate difference is a fact value(not available in the cube) which calculated from "version-1 volume minus version-2 volume" (1003->volume - 1000->volume).whwn i try to do in analysis tool functionality in web analysis,the rate difference will be coming as in 2 columns for both version...
My idea is to write a calculation script.but while writing calculation script the rate difference will not be there in the cube level..if i write the scripts how can i validate...
How to proceed to this?Hi,
I'm not quite sure how your outline is- & your complete reporting requirements(,for the report you mentioned).
However, I presume, Version is one of the dimensions having *1000* & *1003* as members. And, Volume is one of the members in your Measures+ dimension.
If yes, what's the issue if we select Version(s) in Column & Volume in the row. You can certainly add a column-level calculation for seeing the desired difference.
Let us know incase of any concerns.
-Natesh
P.S.:- This should've been posted in "Query & Reporting" forum. Experts for this sit there :D -
Is there a separate forum for Project Systems? Where does PS functional people discuss? I would like to make some changes to a report(12KST1C) which is in project systems. Is there someone to help me? Please advice
In transaction CJE0 - if I choose this drilldown report 12KST1C - I could see the characteristic Object with hierarchial column selected. My requirement is to also include the cost element, partner object details into the result. Is there anyone who did the same or have idea about this??? please help!!!
Message was edited by: Thilothama vThanks Saquib. I did post there...Do you think we can include cost element, partner object information in the project structure in any report - drilldown or report painter???? If yo have some ideas, please let me know...
Thanks
Thilothama -
Project System Restructuring -- Reporting Requirement
Hi All,
Due to Restructuring in our client.Our Project System is adopting the following method and asking for BI input on this please let me know if anyone has come across this situation.
Projects are going to move from one Company Code to another Company Code. So they are closing the existing projects in Old Comp. Code and new projects are being created in New Comp. Code . In doing so they are closing the Old Projects(say P1 u2013 total budget 100) consumed 60 and then new project they will create with remaining balance 40. (say P2). Also
Reporting Requirement :
Then when they run the report for the New Project P2 then it should bring the information of P1 also.
Please let me if it is possible to achieve this.
Regards,
Mayankinteresting, load previous data in a cube completely for all the previous years and have the new data load in another cube and create a multiprovider to join them. and in your selection for wbs use both data selection...thats all i can think of on top of my head..
-
Problem in project system report ZPS_PROJSUMMARY
i am working with a report ZPS_PROJSUMMARY which extracts all project summary report.now problem is it is extracting las financila years (2006 ) closed WBS element also with this years WBS elements. this problem happening in production only. this is not coming in pre production.in pre production it is deleting all the previous years WBS using this subroutine perform process_delete_child using it_report-pspnr which is based on condition if l_status_fyear lt s_fyear-low.
i am giving the full code below:-
report zps_projsummary line-size 623
line-count 65
no standard page heading
message-id zfiwip.
Report Name: ZPS_PROJSUMMARY
Author: Rey Salvador (for NDC)
Date: 14.09.2001
Purpose: Project Summary Report (with Commitments)
Modifications Log
Mod Id Author Date References Purpose
M001 R.Salvador 19.10.01 THOR 2845 Add YTD Rev.Recognised
M002 R.Salvador 19.11.01 THOR 2978 Fix YTD Rev.Rec. Level 1
M003 R.Salvador 19.11.01 THOR 3050 Fix YTD Rev.Rec. Level 1
M004 R.Salvador 08.03.02 THOR 3222 Fix Include Closed WBS
M005 R.Salvador 17.05.02 THOR 3342 Fix issue with Profile
M006 C.Kontkanen 22.05.02 LOB Add ProjManager sel
M007 R.Salvador 19.06.02 LOB Incl. WIP/COGS Adjustments
M008 R.Salvador 26.07.02 THOR xxxx Add ProjOfficer
M009 R.Salvador 06.08.02 THOR 3508 Revenue Recognition Changes
M010 R.Salvador 29.11.02 THOR 3704 New Billing Reports
M011 R.Salvador 17.12.02 THOR 3646 Fix problem with statuses
M012 R.Salvador 20.01.03 THOR 3930 Add CP/SP/WO number
M013 R.Salvador 07.03.03 THOR 3953 Incorrect Status
M014 R.Salvador 15.04.03 THOR 4056 Fix Level 1 Calculation
M015 R.Salvador 01.05.03 THOR 4070 Fix Level 1 Calculation
M016 R.Salvador 17.06.03 THOR 4125 Fix Level 2 Calculation
M017 R.Salvador 03.09.03 THOR 4220 Change RevRec Calculation
M018 R.Salvador 25.09.03 THOR 4237 Fix WBS Selection
M019 R.Salvador 11.11.03 THOR 4297 Add SP number
M020 R.Salvador 16.01.04 THOR 4342 Fix Revenue Recognition
M021 R.Salvador 28.01.04 THOR 4344 Fix Revenue Recognition
M022 R.Salvador 11.02.04 THOR 4340 Fix Selection Criteria
Ta Tran 10.06.04 DI4K900626 Copied from NDC
M023 Maccha 29.08.05 DI2K921397 Honing the selection
Srinivas process for Director and
Manager criteria.
M024 M.Srinivas 20.09.05 DI2K921599 Rectifying the order level
- Partner profile
selections. Ref.
docket:203680869
M025 M.Srinivas 01.05.06 DI2K922837 Order level - Status
profile selections
rectification. PD:203960491
M026 Gaurav Dixit18.09.06 DI2K923361 Not to select the deleted
partners from IHPA table.
