C4C integration with ECC 5.0

Guru,
My company is looking for implementing cloud for customer, but our backend system is running on ECC 5.0.
SAP had strongly recommended us to upgrade our ECC before implementing C4C project.
Through some reading, it seems that integration prerequisite is ECC has to be version 5.0
Or there is any workaround to integrate (standard integration) C4C to ECC 5.0 through HCI? Like by applying or enhancing standard iflow that released for ECC 6.0?
Thanks.
Cheers,
Jim

Not sure where you have read that ECC 5.0 would be supported. The official SAP position is summarised in the table below. You can clearly see that some functionalities even depends on what EHP level you are at with ECC 6.0.
SAP PI and HCI leverage the same iFlow content.

Similar Messages

  • C4C Integration with ECC (popup in ECC during connection)

    Hi,
    can someone please help me, to find the issue when sending e.g. customer master from ECC to C4C via HCI.
    In ECC I receive the following popup asking about username/password on HCI.... I activated certificate based authentication....
    ¨
    Thank you!
    Florian

    Hello Florian,
    yes the client certificate must be signed by one of the CA's refered in this link:
    SAP HANA Cloud Integration
    this is because of the security and load belancing environment in front of your HCI tenant.
    A self signed certificate will just be removed there and therefore you receive an http 401 error.
    Best regards,
    Berthold

  • How is the integration with ECC in SRM 7.0??

    Hi,
    Working with SRM 5.0 or 5.5  the use of XI for integration with ECC is not mandatory because when we send any document from ECC to SRM like requisitions (to convert them in shopping cards) or when we send any document from SRM to ECC like shopping cards, PO´s, contracts,  we only use the RFC´s and the abap programs.
    Is the same behavior with SRM 7.0?????
    Could the integration from SRM 7 with ECC 6 work with RFC´S without XI or for this vertions is XI mandatory?????
    Thanks

    SRM70 is closely integrated with XI for transferring docs between ECC and SRM.  SAP introduces eSOA tech nology with SRM70 and hence all documents like PR from ECC to SRM, Central Contract from SRM to ECC, PO creation (Classic), etc uses this techn ology.
    Thanks,
    Jagadish

  • CRM 3.0 integration with ECC 6.0

    Hi all, I wanted to confirm if CRM 3.0 can be integrated with ECC 6.0
    If yes, then which support pack,etc. will be applicable and what all issues could be encountered in integration?
    Thanks in advance.

    Hi Animesh,
    just to be clear.
    the CRM and the backend ECC60 are communicating via  Plug -ins
    you can read more information here
    http://service.sap.com/r3-plug-in
    http://service.sap.com/~form/sapnet?_SHORTKEY=01100035870000601131&
    The other  SP level of the systems (BASIS etc.) are independent.
    Once you could conect the systems at basis level. You can begin your work at
    Application level.
    Whether you can have problems here please ask the CRM Gurus in a separate therad in other forum.
    I Hope I have answered all of your questions.
    Kind regards
    Imre Takácsi-Nagy
    Senior Support Consultant II.
    SAP Global Support Center Austria
    Netweaver WEB Application Server ABAP / JAVA

  • C4C Integration with HubSpot.

    Hi Team,
    Appreciate if someone can shed knowledge on C4C Integration with HubSpot for Master Data (to & fro).
    Below are my concerns;
    If HubSpot can consume C4C web-services to update data.
    Also whether C4C can consume Hubspot web-services or not for updating data back to C4C.
    Regards,
    K.F.

    Hi  K.F,
    I have never tried but if they are using .NET ,Java or PHP platform then we can consumer C4C web service into that.
    Please check the Help Center in C4C and search "Web Service" and there is a topic called Sample Code for Consume Web Service into C# and Java code.
    Also C4C is capable to consumer SOAP as well as REST web services.
    Regards,
    Mithun

  • SAP XI 2 BI Integration with ECC 6.0

    Dear all,
    we are planning to do XI integration between ECC 6.0 to BI
    1) How to Get the BI Standard data from ECC 6.0?
    2)We are planning to integrate Standard BI reports with ECC 6 0 through XI.
    Please sugget the scenario for integration between ECC 6.0 to BI through SAP XI.
    Thanks In Advance.
    Mahesh

    Hi Mahesh,
    Please go thru these links
    To push data from BW to XI, please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20push%20data%20into%20bw%20from%20xi.pdf
    To send data from XI to BW please check
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/integrate%20bw%20via%20xi.pdf
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/40574601-ec97-2910-3cba-a0fdc10f4dce
    XI-BI Integration unsing RFC
    Pushing data from BI to XI using RFC Adapter
    https://forums.sdn.sap.com/click.jspa?searchID=17734474&messageID=5878682
    Thanks,
    Shweta

  • Steps: SNC (Supplier Network Collaboration) Integration with ECC through XI

    Hi,
    Has anyone worked on the SNC(Supplier Network Collaboration) integration with SAP ECC via SAP XI.
    Could you pls share any documentation related to this. And also could anybody tell me the setup required to go ahead with the integration.
    Thanks,
    S

