By- Product - Reg

Dear All,
Plz explain me the By- Product concepts , Customisation & steps to be followed during Transactions .
Regards,
Suresh

Hi Suresh,
Pls. find below the link, It will be helpful.
http://help.sap.com/saphelp_40b/helpdata/ru/34/55c7e198482bc0e10000009b38f91f/content.htm
In case of By-product the price of this by-product is credited to the order or the material stock account of the lead material being manufactured. They have negative quantities. ( Not all negative quantity items fall under these categories!).
Hope it will help.
Award, if useful.
Regards
Rifaie.M

Similar Messages

  • By product / Co product  : Reg

    Hi,
    I am working with joint production and have some issues related to same.
    1 -  I have created a production order with one co product and one by product.
          But when I do the goods receipt, in MB31, by product is not appearing during goods movement.
    2 - During WIP calculation I am always getting values as zero. Even though system is not showing any errors.
    3 - System is not identifying any Settlement Rules automatically when I create production order.
    4 - Even when I maintain settlement rule with equivalence no.s, system shows settlement only for the main
          product but co product and by product is not appearing at all,
    Can you guide me to resolve these issues.
    Pavan

    Hi
    1) Co - Products will be posted in to stock with 101 and by-products with 531 hence you can't post a by product in MB31
    3) Assign the settlement Profile in OPJH per order type then u will get the settlement rule copied to Order
    4) For the main product and co-product tick co-product check box and for Main product in MRP-II view in Joint Production tab assign source structure
       In the source structure maintain both material no of main & co-product , valid to and eq no
    Regards
    Brahmaji

  • Float before production reg.

    HI dudes,
    one of my client is having one issue regarding floats, they are using float before production in the schedule margin key and they complaining that the total production time for production order according the basic start  and finish dates is lesser than the total activity time given in the routing. i have not checked in the system so far as its new client, can anybody suggest what might be the reason for this.
    regards
    Daniel.

    The following is the logic behind scheduling.
    In basic date calculation ( order start date/ order finish date ) the system always calculates backward scheduling.
    Steps:
    1. From the reqmts date the system subtracts the GR processing time to calculate the order fininsh date.
    2. From the order finish date the system subtracts the inhouse production time to calculate the order start date.
    3. From the order start date the system subtracts the opening period given in scheduling margin key to calculate the order opening date.
    Lead time scheduling :
    1.From the order finish date the system subtracts the float after production to calculate the production finish date.
    2.From the production finish date the individual operations in the routing are scheduled backwards to calculate production start date.
    3.From the production start date the system subtracts the float before productionto calculate order start date.
    Regards,
    nandha

  • Quicktime disconnects computer

    Hi,
    I've been having this issue for awhile. I'm on a wireless home network, and something odd, everytime I try to stream video with Quicktime (any sort of quicktime streaming media), it completely kills my wireless connection, and I have to reset my reuter before I can reconnect to the internet. Any idea why it does this and and how to fix it? Thanks!

    where do I find my products reg. key on this site or does apple expect me to buy another key?
    https://discussions.apple.com/thread/4083519?tstart=0   <<< click here for a possible solution.

