Campaign cost analysis

Hi experts,
we are working on CRM 5.0 and ECC 6.
In our implementation we are not using Project Systems(PS) and SEM-BPS(Business Planning and Simulation) so that the hierarchical structure of all Campaigns/Campaign elements will not be transfered to ECCor R/3.
But we jsut want the actual costs associated with the Campaign to be entered in the Campaign by the marketing person creating the Campaign and later used for analytical purposes to calculate cost per Transaction.
Any one please help me how to achieve this????? its a kind of urgent.
Thanks in advance,
Regards,
DV.

In CRM 5.0, you can use BW (through SEM-BPS) to save the cost of a campaign. To do that you have to create a planification profile in SAP CRM, to open the cube in SAP BW and to customize little things in SEM-BPS to rename the costs that are possible in standard. Customizing like that, these costs won't be used in R/3.
Afterwards, it will be possible to make reports on it.
If you don't have SEM-BPS, maybe the best solution is to take a field in the campaign that will include the costs. The reports will look for this field.
Regards,
Steven

Similar Messages

  • Cost Analysis by Sale Order

    Hello,
    I'm seeking to enable in BI a Cost Analysis Scenario with repect to the <b>Sales Orders</b>. That is, something similar to the analysis you can easily perform in the R/3 area <i>Accounting -> Controlling -> Product Cost Controlling -> <b>Product Cost by Sales Order</b></i>.
    For instance in standard report KKBC_KUN, you can choose a sales order number and get all the <b>cost elements</b> related to that sales order, with the corresponding costs.
    I have examined the following objects provided by the BW's Business Content:
    - <u>InfoCube 0PC_C01</u>: it contains only the costs related to <b>production orders</b>, and not the costs associated with sales orders.
    - <u>InfoSource 0CO_OM_CCA_9</u>: it seems interesting, in fact it delivers some header and line item data of the <u>Controlling Object Document</u>. Unfortunately it doesn't deliver the crucial characteristics <i><u>Controlling Object</u></i> and <i><u>Controlling Object Type</u></i>, which I definitly need for enabling my analysis scenario!!
    (By the way, are these 2 characteristics delivered by the BC? There exists a 0COSTOBJ characteristic, but it's not used by any object in the flow afterwards. Moreover, I can't find a standard DataSource in R/3 which I can use to load either its attributes or its texts, and see what data enter it..)
    Business Content for Product Cost by Sales Order), but none could help me.
    It seems really weird that it's not possible to carry out a <b>Cost Analysis by Sales Order</b> in BW, so if anyone has some suggestion it'll be very appreciated indeed.
    Thanks & Regards, Davide

    I eventually found the following SAP Note. No BCT for this analysis scenario....
    <b>Note 584791 - BW-BCT-CO: Costs not extracted on sales orders</b>
    <b>Symptom</b>
    In R/3, costs are posted directly to sales orders. The costs have to be analyzed in the BW system. In the standard system, however, this data is not extracted into the BW system.
    <b>Other terms</b>
    0CO_OM_OPA_1; 0CO_OM_OPA_6
    <b>Solution</b>
    1. There are currently no DataSources for costs on sales orders in the standard BW Business Content. Unfortunately, there are currently no resources scheduled for a new development in this area either.
    2. Therefore, the DataSources and the Business Content must be created in the customer project within the framework of consulting as a customer solution concerning the generic extraction options of the BW Service APIs or function modules you have programmed yourself for extracting data.
    3. Technical background information about costs on sales orders:
    The transaction data is available in the following R/3 tables
    COSS and COSP - Totals records or COEP - Line items.
    This concerns records for the VB* object numbers.
    The master data of the sales orders is contained in the VBAK and VBAP tables.
    The 0CO_OM_OPA_1 and 0CO_OM_OPA_6 DataSources only extract costs for orders with master data in the AUFK table. These types of requests always have OR* object numbers. Therefore, these DataSources cannot be used for sales orders.
    However, you may be able to assign requests from the AUFK table (for example, maintenance orders or production orders) to a sales order through the AUFK-KDAUF table field.

