Campaign possible to canceleld ..?once it is released along woth po's also

HI GURU'S&MENTORS,
Is it possible to stop a campaign from being cancelled if it has purchase orders attached to it, using standard functionality?  Reason Iu2019m asking is cos at MY PROJECT there have been instances where the campaign has been cancelled but there are still open POs against it.
My initial thinking is that  no its not possible because the WBS element still exists if the campaign is cancelled (the status is not changed) so in theory there could still be open POs against the cancelled campaign.
please advice me...
hemanth

Yes it is. That is why you got a set of reinstal disc with your Mac. For just this purpose.
But if you have a 2009 model it might of come with Leopard. But you should still be able to use that reinstall disc or the retain Snow Leopard DVD you used to upgrade to SL to restore your Mac from a Time Machine backup.
First you need to boot the system from either the original reinstall DVD or the retail SL DVD and use Disk Utility to Repartition the drive as One Partition. you MUST do that to get rid of the Mt Lion Recovery HD partition. Once that is done there should be an option to Restaore your Mac from a TM backup. Have the backup drive connected before you start the system from the Reinstall DVD, either of them whichever you chose.

Similar Messages

  • Once PO is released against a PR, how can the PR be deleted or modified by

    Once PO is released against a PR, how can the PR be deleted or modified by the Requisitioner. Any / deletion of a PR,
    Note: Our Req No one Can PR delete if it have converted in po,

    hI,
    Note 521174 - ME52N: Deletion of a PReq despite PO
    Check this note is applicable or not at your end
    Summary
    Reason and Prerequisites
    You create a purchase requisition and a purchase order is generated from it. Afterwards, you change the purchase requisition by setting the deletion indicator. The system generates a warning message that a purchase order already exists for this purchase requisition. However, the deletion of such a purchase requisition should be prevented. Therefore, the system should generate the error message 06152.
    Other terms
    ME52, 06152.
    Reason and Prerequisites
    The warning message does not suffice.
    Solution
    After you implemented the correction, you can set set the message via Customizing. If you customize the message as an error message, a deletion is no longer possible. However, the message is not output as an error message in order to block a further processing of the purchase order. This only appears as an information message.
    Regards
    Kailas Ugale

  • Please a simple problem but I don't know how to solve it. After installing 16 gb of ram all is good but when I turn on the computer it is a window signaling that all is correct. How is possible to delete once and for all that window? Thank you

    Please a simple problem but I don't know how to solve it. After installing 16 gb of ram all is good but when I turn on the computer it is a window signaling that all is correct. How is possible to delete once and for all that window? Thank you

    Well then maybe you could take a screenshot because the appearance of such a window is news to me.
    Also post your OS X version and what model Mac you have. The more detail, the better. Thanks.
    To take a screenshot hold ⌘ Shift 4 to create a selection crosshair. Click and hold while you drag the crosshair over the area you wish to capture and then release the mouse or trackpad. You will hear a "camera shutter" sound. This will deposit a screenshot on your Desktop.
    If you can't find it on your Desktop look in your Documents or Downloads folder.
    When you post your response, click the "camera" icon above the text field:
    This will display a dialog box which enables you to choose the screenshot file (remember it's on your Desktop) and click the Insert Image button.
    ⌘ Shift 4 and then pressing the space bar captures the frontmost window.
    ⌘ Shift 3 captures the entire screen.
    Drag the screenshot to the Trash after you post your reply.

  • TS1424 I purchased songs from an EP then bought the album once it was released and have been charged twice for the same song when I already own it. How do I get refunded?

    I purchased songs from an EP then bought the album once it was released and have been charged twice for the same song when I already own it. How do I get refunded?

    Contact iTunes Customer Service
    Apple  Support  iTunes Store  Contact Us

  • Is there any possibility in LABVIEW to Create a release mode EXE like VC++

    iam krishnaprasad. iam new to LABVIEW.
    i have 1+year experiance on VC++6.0.
    Is there any possibility in LABVIEW to Create a release mode EXE like VC++ .
    if there please suggest me how to create  it..
    Solved!
    Go to Solution.

