Can a R3 system connect two XI  system?

Hi,gurus:
Can a R3 system connect two XI  system?In SM59 we have to point the rfc to a single xi.Is it right?

If my scenario is about idoc,we can define two RFC in SM59,
and two partners in WE21 and two ports in WE20,right?
Correct..
If my scenario is about abap proxy,then we can define two RFC in SM59,
and two parameters in sxmb_adm in the R3 side,right?Then in the tcode:SPROXY,
we can see both interfaces in two XI systems,right?
this is not posssible...

Similar Messages

  • Connecting two BW systems to the one R/3 source system

    Hi all!
    I have to connect two BW Systems to one R3 system. In our last tests we have had problems trying to connect two BW  servers simultaneously with R/3 source system because it allows only a logical system name for each R/3 client, and (We guess that we need to define tow diferent logical system name, one for each connection). This has been generating errors when we try to load data from R/3 to BW because, we guess, R/3 does not recognize the BW source system in the ALE connection for someone BW systems at transfer data. In this moment I have one connection active (BW1-R3). The BW2-R3 connection is already inactive. Does anybody know how perform this? we need solve the transfers problem as soon as possible.
    Thanks!  Judi

    Ah...
    please don't post twice the same question...in these forums we are always the same !!!
    You can close this thread to avoid to look in two different posts...
    Bye,
    Roberto

  • When we connect two bw systems to one R/3 system?

    Hi ,
    When we connect two bw systems to one R/3 system,
    could you please exlain what is the imact to SAP and BW in terms of query performance, batch performance,Develoment ,Quality system,security,BW Support.
    Thanks in advance.
    Regards,
    kranthi

    you can connect multiple BW to single R3 source system.
    In the delta queue (RSA7 in source system), you have a field with the target system, so you don´t have problem if you have many target bw system, because the data selection is done by system field.
    Challenge arises when you have multiple R3 feeding to single BW system and then you have to consolidate the master data say 0material fed from different source system R3 then you can consolidate data using consolidated infoobject.
    The following components concatenate to the key of a consolidated InfoObject:
    1)source system ID (two-character source system ID; permitted values are stored NW BI table RSSOURSYSTEM)
    2)one blank character
    3)backend object type (four-character backend object type; permitted values are stored BI table RSBWBEOTYP)
    4)master data key value as stored in the source system
    Note that the key of a consolidated InfoObject solely consists of non-integrated informations from the different source systems. Integration across source systems results from a (maybee repeatedly applied) data consolidation and cleasing process which unveils duplicate master data keys.
    Hope it Helps
    Chetan
    @CP..

  • Can One Business system have two technical systems assigned to it

    Can One Business system have two technical systems assigned to it

    hi,
    the technical system describes the physical view and the business system the logical view, respectively.
    So in most cases you must define both but while a technical system can only link to one WEB AS, more than one business systems can link to the same technical system.
    But one Business System can have only one technical system.
    Logical system for senders and receivers in XI can be defined as business systems which is associated with technical systems. You may req to create BS for identifying individual senders and recievers. Technical system is gateway having the technical details and it is in the ID we designate it to be either a sender or a receiver.
    Follow the link below to learn moer on it:
    http://help.sap.com/saphelp_nw04/helpdata/en/97/9d84494b9f45caabe0713296d89b72/content.htm
    Regards
    Mamta
    Edited by: Mamta Yadav on Sep 12, 2008 11:13 AM

  • I have One Sender system and two receivers system scenario. Pls help

    Hello,
    I have One Sender system and two receivers system scenario.
    My sender is RFC (sync) in nature.
    My one receiver is RFC (sync) in nature.
    My second receiver is RFC (sync) in nature.
    How to proceed with this.
    If my second receiver is async then how to proceed with this.
    Regards

    Hi Rick !
    Depending on your requierements, you can create a BPM that
    1) receives request from sender
    2) sends request to receiver 1 / receives response from receiver 1
    3) sends request to receiver 2 / receives response from receiver 2
    4) do some processing with both responses
    5) sends response to sender.
    If your second receiver is async, just use an async send step in step 3. As far as I know, you cannot use multimapping with sync scenarios.
    Regards,
    Matias.
    ps: please award points if helpful

