Calibration inspection

I have done all configuration regarding calibration of equip. but when i am going to release an order for a test equipment then an error occurs
"No inspection lot could be generated for order'Release order anyway"
Message no. IW217
Diagnosis
An inspection type has been defined for the order type in question. An inspection lot should be generated when the order is released. No inspection point field combination has been defined in any of the maintenance task lists used in the order. This is why no insepction lot can be generated.
Procedure
If an inspection lot is to be created, the order must contain at least one procedure which was taken from a maintenance task list and which has been define for one of the inspection point field combinations. This must be done before the order is released.
Please suggest me how to come out of that situation.

hi Shoaib,
Please check inspection point in task list header data. It should be 300.
In customizing please assign inspection type 14 to order type. For customization go to :
IMG -> Plant maintenance & Customer services -> maintenance and service processing -> Functions and settings for order type -> Assign inspection types to maintenance/ service order types
Hope this may help you.
Regards,
Vaibhav

Similar Messages

  • Digital signatures for calibration inspection (inspection type 14)

    Hi,
    I want to use digital signatures for results recording and usage decision (ud) when performing a calibration (inspection type 14). Normally you'd set-up the material authorization for digital signatures. But this can't be added to maintenance plans or equipment. Is there any way to set-up digital signatures for calibrations?
    Regards,
    Maarten

    Explore SAP Note 576307
    It may help u.

  • Auto creation of calibration inspection lot thru maint. planning/scheduling

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance
    Edited by: Chris SAP on Jul 5, 2010 9:56 AM

    HI Chris,
    During calibration order  creation only inspection lots are generated.
    Manual order creation
    Run Tcode IP30 deadline monitoring to create order if it is due date the order will be generated with inspection lot.
    Automatic order creation
    Create a batch program to run IP30  daily giving inputs needed so that the order will be generated daily.
    Usage decision is completion of inspection lot
    Technical completion and business completion is for order completion. Technical completion is needed to schedule the job correctly.
    Regards,
    Alagesan M

  • Problem in the calibration inspection

    hi
    I got a error regarding calibration inspection....
    When creating the device category, i gave the calibration inspection as internal and period of year one year...
    but when i am doing technical installation, it gives a error message as " in 2008 No replacement for the material with 0000 year"
    can any one help me

    Try this....
    Go to EG05
    and remove the calibration settings..you can do technical installation now.
    Regards,
    Narendar Konaknchi

  • Queries related to calibration inspection process

    I have some queries related to calibration business process.They are as follows:-
    1.Which equipment category do we choose, Q or P?
    2.While creating a maintenance plan,which category do we choose, maintenance order or quality maintenance order?
    3.Is it that we can't do a time confirmation before results recording?If I try to do so,I get this message"No open operation recieving confirmation entries for order".
    4.While I create my maintenance plan,I get this message, a counter could not be defined for the reference object.Why so?
    5.After usage decision,if I lock my equipment for further use,the equipment has the status both AVLB and NPRT.Why?
    6.Can I create my calibration order manually and assign equipment task list.If so,how?
    7.While creating my test equipment,for the PRT tab,the task list usage becomes a mandatory field.What setting is done for this task list usage to become a mandatory field?
    Edited by: Pallavi Kakoti on Feb 2, 2012 8:19 AM

    Hi
    1.Which equipment category do we choose, Q or P?
    Ans:
    Q is normaly used for Instruments,Lab equipments
    P also used for Production/process related equipments needs calibrations often
    2.While creating a maintenance plan,which category do we choose, maintenance order or quality maintenance order?
    Ans:
    Its all depends on config you have did. if Quality maintenance order should be linked to inspection type.can be used.
    we can not used maintenance order if it is not linked to inspection type 14.
    3.Is it that we can't do a time confirmation before results recording?If I try to do so,I get this message"No open operation recieving confirmation entries for order".
    Ans:
    You can do time confirmation after result recording, then UD.after UD ,order will be TECOed automaticlay.
    4.While I create my maintenance plan,I get this message, a counter could not be defined for the reference object.Why so?
    Ans:
    Check any measuring counters created for the equipments,
    5.After usage decision,if I lock my equipment for further use,the equipment has the status both AVLB and NPRT.Why?
    Ans:
    After UD, system changes the status NPRT for the equipments have PRT view only.
    if PRT view maintained in the equipment, system status remains AVLB.
    If you dont to use the equipment after UD-Reject,have to go development using user status.
    6.Can I create my calibration order manually and assign equipment task list.If so,how?
    Ans:
    Yes. you can
    Create task list with 300 inspection point, assign when u create order
    also you can have manual call in the maintenance plans.

  • Calibration inspection lot

    Without Cost center, is it possible to schedule and release inspection lot 14 for instrument calibration.
    I tried without CC, but inspection lot has not triggered, if i give cost center either in work center or equipment data, then every thing is happening.
    Please advice...

