Calculated field in model of easy cost planning

Hi,
I would like to introduce the cost model easy planing a calculated field (characteristic), which was the multiplication of two fields (Characteristics).
I have entered into the transaction CKCM "Easy Cost Planning: Model", I created 3 Characteristics (A,B,C)through the option
"Assign Characteristics to the model."
I entered the "Define the derivation rules (template)" and created a calculation with the two characteristics( C = A * B). The problem I have is that I did not enter the calculation in characteristic 3, which is what I want to pick up the value.
Many Thanks.
Regards.

Hi Vivek,
Thanks for answering.
My question is, how I can assign a  calculation in a characteristic?
Characteristic A
Characteristic B
Characteristic C = A * B
I want the easy cost planning screen, enter a value in the characteristic A and B, it will automatically calculate the C and view the calculation in the screen in characteristic C. As I can do?
Thank you very much.

Similar Messages

  • Adding Z-field in tcode CJ9ECP - Easy Cost Planning,

    Dear ABAPers,
    I have a requirement where I need to display (Display only) MPN (Mat Part no) in Easy Cost Planning screen.
    I have extended CI_KISU and CI_CKIS`structure  with a new Z-field for MPN and the field is displayed on the screen without any value.
    However, which BADI to implement to fetch the MPN.
    Should I implement  BADI GUI_ITEMIZATION_CK or CP_ADD_FUNCTIONS_CK,
    If anyone have done similar taks, would you please share the code of the method, and other information , which method to use and how to go about it.
    Thanks
    Mahi

    Hi Vivek,
    Thanks for answering.
    My question is, how I can assign a  calculation in a characteristic?
    Characteristic A
    Characteristic B
    Characteristic C = A * B
    I want the easy cost planning screen, enter a value in the characteristic A and B, it will automatically calculate the C and view the calculation in the screen in characteristic C. As I can do?
    Thank you very much.

  • Easy Cost Planning in a currency other than Cont Area and comp code curren

    Hi,
        I want to do the easy cost planning in a currency which is other than controlling area and company code currency.
      But I am getting the option of only these two currencies only.
    Any idea how to do it?
    Example:
      Controlling Area currency :INR
    Company Code Currency : AED
    Planning Currency to be used for Easy Cost Planning :USD
    Regards,
    B P Singh

    Hello,
    You may try to go to transaction CT04 - Characteristics. There in tab BASIC DATA you choose Data Type - Currency Format. In field Currency enter the required currency. Save the characteristic.
    Next step is to go to CKCM - Models for Easy Cost Planning. Open the Costing model and add line with the created characteristic.
    Good luck, Aleksandra

  • Easy Cost Planning-prob Costing model

    Hello ,
    I am creating costing model
    i want at time of Easy cost planning  court fee(Characteristics)   to be selected from drop down list
    i have made characteristic court fee ,in currency format
    (CKCM) while defining derivation rule(template), if i am mentioning quantity as court fee
    Facing error that Syntax error in quantity
    Pls help
    Thanks

    After Double click on Qty , you have to define the formula there,
    correct your Formula which may be wrong leading to Syntax Error.
    Regards,
    Nitin

  • Note Field in Easy Cost Planning

    Hi All,
             we want to increase the lenght of Note field from 250 characters to 1000 characters in " Easy Cost Planning".It's  limited is 250 Characters only in standard SAP.Is there any SAP Note avilable for the sam or we have to change SAP Program / Field.
    Please suggest.
    Thanks
    Pavan

    Hi Pavan,
    I hope you have to change some source code related to HTML forms. Please write to SAP so they can help you on what source code for HTML should be changed.
    good luck,
    Krishna Reddy.

  • Easy Cost Planning (SAP) in Tender Process

    Hi All,
    I am using SAP ECC 6.0 EHP 4. I wanted to know if Easy Cost Planning in SAP PS can be used to cost a project initially while Tendering process.Or is there any other tcodes in SAP for tender process? I created Costing Models for most of the possible processes in a civil project and included the labour cost,equipment cost and material cost in it.By this way can we proceed implementing SAP in our tendering department.Looking forward for your valuable replies.

    Hi ,
    SAP has easycost planning objects available to cater to it. Process starts with inquiry.
    1) Create inquiry for customer request. Define service material in material field in VA11
    2) Create Project copying closest executed in part ( you have said 70% is engineered fresh, then project is 30 % correct at the time of copying)
    3) Amend project to add/chnage/delete components & network activities. Add miilestone payment you wish to propose in quotation.
    5) Add project no in inquiry (Accoutn assignment in Line item )
    4) Use DP81 traxn to create quotation.Easy-cost planning need to be configured to calculate price( Cost+ mark up scenario possible) There are possibilites to pull as many deatils as you wish in quotation ( As line items) from project structure. It is possible to list major assemblies that will be delivered to customer( Make- To - Order variations). It is also possible to replace Service item used in inquiry with 'Material masters' of FERT & itemization in Quotation. Milestone dates from project will be copied you can propose % billing arrangement at each date to customer.
    5) Able to revise quotation seamlessly & resond to customer changes/addtioal request. Revised quotation reflects your ability understand customer request & changes are seamlessly reflected in qty,  total price & dates.
    6) Upon confirmation of Sale, Sales order can be created copying quotation. All hard work/ iteration of commnucation with customer , need not be defined in system again. Order Acknowledgement will reflect agreements with customer.
    SAP E C & O best practice has few more addtion for Civil project ... how to measure % completion based on Mortar used & daily output of cement mixing. That will help,
    Regards,
    Jatin