  • One Sender system and two receivers system scenario. Pls help

    Hello,
    I have One Sender system and two receivers system scenario.
    My sender is RFC (sync) in nature.
    My one receiver is RFC (sync) in nature.
    My second receiver is RFC (sync) in nature.
    Pls tell me and send me links/docs for this scenario.
    Regards

    Hi Rick,
    For two receivers you require 2 interface determination, receivers determinations etc.
    Go through these threads for one sender and multiple receivers:
    one sender and two receiver
    /people/shabarish.vijayakumar/blog/2005/08/03/xpath-to-show-the-path-multiple-receivers
    Then configure your RFC communication channel in XI system + activate it and after that using all same parameters make an TCP/IP RFC destinatioon on R3 side.
    Rewrads if found helpful.
    BR,
    Alok

  • Connect two ECC systems with one SAP CRM 7.0

    Hi Gurus!
    I have to do a customizing for connect two ECC 6.0 and one SAP CRM 7.0, only I need the organizational structure from both systems and they need update when the structure from CRM has changes. The business partner goes to ECCs system by PI interfaces.
    Both organization models are different, so I have to maintain and update depending the changes in the business.
    But I don't know if this is possible, I don't know if we can do this by Middleware, ALE or PI.
    Can you please, give your oppinion about this topic?
    Best regards,
    Eugenia.-

    Hi Eugenia,
    Please see note 1084315 which descriibes the the multiple backend scenario.
    This should be relevant here.
    Best regards
    Christophe

  • Connecting two BW systems to 4.6 C OLTP SYSTEM

    hello experts,
    i got issue while creating source system in BW SYSTEM.
    My is i trying to conect single oltp source system(4.6C) to TWO BW clients
    one system is having connection already... now i am trying to connect other system.
    all the RFC Conections looks fine from the both the systems..
    here the problem is i am getting error saying source system cannot to created.
    as error occured in the oltp system... when i cheked in R3. THERE IS SHORT DUMP.
    .....can pls help on ythis process... what steps do i need to follow
    other issue.
    same rfc connection between CRM AND BI client.
    when i try to create crm source in bi...all rfc connetions are fine
    i am getting error is source does not exist.
    this is minor issue
    i want help on the FIRST ONE.. THAT IS REALLY IMPORTANT
    THANKS
    NAG

    Hi Roberto,
    Thaks for your quick answer! that is usefull for configuring the system after the connection! but, I need that the connection work properly first. itsn't the case. We connect the both systems to R3 and defined the background user's for connection, but at moment to transfer data the process is not initiated in R3 (back job) for the BW2-R3 link. But for BW1-R3 does. then, we had changed the BW1-R3 link by changed the logical system name in R3, for connect BW2-R3 and this is working correctly. It is the problem: parallel simultaneous load is not working... do you any idea about this? which task we need perform... or some suggestions?  thanks!

  • Connect two BW systems to one source system

    Hi Experts!
    I would like to know if I can set up two BW systems connect to one source system.  We copied and built new BW system (BW2) from existing BW system (BW1).  We need to have both system connect to one source system.  When I execut Restore from BW2 - RSA1 - Source System, I'm getting a following prompt:
    "Connection cannot be used. The connection BB is used in the DEV400 source system as a connection BW1400 to BW. Do you want to delete this connection in source system".
    If I select "Delete" then it replace exising connection between BW1 - DEV and creates new connection BW2 - DEV.  If I go back to BW1 and do restore then same thing happens as BW2 connection removed.
    Is there anyway we can set up two BW systems connection to one source system with restore?  Connection works fine since each one can connection with no issues.  Just when I do restore, it removes other connection.
    Thanks.