    First, you must include you VI inside a LV project. This can be done automatically by selecting New Project from the Files menu in that (any) VI.
    LV will ask you whether to include any open VI to be added to this newly opened project. Click Add & thats it. Now save this project in a location of your preference.
    Then, in the Project Explorer window, right click Build Specifications >> New >> Application (EXE) or Installer, as per your requirement.
    The former will create you an EXE only while the latter will bundle all that needed for an installer (mainly LV run-time engine of the version under use).
    If you create the EXE alone, then you need to install the LV run-time engine of the corresponding version manually in the target PC first, before trying to run you application (EXE). Else, it will throw error & wont run properly.
    - Partha
    LabVIEW - Wires that catch bugs!

  • ERM5.3 - Is it possible to make Sub Process & Project/Release non-mandatory

    Hi All.
    I would like to know whether it is possible to make Sub Process & Project/Release in Create Role Definition section non-mandatory fields?
    If so where would I be able to change the config?
    Thank you.
    Mike Hannie

    Dear Mike Hannie,
    It is not possible. Project/Release ID and Subprocess are required fields.
    The Project or Release ID field allows you to track and filter roles by project or release based on your organizationu2018s requirements.
    When you create a role in Enterprise Role Management, the business process you assign to the role is one of the roleu2018s defining attributes and determines which subprocesses you can assign to that role. During the role creation process, the subprocesses available for you to select as role attributes are determined by the business process to which the subprocess is mapped.
    Condition group:
    A condition group is defined from a set of role attributes (such as a business process, subprocess, functional area, role type, or role name) and is based on role values and conditions. After you create a condition group, the system applies it to a role creation process to override the default role creation process when the criteria from the condition group are met. You can apply multiple condition groups in one role creation process, but you cannot associate multiple processes to one condition group.
    Regards,
    Naveen

  • Mail to Buyers SAP inbox once PR is released

    Hi All,
    How to configure the system so that a mail will be triggered to buyers SAP inbox once PR is released.
    Thanks in Advance
    Pavan H S

    Hi,
    Found this in SAP Note 365604 for release strategies in purchasing:
    "3. User exit
    During the individual release for purchase requisitions, the user exit
    is called in function module ME_REL_STRATEGIE_EBAN, in the overall
    release, it is called in function module ME_REL_GENERAL_STRATEGY_EBAN.
    (Enhancement M06B0002, EXIT_SAPLEBND_001, ZXM06U13)"
    You may be able to get a programmer to insert some code in this customer exit to initiate the mail message.
    Regards

  • Unable to edit WBS element once Project is released

    Hi,
    I am unable to edit the WBS element once Project has been released. Is this SAP standard behaviour? Is yes, is there a way we can make this editable and is it advisable?
    Please advice.
    Regards,
    Sophia Xavier

    Hi,
    The point is I am able to edit the WBS element before I have released the Project. But, once I have released the project the WBS element is blocked for changes.
    Infact the WBS element is editable until the higher level WBS element is released. But finally when I release the Project and system status changes to REL, the WBS element is blocked for changes i.e., it is not editable.I am just trying to understand if this is standard behaviour of SAP that WBS element becomes ineditable only overall Project is released. If the WBS element has to be changed after release, is there a way out?
    Regards,
    Sophia Xavier

  • Mail to buyer once PR is released

    Hi All,
    I want a mail to be triggered to buyers SAP inbox (purchase group) once PR is released. How to configure this.
    Please guide.
    Thanks in Advance
    Pavan

    Hi
    Refer this link
    Work flow for release strategy for PO & PR
    Regards,

  • Once iOS6 is released, will Siri be available for iPhone4 (or even iPhone3G) users?

    Once iOS6 is released, will Siri be available for iPhone4 (or even iPhone3G) users?

    You can look this up yourself.
    "Siri is available on iPhone 4S, iPhone 5, iPad (3rd generation), and iPod touch (5th generation)"
    http://www.apple.com/ios/whats-new/#siri

  • Is it possible to export full PCD object list along with their PCD ID?

    Hi
    Is it possible to export full PCD object list along with their PCD ID to an excel sheet or txt file?
    Any help will be appreciated.
    Regards
    Vineet

    Hi,
    I have provided a simple method below to Get all the PCD objects PCD  ID.
    1. Create a transport package.
    2. Add all the PCD objects for which ever you need the PCD ID.
    3. Now release the Transport package as the "File system" mode.
    4. Once it is done successfully, it will display all the transported object and its corresponding PCD ID in a table format.
    You can simply copy and paste it in a excel to get the PCD ID for the PCD objects.
    Hope this is helpful.
    Thanks,
    Mahendran B.

