Calculating Capacity Requirements

Dear Friends ,
To calculate capacity for a workcenter , we need to assign any standard value key or simply we can use the work and duration to calculate the capacity . Please advice.

Hi
In capacity tab
Other formula should be SAP008

Similar Messages

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • How capacity requirement calculated in RCCP in SOP

    Hi,
    I am executing RCCP (Rough cut capacity planning in SOP)  for a material through MC93... I am in the below situation as shown in the below screen shot... in the below screen shot if we consider April 2014 month I understood how available capacity 34819 (MIN) is calculated but not getting how capacity reqmt 397 (MIN) is calculated... can anybody guide me on this how capacity reqmt is calculated....
    Thanks
    Kumar

    Hi,
    Thanks for your reply....While creating the rough cut capacity planning profile where I need to mention the qty produced..I will give you my exact situation..
    I have resource with  six days working. total working time per day is 1339.2 MIN. Total work days in a month are 26 so total available capacity becomes 26*1339.2 = 34819.2 MIN
    Now in a month I have a requirement of product is 20,00,000 PC. Machine can produce i.e. capacity of the machine is 1,00,000 PC per day....now my capacity requirement will become like this
    total to produce 20,00,000 PC no of days required are is  20,00,000/100000 =  20 days
    Per day capacity is 1339.2 MIN so total capacity requirement is 20*1339.2 = 26784 MIN
    So now capacity load is 26784*100/34819.2 = 76.92
    Now question is where to give capacity of the machine is 1,00,000 PC per day. is it in the RCCP profile header in the base qty as shown below or some other place....  plz clarify....
    Thanks
    Kumar

  • Repetitive manufacturing - CM01 Capacity Requirement

    Hi All,
    I configured repetitive manufacturing process with lead time scheduling.
    Conf. at OPU5 is set as below
    Rate.plng horzn  - 999
    SelID:rate plng -  02
    Scheduling u2013 X (selected)
    Generate Capacity reqs. u2013 X (selected)
    Scheduling level  - Via Rate based scheduling
    Adjust dates u2013 Do not adjust basic dates, dep reqmt to operation dates 
    For capacity scheduling u2013 Always basic dates, dep. Reqmt to operation dates 
    I run MRP (MD02) with option - Lead Time Scheduling and Capacity Planning
    I could see required capacity is calculated at tab u201CProduction Ratesu201D & also in menu Planned order >> Goto >>Capacity leveling.
    we are unable to view Capacity requirement in CM01 transaction & in planning table MF50.
    Regards

    Hi,
    Select the correct profile in CM01.  Menu->Planning->Profiles
    Thanks

  • Capacity requirement in workcenter.

    Hi all
    Please explain about  setting for determining actual capacity requirements in workcenter.
    Also explain how it is useful?

    Hi,
    Capacity planning is divided into two components in SAP
    1. capacity leveling
    2.capacity Evaluation
    Capacity Leveling
      Following elements will create Capacity requirements,
      1. Planned order with Lead time scheduling
      2. production orders
    Following elements will be used to calculate  required capacity  and Capacity Percentage:( Actual capacity calculation)
    1. Work center formula
    2. Routing Base qty.,activity times
    3. Number of Individual capacity
    4. production order/ Planned order Order Qty
    Capacity Evaluation
    Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
    This is Just an overview about CRP.
    Regards,
    Velmurugan S

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • How to calculate the Remaining capacity requirement in SAP Production Planning?

    Hi SAP Guru's,
    I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
    Can please let me know the Transparent tables for below Fields?
    BEDAKT: Capacity Consumption Rest
    OUTPUTLEN: Capacity Consumption Offer
    SLIBELAS: Capacity load and
    SLIDELTA: Capacity Unused.
    Could you please help me accordingly
    Regards
    Bhupal

    Wrong space. Please move this to BW area.

  • Function Module to get a work center's capacity requirements (load) within a given period

    Hi all experts,
    Currently I’m doing a capacity summary report similar to CM01, but with a summarized capacity availability and loading for a period.
    Selection Parameters: Work center range from and to, Period from and to
    List Format: Work Center, Avail Capacity, Loaded Capacity, Free Capacity, Load %
    I have found a standard function module (FM) to get work center's available capacity for a period, but still facing the challenge to find a FM to get a work center’s capacity requirements (load) in a period.
    I have read through all the related threads from the web, and tested the recommended FMs, but still cannot get a right result.
    Please help to provide some leads for a FM or the logic.
    Best Regards
    Philip

    Hello Philip
    The following function modules should be useful:
       - CY_PRIMARY_SELECTION            - Function module for selection of orders for the work center
       - CY_SECONDARY_SELECTION          - Check for additional criteria
       - CR_CAPACITY_AVAILABLE_PERIODS   - Reads the available capacity from work center
       - HR_PERSON_READ_TIME_INFO        - Reads the available capacity from person (modification)
       - CY_GET_PART_CAPACITY            - used only for the first period to read backlog
       - CY_LOAD_DISTRIBUTION            - Distribution key
    Please observe that these are simple function modules, not BAPIs, That means, they were developed to be used on the SAP internal programs and they are not supported by SAP when used in custom programs.
    BR
    Caetano

  • Function module to calculate capacity requirements of production order

    HI
    Hav a requirement to calculate capacity requirement  for production orders like we see in cm50... does anyone know a function module to calculate capacity requirement?

    Hi All,
    Just to reopen this issue, even I am looking for a similar functionality.
    To reinstate the requirement:
    I want to find shifts and corresponding capacities for a work center. These details are obtained from CR03 and CR13 transaction.
    If possible do let me know Function module or tables for the same.
    Debs

  • Tables for PDS modes and capacity requirements

    Does anyone  know which tables store the Mode and Capacity Requirement data for SNP PDSs?  In particular I am looking for the Mode Duration and Capacity Requirement Bucket Resource Consumption fields. 
    Thanks,
    Laurence.