M027 SaiKiran Reddy07.06.07 DI2K923793 To Exclude Deleted partner
from IHPA table.
include zps_projsummcomd.
types: begin of ty_wbs_report2, "Reporting Table
Pdir(20), "Prog Dir
posid like prps-posid, "WBS Element
post1 like prps-post1, "Short Text
fkstl like prps-fkstl, "resp const centre
prart like prps-prart, "Proj Type
ZZORDERLEVEL(2), "order level
ZZACTTYP(6), "Activity type
sstatus like bsvx-sttxt, "system status
ustatus like bsvx-sttxt, "user status
ZZIMCINITIATIVE(24), "IMC initiative
ZZIMCPROGRAM(02), "IMC Program
ZZWORKCATEGORY(02), "Work Cat
ZZWPMANLOB(01), "LOB
ZZSOURCE(02), "Source
ZZPRIN(02), "Principal
ZZIMPLEMENTREG(01), "IMP Reg
ZZCONTRACTID(10), "Contract
ZZWPNUM(08), "WP No
ZZsPNUM(08), "SP No
ZZORDERNUM(04), "Order No
lead(20), "Prog Lead
Pmgr(20), "Prog Mgr
Poff(20), "Prog Officer
acthours type megxxx, "megXXX: 3decimal"Actual Hours
acthours type wkgxxx, "wkgXXX: 2decimal"Actual Hours
planhours type wkgxxx, "Planned Hours
PLANLABOUR type wkgxxx, "PLAN LABOUR
ACTLABOUR type wkgxxx, "ACTUAL LABOUR
planmatcosts type wkgxxx, "plan material costs
actmatcosts type wkgxxx, "actual material costs
plancosts type wkgxxx, "Planned COsts
actcosts type wkgxxx, "Actual Costs
prcommitment type wkgxxx, "PR Commitment
pocommitment type wkgxxx, "PO Commitment
totcommitment type wkgxxx, "Total Commitment
zzwip like prps-zzwip, "rev rec process
planrev type wkgxxx, "Planned Revenues
actrev type wkgxxx, "Actual Revenues
pcnt_comp(8) type p decimals 2, "% complete
acttotrevrec type wkgxxx, "Act.Rev.Rec m009
actytdrevrec type wkgxxx, "Act.Rev Rec m009
revrec type wkgxxx, "revenue Recognise
revrecytd type wkgxxx, "RevRec YTD M001
rev_collected like vbrp-netwr, "Collected Rev
end of ty_wbs_report2.
types: begin of ty_wbs_report, "Reporting Table
Pdir(20), "Prog Dir
posid like prps-posid, "WBS Element
post1 like prps-post1, "Short Text
fkstl like prps-fkstl, "resp const centre
prart like prps-prart, "Proj Type
ZZORDERLEVEL(2),
ZZACTTYP(6), "Activity type
sstatus like bsvx-sttxt, "system status
ustatus like bsvx-sttxt, "user status
ZZIMCINITIATIVE(24), "IMC initiative
ZZIMCPROGRAM(02), "IMC Program
ZZWORKCATEGORY(02), "Work Cat
ZZWPMANLOB(01), "LOB
ZZSOURCE(02), "Source
ZZPRIN(02), "Principal
ZZIMPLEMENTREG(01), "IMP Reg
ZZCONTRACTID(10), "Contract
ZZWPNUM(08), "WP No
ZZSPNUM(08), "SP No
ZZORDERNUM(04), "Order No
lead(20), "Prog Lead
Pmgr(20), "Prog Mgr
poff(20), "Prog Officer
acthours type wkgxxx, "Actual Hours
planhours type wkgxxx, "Planned Hours
PLANLABOUR type wkgxxx, "PLAN LABOUR
ACTLABOUR type wkgxxx, "ACTUAL LABOUR
planmatcosts type wkgxxx, "plan material costs
actmatcosts type wkgxxx, "actual material costs
plancosts type wkgxxx, "Planned COsts
actcosts type wkgxxx, "Actual Costs
prcommitment type wkgxxx, "PR Commitment
pocommitment type wkgxxx, "PO Commitment
totcommitment type wkgxxx, "Total Commitment
zzwip like prps-zzwip, "rev rec process
planrev type wkgxxx, "Planned Revenues
actrev type wkgxxx, "Actual Revenues
pcnt_comp(8) type p decimals 2, "% complete
acttotrevrec type wkgxxx, "Act.Rev.Rec m009
actytdrevrec type wkgxxx, "Act.Rev Rec m009
revrec type wkgxxx, "revenue Recognise
revrecytd type wkgxxx, "RevRec YTD M001
pspnr like prps-pspnr, "WBS Internal Key
postu like prps-postu, "Short Text
fakkz like prps-fakkz,
psphi like prps-psphi, "proj def
zzcust like prps-zzcustNUM, "Customer
zzcustnum like prps-zzcustnum, "Customer
kostl like prps-kostl, "Cost Centres
prsumm(1) type c, "Project Summary
actcostscfy type wkgxxx, "Current FY Costs
actrevcfy type wkgxxx, "Current FY Rev
rev_billed like vbrp-netwr, "Billed Revenue
gst_billed like vbrp-mwsbp, "Billed GST
rev_collected like vbrp-netwr, "Collected Rev
gst_collected like vbrp-mwsbp, "Collected GST
totbudget type wkgxxx, "Total Budget
verna like prps-verna, "PM m006
astna like prps-astna, "PO m006
totcogs type wkgxxx, "Total COGS m009
ytdcogs type wkgxxx, "YTD COGS m009
end of ty_wbs_report.