    Yes,
    Bcoz PM order is an Cost object whcih needs some cost center, without this order will not released and thus ur lot not triggered.
    Enter Cost Centre .
    Regards

  • Set up Calibration Inspection in Inspection Interface

    Hello,
    I’m currently designing an inspection interface “front panel” for a program that detects faults in caps. I’ve been having a look at some of the features that are offered in the interface and I was wondering if there is a way I can perform an edit calibration in the inspection interface. Thanks for any response.

    Actually, the Calibration step in VBAI allows you to dynamically relearn calibrations based on previous points. The simple calibration and point distance calibrations allow you to use previous points to update the calibration. On the second tab of the calibration step, check the relearn option. All calibration types allow you to dynamically adjust the calibration origin/angle based on previous points using the same relearn flag in the calibration step.
    If you want to permantely update the calibration, you can check the "Save Image Calibration to File" option on the first tab of the calibration step.
    Hope this helps,
    Brad

  • Issue in calibration(inspection lot (result recording))

    Hi,
    I want that when user do result recording if all readings will deviate then system automatically shows the valuation should be can not be used but it is now showing is can be used. see attached screen shot

    steps:
    1. run t-code qe17(result recording)
    2. do RR and then when we click on save button pop up comes which gives the scree. which is attached in original thread.
    3. i want that when RR is rejected means values deviate valuation should be automatically suggested that equipment can not be used

  • Need to develop a calibration report

    Hi experts,
    i need to develop a report for calibration
    input screen parameters are
    equipment no.
    date
    output screen
    Equipment no.
    equipment description
    Functional location
    order no.
    inspection lot no.
    inspection reading before calibration
    inspection reading after calibration
    Usage Descion
    I am new to PaM module kindly help me so that i can give proper details of tables to abaper.put
    and kindly tell me from which table i can pass equipment no. and get inspect lot no. and other details as per output screen.

    Hi all,
    i am facing an issue while developing a report.
    i am using a table QAMV (LOGIC  stated below)
    pass inspection lot no. pick MIC , MIC Description
    issue is that against single inspection lot no. multiple MIC are assigned. How i can pick all MIC , MIC Description by entering inspection lot no.
    ABAPer is asking for another primary key to fetch all MIC. According to abper he is unable to fetch all MIC on the basis of single inspection lot no.
    format of report and table (qamr) screen shot attached below.

  • QM Inspection of a Service

    The issue I have involves request to perform QM Inspection when purchasing via a service master, not a material master.  Not MM-knowledgeable enough to understand why material masters are not being used.  That decision has already been taken by part of business.
    If material master was established, no issue for me.
    With service master, I need comments about whether / how QM Inspection can be planned and executed at completion of service.
    The closest I could see was calibration inspection where the focus of the inspection is on equipments.
    There are no OSS Notes in QM where "service master" is found.
    Thanks for -some- feedback.
    Warren

    Please use Source Inspection
    For Better Read Following Link
    <u>http://help.sap.com/saphelp_erp2005/helpdata/en/2d/351b7d448c11d189420000e829fbbd/frameset.htm</u>

  • Enable Valuate Inspection Point

    Dear All
    I have entered results in instrument calibration inspection lot (Inspection Origin 14). When i have save this results system suggest for valuation that A - Can be used, R1 - Adjustment is required and R2 - Cannot be used. I cannot select any of them. B'coz all are in disable form. Please give me suggestion that what can i do to select any one from this.
    Regards

    Have u maintained the UD selected set in inspection type 14 in SPRO. Also, in QS41, dont forget to mention the code group for the insp type 14.
    Thanks
    Sachin

  • Inspection type 14

    do we ever need to assign inspection type 14 in material master?
    if yes, when?
    Because without doing that also system is generating the inspection lot for calibration.

    Hello Sandip,
    the inspection type 14 is used for i.e. calibration inspections.
    Example: If you are using production recource tools then this could be a measurement instrument which has to be maintained in certain cycles to guarentee that the measurement results are correct. For this reason you create a maintenance plan in which you add inspection characteristics, these are for example the testing of measurement results and how far they are in or out of scope. The correspondent inspection lot is created when the maintenance plan is called and the maintainance order is released.
    The status of the PRT can be changed via a follow-up action of the usage decision.
    I hope that this helps you understand the functionality.
    Regards,
    Isabelle

  • Vision builder calibration

    bonjour, 
    j'ai un projet pour guider un robot à des positions de prehension d'un objet (compteur d'energie) alors je voulais faire le traitement d'image avec VBAI pour traiter l 'image comme suivavt:
    1- fixer un repere(X,Y) pour determiner les coordonnées d'un point du compteur.
    2- determiner l'angle de dephasge du compteur par rapport à l'horizontal s'il vient decalé .
    3- transformer les coordonnés du pixel vers le millimetre.
    tout type d'aide est apprecié .
    cordialement