  • Please help...I was downloading my pics from the SD card. I then I highlighted 5 pics and selected erase, once I selected erase 20 other pics was also erase. I need to know how can those erase pics be recovered? Please Help!

    Please help...I was downloading my pics from the SD card. I then I highlighted 5 pics and selected erase, once I selected erase 20 other pics was also erase. I need to know how can those erase pics be recovered? Please Help!

    You will need data recovery software. See this post:
                                                                                       Re: I accidentally lost 3 weeks of photos, how do I recover them?                                            
    And please send feedback to Apple: This is a bug. Only the imported photos should have been deleted, not all photos on the card. You can use this form: Apple - iPhoto - Feedback

  • Automatic Creation of PO by workflow once PR is released.

    Hi All,
    Can anybody explain the details steps for creation of workflow template if PR is released then automatic creation of PO needs to be created with reference to PR.?
    Thanks,
    Ravi

    You can take a look at standard Workflow WS20000075(PO). Regarding your requirement most probably you need to do some configuration. In SRM this is possible once a Shopping Cart is completed it can be converted to a PO.
    Thanks
    Arghadip

  • Payment terms, delivery terms not to be editable, once PO is released

    Hi experts,
    Our requirement is that once Purchase Order is released thru tcode Me29n .
    The payment terms & delivery terms mentioned in the purchase order should not be edited.
    Please guide me.  Suggestions / Rewards will be highly appreciated.
    Regards,
    ( Rajneesh Gulati )

    Hi,
    To achieve this requirement the release indicator for the PO release strategy should be set as 1.
    The path to change the release indicator is:
    SPRO->Materials ManagementPurchasingPurchase Order-Release Procedure for Purchase order---Define Release Procedure for Purchase Orders--Release indicator
    hope it will help.
    Regards,
    Manish

  • ECC WM Wave picking- reversal once Group is released

    We have a wave picking process, wherein a number of shipments are grouped into a wave pick Group.Group is generated
    -The transfer orders are generated from VL37 (Wave pick monitor).
    -A consolidated pick list is printed by releasing the Group.
    -The pick list is then used for the physical pick in the warehouse and transfer orders are confirmed by RF.
    The scenario is, something goes wrong after the group is released and pick list is printed.Users want to reverse/cancel the transfer orders and amend delivery.Once done, deliveries need to be assigned to a new Group, so that a fresh pick list can be printed.
    The issue in the above scenario is, once the Group is released, we are not able to dis-associate the deliveries from the Group.The error message is 'Change cannot be made due to status of reference number 103 2000000009
    Message no. VL826'
    As deliveries cannot be removed from the released Group, the deliveries cannot be assigned to a new Group.
    Is there a way to get around this?
    Thanks,
    Bikram
    Is there any way we can get around this

    Hi,
    Pls check the following SAP Notes: 492287, 539470, 1069479 and 1017834.
    It may help in your situation.
    Thanks.

Maybe you are looking for

  • Trouble syncing new ipod touch

    I just got my new ipod touch. I started syncing it, but lost my internet connection in the middle of syncing (seems like a problem with the pc, just not sure why). The ipod seemed to stop syncing. It still said at the top of itunes that it was syncin

  • Computer Authentication /host/machine name using EAP on AP Problem

    Hi All, I have a wireless access point model 1242 with ACS server. Acs server is intigrated with windows domain. The user authentication is working ok but i would like to have a computer authentication setup. I am using PEAP with MS chapv2 on client

  • What are 'Wheel' and Everyone' accounts?

    Following an upgrade to leopard from panther, I used the "Reset Password" item on the "Utilities" menu of the Leopard install disk to reset all my ACLs to their default values. I did this to (successfully) resolve an issue with not being able to tras

  • Java.sql problem

    Hi, I have a problem with "import java.sql.*". When a try to compile i get the error: "package java.sql does not exist" I've tried everything, classpath, add JAR/Libraries, install CDC tools, looked into hundred forums and can't solve the problem. I'

  • User exit for mb02

    Hi friends,   For MB02 Trans i need a user exit. I found out that the following exit can be used. Mainly MBCF0002 as for MB01 Trans.But,when I placed a breakpoint in this exit.It is not triggering. I tried other exits also.But none of the exit is tri