types: begin of ty_totals, "Structure for Sub-totals
actmatcosts type wkgxxx, "Actual material Costs
actcosts type wkgxxx, "Actual Costs Total
actrev type wkgxxx, "Actual Revenues Total
planmatcosts type wkgxxx, "plan material Costs
plancosts type wkgxxx, "Planned Costs
planrev type wkgxxx, "Planned Revenues
acthours type wkgxxx, "Actual Hours
planhours type wkgxxx, "Planned Hours
ACTLABOUR type wkgxxx, "ACTUAL LABOUR
PLANLABOUR type wkgxxx, "Planned LABOUR
revrec type wkgxxx, "Revenue Recognised
revrecytd type wkgxxx, "RevRec YTD M001
acttotrevrec type wkgxxx, "RevRec Actual M009
profit type wkgxxx, "Planned Profit/Loss
actcostscfy type wkgxxx, "Actual Costs Current FY
actrevcfy type wkgxxx, "Actual Revenues Current FY
rev_billed type wkgxxx, "Billed Revenue
gst_billed type wkgxxx, "Billed GST
rev_collected type wkgxxx, "Collected Rev
gst_collected type wkgxxx, "Collected GST
prcommitment type wkgxxx, "PR Commitment
pocommitment type wkgxxx, "PO Commitment
totcommitment type wkgxxx, "Total Commitment
totbudget type wkgxxx, "Total Budget
actytdrevrec TYPE wkgxxx,
end of ty_totals.
type-pools: gsetc.
tables: cepct.
data: it_wbs_report TYPE ty_wbs_report OCCURS 0 WITH HEADER LINE,
it_wbs_report2 TYPE ty_wbs_report2 OCCURS 0 WITH HEADER LINE,
wr_wbs_report type ty_wbs_report,
it_prctr type standard table of setlist,
it_stat(72) occurs 0 with header line,
et_stat(72) occurs 0 with header line,
begin of it_tj49 occurs 0,
stats like tj49-stats,
incex like tj49-incex,
verkz like tj49-verkz,
end of it_tj49,
begin of it_csla occurs 150,
vksta like csla-vksta,
end of it_csla,
w_stat_flg,
w_join(3),
w_not(3),
w_stat_val(7) value ''' ''',
W_LEAD(40),
W_PDIR(40),
W_PMGR(40),
w_poff(40),
w_tab like sy-tabix,
n like sy-index,
w_reporting_level(2) type c,
w_gtotal_text(500) type c,
w_other_level(1) type c,
w_budat like bkpf-budat, "m002
w_level like prps-stufe,
w_record_count(8) type n,
w_pspid_ind(1) type c, "m003
begin of ziheader,
w_strlen type i,
hdr_pos type p,
hold_name(30),
conf_txt(54) value
'* CONFIDENTIAL - PROPERTY OF BACCHUS *',
end of ziheader,
p_budat like bkpf-budat,
w_sel_posid like prps-posid,
Internal tables to hold set hierarchy, values, pointers and sorts
set_hierarchy like sethier occurs 0 with header line,
set_values like setvalues occurs 0 with header line,
set_id like rgsbs-setnr,
set_id2 like rgsbs-setnr,
w_setnr(30) type c,
w_set_values like rgsb4 occurs 0 with header line,
lt_objlst type standard table of onr00,
lr_objlst type onr00,
w_first type c.
Start of M011
data: it_wbs1 like it_wbs occurs 0.
data: it_wbs_tmpo like it_wbs occurs 0 with header line. "M024
data: begin of loc_wbs occurs 0.
include structure zco_wip_wbslst. "test '''
data: pdir(20),
zzacttyp(6),
ZZIMCINITIATIVE(24),
ZZIMCPROGRAM(02),
ZZWORKCATEGORY(02),
ZZWPMANLOB(01),
ZZSOURCE(02),
ZZPRIN(02),
ZZIMPLEMENTREG(01),
ZZCONTRACTID(10),
ZZWPNUM(08),
ZZSPNUM(08),
ZZORDERNUM(04),
PERNR(08),
PERNR2(08),
end of loc_wbs.
data: begin of it_report occurs 0,
posid like prps-posid,
pspnr like prps-pspnr,
end of it_report.
End of M011
data: begin of it_deleted occurs 0,
posid like prps-posid,
pspnr like prps-pspnr,
end of it_deleted.
data: begin of l_deleted occurs 0,
posid like prps-posid,
pspnr like prps-pspnr,
end of l_deleted.
data: w_year like bkpf-gjahr.
data: begin of t_date occurs 0,
w_budat like bkpf-budat,
poper like t_poper-poper,
end of t_date.
data: t_ihpa like ihpa occurs 0 with header line,
t_ihpa1 like ihpa occurs 0 with header line,
t_ihpa2 like ihpa occurs 0 with header line,
t_ihpa3 like ihpa occurs 0 with header line,
t_ihpa4 like ihpa occurs 0 with header line,
l_status(3),
w_PLANHOURS like it_wbs-PLANHOURS,
w_PLANREV like it_wbs-PLANREV,
w_PLANCOSTS like it_wbs-PLANCOSTS,
it_tmp_wbs3 type zco_proj_summary_v2 occurs 0 with header line,
W_it_wbs5 like it_wbs .
ranges: r_prctr for prps-prctr.
ranges: r_stufe for prps-stufe.
ranges: r_posid for prps-posid.
constants: c_crtd like tj49-stats value 'I0001'.
CONSTANTS: C_LEAD(2) VALUE '4A',
C_PDIR(2) VALUE '4B',
C_PMGR(2) VALUE 'A1',
C_Poff(2) VALUE 'A2',
c_pdn like ihpa-OBTYP value 'PDN',
c_prn like ihpa-OBTYP value 'PRN'. "M023
tables : pa0002.