  • Easy Cost Planning & Project Stock

    Dear Experts,
    I am using Easy cost planning for WBS cost planning and Project definition control data tab page has Valuated Project stock selected.My costing model had an external procurement material for which I generated PR & PO thru Execution services.But the account assignment in my PR & PO was P with the corresponding WBS as account assignment and not Q.
    I have two question regarding this,
    1) Does it mean that while using ECP, Project stock concept will not work?
    2)How can we get the pop up of procurement type options(like Res + PR for WBS element) while generating PR through execution services?

    Hi,
    I am replying again because in my last answer there was some typing mistake.
    Hi,
    I tried your scenario is my system.
    whenever i am changing P to Q in Config in SPRO,It is giving an error that "The selected account assignment category is not supported" that means it is not meant for Q but i double click for object type PR WBS Element and changed Acct Assgmt Cat to Q then system allowed me to save.
    The i create a PR and WBSE is coming in the Account Assignement ,then i converted PR to PO and then i recived goods as project stock.when i issued the material in ECP it is not issuing from Project stock because 221 Q is not present in Config for SPRO so it is issuing from Normal stock so special stock from ECP is not supported.
    But you can manually issue the material to the WBSE in MIGO/MB1A by 221 Q.
    Hope it is clear.
    Muzamil

  • Easy Cost Planning - Passing info down the hierarchy

    Is it possible in Easy Cost Planning to pass characteristics down the hierarchy for use lower down.
    For example, enter the dimensions at the top level and have them passed down for use in calculations lower down the hierarchy?
    Thanks
    Graham

    Here is a WIKI that has detailed steps to create.
    http://wiki.scn.sap.com/wiki/x/5IHpFQ
    http://wiki.scn.sap.com/wiki/display/PLM/ABAP+calls+to+create+Easy+Cost+Planning+in+Project+Systems

  • Easy Cost Planning -Costing has already been completed. No changes possible

    Hi,
    I am in Easy Cost Planning tool and i would like to remove some items or add in some items.
    The system is giving a message that "Costing has already been completed. No changes possible"
    May i know where did we complete the costing(Transaction code?) such that no changes are possible on East Cost Planning tool anymore?
    Thank you.

    Hi,
    Check the Costing Model in CKCM and do changes as per your requirement.
    Now Use this costing Model in CJ20N while cost planning for wbse. you can change cost plan here also as per wbse specific requirement.
    regards,
    Hari

  • Easy cost planning in Project & sales pricing

    Dear All
    When i was trying to create easy cost planning from project, I am uable to get the costing variant. I have done basic settings.But the same is not working properly
    Kindly advise me how do i do this?
    I need to create easy cost planning from project and from project i need to create salespricing through DP91. I have assigned DIP profile in project profile.
    Please advise
    Regards
    Deepu Pillai

    Hi,
    Yes, that is the key that determines how a cost estimate is performed and valuated.
    Depending on the object being costed, either the functions of either unit costing or product costing can be used.To calculate the costs of producing a material, you create a product cost estimate with or without a quantity structure
    In a cost estimate with a quantity structure, the costing variant determines the following:
    1. Which dates are valid for the cost estimate itself and for exploding and valuating the quantity
        structure.
    2. How the BOMs and routings are selected to create the quantity structure
    3. Which prices are selected to valuate the quantity structure
    4. How overhead is calculated
    You create a unit cost estimate to cost the following objects:
    1.Materials (cost estimate without quantity structure)
    2.Materials (additive cost estimate)
    3.Production orders in Controlling
    4.Internal orders
    5.WBS elements
    6.Base planning objects
    7.Cost object IDs
    8.Sales documents
    In unit costing, the costing variant determines which prices are selected to valuate the individual costing items and how overhead is calculated.
    Costing variants are also used to calculate costs for Production orders,Networks,Maintenance orders,
    Run schedule headers,Process orders,Sales document items,Appropriation requests,Ad hoc cost estimates.
    A costing variant is linked to the control parameters like Costing type,Valuation variant,
    Date control (in costing with and without quantity structure).
    For config of Costing Variant,
    Go to SPRO- Project system-Costs-Planned Costs-Costing-Define Costing Variants
    Hope this helps.
    Regards
    Tushar

  • Which all tables are used in easy cost planning

    hello all,
    can anybody tell me that which all functions are used in easy cost planning.
    if i use transactions cj20 and ckcm then which all tables will be reflacted. if possible plz tell which all the function modules are used....
    Thanx,
    hetal.......