    Check if it helps:
    Loading two different SAP BW system from one SAP R/3

  • Connecting two BI systems to one R/3 system

    Hi Experts,
    We are upgrading our BW 3.x to 7. This activity we are doing on a sandbox server. Now for integration testing we want to connect this BI sandbox to R3 QA system. RFC destination parameters are maintained in both the systems.
    Now when we go for source system Restore option from DW workbench, it pops up with message -
    "Connection AA is used in the ARQ100 (R/3 QA) source system as a connection ABQ100 (BI QA).
    Do you want to delete this connection in the source system? Connection is restored after it has been deleted successfully."
    I checked in RSBASIDOC table in R3 QA system, there exists this entry to ABQ100.
    My question is - without touching the R/3 QA -> BI QA connection, can I create a connection between R/3 QA & BI sandbox? & How?
    or Can we create new connection similar to AA for this new BI sandbox system?
    I have already gone thru SAP Note - 775568, but it does not mention anything related to my scenario.
    So appreciate help from experts.
    Regards,
    Vikram.

    Hi WernerS,
    Thanks for the reply.
    Both the BI systems have diff Logical Sys names. And at this time I am not concerned about delta.
    But as I mentioned earlier, while trying to restore source system from new BI sandbox server, it is asking to delete the connection from R/3 QA to BI QA which I dont want.
    My question is How to establish this new connection without disturbing the existing R3 QA to BI QA connection.
    Regards,
    Vikram.

  • Connecting two R3 systems to BW

    <i><b>Current State:</b></i>
    We currently have two R3 test systems defined as source systems  to our BW test system.   All the infosources, infopackages and process chains are connected to only one of those R3 test systems.
    <i><b>Desired State</b></i>:
    What I want to do is "copy" all these definitions to the second test system creating a parallel set of Infopackages and Process chains that pull from the second test system.
    Is this possible to do via an SAP supplied program or do I have to do each one manually?

    Hi:
    Create a new Entry for the new R/3 System in BW QAS:
    RSA1
    Tools
    Mapping of Source System ID
    DELETE the OLD Mapping that you already have with Old R/3 System.
    Now,
    1) COLLECT all the InfoSOurces including Infopackages that you need and Transport them in QAS. If you chose this step, make sure yuo tell BASIS not to move them to PROD.
    2) Re-IMPORT some of your old Requests that have those InfoSource/Data SOurce. This may not work because you likely mixed up your transports. Then, I would go with Option-1.
    When you complete this step, you will have duplicated all you old R/3 Data SOurces to NEW R/3.
    P-CHains have to manaully COPIED. Here, after Copying, change the InfoPackages to new R/3 system.
    U.P. Chamarthy
    Message was edited by:
            U.P. Chamarthy

  • How to connect two BW systems to one ECC system?!?

    Hi Experts!
    We want to connect our ECC system (P11) to multiple SAP BW systems. Therefore we made a system copy of our productive BW System (P81) and create a new second BW System (T81). When I want to restore to connection to the P11 in the T81, Iu2019ll get the following error message:
    u201CDie Verbindung CA wird im Quellsystem P11_001 als Verbindung zum BW T81CLNT001 genutzt.
    Soll diese Verbindung im Quellsystem gelöscht werden? Nach erfolgreicher Löschung wird der Anschluss wiederholt.u201C
    In English this message means something like that: u201EThe connection CA is used as a connection to the BW T81CLNT001 in the source system. Should this connection be deleted in the source system? This connection can be repeated after successful deletion.u201D
    Now I ask myself: How can I connect our new BW System to our ECC System, without destroying the old connection to our productive BW system?!?
    Have anyone of you an idea how we can handle this issue?
    Thanks in advance!
    Regards, Alex

    Hi
    This happens because of RFC settings duplication as your new BW system is copied from Old one.
    First you restore the Production system connection by deleting the existing RFC.  But this will delete the new connection you have created ( that is what your dialog message is saying) 
    Basically , before creating new connection you need to delete some table entries manually , then you can connect both the system to your same source system
    Please find the link below where I mentioned the table names from where you need to delete duplicate entries manually.
    How to delete old source system assignment and assign new source system.
    Regards
    Anindya
    Edited by: Anindya Bose on Oct 13, 2011 9:01 PM

  • Connecting two BW systems

    Hi guys,
    I need at the moment to connect another BW system to ours. The Data should be extract everyday from our BW to the secound one.
    At the moment I have 2 points in my mind:
    - RFC User
    - Datasources
    Is there any other things that I have to keep in mind?
    Do you know maybe any "how to paper..." to this topic?
    Best Regards
    Erwin