---------------------Organisational Units------------------------*
selection-screen begin of block orgunit with frame title text-t06.
*WP/CP Managing LOB
select-options: S_ZWP for PRPS-ZZWPMANLOB MATCHCODE OBJECT ZZWPMANLOB.
*Implementing Region
select-options: S_ZIMP for PRPS-ZZIMPLEMENTREG MATCHCODE OBJECT
ZZIMPLEMENTREG.
*Cost center group
PARAMETERS: P_CTGRP LIKE RKSB1-KSGRU no-display.
*Responsible Cost Center
select-options: s_fkstl for prps-fkstl.
select-options: s_src for proj-zzsource MATCHCODE OBJECT ZzSOURCE.
select-options: s_prin for proj-zzprin MATCHCODE OBJECT ZzPRINCIPAL .
select-options: s_wcat for proj-zzworkcategory MATCHCODE OBJECT
ZZWORKCATEGORY.
select-options: s_wpcpt for proj-ZZTYPE MATCHCODE OBJECT ZzTYPE.
selection-screen end of block orgunit.
selection-screen begin of block periods with frame title text-t05.
selection-screen begin of line.
selection-screen comment 1(20) text-c04 for field p_kokrs.
selection-screen position pos_low.
parameters: p_kokrs type kokrs obligatory default 'TELC'.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(20) text-c01 for field s_fyear.
selection-screen position pos_low.
select-options: s_fyear for bkpf-gjahr obligatory no intervals
no-extension.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(20) text-c02 for field s_poper.
selection-screen position pos_low.
select-options: s_poper for T009B-poper obligatory no intervals
no-extension.
selection-screen end of line.
selection-screen begin of line.
selection-screen position pos_low.
selection-screen end of line.
data: p_incwip(1) type c value ' '.
selection-screen begin of line.
selection-screen comment 1(30) text-c25 for field p_calrev.
selection-screen position pos_low.
parameters: p_calrev radiobutton group 0001 default 'X'.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(30) text-c26 for field p_actrev.
selection-screen position pos_low.
parameters: p_actrev radiobutton group 0001.
selection-screen end of line.
End of M007 Mods
selection-screen end of block periods.
selection-screen begin of block psjsel with frame title text-t01.
*Program Leadhouse
select-options: s_plead for pa0002-pernr matchcode object ZPA0002.
*Project Director
select-options: s_pdir for pa0002-pernr matchcode object ZPA0002.
*Project Manager
select-options: s_pmgr for pa0002-pernr matchcode object ZPA0002.
*Project Profile
select-options: s_PROFL FOR PROJ-PROFL default 'EXTERN' obligatory.
*Project Definition
select-options: s_pspid for proj-pspid.
*WBS Element
select-options: s_posid for prps-posid.
selection-screen end of block psjsel.
selection-screen begin of block othersel with frame title text-t07.
parameters: p_lvl1 radiobutton group rplv,
p_lvl2 radiobutton group rplv,
p_wip radiobutton group rplv.
selection-screen begin of line.
selection-screen comment 1(20) text-c16 for field p_oth.
selection-screen position pos_low.
parameters: p_oth radiobutton group rplv.
selection-screen comment 40(20) text-c17 for field p_level.
parameters: p_level like prps-stufe.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(22) text-c22 for field p_incwbs.
selection-screen position 42.
parameters: p_incwbs as checkbox.
selection-screen end of line.
Start of M006 Mods
selection-screen begin of line.
selection-screen comment 1(41) text-c23 for field p_clwbs.
selection-screen position 42.
parameters: p_clwbs as checkbox default 'X'.
selection-screen end of line.
End of M006 Mods
parameters:
p_status like tj49-selid.
select-options:
s_prart for prps-prart.
selection-screen end of block othersel.
selection-screen begin of block outfile with frame title text-t11.
selection-screen begin of line.
selection-screen comment 1(20) text-c11 for field p_file.
selection-screen position pos_low.
parameters: p_file as checkbox.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(20) text-c13 for field p_runid.
selection-screen position pos_low.
parameters: p_runid like zcnwip_log-zrunid.
selection-screen end of line.
selection-screen begin of line.
selection-screen comment 1(20) text-c12 for field p_filenm.
selection-screen position pos_low.
parameters: p_filenm(40) type c default '/batch/int/send/ndcreports/'
lower case.
selection-screen end of line.
selection-screen end of block outfile.
initialization.
perform ini_fiscal_year_current.
Default year/period in the selection screen
s_fyear-sign = 'I'.
s_fyear-option = 'EQ'.
APPEND s_fyear.
s_poper-sign = 'I'.
s_poper-option = 'EQ'.
APPEND s_poper.
perform ini_file_path.
at selection-screen on block outfile.
if not p_file is initial.
if p_filenm is initial.
message e017.
endif.
if p_runid is initial.
message e017.
endif.
endif.
at selection-screen on p_status.
clear it_stat.
refresh it_stat.
if p_status is initial.
w_stat_flg = 'N'.
else.
w_stat_flg = 'Y'.
endif.
at selection-screen.
include ZCNWIPCOMF_V2.
if not p_actrev is initial.
move: w_curr_year to w_curr_fperiod+0(4),
w_curr_period to w_curr_fperiod+4(2),
s_fyear-low to w_sel_fperiod+0(4),
s_poper-low to w_sel_fperiod+4(2).
if w_sel_fperiod le '200212'. "temp
message e025.
endif.
if w_sel_fperiod ge w_curr_fperiod.
message e026.
endif.
endif.
