Calendar for Italian and American computer

I create a .vi where there is the calendar control to insert the start and stop dates. Into a computer with Italian date format it works without any problem, but if it's installed into another computer with American date format it doesn't work. I try with different type of .vi (the original is Calendar_test.vi) Can anyone help me?
I append the .vi and .exe
Attachments:
Calendario.zip ‏265 KB

Are you saying that you could not even see the calendar in the DTPicker?
If that's the case, it is strange, because I can pick a date even without running the VI.
Which version of LabVIEW are you using?  Can you show the Front Panel after you open the VI, and without running it? 
See screen captures of the Front Panel without running the VI.
Image 1:  Immediately after loading the VI.
Image 2:  Selecting a date without running the VI.
Message Edited by Ray.R on 02-24-2010 12:58 PM
Attachments:
dateNotRun.PNG ‏8 KB
dateSelNotRun.PNG ‏28 KB

Similar Messages

  • After last icloud backup, unrequested by me public holidays in the UK have been marked on the calendar and I can't find how to delete this. Also, I have been trying to delete a birthday from the same calendar for months and it keeps reappearing.

    iPad 2 with iOS 7.01 After the last backup to Icloud, unrequested by me,  my calendar has been filled with public holidays of the UK which there doesn't seem to be any way of deleting. Also, I have been trying to delete a birthday from the calendar for months, this time using all variations of 'delete' and it keeps popping up again!

    Are you also restoring from your backup? That sounds like what is happening or someone else has your Apple ID.
    A backup to iCloud would have no way to add UK holidays to your calendar. Open Calendar, tap on Calendars at the bottom middle of the page and untick the ones you don't want.

  • Project Resource Calendars for onshore and offshore (different working hours)

    Advice please.
    As with many companies we use Project 2010 with onshore and offshore resources.
    Facts are as follows:
    Onshore resource – 09:00 – 17:00 – 35 hour week
    Offshore resource – 08:00 – 18:00 – 40 hour week
    These resources are in different time zones; however that element is not an issue.
    The problem seems to be with resource calendars.  Resource calendars are setup as per above and assigned to appropriate resources in EPM/Project Server 2010 - however could be local for same issue. 
    The problem is that work is reflected correctly in hours or days but not both.  
    So looking at Task usage table. 
    For example:
    Typing in hours for Onshore and Offshore resources on any task is correct. 
    So 7 for onshore and 9 for offshore.  However when you can the work view in options so that work is entered in days, its incorrect for offshore. 
    Same hours for both but incorrect days.  Basically the resource calendar does not seem to have an impact.
    The Plan default working times can be set to either schedule but either way one or the other type of resource is out.
    For instance :  Offshore resource 9 hours should equate to 1day. However it equates to 1.29 days. 
    Which would be correct if that resource was on an onshore cal.
    My assumption is as follows:
    Set the Project default hours to 08:00 – 18:00 – 9 hour days, 40 hour week.
    This allows offshore to work there hours as the project plan is effectively open for business.
    Onshore resources should then be restricted to their resource calendar meaning that they only work 7 hours per day regardless of the plan indicating 9 hour days.
    Hope that makes sense...
    Any thoughts would be much appreciated…..
    -CL.

    Hi,
    Everything you write is right, and your confusion only stems from the misunderstanding of how Project defined the "day" as a time unit.
    Matter of fact, Project uses for its calculations only ONE time unit which is the MINUTE.
    Of course, that implies the HOUR is a usable unit as well - an hour being 60 minutes isn't questioned by anyone.
    OTOH, your post illustrateds tha a definition for  day is not so obvious; Project's definition is that a day is always equal to an hour times the parameter "hours per day" in the options. So what a day is, is totally independent from any calendar, Project,
    Resource or Task calendar. Within that definition the values you see are "right".
    But the good news is that your other assumption,quote:
    Onshore resources should then be restricted to their resource calendar meaning that they only work 7 hours per day regardless of the plan indicating 9 hour days.
    That is true. Work is planned according to available working time in the appropriate calendar.
    My advice is to not use the day as planning unit in any view: the hour will better allow to understand how Project is planning the tasks.
    Greetings,

  • Missing translations for Italian and French

    Hello Experts, I have successfully installed a ECC 6.0 server-ABAP +JAVA system (DB2 v9.5 FP4 windows server 2008-x64 bit). Kernel: 700 , Patch: 185 ; SP level : rel 700 , level 17. I have created 3 clients : 100, 700, 701
    I have installed 2 languages apart from default ones -- Italian and french.
    My issue is there are missing translations for few transactions when i log in italian and french and this problem is only with client 100(clients 700, 701 have no missing translation issue).
    For example, if i log in to client 100 in Italian or French and go to t-code FS00, the Tabs(Type/descripton,control data,Create/bank interest , Key word/translation, Informamtion (C/A)  ) are displayed in english instead of italian or french.
    I have already followed Note 1156507 - Language supplementation, RSREFILL and client maintenance.Still facing the same issue.Requesting expert help.

    Hi ,
    Refer sap note 1159021-in client 100, 518950-efforts to translet the language.
    You can run client maintainance again in client 100 and check.
    let us know, further.
    Thanks
    R.