  • Appserver Install Probs

    Hello :)
    My appserver on Win32 SP2 stll wont install correctly. Here is the message I am getting .....
    java.net.UnknownHostException: tester: tester
         at java.net.InetAddress.getLocalHost(InetAddress.java:1308)
         at com.sun.rave.dataconnectivity.explorer.IdeServerNode.<init>(IdeServerNode.java:162)
         at sun.reflect.NativeConstructorAccessorImpl.newInstance0(Native Method)
         at sun.reflect.NativeConstructorAccessorImpl.newInstance(NativeConstructorAccessorImpl.java:39)
         at sun.reflect.DelegatingConstructorAccessorImpl.newInstance(DelegatingConstructorAccessorImpl.java:27)
         at java.lang.reflect.Constructor.newInstance(Constructor.java:494)
         at java.lang.Class.newInstance0(Class.java:350)
         at java.lang.Class.newInstance(Class.java:303)
         at org.openide.loaders.InstanceSupport.instanceCreate(InstanceSupport.java:203)
         at org.openide.loaders.InstanceDataObject$Ser.instanceCreate(InstanceDataObject.java:1180)
         at org.openide.loaders.InstanceDataObject.instanceCreate(InstanceDataObject.java:692)
         at org.openide.loaders.FolderInstance.instanceForCookie(FolderInstance.java:515)
         at org.openide.loaders.FolderInstance$HoldInstance.instanceCreate(FolderInstance.java:998)
         at com.sun.rave.servernav.ServerNavigator$ServerNavigatorFolder.createInstance(ServerNavigator.java:182)
         at org.openide.loaders.FolderInstance.defaultProcessObjects(FolderInstance.java:736)
         at org.openide.loaders.FolderInstance.access$000(FolderInstance.java:68)
         at org.openide.loaders.FolderInstance$2.run(FolderInstance.java:622)
         at org.openide.util.Task.run(Task.java:189)
         at org.openide.util.RequestProcessor$Task.run(RequestProcessor.java:330)
    [catch] at org.openide.util.RequestProcessor$Processor.run(RequestProcessor.java:721)
    I do hope somebody can help me sort this out thanks - btw
    (F/W V/C are off, D/L is right number of bytes, uninstall processes followed, tried install to different user names, user has admin rights. ProductRegistry renamed , searched for other product reg files,restart before re-install. Install from console didnt seem to proceed correctly, followed the Cant start install er FAQ )
    Is it a path problem ?
    Current Path ;;C:\WINDOWS\system32;C:\WINDOWS;C:\WINDOWS\System32\Wbem; (this is a user variable)
    Current path from system variable
    %SystemRoot%\system32;%SystemRoot%;%SystemRoot%\system32\WBEM;C:\Program Files\Executive Software\Undelete\;C:\Program Files\ATI Technologies\ATI.ACE\;C:\Program Files\ATI Technologies\ATI Control Panel
    Cant see a variable for Java home?
    Les.

    C:\Documents and Settings\ridj.TESTER>hostname
    tester
    C:\Documents and Settings\ridj.TESTER>ping tester
    Pinging tester [::1] with 32 bytes of data:
    Reply from ::1: time<1ms
    Reply from ::1: time<1ms
    Reply from ::1: time<1ms
    Reply from ::1: time<1ms
    Ping statistics for ::1:
    Packets: Sent = 4, Received = 4, Lost = 0 (0% loss),
    Approximate round trip times in milli-seconds:
    Minimum = 0ms, Maximum = 0ms, Average = 0ms
    Marco Thanks for helping. Ping returns with tester ok.
    Hosts file doesnt have a tester entry?
    Can ping other PC's on network but they are not seeing tester either although they used to. I appreciate therefore its not a creator prob but its stopping me from getting Creator going.
    Les.

  • I have two apple products registered to the same apple id.  I would like to use FaceTime on my iPad while out of town.  I need to do FaceTime to my iMac at home (both iPad and imac are reg. to same id).  It won't let me do it, help?

    I have two apple products registered to the same apple id.  I would like to use FaceTime on my iPad while out of town.  I need to do FaceTime to my iMac at home (both iPad and imac are reg. to same id).  It won't let me do it, help?

    You should really read the manual.
    "How do you restore from backup? "
    Restore.  When given the choice, choose to use backup.
    "And how can I check to see if the pics and videos are on my computer somewhere first??"
    They would only be where you put them.  What program did you use to import them?  Pics/vids taken with ipod are not part of the sync process at all.  You should be importing them just as you would with any digital camera.
    If you did not import them, then they are not on your computer.

  • I saw that the APPLE TV product can be used with VIMEO videos.  can i still access VIMEO videos to my TV with a reg PC or do i have to have an APPLE?

    i saw that the APPLE TV product can be used with VIMEO videos.  can i still access VIMEO videos to my TV with a reg PC or do i have to have an APPLE?