Check if Other level check, specify level from 3-4
if not p_oth is initial and
p_level is initial.
message e021.
endif.
Validate File Information
if not p_file is initial.
if p_runid is initial or
p_filenm is initial.
message e014.
endif.
select count(*) from zcnwip_log
where zrunid eq p_runid
and zrep eq 'PROJCE'. " to be changed
if sy-subrc eq 0.
message w022 with p_runid.
endif.
endif.
if not p_ctgrp is initial and not s_FKSTL is initial.
message e087 with 'Cost Center Group' 'Responsible Cost Center'.
endif.
if not p_ctgrp is initial.
clear w_setnr.
move: '0101' to w_setnr+0(4),
P_KOKRS to w_setnr+4(4),
p_ctgrp to w_setnr+8.
call function 'G_SET_GET_ALL_VALUES'
EXPORTING
setnr = w_setnr
TABLES
set_values = w_set_values
EXCEPTIONS
set_not_found = 1
others = 2.
if sy-subrc eq 0.
loop at w_set_values.
if w_set_values-from = w_set_values-to.
S_FKSTL-low = w_set_values-from.
S_FKSTL-option = 'EQ'.
else.
S_FKSTL-low = w_set_values-from.
S_FKSTL-high = w_set_values-to.
S_FKSTL-option = 'BT'.
endif.
S_FKSTL-sign = 'I'.
append S_FKSTL.
endloop.
else.
message e201 with p_ctgrp.
endif.
endif.
start-of-selection.
data: w_poper like s_poper-low,
w_fyear like s_fyear-low.
w_poper = s_poper-low.
loop at s_poper.
case s_poper-option.
when 'EQ'.
move s_poper-low to t_poper.
append t_poper.
clear t_poper.
when 'BT'.
move s_poper-low to t_poper.
append t_poper.
clear t_poper.
while w_poper < s_poper-high.
w_poper = w_poper + 1.
move w_poper to t_poper.
append t_poper.
clear t_poper.
endwhile.
endcase.
endloop.
w_fyear = s_fyear-low.
loop at s_fyear.
case s_fyear-option.
when 'EQ'.
move s_fyear-low to t_fyear.
append t_fyear.
clear t_fyear.
when 'BT'.
move s_fyear-low to t_fyear.
append t_fyear.
clear t_fyear.
while w_fyear < s_fyear-high.
w_fyear = w_fyear + 1.
move w_fyear to t_fyear-fyear.
append t_fyear.
clear t_fyear.
endwhile.
endcase.
endloop.
sort t_fyear by fyear .
CALL FUNCTION 'DATE_TO_PERIOD_CONVERT'
EXPORTING
I_DATE = sy-datum
I_PERIV = 'V6'
IMPORTING
E_BUPER =
E_GJAHR = w_fyear.
w_fyear = s_fyear-low.
s_fyear-low = w_fyear.
Reset Indicator
if p_calrev is initial.
move 'X' to p_incwip.
else.
clear p_incwip.
endif.
loop at t_poper.
*get last day in each period of range
t_date-poper = t_poper-poper.
*------ Start of M002 modifications
*------ Determine last day of the posting period
call function 'LAST_DAY_IN_PERIOD_GET'
EXPORTING
i_gjahr = s_fyear-low
i_periv = tka01-lmona
i_poper = t_poper-poper
IMPORTING
e_date = t_date-w_budat.
append t_date.
clear t_date.
endloop.
*get last day of last period in previous fiscal years chosen
*016 = last period
delete t_fyear where fyear = w_fyear. "remove current fyear
loop at t_fyear.
call function 'LAST_DAY_IN_PERIOD_GET'
EXPORTING
i_gjahr = t_fyear-fyear
i_periv = 'V6'
i_poper = '016'
IMPORTING
e_date = t_date-w_budat.
t_date-poper = '016'.
append t_date.
clear t_date.
endloop.
*Get the Proj Def from WBS selct option and refresh wbs select option.
data: begin of l_psphi occurs 0,
POSID like prps-POSID,
pspid like prps-psphi,
end of l_psphi.
data: begin of l_pspid occurs 0,
pspid like proj-pspid,
end of l_pspid.
data: begin of i_proj occurs 0, "M023
pspnr like proj-pspnr, "M023
end of i_proj. "M023
data: begin of i_prps occurs 0, "M023
objnr like prps-objnr, "M023
end of i_prps. "M023
data: begin of i_psphi1 occurs 0, "M023
psphi like prps-psphi, "M023
end of i_psphi1. "M023
data: len_posid type i.
if not s_posid[] is initial.
select posid psphi into table l_psphi
from prps
where posid in s_posid.
if sy-subrc ne 0.
message i100.
exit.
endif.
if not l_psphi[] is initial.
sort l_psphi.
select pspid into table l_pspid
from proj
for all entries in l_psphi
where pspnr = l_psphi-pspid and
profl in s_profl.
if sy-subrc = 0.
delete adjacent duplicates from l_pspid.
loop at l_pspid.
s_pspid-sign = 'I'.
s_pspid-option = 'EQ'.
s_pspid-low = l_pspid-pspid.
append s_pspid.
clear s_pspid.
endloop.
else.
message i100.
exit.
endif.
endif.
clear s_posid.
refresh s_posid.
loop at l_psphi.
s_posid-sign = 'I'.
s_posid-option = 'CP'.
CALL FUNCTION 'CONVERSION_EXIT_ABPSN_OUTPUT'
EXPORTING
INPUT = l_psphi-posid
IMPORTING
OUTPUT = l_psphi-posid.
while l_psphi-posid ca '.'.
replace '.' with space into l_psphi-posid.
endwhile.
condense l_psphi-posid no-gaps.
concatenate l_psphi-posid '*' into s_posid-low.
append s_posid.
endloop.
endif.