  • Different calendar for sp and route

    Hi all,
    Can we have a different calendar for a shipping point and a different calendar for a route?
    Regards
    Manivannan R

    calendar will be maintaing in shipping point only not in route

  • Converting cs3 for web and IBM computer

    I am on mac os 10 and using illustrator cs3 ... how do I save for web for a word document to open on a IBM computer?

    I am doing a pro bono newletter for the local garden club and the person that is in charge of the website only uses Word on her IBM to create the site and upload my newsletter. I know this is far from ideal.
    I have saved my file as "save for web" and save for microsoft office" sometimes when she opens it the layout of the page is screwed up and sometimes she can't open it at all and sometimes it works. I'm wondering if the order I am doing saving could be the problem.
    Thanks
    Kathy

  • Media based deployment for Refresh and New Computer

    Hi ,
    I am looking for some pointers for using media based deployment for refresh scenario (xp to Win 7 with USMT) and new computer deployment (without OS). 
    Setup we have is Configuration manager 2012 R2 integrated with MDT 2013. 
    I need some pointers on below:
     - Since its winxp to win 7 and its boot images that comes with (ADK 8.1) confi. manager 2012 R2 doesn't support it. Article says we need WINPE 3.1 for such scenario. Since its MDT 2013 (again ADK 8.1 boot images only), how do generate WinPE 3.x for
    MDT based boot image?
    - Since it is going to be 2 deployment scenarios, do i need to have 2 separate TS (one for new computer and 2nd for USMT based deployment for refresh scenaro) or is there anyway to manage both scenarios with 1 TS?
    - If we need to have 2 TS, do we need to have 2 media created or 1 media can have both TS (like in MDT we have selectionprofile with multiple TS and then media created including both TS)
    Looking for some options to deal such scenario. Thanks
    Regards,

    Check out this blog post also:
    http://blogs.technet.com/b/configmgrteam/archive/2013/09/12/how-to-migrate-user-data-from-win-xp-to-win-8-1-with-system-center-2012-r2-configmgr.aspx
    Jason | http://blog.configmgrftw.com

  • How do I download Photoshop for windows xp and vista.... I currently pay per month for photoshop and a computer running vista i ned to install photoshop on two aditional machines. How can I download, photoshop says I have an os that is no longer supported

    I have a computer running windows vista that I pay per month for photoshop, I want to use photoshop on two other computers I have, not that it matters but they are both identical hardware wise, and software one runs xp and the other runs vista, I can upgrade but I am not intrested in other os. When I attempt to download I am told that my os is no longer supported. Now i know that I could find an offline version and should be able to get it installed but im not sure of a safe site that provides the iso or install exe. I want to use the other two computers because they have touch interface early computer/tablet highbird. thanks in advance.

    Michaelt65951582 I am sorry but you will need to run at least the minimum operating system to use Photoshop.  You can find the system requirements at System requirements | Photoshop.  I would recommend upgrading to Windows 7 or later.  You may find that your computer can support the more recent operating system depending upon the hardware installed.

  • Calendars for manufacturing and finance

    hi,
    we have a situation here in which we have gone live on financials with the calendar having 13 periods, periods coinciding with calendar mths. in manufacturing, we are going to have the 4/4/5 calendar: we believe manufacturing calendar cannot be anything but 4/4/5 or 5/4/4.
    any gotchas there?
    now, the client wants to switch over to the same calendar (4/4/5) for financials also, to have manufacturing and financials reporting in sync. question: is it necessary to do so for the sync to happen? what are the pros and cons of making/ not making the switch?
    what could be the possible gotchas in the switch? need your opinions on this.
    if any of you feel like responding on my personal mail id you can, at <[email protected]>
    null

    Read Macworld or Maclife and you will get a good flavor of the many aftermarket companies out there. Patenting anything is really outside the scope of this forum and so is marketing for that matter. Get a lawyer for the former as a start.

  • Sync Calendar for pop3 and exchange in entourage.

    I have about 6 pop3 emails with my website and one exchange email. how can i send myself an invite to a meeting or calendar event on my iphone. when I receive my email to my iphone it gives me an icon that says meeting.ics but it cannot read it. how can i go around this.
    Message was edited by: AROD677

    I sync the calendar from Entourage (but not contacts).
    In Entourage, Preferences, Sync Services, you have to turn it on. After that, you should see info magically show up in iCal and Address Book, and when you sync the phone via iTunes (or MobileMe), it should sync to the phone.
    It is prone to glitches, though, I think, so do some backup first. But you'll get better info with a search/question on the Entourage forum--many more iPhone users there than Entourage users here:
    http://www.officeformac.com/ProductForums/Entourage/

  • Hi my name is Steve,my problem is? last time I bought bobby carrot for ever and my computer crush , and bought a new computer , now I would like to download bobbycarrot forever, what do I have to do? Please!

    Hi
        can you tell me how to redownload bobbycarrot forever please!