    Hi Hetal,
    PRPS: master data of the WBS, espeically, field kalnr, which link to ECP
    KEKO: BZOBJ = 6 for ECP with project system
    CKHS: Header
    CKHS: Item
    For MECP (ECP mit multiple CO version using Addon), there are other tables relevant: PRECP1, PRECP2,
    Kind regards!
    Zhenbo

  • Is it Possible to do easy cost planning in network and acitivity level

    Hi,
    Is it possible to do easy cost planning in network and acitivity level
    Rgds
    Purna.M

    Dear Sanjeev,
    ECP not possible at Network or activities but it is not like that as you saying " any of cost planning not possible at activity level as per sap standard."
    It is possible to do Network Cost Planning, for that you have to make the settings required for to determining the plan costs in networks.
    In networks/activities the plan costs are:
    Calculated automatically on the basis of the defined price and quantity structures
    Planned using unit costings for general costs activities or material components
    for this make the setting in config of PS node Project System -> Cost -> Planned Costs -> Automatic Costing in Networks/Activities.
    Rgds
    Rajesh

  • Unable to update revenue plan values in Easy Cost Planning

    Hi,
    Business maintains planned costs and revenues on WBS element using Easy Cost Planning tool. But for one of the WBS element system is not allowing to update/add planned revenue line items.User is able to update the planned costs for this WBS element.
    The Legend in Easy Cost Planning screen is Non-Changeable Cost Estimate.
    The status of WBS is REL,ACPT(Order Accepted),NSCH(Not Scheduled - Forecast Dates),RESA(Result Analysis Carried out).
    We have checked all the business process and all the revenue planning is allowed.
    Please guide us on how to resolve this issue.

    This is resolved...Select the WBS and click on CLOSE icon to reset the cost estimate. This allows to plan revenues again.

  • Easy Cost Planning

    Hi ,
    I am using Easy cost planning methodlogy for Cost planning.
    I need some guidance on following points.
    1. Can easy cost plan can be saved in versions ?
    2. In CJ30 planned cost I can view in annual view but it doesn't get Summed up at Header level WBS ?
    3.After releasing the WBS easy cost plan can be changed How to restrict that ?
    Pl suggest.
    Rgds

    Hi  Rasam,
    You can see the ECP of simulation using CJ20N, or CJ9ECP.
    The multiple ecp (MECP) is applied using SAP extenstion, after release 2.0. If you can check the system status of your system, you can find out, if the EA_APPL (at least 2.0 release) is applied your system or not. IF yes, you can find the corresponding customizing to active the MECP.
    If MECP is active, you can then determine in which version should be ECP maintained. You get an additional POP UP screen to let you select the CO version, as you lauch to the ECP in CJ20N or CJ9ECP.
    Kind regards,
    Zhenbo

  • EASY COST PLANNING at Network Activity Level

    Hi All
    I am using EHP4 system. I want to do easy cost planning at NWA level for this I already activate ECP for NWA in configuration setting and other necessary settings but still when I create ECP from CJ20N or CJ9ECP I can not able to do ECP on NWA activity level. Please give your inputs on same.
    Regards

    Hi Gokul
    All basic settings for ECP have been maintain. It allow me for ECP on WBS level but it not show me any activity or Network in ECP as I activate Planning for Network Activities with Easy Cost Plan in configuration.
    Regards

Maybe you are looking for

  • Issue in BI Reporting..

    Hi BW Experts, Currently i am working on Support Project. Users are running the report and while executing, it is taking more time to display the report in Web. I have checked the same report in RSRT and the report executes quicly. Can you please hel

  • 220V power adapter for 110v iMacs, Time Machine, etc

    we are moving to hong kong next month and I have 3 iMacs in our house, a 1 terabyte Time Machine backup/802.11n device and an airport. Does anyone know what i need to do to support 220v power in Hong Kong? Does Apple make/sell devicees that convert t

  • Is it possible to store all iTunes files on an external drive?

    Is it possible to store all iTunes files on an external drive? I'd like to free up space on my Mac Book Air and iTunes is the largest space hog. What can I store on my 1TB external drive and delete from the laptop's hard drive?

  • Updating imported images automatically?

    I am working on an all-Fireworks 8 mockup, and I want to be able to build each piece of the mockup separately, then bring them all together into one complete Fireworks document. My question is, can I get it so that when the pieces are edited and save

  • Itunes upload error code "4002"

    When I want to upload my music to the Itunes store, I get an error code "4002" What can I do about that?