    Intermittent problems are often a result of interference. Interference can be caused by other networks in the neighbourhood or from household electrical items.
    You can download and install iStumbler (NetStumbler for windows users) to help you see which channels are used by neighbouring networks so that you can avoid them, but iStumbler will not see household items.
    Refer to your router manual for instructions on changing your wifi channel or adjusting your multicast rate.
    There are other types of problems that can affect networks, but this is by far the most common, hence worth mentioning first. Networks that have inherent issues can be seen to work differently with different versions of the same software. You might also try moving the Apple TV away from other electrical equipment.

  • Reg: DS enhancement code in production

    Hi to all,
    We are now in the production support. I want to change the DS enhanced code which is written in the implementation bcoz of performance reason. What is the procedure to do that and is there any prerequisites to take. No need to code help here.
    Thanks,
    Babu.

    Hi Babu,
    You just need to change the code in EXIT from development system and then do a transport. The code changes will be directly reflected in production after transport.
    You don't need to worry about any delta or anything else as there are no structural changes and new code will start executing from next extraction onward.
    Just transport the EXIT FM, no need to transport DS or anything else. If you are doing further structural enhancement then you will have to transport other objects accordingly. But if you are only doing code changes then just transport EXIT.
    Regards,
    Durgesh.

  • Reg : BOM and production order

    Hi all,
    I have created two production orders for the same material but with diffrent BOM explosion date. now can any one please let me know how will i find which version of alternate BOM of the material is used in the production order.
    In the production order header table ( AFKO) i am getting only the alternate BOM number, i am ubable to find which version of alternate BOM is used for Production order.
    Thanks .
    VIJAY

    the relation is as below
    AFKO-STLNR = STAS-STLNR
    AFKO-STLTY = STAS-STLTY
    AFKO-STLAL= STAS-STLAL
    FROM HERE TAKE ALL
    STAS-STLKN AND STAS-STLTY
    PASS IT TO STPO
    STPO-STLNR = STAS-STLNR
    SPO-STLTY = STAS-STLTY
    STAS-STLKN-= STPO-STKLN
    THIS WILL GIVE YOU ALL THE BOM ITEMS USED IN THAT PROD ORDER.
    IS IT OKAY?

  • Reg : Open Production Order

    Hi Experts ,
    Herewith iam having one doutb in Open production order (CO01)
    1. what is Open Production order ?
    2. what are all tables that are involved in Open production oder ?
    3. step by step procedure require for how 2 create Open Production order?
    Regards,
    Narayana Murthy

    hi
    good
    go through this link,hope this ll help you to solve your problem
    http://sap.rfgen.com/docs/PR/PR%20Inquiry%20by%20Material.pdf
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/c309c589-0d01-0010-e094-c7113ec43c5a
    thanks
    mrutyun^

  • Reg open production orders

    Dear all,
    Suppose if we are transfering data from one company code,controlling area,and plant to other, how to deal with open production orders specially for orders for which goods issue has taken place and in which somel operations are confirmed.How to settle these orders.

    Hi,
    Since already Goods issue is over. Some of the operations confirmed also. The best suggestion is you can complete the production in the existing plant/company code only.
    regards,
    V. Suresh

  • Reg :Production order cost  report day wise.

    Dear Expert,
    1.We want a report for a particular Production order cost  day wise.
    The scenario is like this Production order is Released for 100 Qty.
    Today they confirmed only 50 Qty.
    Tomorrow they will confirm 50 qty.
    Now they want to see the cost for today confirmation and tomorrows confirmation.
    Reason being daily the Raw Material cost is changed and they want to track the variance.
    Is there any standard report we can achieve this or do we have go for development
    2. And also i need to know daily how many production orders have been released.
    Thank u in advance.

    A day is not a controlled cost object. You could write a report to look at costs gathered in a day (by reporting date), but I strongly suggest that if you need to analyze costs per day you switch to daily orders.
    You'll find then that all the standard processes work for you.