    How to redownload purchased apps from the App Store

  • Shared Calendars / Room Lists and automatically forcing them to users based on Security Group Membership

    Good morning all,
    I need some help achieving the following in our Exchange 2013 Environment.  First off, we have Exchange 2013, but all our clients have Outlook 2010.
    Here's what I would like to be able to do:
    1) create/manage public calendars / rooms in exchange 2013
    2) force these shared public calendars / rooms to users' calendars who are members of particular security groups
    3) give edit permissions / "booking" permissions for the shared calendars so select users are able to make changes to the shared calendars, as well as accept/deny requests to "book" shared room calendars
    Any one got any resources they can give to point me in the right direction?
    I have already created two mailbox room resources, and have them set up in a room list in AD.  But need to know the above as far as creating a shared calendar for events, and forcing these calendars / room lists out to users based on security group
    membership.
    I don't want my users to have to know how to add a shared calendar...that would be a nightmare explaining.  I just want it to show up.
    Any help on this is greatly appreciated, thank you!

    1) I recommend using Room Mailboxes for resource calendars because it just works better.
    2) This is a standard feature of a Room Mailbox.
    3) You're pretty specific here, but I think this is also more or less available with a Room Mailbox combined with folder rights.
    I don't know any way to just make them "show up".  You'll have to teach them.  Well written instructions can work wonders.
    Ed Crowley MVP "There are seldom good technological solutions to behavioral problems."

  • Can't enable calendaring for some users in WGM

    10.5.6 server
    OD set up and working fine
    I'm trying to get going with iCal server for the first time
    The 3 accounts that I initially enabled for calendaring seem to work fine, but now I can't add any more. If I enable calendaring for a user in WGM and save the record, if I go to another record and then back to the one I changed, I see that calendaring is disabled for that user.
    It continues to work for the initial 3 users.
    iCal server error log did have some messages about "Record disabled due to conflict: <OpenDirectoryRecord..........."
    I read on another post that this indicates a problem with duplicate UIDs/GIDs
    I found one each UID ad GID that were both duplicated in local and LDAP records, so I changed those in WGM. On top of that I found that groups "Open Director Users" and "Open Directory Administrators" had the same GIDs in both local and LDAP domains, but guessed that I had better leave these alone. There are no other duplicate UIDs or GIDs.
    Stop and start iCal server.
    Problem remains.
    Any ideas please?
    Many thanks......

    Dear All,
    I have the same problem, i can't active the 'web calendaring' for groups and for users, the checkbox 'enable calendaring' don't stay checked if i close and open the workgroup manager...
    Someone has a solution?

  • Generate Calendar for Cumulations

    Hi Guru's,
    Can u explain clearly what does this step means Generate Calendar for Cumulations  I have read this step many times in F1 help but i couldn't get the correct information. Can u please explain in detail where it is used.
    Thanks & Regards,
    Ravi

    Hi,
    use the report RPUCTP10 (Generate calendar for cumulations and deductions) to define the assignment of payroll periods.
    Ex: this we will use this report for deduction like I want to deduct wage type amount quarterly basis,  the wage type amount in  IT0014 accordingly time intervals  (for example, monthly, quarterly, half-yearly or yearly).
    For this deduction and cumulation we need to define the payment models and periodicities, for that payment models we have to assign the period parameters like monthly, quarterly, half-yearly or yearly.
    This payment model again we have to assign MODDE feature.
    If do you want understand easily go to path:
    Personnel Management-> PA->Payroll Data->Recurring Payments and Deductions->Payment Models-> Define deduction periods - before this node we have to generate the RPUCTP10 program.
    Regards
    Devi

  • How do you setup workgroup calendar for everyone?

    I am not quite certain how to setup a shared calendar for everyone - like one general office calendar.  Is the only way to do this is to use a fake user in my ODM?  I have a calendar for myself, and I see how there are calendars bound to wikis, but the documentation isn't clear on how to setup a calendar for a workgroup.
    Thanks.

    Hello;
    You can do that is Measurement and Automation Explorer (the blue NI logo at your desktop screen). Then, you create a virtual channel, configure the channel as a voltage input, and enter the scalling for that particular sensor. You can probably get all the information as far as scalling from the sensor vendor.
    After you enter those numbers, you should be all set to start your acquisition.
    Hope this helps.
    Filipe

Maybe you are looking for

  • ICal: "all day" checked by default

    Another problem caused by updating OS to Yosemite: anyone knows about a possibility to have new entries in iCal as "all day" events by default? To change the duration to 24h is not the solution - new events will start a 0900 and end on the next day a

  • Creating I-Doc from F110

    I want to create check information as an I-doc from F110. I have run F110, successfully, it gave me that 1 document is generated and 1 is completed. Now I want to create an I-doc which contains all the check information and send it to an external sys

  • Integration Crystal 2008 in C++ builder ?

    Hi, I use c++ builder developpement tool. How can i integrate or connect to crystal report 2008 viewer. I search since several weeks but i found nothing. Best regards.

  • Probably very simple ++ issue

    Ok... I'm quite sure this is kid stuff for you guys who have a clue what you are doing... but I can't for the life of me figure it out. The page is supposed to work like this: http://www.bradleynewton.com/rick/project1 But instead it's doing this: ht

  • Owa_util.calendarprint