    Hi Xavier,
    SNC integration with XI has predefined mappings. So ask your basis guys to download the XI content for SNC using with PI. Once they deployed you will have a builtin predefined content in XI. Within the predefined content mostly they all are xsl mappings.
    If your requirement is with the standard idocs then you can use them directly. Else if their is customization they you may need to change the mappings according to your requirements.
    Also check this help:
    http://help.sap.com/esoa_scm_snc2007/helpdata/en/index.htm
    Regards,
    ---Satish

  • Sourcing integration with ECC using PI (percentage rebate scenario)

    Hi Experts,
    Sourcing - OP 7
    ECC - configurations done for rebate conditions as mentioned in standard configuratin guide
    PI - SP02 patch 0
    We are publishing percentage rebates in Master agreement from sourcing to ECC to create Online Agreement using standard predelivered content for PI from SAP, however ECC returns error in RFC response mentioning
    No currency code found for ISO code P1 in field HEADER_CONDITION/CURRENCY_ISO
    I checked PI content & I see for % rebates, field HEADER_CONDITION/CURRENCY_ISO is always populated in PI with P1.
    What are the next steps to be done in ECC or in PI to overcome the mentioned error.
    Any pointers will be appreciated, Thanks.

    Hello Jeet,
    I would suggest to check first that in both your SAP ERP and SAP Sourcing an ISO Code P1 for percentage exists. Further I would check if a rebate with an absolute amount works fine (also create multiple amounts and check if a scale is created in ERP, just to ensure that it works in general). E.g. check if the price condition/condition type exists and is configured correctly in ERP.
    If that all looks good you might want to check the ERP transaction BBP_ES_ANALYZE. I recently created a SDN blog about some tips and tricks, it also explains this transaction, please see ERP integration with SAP Sourcing – tips and tricks Maybe the error message(s) in this transaction will help you to better understand what is going on.
    Hopes that will help you
    Markus

  • Pro/E integration with ECC 6.0

    I want to integrate Pro/E with ECC 6.0 in order to transfer/exchange engineering data such as materials, BOMs, engineering changes, documents, etc.
    Does anyone know of Pro/E functionality or a 3rd party product that does this sort of thing?
    Kind regards,
    Rex L. Farris

    A direct interface is developed by .riess GmbH and SAP.  It is SAP certified and supported by SAP.
    For more information,
    Go to <a href="http://service.sap.com/plm">http://service.sap.com/plm</a>
    Life-Cycle Process Support -> Product Development -> Integration -> MCAD Integration -> Pro/ENGINEER

  • CRM2007 integration with ECC 5.0

    Hi All,
    Will appreciate if someone can send a document or link that can help me with ECC5.0 and CRM 2007
    Regards,
    Suren

    this is copied from the installation guide
    Prepare an OLTP Backend System:
    n SAP R/3 or R/3 Enterprise systems as well as ECC 5.0
    systems require the R/3 Plug-In 2004.1 with at least
    SP10.
    See SAP Note 704564 (R/3 plug-in:PI 2004.1
    installation/delta upgrade) and SAP Service Marketplace at
    http://service.sap.com/r3-plug-in
    n As of SAP ECC 6.0, the R/3 Plug-In is no longer
    required. New and extended interfaces for integrating
    SAP ECC 6.0 are directly contained in SAP ECC 6.0.
    [SAP ERP 6.0 <Technology> on <Operating System>: Database
    then it should be done as with any OLTP system.
    I've done a connection to a R/3 Enterprise 4.7 system and that worked fine.
    Follow the Best Practices documenation and you will be fine!
    http://help.sap.com/bp_crmv12007/CRM_DE/HTML/index.htm

  • Integration with ECC 6 and Xcelsius

    Hi,
    I would like to know if its possible to integrate Xcelsius directly with an ECC report.
    For example, take the ALV data and 'send' it to Xcelsius in order to have an Xcelsius report.
    I know that Xcelsius has (now), built in integration with BW queries, but wonder if that is proprietary with BW, or can the concept of integrating a report from BW work in ECC?
    Please advise.
    Thanks.
    JP

    Hi,
    in case you would like to build an Xcelsius dashboard on top of ERP data you can use Crystal REports to connect to the ERP system  (see here: /people/ingo.hilgefort/blog/2008/03/23/businessobjects-and-sap-part-4) and then you can use Live Office to connect Xcelsius to a Crystal REports objects. see here:
    XC, CR and LO Part 1 of 4
    /people/ingo.hilgefort/blog/2008/10/03/businessobjects-and-sap-part-1-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 2 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-2-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 3 of 4
    /people/ingo.hilgefort/blog/2008/10/07/businessobjects-and-sap-part-3-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    XC, CR and LO Part 4 of 4
    /people/ingo.hilgefort/blog/2008/10/10/businessobjects-and-sap-part-4-of-4--creating-a-xcelsius-dashboard-on-top-of-sap-bi
    In regards to an ALV - there will be an integration with Crystal Reports but not for Xcelsius and keep in mind that an ALV is a push model and is only available when the transaction is been executed.
    Ingo