  • Process Order Cost Analysis Target and Actual Quantity Missing

    This is related to Process order costing .
    Issue : Before activating  Material Update field in Costing view 1 of Material master , we have created few process orders and Delivered .
    Hence cost analysis shows Actual and target cost fields  Empty in COST ANALYSIS  report of  order  . After Updating field in Material master , New Process orders are calculated with Actual and Target cost .
    Solution needed : How to do Actual and Target cost estimation back in cost analysis report  for old process orders which are created before Material Update field ?

    You have deleted the Component in the BoM.
    Then you have created a production order, check if the start date of this order is after the date change in the BoM..... Can be that the component stills exists in the order ? Have you tried deleting the compoent in the order BoM ?

  • Cost Analysis Report - For a range of process orders

    Dear all,
    Is there a standard report available to get the cost analysis for a range of process order? COR3 --> Go to --> Cost --> Analysis. Here I can see the cost analysis for one report. But I wanted to get the cost analysis report for a range of process orders. Please help.
    Thanks
    Nagarajan

    Dear
    You can use cost analysis report like
    1.S_ALR_87099932 - Variances Between Costing Runs
    2.S_ALR_87099931 - Price vs Cost Estimate
    3.S_ALR_87099932 - Variances Between Costing Runs
    5.KOC4
    Regards
    JH

  • Production Order Cost Analysis - Goods Receipt

    I have been assigned to create analysis of production orders.  I need to show the volume variance as well as the cost variance using both the initial planned costs as well as the actual costs when the production order is completed.  All this information is available in COR3 on cost analysis, but I need to allow for display of multiple orders based on plant and date information.
    I have found that the ingredients are in the table RESB with most of the information that I need, I have not had luck in finding what table has the goods receipt information (produced product).  SAP help says that the fields are in KKBCS_OUT, which is a structure that I can't find where populated from.
    I would appreciate any assistance in this endeavor.
    Thanks
    Steven M Engel

    Thanks for the suggestions, but they have not provided me with what I think I need to give a solution to my superiors.
    I will attempt to clarify what I need to do.  We are a manufacturing facility.  We have a BOM that says to make 10 E, I need 3 A, 2 B, 3 C, and 4 D.  Each of the components (A to D) have a set cost at the time the production order is created, this looks to be saved as part of the planned cost in RESB.  Produced product E also has a planned cost at time production order created (as seen by COR3) but that is not stored in RESB.
    At production time we actually use 2.5 A, 2.5 B, 3 C, and 5 D to make the 10 E.  COR3 cost analysis is showing me the cost variance.  This cost variance has two parts, part 1 is because the quantities of the inputs are different.  Part 2 is because between the time the production order was created, and the production order was finished, the costs of A to E may have changed.
    I need to breakout the different components to show management how much of the total cost variance is attributed to each part.  I need a report that management can run (or have run) that will allow them choose by plant, date, end product, etc.  so they can direct what changes need to be made to costing, pricing, and BOMs.
    I hope that I have laid out what I am trying to do in a coherent manner.  Also I am new to the SAP system with less than 1 year using the system.
    Thanks for your time.
    Steven M Engel

  • Cost analysis through Purchase Order created from Sales Order

    Hi Experts,
    This is the scenario: There is an Item No. which is not stocked in warehouse and is purchased only when customers ask for it. The cost of the sales order line having this item is calculated by the Purchase Order line on which the item is there. (The PO have items for other Sales Orders as well. And, Sales Orders have multiple item types) The Sales Order have the PO no. against it and Purchase Order has SO no. against the line. This is all done using MS Access and Sage Accounts. Lots of free typing and manual cost analysis involved.
    I have gathered from this forum that we can create Purchase Order from the Sales Order. The Document No. information can be pulled from one another using Formatted Search. Can we do the accounting and cost analysis as well?
    Please let me know if I have not made myself clear.
    Thank you in advance and kind regards.
    IC
    Edited by: iancameron03 on Sep 20, 2011 4:35 PM