    Hi Erwin,
    You can Access to one Particular Cube and provide access to only limited data by Authorization relevant fields.
    You can define all these settings in PFCG t-code.
    Create role and assign particular Users.
    You can use tabs like Menu/Authorizations/User to configure above settings.
    You can just get into PFCG t-code in your first BW system and see What kind of settings are there in the system?
    Regards,
    Suman

  • Connecting two SCL systems to one backend

    Hi,
    Is it possible to maintain 2 SCL system connections to one ECC system? We have already connected one SCL system to ECC as a backend and now we want to connect second one.  Is it possible to do that?
    If yes how to maintain Logical Ports call parameters for that?
    Thanks
    Domas

    Hi Domas,
    As pointed our by Holger, this is supported for inbound flows where your use case is to read (pull) some information from SAP into SharePoint. But use cases like reporting and workflow which publishes some items in SharePoint you cannot have the same ECC system.
    But if you intention is only for DEV landscape setup and want to save a VM image and still want to support reporting & WF scenarios, then you could also create a new client which is the copy of your existing clients in the same ECC system.
    Since logical port configurations are client specific you could practically connect same ECC system (but 2 diff clients) to 2 gateway systems.
    Thanks,
    Girimurugan

  • Problem restoring source system connection post BW system copy

    Hi.
    I am having problems restoring the R/3 connection in our BW system.
    This is the scenario.
    We need to move our BW production system onto a new system, but keep both BW connected to R/3 production for testing etc until cutover to our new BW system.
    Basis performed a system copy and restore of BW production to the new system and ran BDLS.
    When I try to restore the R/3 connection via RSA1 I am getting the following error at the end-
    "A connection already exists there ......." and the message refers to our current/live BW system. The options are to delete the existing or not delete. I have only chosen "do not delete" and therefore the connection is not restored. My concern is that if I choose "delete" this will damage my existing connection between R/3 and the currently live BW system which is we cannot afford to do.
    In our newly copied BW system we are using the existing R/3 SM59 (from system copy), and in R/3 we have created a new SM59 for our new BW system.
    It seems from the error message information that is complains that BW sent R/3 some sort of ID (value = "WS") and that is already taken by the existing BW system. I tried to find where and what this WS value is referring to and the only thing I have found is that in table RSBASISIDOC "WS" is the suffix for transfer structure for that R/3 system. ??? Not sure if this is related for what.
    Thanks for any help

    Hi ,
    Please check with basis or if you can ,then try to restore the source system in BI/BW.This should correct the  inconsistencies between the two systems which is being caused by different Idoc types
    Also check the table RSBASIDOC in the BI system and compare this to R/3 system ,the "basic type" field should be same.
    A restore should work,it has always worked for me.
    Regards
    Amit

Maybe you are looking for

  • Sharing a single iphoto library and backing up with time machine

    Alright, I want to share my iPhoto library between several users on my Mac. I have found an Apple article that explains how to set up a disk image to store the iPhoto library in. This article is at http://support.apple.com/kb/HT1198 However, implemen

  • GR Amount diffrent to Itemline amout

    HI All, i got question  reg PO, PO was raised for 50 hrs @1900 Dkk makes total of 95000DKK i can see this in conditions when they GR'd for 27.3 hrs @1900 hrs same line item the total amount comes to 16,648.78 DKK so  dont understand why this happens

  • ZCM 10.2.2 Bundle.ItemCreationError

    We are seeing many of the following errors on one particular XP sp3 PC with ZCM 10.2.2 agent. Bundle.ItemCreationError{269306fe78d65c9119ecad9cd 1f7a82e;The process cannot access the file 'C:\Program Files\Novell\ZENworks\cache\zmd\269306fe78d65c9119

  • Sorting within sorted columns?

    Is it possible to sort columns by say artist & say track names all at one time? If so how is this done? Thanks in advance

  • Unwanted starting of taskflows

    Hi, I have unbelievable problem with taskflows. I am using JD Studio Edition Version 11.1.1.5.0 on Weblogic 11.1.1.5 I have page with 4 popups (new, assign, assume, return). Each popup has dialog and region with taskflow. Popup and region are binded