  • Supplier Registration in ESourcing  ( Vendor integration with ECC or MDM )

    Hi All,
      SAP ESourcing has the functionality of Supplier Registration.  As per the functionality, Supplier will provide all the required information in the registration form. The Supplier form will go for approval to the Buyer / Purchaser. Once approved, the supplier will considered for RFx event. My questions are :
    1 :Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system  with ECC so that system will automatically create new vendor in ECC.
    2 : Is there OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) .
    Please through some pointer on this ?
    Regards,
    Kalandi

    Hi Kalandi
    For your first question, if you deploy standard integration package provided by SAP  for e sourcing-ECC integration, you can replicate approved e sourcing vendor to ECC using  standard script (I think script name is  "Publish to ECC" ).
    In case you prefer a custom option,you can write a customized script to get a flat file (.CSV) download of  e sourcing vendor whcih can be used to update ECC
    As far as OUT OF BOX standard solution provided by SAP for integration of newly Approved supplier / vendor of ESourcing system with MDM (Master Data Management system ) is concerned, there is no standard solution provided by SAP but again since it is possible to get a CSV export of vendor field, it can be used to update MDM as well
    Hope this helps!
    Regards
    Mudit Saini
    Edited by: Mudit_UCB on Jun 28, 2011 1:20 PM

  • C4C Integration with Yammer

    Hi,
    Can C4C integrate with external collaboration tool such as Yammer.
    Regards,
    Roy

    Yes. This is possible to do as a custom project leveraging the API's that are available from SAP Cloud for Customer. Thank you.

  • C4C integration with Oracle

    Hi,
    We are currently exploring the possibility of integrating SAP Cloud for Customer with Oracle database. Can anyone please elaborate the available options, if any. Does Oracle provide adapters or webservices for integration?

    C4Service and C4Sales are public cloud solutions, meaning the only way you can get data in and out are:
    1. Public APIs
    2. Flat files (CSV/XML files to mass upload/download data)
    3. HCI/PI (which basically call our Public APIs to get data in and out of C4C)
    There are no other ways as a customer to get data in and out. With these typical public cloud characteristics, my recommendation is that if you need to get data in C4C from a database, I would use SAP Data Services On Premise. It is a great ETL (extraction, transformation, load) tool that has a bunch of adapters to extract data such as from the Oracle database, transform/clean the data so that it is in a format that C4C can accept, and then load the data into C4C either calling the C4C bulk load APIs (Option 1) or create flat files (Option 2) which an admin needs to manually upload the data into C4C.

  • ITS Integration with ECC 6.0

    Hi
    we are doing upgrade from 4.6c to ECC 6.0. It is technical upgrade. In SAP HR, we are using ESS timesheet entry (CATW). Now during upgrade we are facing problem in using ESS timesheet as we are using ITS server and SAP ECC 6.0 does not support ITS anymore. As the result the system doesn't allow to enter time data and save it through ESS, the error message it gives is "No Posted Data for 5_CPR_EXTID 5( Include LCATS_ITSF10)" but if we enter time in SAP directly then it is working fine.

    Replying to this old post hoping for some answers.
    We had researched this and converted to Integrated ITS using our ZCATW over a year ago. The notes read that while integrated ITS is a suppoted platform, ESS scenarios for which newer technology exists are no longer supported. We tested ZCATW under ECC5 and decided to move forward because of a pending technical upgrade. We are now in the middle of the technical upgrade and wishing to keep it technical we are trying to keep ZCATW going and then look at the newer components as a seperate project. Has anyone found a way to overcome the above issue in CATW/ECC6?
    Thanks,
    Doug

Maybe you are looking for

  • Multiprovider design -problem

    I am just creating the multiprovider on Custom Billing cube and Custom DSO . In my billing cube , I have Billing document assigned to line item dimension and Line item is also in another in another line item diemsion . My DSO have Billing document nu

  • Native Canvas Painting and Refresh

    Hi, I have a project where I get live video from a firewire camera, and paint it to an awt Canvas natively using JNI. I need additional items painted on the canvas (on top of the video), like a pair of crosshairs and rulers to measure certain widths,

  • How to download the Oracle BI Apps 7.9.5.2 (the one with ODI) ?

    Hello, I would like to take a look on some real life usage of the ODI as an ETL tool and decided to install the Oracle BI Apps, where ODI is used instead of Informatica.. Unfortunately, I am not able to download it. Do you have an idea what a (Contro

  • Precal Server Issue

    HI Experts, I recently inserted a new query5 ( workbook has 4 more queries) . query5 is a copy of query2. so it shares the same Characteristic Variable but some chnages with filters. Now my issue is when this Workbook is executed by precalc server, a

  • Cache memory issue!

    Hi All, we have a report that has around 4000 pages of data, and when i try to print manually to the printer it has going around 3200 pages and can't go further. I am guessing it is a cache memory issue, any suggestions on how to fix this. thankz, ka