*------ End of M002 modifications
----- Exclude the P. WBS elements, these are only used for
*----- intermediate postings and are not relevant for WIP, COGS,...
perform ini_posid_range.
perform ini_pspid_range.
if not s_pspid[] is initial.
*----- If projects are selected, then make sure we have the internal
*----- key to PROJ (ie, field PSPNR)
perform get_partners.
perform sos_prepare_proj_range.
if r_psphi[] is initial.
message i100.
exit.
endif.
endif.
*----- WBS ranges with "CP" (Contains Pattern) entries need
*----- to be condensed, because the conversion exit for field POSID
----- causes an entry entered as "P." to be stored as "P *". Hence
*----- selection is flawed.
perform sos_condense_range_wbs.
*----- Activity Type Group is used to determine what Activity Types
*----- to take into account for the computation of planned and actual
*----- hours. The Activity Type Group must be exploded into its
*----- individual Activity Types, so we can build a range of Activity
*----- types.
perform sos_build_act_type_range.
*----- Selection of WBS as per selection criteria, but only Billing WBS
*----- Elements or Level 2 WBS elements
Get Level re-determined
if not p_oth is initial.
case p_level.
when 1.
move c_on to p_lvl1.
clear p_oth.
when 2.
move c_on to p_lvl2.
clear p_oth.
endcase.
endif.
if not p_lvl1 is initial.
w_reporting_level = 'L1'.
w_level = 1.
endif.
if not p_lvl2 is initial.
w_reporting_level = 'L2'.
w_level = 2.
endif.
if not p_wip is initial.
w_reporting_level = 'BE'.
w_level = 0.
endif.
refresh r_stufe.
if not p_lvl1 is initial.
clear: r_stufe.
move: '1' to r_stufe-low,
'2' to r_stufe-high,
'BT' to r_stufe-option,
'I' to r_stufe-sign.
append r_stufe.
elseif not p_oth is initial.
clear: r_stufe.
move: p_level to r_stufe-low,
'EQ' to r_stufe-option,
'I' to r_stufe-sign.
append r_stufe.
elseif not p_wip is initial. "INS DI5K902370
clear: r_stufe. "INS DI5K902370
move: '1' to r_stufe-low, "INS DI5K902370
'99' to r_stufe-HIGH, "INS DI5K902370
'BT' to r_stufe-option, "INS DI5K902370
'I' to r_stufe-sign. "INS DI5K902370
move: '2' to r_stufe-low,
'99' to r_stufe-HIGH,
'BT' to r_stufe-option,
'I' to r_stufe-sign.
append r_stufe. "INS DI5K902370
else.
clear: r_stufe.
move: '2' to r_stufe-low,
'EQ' to r_stufe-option,
'I' to r_stufe-sign.
append r_stufe.
endif.
perform select_wbs_new tables r_psphi.
commit work.
Process any WBS elements missed during initial selection
if not s_posid[] is initial.
perform check_billing_elements.
sort it_wbs by psphi
pspnr.
endif.
delete adjacent duplicates from it_wbs.
append lines of it_wbs to it_wbs1.
sort it_wbs1 by psphi
pspnr.
Transfer to temporary table before calling function
refresh loc_wbs.
loop at it_wbs1 into wr_wbs.
w_tabix = sy-tabix.
if wr_wbs-psphi ne w_ref_psphi.
if not loc_wbs[] is initial.
*----- CAREFUL: THIS FUNCTION MODULE ASSUMES THAT THE WBS ELEMENTS
*----- PASSED INTO TABLE I_WBS ALL BELONG TO THE SAME PROJECT
*----- DEFINITION. FUNCTION MODULE WILL NOT GIVE PROPER RESULTS
*----- IF CALLED FOR A TABLE I_WBS WITH WBS ELEMENTS BELONGING
*----- TO VARIOUS PROJECT DEFINITIONS. BE WARNED!!!
call function 'Z_CN_DETERMINE_REPORTS'
EXPORTING
i_fyear = s_fyear-low
i_prsumm_level = w_level
i_closed = 'X'
TABLES
i_wbs = loc_wbs
i_deleted = l_deleted.
if not p_lvl2 is initial.
loop at loc_wbs where stufe gt 2 and lvl2_posid is initial.
do.
select single up into prhi-up
from prhi
where posnr = loc_wbs-pspnr.
select single * from prps
where pspnr = prhi-up.
if prps-stufe = 2.
loc_wbs-lvl2_pspnr = prps-pspnr.
loc_wbs-lvl2_posid = prps-posid.
exit.
else.
loc_wbs-pspnr = prhi-up.
endif.
enddo.
modify loc_wbs.
endloop.
endif.
perform sos_append_wbs.
refresh l_deleted.
endif.
w_ref_psphi = wr_wbs-psphi.
refresh loc_wbs.
endif.
clear loc_wbs.
move-corresponding wr_wbs to loc_wbs.
append loc_wbs.
endloop.
if not loc_wbs[] is initial.