    Hi Ian,
    I concur with Faraz, it is better if you use procurement document facility in doing back to back transaction from SO to PO.
    However, in your case, I'm afraid you can't analyze the gross profit and recording the accounting related activity as your request using standard SAP B1 function.
    As for gross profit case:
    Since you're actually using workaround in order to evade all hassles in maintaining all item master data related to this case, you create just one item code called S1 right?
    SO DocEntry - SO Line # - Item Code - Item Name - Quantity - Price
    1001 - 0 - S1 - Table - 2 - 100
    1001 - 1 - S1 - Chair - 8 - 25
    1001 - 2 - S1 - Cloth - 3 - 10
    PO # - PO Line # - PO BaseEntry (SO DocEntry)  - PO BaseLine (SO Line #) - Item Code - Item Name - Quantity - Price
    2001 - 0 - 1001 - 0 - S1 - 2 - 100
    2001 - 1 - 1001 - 1 - S1 - 8 - 25
    2001 - 2 - 1001 - 2 - S1 - 3 - 10
    Note that standard B1 gross profit calculation is that system will compare selling price for each item with item cost / certain price list of each respective item. However, in your case, you put all item as a single item master. Thus, system couldn't compare Table to Table, Chair to Chair, Cloth to Cloth since the item cost for these 3 items will be the same, the price list for these 3 items will also be the same since it is actually only one master data. Of course you could update the gross profit calculation manually for each SO, but to be honest it seems rather weird to do this manually.
    So, in order to simulate the gross profit calculation, you need to create a custom query and comparing PO line no with SO line no.
    As far as accounting related recording concern, I'm afraid you can't do it
    1. SO 1 : Item Table - Selling price 130 ; Item Chair - Selling price 30
    2. PO 1 (linked to SO 1) : Item Table - Purchase price 100 ; Item Chair - Purchase price 25
    3. SO 2 : Item Table - Selling price 150 ; Item Chair - Selling price 40
    4. PO 2 (linked to SO 2) : Item Table - Purchase price 110 ; Item Chair - Purchase price 30
    Correct me if I'm wrong, you want to record accounting wise that CoGS of Delivery based on SO 1 is 100 for Table and 25 for Chair, isn't it? No matter what costing method you use, you can't achieve this.
    If you use moving average, system will average both Table and Chair cost price, since it is actually one item master data. Even if you distinguish each item as a master data, system will average the cost price for Table and Cloth by the time GR for PO 1 and PO 2 occurred.
    Example (order by sequence of event):
    1. GR based on PO 1 - Table - Purchase price = 100, therefore Item cost = 100
    2. GR based on PO 2 - Table - Purchase price = 110, therefore Item cost = 105 (considering quantity only one for both PO)
    3. Delivery based on SO 1 - Table - CoGS incurred will be 105, not 100
    To certain extent, same thing could be said with FIFO costing method
    1. GR based on PO 1 - Table - Purchase price = 100 (qty 1)
    2. GR based on PO 2 - Table - Purchase price = 110 (qty 1)
    3. Delivery based on SO 1 - Table - CoGS incurred will be 100 (qty 1)
    4. Delivery based on SO 2 - Table - CoGS incurred will be 110 (qty 1)
    At first glance, it seems right since the CoGS for SO 1 is 100, tied up with purchase price for PO 1. And CoGS for SO 2 is 110, tied up with purchase price for PO 2. But we're using assumption here, we're assuming the sequence of Goods Receipt of PO and Delivery of SO occurred in the very same sequence as the issuance of SO and PO.
    1. GR based on PO 1 - Table - Purchase price = 100 (qty 1)
    2. GR based on PO 2 - Table - Purchase price = 110 (qty 1)
    3. Delivery based on SO 2 - Table - CoGS incurred will be 100 (qty 1)
    4. Delivery based on SO 1 - Table - CoGS incurred will be 110 (qty 1)
    If above scenario / sequence that happened, you will get the wrong figure of gross profit since the Delivery of SO 2 will take the item cost based on GR of PO 1. Since we're actually talking about real life business process, who can guarantee that above scenario wouldn't happen? It is possible that you send goods to customer who ordered late in real life, too much possibility that it is better for you to mitigate such result.
    My suggestion would be that you record the accounting transaction based on standard business process, no need to really capture the actual cost and actual gross profit for certain SO and PO. Too complicated, and the software itself doesn't cater this kind of requirement. Best thing you could do only create custom query for gross profit simulation calculation, but for very accurate accounting recording, IMO you should forget it. Hope this help.
    Best Regards,
    Hendry Wijaya