  • Reg.Stock transfer from Sale order into Production order

    Dear All
    We want to transfer the sale order stock in to production order.
    What I have to do ? Pls help me.
    Thanks
    Rajakumar.K

    Hi,
    Could you please explain in details?
    Other than the way of converting  sale order stock which is the normal course of working, you can also consume the unrestricted stock to the production order which has a assignment to the sale order by manually changing the assigment of the material  in the production order components. If you enter into the production order components u will be able to see a column called "Spec procurement" where in by default it will be '1' if the production order is w.r.t a sale order. Then proceed with material availability check.
    Regards,
    R.Brahmankar

  • Reg: Error while transporting from Quality to Production

    Hi ,
    I am facing a problem while transporting ODS from quality to production.. The same works perfectly when i transport from Dev to quality.
    The Error Displayed while transporting is
    Start of the after-import method RS_ODSO_AFTER_IMPORT for object type
    The creation of the export DataSource failed
    Password logon no longer possible - too many failed attempts
    Error when creating the export DataSource and dependent Objects
    Error when activating DataStore Object
    The creation of the export DataSource failed
    Password logon no longer possible - too many failed attempts
    Error when creating the export DataSource and dependent Objects
    Error when resetting DataStore Object to the active version
    Kindly give me some suggestion ..
    Thanks in advance
    Regards
    Guru

    go to the source system RFC connection in SM59 and do a remote login - if you get the login page there then there is an issue with the RFC connection. also check if any other system is using the same RFC.. we had a situation where th R/3 connection was being used by 3 BI instances and everytime we reset the password , another system would lock the sme , ultimately we identified the systems and did a password reset in all the systems and then the issue got resolved.
    but then we also faced the same issue you faced and it was related to login issues - check the remote login and that will tell you.

  • Reg: Error in scheduling of production order

    Hi experts,
    I have an issue during creation of production order. During production order creation, if i am giving todays date as start data and scheduling type as forwards (1) and executing it, it is showing the following error message and it is automatically taking the start date as 2 days forward date (if i am creating order on 06.02.2012 it is taking 08.02.2012).
    Start date is in the past: today scheduling
    Message no. C7030
    Diagnosis
    The start date determined in scheduling is in the past.
    In customizing, you have defined the number of days that the start date is allowed to be in the past.  This number is exceeded.
    System Response
    "Today" scheduling is carried out.Hallo
    Please suggest me a possible solution.
    Regards,
    Krishna Chandra

    Dear Krishnachandra,
    If my understanding is correct then I guess you are mentioning the start date as a date which is more than 2 days older(more
    than 2 days in the past) and so the system is automatically switching over to today's scheduling as you might have mentioned
    in OPU3 the number of days allowed in past as 2.
    Check if this setting is defined as I have mentioned,if so means tiher you can only mention a date within the allowed range or
    else use today's date and carryout a forward scheduling.
    Check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Overflow when converting error key: RFC_ERROR_SYSTEM_FAILURE

    Hi, When user tries to log his time through portal in "My time" iView, who has got over 400 different choices for worklists that he can log time against, certain choices always error out "Overflow when converting from 417 error key: RFC_ERROR_SYSTEM_

  • In iphoto i could export direct to flickr and facebook is it possible to this in photos ?

    in iphoto i could export from the application to flickr and facebook i cant seem to do this in photos also where is the straighten button in edit ?

  • IMac Video Interface

    We have an iMac 21.5", and we want to do video editing using SDI interface, and audio capture using XLR. The device we are going to connect is Blackmagic Atem 1 Production Switcher http://www.blackmagicdesign.com/products/atem/techspecs What equipmen

  • Authorization control for creating change request transaction

    Hi, We are creating the Change Request(SDCR) through support desk message by using action Create Change Document. How can I control the creation of Change Request Document(SDCR). By which  roles i need to control this. Regards PK Edited by: PK on May

  • What is AQ Enqueue/Dequeue

    Hi , Can anybody explain me the concept of AQ Enqueue/Dequeue I google and read the document but no get clear picture Thanks in Advance