    Bonjour,
    National Instruments a mis en place un manuel d'utilisation de VBAI très bien fait.
    Q.1 : Il y a un tutoriel pour la mise en place de repère (2.2 Defining a Feature on which to Base a Coordinate System). 
    Q2 et Q3. Ainsi que, un tutoriel pour fixer une échelle métrique et un repère d'angle. (3.1 Acquiring and Calibrating Inspection Images).
    Manuel: http://www.ni.com/pdf/manuals/373379f.pdf
    N’hésitez pas à consulter ce manuel durant l’avancement de votre projet.
    Cordialement,
    Jovan N. - Application Engineering

  • Discussion: The usage of Inspection Points

    Hi Experts,
    Talking about the INSPECTION POINTS, what kind of usage could it be ?
    In some occasions,  it can be used as an sign that distinguish each delivery from the production line to the QM dept.
    How about any other way to use it?

    An inspection point is an identifiable record of inspection results that is assigned to a work or inspection operation. Several inspection points can be assigned to an inspection operation.
    With inspection points, you can have several inspections and can record multiple sets of characteristic results for an operation.
    Inspection Points for Inspections During Production
    If you inspect during production using routings, rate routings or master recipes and you want to record inspection results in specific intervals, choose the inspection point type Free inspection points in production. You can define your own field combinations for this inspection type in Customizing.
    Inspection Points in Goods Receipt
    If you carry out goods receipt inspections with inspection points, choose the inspection point type Free inspection points in production. You can create your own field combinations for this inspection type in Customizing.
    Inspection Points in Plant Maintenance
    If you carry out calibration inspections and want to record inspection results for equipment or functional locations, choose the inspection point type for Equipment or Functional location. You can create your own field combinations for these inspection types in Customizing. However, the field Equipment or Functional location must exist in the field combination.
    Inspection Points in Sample Management
    If you use the sample management functions in a goods receipt inspection, or inspection during production with planned physical samples, each sample number is uniquely identified by an inspection point. Choose the inspection point type Physical sample. You can create your own field combinations for this inspection type in Customizing. However, the field Sample must exist in the field combination.

  • Maintenance Planning & Scheduling of calibration order

    Hi
    I have to schedule calibration inspection of a few equipments in such a way that system automatically create inspection lot & calibration order daily.
    Whether user enter calibration result or not, inspection lots in future should be created automaticallly.
    I created a single cycle plan using IP41 and start the schedule using IP10, the system created first inspection lot automaticaly but always require me go to to scheduling and save the plan again if I want to create next inspection lots. How can I configure/set the system in such a way that it creates inspection lots/calibration order automaticaly
    Plz also tell after taking usage decision of inspection lot whether I need to do some act on calibration order such as technical completion or business completion.
    Thanks in advance

    Dear Chris,
             In maintenance plan go to Maintenance plan scheduling parameter & put Schedule Period '360' Days in sub screen under Call control parameter.
    Then Go to IP10and make automatically scheduling it will make plan for whole yera.
    Regards... Rakesh Saxena

Maybe you are looking for

  • Is there a way to open looong Word documents in Illustrator?

    Hi, I absolutely DO NOT want to install some office progs on my machine (I have another one for that kind of boring stuff but that's still on its way across the ocean) and need to open a .doc document consiting on more than 1 page. Is there a way to

  • Windows 7 Wireless and Audio Drivers on 2010 MacBook Pro

    I have a new MacBook Pro i7 2.66 Mhz with Snow Leopard and dual boot to Windows 7 64 bit Ultimate. I can't find the correct drivers (Windows 7 side) to get the audio and the wireless networking operating. I ran the bootcamp setup from the Snow Leopar

  • [SOLVED] .SRCINFO file and multiarch PKGBUILD/package

    Is it a bad practice to have one PKGBUILD/package for x86 and x86_64 when they have not the same source? Exemple: # Maintainer: Tanguy ALEXIS <[email protected]> # Contributer: Shaun Hammill <[email protected]> # Contributer: Travis Lyons <[email pro

  • LabVIEW file browser can't see folders

    I am using LabVIEW 7.0 on Sparc Solaris 2.6.  I am using NFS to serve folders from a RHEL5 linux server.  These folders contain my LabVIEW code, and I am mounting them on my Sparc Solaris workstation.  When I open the LabVIEW file browser, some folde

  • Preparing files for printer - no CM requested, image resizing

    Using InDesign CS3 504, on Mac OSX 10.6. I'm approaching the end of preparing a 40pp A4 magazine for a client.  In about one week I'll be submitting my file to the printers who are UK based (I am UK based, too).  I'm looking for the best set up to he