  • Runtime error in kob5, kob1 and line items display in Cost Analysis in ko03

    Hello everyone,
    I would like to ask for your expert advice on a situation we need to have a solution. Let me tell you what happened.
    In ko88, we tried to settle an internal order to a final asset using 'partial capitalization'. We encountered an error 'Settlement amount is greated than available amount'. I checked in kob5 and we have two line items: 90,000 and 30,000. Both have to be settled to three different final assets namely asset 1, asset 2 and asset 3. The settlement rule was as follows at first:
    Line 1: 90,000 to be settled to asset 1, asset 2 and asset 3 at 65,000; 40,000 and 15,000, respectively.
    Line 2: 30,000 to be settled to asset 1, asset 2 and asset 3 at 65,000; 40,000 and 15,000, respectively.
    Due to the error, we changed the settlement rule following these directions:
    1. Remove the settlement rules that we had so we can start anew.
    2. Choose the first line item and click on "Final Settlement".
    3. Enter the necessary settlement details (total should equal to 90,000 only).
    4. Go back and save.
    5. Choose the second line item and click on "Final Settlement".
    6. Enter the necessary settlement details (total should equal to 30,000).
    7. Go back and save.
    8. Then, check again the distribution rules set.
    Everything was saved and done correctly. So, we tried to do ko88 this time. But, the previous error 'Settlement amount is greated than available amount' still occured.
    I went back to kob5 and when I ran it, a runtime error occured. I went to see the actual line items in kob1, and I encountered the same runtime error. I went to see in ko03>cost analysis>the actual debit line items, and I encountered the same runtime error. Were my actual line items lost? How do I retrieve them?
    Thanks in advance.
    Best regards,
    Peter

    hi,
    check in SAP OSS with the message number you get is there any SAP Notes tobe applied.

  • Not able to see the Cost analysis in the Process order (T-Code COR2).

    Hi SAP Guru's
    Csoting in the Process order Configuration.
    I have done the Config setting related to the Product Costing Controlling with regard to the
    Cost Sheet, Cost Componet Structure.Overheads, asssigning the Cost elements in the Costing sheet.
    assigned the same in the Process order.
    And also the Costing variant options seen in OPL1 t-code can not be displayed in the Process order Csoting Variant selection.
    where as the in the Costing variant for the cost component structure, i can see  the Xompany code with required plant details.
    looking  the costing alanysis data in Process order, unable to see

    Hi,
    If you are looking at cost analysis.  You will get this only some you do confirmations to the production or process Order.
    I hope you did confirmation of material and quantities to the Process Order
    Best Regards
    Surya

  • To develop Z-Report related to Cost Analysis as in COR3

    Hi,
    I am trying to develop a Z-Report similar to Cost analysis as in COR3, I just want to know the tables where actually the Planned Qty,Planned Cost,Actual Qty,Actual Cost are getting stored.My requirement is to run it for Multiple Orders with some more fields to add on(for eg. Accounting Document).Please help.
    Regards,
    Sandeep

    For finding out the tables.
    use st05> activate the trace> then come back COR3 then execute the same . after showing the output--> go back st05 and deactivate the trace and then use list trace. There you can all tables used in COR3

  • How to get Cost element for a component in co03 cost analysis report

    Hi,
    I'm using table COSP to find the quantity for a production order component.  However, I need to identify the cost element first to get the unique data.  In CO03 cost analysis report, there is cost element for the component.  Does anyone know how to get it ?
    Thanks.

    CSKA stores the basic info about the cost element
    There is no data in CSKB.
    I'm trying to use different tables to get the cost element.
    AUFK, AFKO, AFPO, RESB, ...but no luck...