*----- CAREFUL: THIS FUNCTION MODULE ASSUMES THAT THE WBS ELEMENTS
*----- PASSED INTO TABLE I_WBS ALL BELONG TO THE SAME PROJECT
*----- DEFINITION. FUNCTION MODULE WILL NOT GIVE PROPER RESULTS
*----- IF CALLED FOR A TABLE I_WBS WITH WBS ELEMENTS BELONGING
*----- TO VARIOUS PROJECT DEFINITIONS. BE WARNED!!!
call function 'Z_CN_DETERMINE_REPORTS'
EXPORTING
i_fyear = s_fyear-low
i_prsumm_level = w_level
i_closed = 'X'
TABLES
i_wbs = loc_wbs
i_deleted = l_deleted.
if not p_lvl2 is initial.
loop at loc_wbs where stufe gt 2 and lvl2_posid is initial.
do.
select single up into prhi-up
from prhi
where posnr = loc_wbs-pspnr.
select single * from prps
where pspnr = prhi-up.
if prps-stufe = 2.
loc_wbs-lvl2_pspnr = prps-pspnr.
loc_wbs-lvl2_posid = prps-posid.
exit.
else.
loc_wbs-pspnr = prhi-up.
endif.
enddo.
modify loc_wbs.
endloop.
endif.
perform sos_append_wbs.
refresh loc_wbs.
refresh l_deleted.
endif.
perform process_report_table.
End of M011
Check Status Profile
if not p_status is initial.
perform process_check_status_profile.
sort it_wbs by psphi
pspnr.
endif.
Start of M006 mods
if p_clwbs is initial.
Ignore projects/WBS closed based on the year
perform process_closed_projects.
endif.
End of M006 mods
describe table it_wbs lines w_lines.
if w_lines eq 0.
message i100.
exit.
endif.
sort it_wbs by psphi
pspnr.
loop at it_wbs
into wr_wbs.
w_tabix = sy-tabix.
*----- We will extract costs and determine to which reports a WBS
*----- by Project Hierarchy, ie, we will look at all the WBS Elements
*----- in a given hierarchy in one hit. This simplifies the
*----- process of determining the highest billing element or the
*----- Level 2 WBS element for a selected WBS
*----- It also had the advantage of allowing parallel processing
*----- using CALL FUNCTION STARTING NEW TASK if required in
*----- the future
if wr_wbs-psphi ne w_ref_psphi.
if not it_tmp_wbs[] is initial.
loop at t_date.
it_tmp_wbs2[] = it_tmp_wbs[].
call function 'Z_PS_WIP_GET_COSTS_COMMITMENT'
EXPORTING
i_fyear = s_fyear-low
i_poper = t_date-poper
i_billing = 'X'
i_prsumm_level = w_level
i_other_level = w_other_level
i_budat = t_date-w_budat
i_commitment = 'X'
i_include_wipadj = p_incwip "M007
TABLES
i_rsparams = it_rsparams
i_wbs = it_tmp_wbs2.
loop at it_tmp_wbs2 into it_tmp_wbs3.
collect it_tmp_wbs3.
endloop.
w_tab = sy-tabix.
n = 1.
while n <= w_tab .
read table it_tmp_wbs2 index n.
it_tmp_wbs3 = it_tmp_wbs2.
modify table it_tmp_wbs3
index n
transporting
PLANLABOUR PLANHOURS PLANREV PLANCOSTS stufe.
n = n + 1.
endwhile.
endloop.
it_tmp_wbs[] = it_tmp_wbs2[].
perform sos_process_tmp_table.
endif.
w_ref_psphi = wr_wbs-psphi.
refresh it_tmp_wbs.
endif.
wr_wbs-tabix = w_tabix.
append wr_wbs to it_tmp_wbs.
if w_tabix eq w_lines.
*----- Don't forget to process the last hierarchy!!
if not it_tmp_wbs[] is initial.
loop at t_date.
it_tmp_wbs2[] = it_tmp_wbs[].
call function 'Z_PS_WIP_GET_COSTS_COMMITMENT'
EXPORTING
i_fyear = s_fyear-low
i_poper = t_date-poper
i_billing = 'X'
i_prsumm_level = w_level
i_other_level = w_other_level
i_budat = t_date-w_budat
i_commitment = 'X'
i_include_wipadj = p_incwip "M007
TABLES
i_rsparams = it_rsparams
i_wbs = it_tmp_wbs2.
exceptions
not_found = 1.
loop at it_tmp_wbs2 into it_tmp_wbs3.
collect it_tmp_wbs3.
endloop.
w_tab = sy-tabix.
n = 1.
while n <= w_tab .
read table it_tmp_wbs2 index n.
it_tmp_wbs3 = it_tmp_wbs2.
modify it_tmp_wbs3 index n transporting stufe
PLANLABOUR PLANHOURS PLANREV PLANCOSTS .
n = n + 1.
endwhile.
endloop.
it_tmp_wbs[] = it_tmp_wbs2[].
perform sos_process_tmp_table.
endif.
endif.
endloop.
end-of-selection.
Delete WBS with no financial information
loop at it_wbs_report into wr_wbs_report.
if wr_wbs_report-actcosts eq 0 and
wr_wbs_report-plancosts eq 0 and
wr_wbs_report-planrev eq 0 and
wr_wbs_report-acthours eq 0 and
wr_wbs_report-actrev eq 0 and
wr_wbs_report-revrec eq 0 and
wr_wbs_report-revrecytd eq 0 and
wr_wbs_report-acttotrevrec eq 0 and
wr_wbs_report-actytdrevrec eq 0 and
wr_wbs_report-pocommitment eq 0 and
wr_wbs_report-prcommitment eq 0 and
p_incwbs is initial.
delete it_wbs_report index sy-tabix.
endif.
endloop.
loop at it_wbs_report.
select single
objnr
psphi
zzacttyp
ZZIMCINITIATIVE
ZZIMCPROGRAM
ZZWPMANLOB
ZZIMPLEMENTREG
ZZCONTRACTID
ZZWPNUM
ZZSPNUM
ZZORDERNUM
ZZORDERLEVEL
ZZWIP
from prps
into corresponding fields of w_it_wbs5
where posid eq it_wbs_report-posid.