    Thanks Nanda,
    I am unable to find this BAPI on our system  (we are on SCM 4.1).  Do you know the tables that store SNP PDS Mode and Capacity Requirement data?
    Regards,
    Laurence.

  • Error in SAP APO Inbound: capacity requirement is invalid

    Hi Experts
    I am getting an error in APO Inbound in APO queue manager. The error text reads " Capacity requirement is invalid".
    I checked for all the resources whether they have validity and also checked for mismatching control key. But these fields are allright in both ECC and APO system.
    I checked note # 924562, but i am still not able to solve this issue.
    Can you please suggest how should i debug this error?
    Many Thanks!!
    Regards
    Mansi

    Hi Mansi,
    Were you able to replicate the issue on which activity triggers this CIF error?
    I remember a similar error which happened when converting planned order to production order where it was giving error"“Bucket capacity requirement has an invalid value” .
    SAP had suggested to implement note 1381483 to fix this.
    Thanks
    Ajay

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • Putting a production order on hold, removing capacity requirement

    Hi,
    I have a need to temporarily remove capacity requirements from production order because there is situation on the shop floor that caused the particular order unable to move ahead.
    Capacity requirement shall be re-instated when the order specific production issue is cleared.
    Is there a way to update a production order to release capacity requirement yet allowing changes to production order routing? I tried "LOCK" production orders but that will not allow me to change anything in the order.
    Can I set up a user status + user exit to remove the capacity requirement? If so, how to?
    Thanks all in advance!!!
    Regards.

    Hi
    Capacity requirement can be deleted when the following functions are carried out.
    1.The production order is set to Technically Complete.
    2. The deletion flag is set for the production order
    3.The production order is locked
    4.The indicator capacity  requirement in the procdution order is reset  and order is rescheduled
    5.The capacity requirement is reset with fucntions -----Availability check---reset cap stock
    Regards,
    Sadan

  • Capacity Requirement

    Hi
    After creating Production order. In Control data tab what is the setting so that the calculate capacity requirement tick will come automatically.
    Regards,
    Anand

    Hi All,
    Nice to see the response for this post. All 4  replies are posted at the  same time. Though the solution was the same, I like the attitude of the Forum members for their prompt reply for the posts & sharing their knowledge & experience.
    Keep it up dear members. Special thanks to Rajesha vittal, Prasobh Karunakaran,YM Reddy,Krishna Mohan,Pradeep,Mangal,Nandakumar,Jaganathan Saravanan & Dharma for their active contributions.
    Dear New members please close the threads if you are satisfied by the replies & reward the posts suitably, which will help all members to post prompt replies for our queries.
    Have a nice day!
    Regards,
    Senthilkumar

  • Capacity requirement and scheduling process

    Hi Experts,
      please explain me how capacity requirement and scheduling (please explain with configuration  settings)    will help in SAP PP.
    Regards,
    Bhaskar.
    Edited by: basi123 on Nov 7, 2011 1:12 PM

    Dear
    Capacity Requirement Are those Which is used  For Operation And Calculate the Time with help of Dervied Formulas
    for instance i take an Example To Describe so that u get clear Picture
    Ex: Suppose i have machine Drilling u assume that Drilling machine as a one capacity under capacity catergory
    here to operate this i need to make my machine set up first then machine time i need to arrange a labour
    so total i required Setup Machine Labour so Here in sap we define a standard value key with all these combination and there we will assign formula for HOW Much to Produce so on...... and in turn it is assigned to control key to perform all the Actions.....
    Scheduling : Scheduling is Nothing but to sechedule Right time at Right job This helps in shop floor to over come overload on machines.scheduling used in
    scheduling for Production orders
    scheduling for Planned Orders
    scheduling for Plant maintainence Order
    Configuration :
    1. Capacity Requirenemnt ;
    SPRO>>>production >>> capacity requirement >>>> Define capacity catergory
    2.Capcity planner
    3.Define parameters OP7B
    4.Assign this to OPCM
    Scehduling
    1. go to OPU3
    With regards
    Pushpalas

Maybe you are looking for

  • IPhoto 6.0.4 keeps crashing on import  - Intel Mac Mini

    Could anyone shed some light on this. During photos imports from camera or usb drive iPhoto chokes and crashed. Below is the error report. Thanks Date/Time: 2006-06-27 23:17:03.744 +0900 OS Version: 10.4.6 (Build 8I1119) Report Version: 4 Command: iP

  • Watching a tv program while it's still recording

    Hi is it possible to watch a tv programe while it's recording. For example if the progame starts at 9.00pm and finishes at 10.00pm and I get in about 9.30pm can I start watching the program or do I need to wait for the show to finish before I can sta

  • XML Publisher Phase 2 Excel template

    Hello, I hava a trouble with the embeded XML Publisher in JD Edwards. I need to generete a template to process informatión in MS Excel, and i don't know how. Can anyone explain me how can i do that? Thanks a lot.

  • Adding 256 SSD to a new iMAC

    History: I have just recently sold my old 2010 Mac book Pro and kept the SSD that came with it and and currently looking to buy the 27-inch  iMac and befor i buy it i was wondering if my SSD i have would work as a second HD i can add to it once i get

  • XFDL viewers that are compatible with MacBook Pro

    I am in the military and I need to be able to sign forms from home and send them in. I have tried the pure edge viewer and I can't get it to work. Any advice or assistance would be greatly appreciated. Thanks in advance.