  • Hide Amount column in COR3 cost analysis report

    Hi Expert,
    We need to hide the amount column in COR3 when user go to costs -> analysis.  Because we don't want PP user to see the cost informant but the need to see the quantity for actual and plan to make sure goods issue is really complete.  Would you please advise how to achive this purpose?
    Thanks and Best Regards,

    hi gimmo,
    thanks for the quick reply.  however, i think this is only possible if i am using a structure in my rows, because there i can specifically assign the appropriate calculated key figure to use.  i need to use the hierarchy because we'd like to present the report down to the account number level.
    thanks

  • Pocess order - target quantity in cost analysis report

    hi experts ,
    i am not getting the target quantity in cost analysis report of header material , though i have made the GR of the process order .
    target quantity is showing zero.
    i am getting target quantity of components , sfg used.
    kindly give your inputs.
    reagrds,
    satish

    Dear
    First Check the Validity of the standard cost for the header material, It can be seen in ck13n, Dates tab.
    Target costs are populated when you do the goods receipt. System will search for the released standard cost estimate and then apply that for each material component. If these 2 conditions are passed, then you will get target cost in order.
    Plan cost = Plan qty * std cost estimate
    Target Cost = Actual qty * std cost estimate
    Actual cost = Actual qty * actual costs
    Eg:
    A production order is planned for producing 10 units of a material
    Then plan cost on the order = 10 units * std cost
    Target costs are calculated once production is confirmed.
    Suppose only 9 units were produced out of 10 planned
    Then target cost = 9 units * std. costs
    Regards
    Ganesh M

  • Cost analysis not showing up in production order

    Hi All
    Preliminary cost analysis is not showing up in the production order...can anyone suggest what could be the possible reason for this

    Hi,
    Once you issue goods(GI) to order then only you can see actaul cost in cost analysis in Production order.
    if you are looking for target cost in cost analysis,you have to post goods receipt(GR) from order to inventory.
    hope this helps you.
    Thanks,
    Rau

  • COST ANALYSIS in Process order

    Please help me,
    This is the doubt regarding Process order COST ANALYSIS,
    After creating Process order and going to cost analysis, it is showing cost of a material( for eg, coal) credit., But this material s not included in BOM , niether co product /by product scenario.
    So my doubt is from wher it is taking this material.
    Thanks and Regards
    NITIN

    Hi Vivek,
    Can you pl share the cause of the same.
    Ulhas

  • Why targetcosts are not displaying in cost analysis

    hi
        i have created productcost collector thru kkf6n for a material.
    for that material i have backflashed and confirmed thru MFBF.then
    i display the cost analysis of productcostcollector where system is
    showing only Actual costs not target costs.
       can any body tell me why it is not displaying the targetcosts
    Thanks,
    Neelima

    Hi prasad kumar,
    1. Make sure the target cost version 0 (TCode: OKV6) is maintained correctly.
    2. Update run the variance calculation (Tcode: KKS6/KKS5) for the PCC.
    Regards

Maybe you are looking for

  • Problem in compilation ( Forms 6i)

    hi The following code is not getting compiled in developer 2000 (forms6i) and backend(oracle8) EXEC SQL BEGIN DECLARE SECTION; char *pctx; EXEC SQL END DECLARE SECTION; EXEC TOOLS GET CONTEXT appl_1 INTO :pctx; so please help me Thanks shailesh

  • Trigger an RFC call to ECC from PI using BPM

    HEllo Experts, This is my first time in ccBPM and require your expertise in gaining some insights onto calling an RFC FM using ccBPM. I am typically implementing the scenario as it is mentioned in this blog: /people/mitesh.parekh/blog/2008/12/01/rece

  • Network time is 40-seconds off!

    This is a mind-boggler! I have two Macs side-by-side, a Power Mac G4 and a G4 iBook. Both are connected (wirelessly) to my Airport Extreme Base station which is about eight feet away. The iBook displays time that is about forty seonds ahead of my G4

  • Putting emoticons in Apple's eMail program

    Does any one know of any utility that I can use to put emoticons in an email being written by Apple's standard email program? Thanks G4   Mac OS X (10.4.9)  

  • DI Metadata Integrator install on non-CMS system

    Our Data Integrator systems do not run a CMS.  We have separate CMS application servers that do.  We are trying to install DI Metadata Integrator on the DI systems.  However the jobs listed in the CMS do not run.  Is install of Metadata Integrator on