CLEAR: W_LEAD, W_PDIR, W_PMGR, w_poff.
select single zztype ZZWORKCATEGORY ZZPRIN ZZSOURCE from proj into
(w_it_wbs5-zztype, w_it_wbs5-ZZWORKCATEGORY, w_it_wbs5-ZZPRIN,
w_it_wbs5-ZZSOURCE) where pspnr = w_it_wbs5-psphi.
CLEAR w_it_wbs5-lead.
select single parnr from ihpa into w_it_wbs5-lead
where objnr = w_it_wbs5-objnr and
parvw = C_LEAD and
KZLOESCH NE 'X'. " M026
PERFORM READ_PA0002 USING w_it_wbs5-lead CHANGING W_LEAD.
CLEAR w_it_wbs5-pdir.
select single parnr from ihpa into w_it_wbs5-pdir
where objnr = w_it_wbs5-objnr and
parvw = C_PDIR and
KZLOESCH NE 'X'. " M026
PERFORM READ_PA0002 USING w_it_wbs5-PDIR CHANGING W_PDIR.
CLEAR w_it_wbs5-pmgr.
select single parnr from ihpa into w_it_wbs5-pmgr
where objnr = w_it_wbs5-objnr and
parvw = C_PMGR and
KZLhi,
1.Capacity check takes place at plant level itself..
2.Pooled capacity:- This is created separately in [u wil find in PP] and this capacity can be used by different work centers.
regards
pushpa -
Display ALV on click of custom filed in custom project system report
Hi All,
Need your guidence.
I am working on custom project system drill down reports which is created using report painter CJE1/CJE2.
Requirement is to display one custom field in drill down output and on double click event of that custom field , need to display one ALV.
I am able to manage to add new custom field in output but not getting how to handle double click event as no user exit / or BADI getting triggered.
Please let me know is it possible to develop such scenario or not?
Thanks in advance.Hi Rachna,
First let us know is custom field z? or standard?
if z then for achieving this functionality please search same word key in abap forum as functionality is related to abap.
if standard then share few screenshot what is already exist and what you want to add.
Regards,
Sanjeev -
Project system Report Developement
To,
Dear Colleagues,
I have a requriement to develop a new report for Project system. Apart from Table PRPS,BSEG,MSEG Please let me know the table and logic to pick up the fileds and displayed in the report
The requirement is as follows
Month WBS Element no Budget uploaded Budget utilized Balance G/L Code Vendor code Amount
These are the coloum heading, out of this Balance= Budget uploaded-Budget utilized.
I need table name, process logic, and some helpful hint so that the performance will be optimum.
Thanks and Regards
yogiIt is possible to write such a report.
Get a good ABAPer to fulfill your requirements.
There is a very good article in the SCN Sheetal Deshmukh which gives all the table details. Look that up -
Report Painter Drilldown on Cost Element for Project Systems
I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.
Hi Avinash,
See my replies below.
1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
When you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
coming to equipment cost - are you capturing using PO through GR?.
2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials have their own valuation class and have default CEs accordingly. that would not be big issue.
Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
3. I have answered the relevance of Cost relevance check box in above.
Hope above makes sense.
Thanks,
Sudhakar -
Project System - Report Painter - Cost roll up issue
Hi,
We have an issue with the roll up of the costs in Report Painter report in Project Systems. The problem occurs only with those costs which have been settled to an internal order from a WBS element.
We are using the same cost elements to settle to the Cost Center and Internal order and roll up of the costs work fine for those settled to cost center. But the roll up does not happen for the costs settled to an internal order. Would appreciate if someone can guide on how to fix this issue.
Raj.Here are the values:
Period/year 000.1900 Remainder 1900 PERIO Period/year
Value Type 4 Actual
Value Type 10 Statistical Plan
Object ind. P Project item
Object ind. 1 Order plan values: appended, apportioned 9 Order values: not appended, deleted
Debit type 1 Costs and credit-side payments
Thanks for your help.
Raj/ -
ABC Analysis - Report Requirement
Hello Experts,
There is a requirement for report on ABC analysis like this:
I)ABC analysis on STOCK VALUE:
1)Report should provide the total stock value
2)Stock values of individual A class, B class & C class items
3)Number of items of A class, B class & C class materials individually
Also we need the above information, based on CONSUMPTION VALUE also...
Is there any way in standard, we can get these information in some form or the other OR even by using multiple standard reports.
Regards
MaheshTry MC40
Maybe you are looking for
-
How do i change my default search engine in firefox 4?
At present my search engine is powered by babylon ..it got installed with some download manager.
-
Doubt in internal table record count
Hi, i have an internal table with 5 fields. Last field is flag. In my internal table lot many records are there. i want to count only the records with flag 'E'. How to count the total records with 'E'. Mohana
-
Hi All, Can anybody explain the importance and use of "Payment Method Indicator " in Transaction Type Dependent Control Sales as per Receipts in POS Inbound . Thanks In Advance Sohan
-
Updated last week, MUSIC GONE.
I updated for iTunes sometime last week. Soon thereafter, my iPod stopped working (namely it keeps telling me to plug it into the ac adaptor [which i dont have] to charge it, when i try to plug it into my USB port it wont charge) having checked every
-
I am trying to install Sloaris 10 on a HP pavilion Intel system and when I boot from the CD I created (sol-10-u3-ga-x86-v1.iso) I get DISK BOOT FAILURE, INSERT SYSTEM DISK AND PRESS ENTER". It will not boot fromthe 'check hardware' CD either. HELP