Can Essbase Dynamic Time Series object be exposed to BI Server repository?

Hi everyone
I imported my Essbase cube metadata into the BI Server repository. I'm using Essbase 11.1.2.1 and OBIEE 11.1.1.5.
Everything is working fine, I'm just missing one piece. In Essbase I have a dimension tagged as time and the Dynamic Time Series has been enabled for YTD, QTD and MTD. After the metadata import, I can't see any of this in the repository's physical layer. So I am assuming that if the member doesn't physically exist in the outline, then it won't be created in the repository physical layer. Is that right? Is Dynamic Time Series integration not possible?
If so, is using TODATE in the repository the only option or are there any other possibilities?
Thanks

http://docs.oracle.com/cd/E26232_01/doc.11122/esb_dbag/frameset.htm?dcatimse.html

Similar Messages

  • Creating Dynamic Time Series in Hyperion Profitability and  Cost Management

    I am creating Dimensions in Dimension Library for Hyperion Profitability and Cost Management. Please let me know if we can set Dynamic Time Series for HPCM.
    I can see DTS Manager option for Period Dimension in Hyperion Planning but this option is not available for Period Dimension in HPCM Application.
    Is there any other way to drill down upto weeks level or day level data in Time Series.

    I am also facing the same issue. Does we have any option to create Dynamic time series in HPCM. Please let me know.

  • Dynamic Time Series in Essbase

    Hello All,
    I am new to Hyperion planning and Essbase development. I would like to implement Dynamic Time Series in Essbase. I could not find any materials where I can understand the concepts of DTS.
    So I know I have an Essbase application created in EAS console with Period and Year dimension. How can I implement the DTS for PTD, QTD and YTD?
    It would be really helpful If someone could help in understanding and implementing the DTS.
    Thanks in Advance
    rdineshkumar

    http://docs.oracle.com/cd/E26232_01/doc.11122/esb_dbag/frameset.htm?dcatimse.html

  • Dynamic Time Series in Essbase =/= Workspace

    Hi all, I have a question regarding DTS.
    I was trying to make changes to Dynamic Time Series to Period dimension in Workspace. I enabled DTS, assigned a generation #, and gave default an alias. After making the changes, I deployed as usual from Application Manager. 100% completed, no errors, all clear in the log.
    When I try to retrieve, the change did not take effect. I also checked in EAS, the change wasn't taken place.
    I suspected that DTS wasn't installed properly between Workspace and EAS. So to prove that, I went directly into EAS and made the change to DTS. Guess what? It worked!
    So in conclusion, does that mean DTS wasn't installed properly? Was my suspicion correct?

    I'm assuming that it is an EPMA application.
    I've seen DTS not working (was that you?) for an EPMA application earlier.
    Regards
    Celvin
    http://www.orahyplabs.com

  • How to use dynamic time series in formula

    I have Time dimension with active Dynamic Time Series for Y-T-D.
    I'd like to use it in member formula - e.g. IF (@ISMBR("Y-T-D(Aug)")) - but this doesn't work as I get error message Unknown variable or member name.
    Any idea how to work with dynamic time series members in formula?
    Still using Essbase 6.5 X-(.

    As Glenn mentioned, I also don't believe you can reference a DTS member in a formula, you would have to calc the YTD. Take a look at the @PTD function to calc Period to date numbers, I believe this function was available in v6.
    Having said that, we're assuming you want to calc a ptd number, but your example was based on an IF @ISMBR(). So the question becomes what are you trying to do? Given what I assume your time dim looks like, what would be the difference between @ISMBR("Y-T-D(Aug)") and @ISMBR("Aug")

  • How to use Dynamic Time Series YTD on a calc script / member formula?

    Hi,
    I activated Dynamic Time Series on Essbase and would like to use the YTD function of a measure for a certain month.
    I tried to use
    MeasureName->YTD(Dec)
    MeasureName->Y-T-D(Dec)
    But couldn't use it to syntax problems. How can I call this function instead of using @Accum or @SumRange?
    Thank you
    Edited by: Icebergue on 10/Ago/2011 11:07

    I could be wrong, but I don't think you can use DTS members in calc scripts or member formulas. As you probably know, they can be used in Financial Reports, SmartView and Excel Add-in.
    You can create an alternate hierarchy in your Time dimension though:
    Jan (YTD): Jan ->Jan is being a shared member
    Feb (YTD): Feb+Jan (YTD) ->Both Feb and Jan (YTD) are being a shared members
    Dec (YTD): Dec+Nov (YTD) ->Both Dec and Nov (YTD) are being a shared members
    Cheers,
    Mehmet

  • Using PeriodToDate MDX function in an ASO cube (Dynamic Time Series)

    Hyperion Essbase 7.1.2
    Since ASO doesn't support Dynamic Time Series (DTS), I am trying to use the "PeriodToDate" MDX function to get MTD and YTD totals. Below is my Time dimension:
    Time (Time - Stored)
    ...I---> 2007
    ......l---> Q1-2007
    .........l---> Jan-2007
    ............l---> 2007-01-01
    ............l---> 2007-01-02
    ............l---> 2007-01-03
    .........l---> Feb-2007
    .........l---> Mar-2007
    ......l---> Q2-2007
    ......l---> Q3-2007
    ......l---> Q4-2007
    Syntax:
    PeriodsToDate ( [layer [, member ]] )
    I tried many different ways to get the right syntax but it didn't work when I set the formula on member "2007" for YTD totals or on months to get MTD. Any help would be appreciated.
    Message was edited by:
    user597443

    ASO does not have Dynamic Time Series at all (unless something just recently changed)
    Period to date functionality has to be managed via MDX formulas and/or alternate roll ups in your time dimension.
    Time Balancing does have to be a stored hierarchy, which is what you generally want anyway. The issue you have with Time balancing is that some times if you have an alternate roll up in your time dimension, it can cause problems with Time balancing.
    If you want to use Time balancing, I would sugest a single stored time heriarchy and use an anakytic view dimension for the period to date functionality.
    You can see a post I have on my blog that talks about this: garycris.blogspot.com
    One other thing to mention. If you wan to use built in time balance functionality, you must tag a dimension as Account Type and it will have to be a dynamic dimension.

  • Dynamic Time Series

    Is it possible to drive your Dynamic Time Series from LEVEL 1 of the Time dimension? I ask because ALL our data is supplied at level 1 (Month) EXCEPT our Adjustments, which are at level 0. Any Dynamic Time Series retrieves (such as Y-T-D) are coming back with #Missing. Time is a dense dimension so there is no sharing blocks of non-Adjustment data. So, any ideas would be appreciated. We are using Essbase 6.5p1Thanks

    Not that I'm aware of.Is it possible to load your adjustments into a different database and just transfer the higher level values in this one (using partitioning maybe) so that you can use DTS?

  • Excel dynamic time series errors

    Has anyone bumped into the problem recently that the Dynamic Time Series is not being recognized on some pc's but works fine on another? I have seen this a couple of times and I can't figure out if it is the Excel version or a problem with the add-in. Any help would be greatly appreciated!

    What do you mean it won't retrieve on some machines?Does it give you an error or just come up with #missing or blank. Or does it calculate but the numbers are wrong.What version on Essbase and Excel are you using. What is the error message and number.Is the client add-in the same patch as the server. Just to check:Do they have the check mark turned on in the Essbase / Options / Display tab to indicate what the lastest time period is.Regards,Corey BidmeadClarity Systems

  • Set-up Dynamic time series

    Hi,
    I have just tried to activate dynamic time series members in the outline.
    In the outline I can now see "Active time series members: Y-T-D behind the dimension name "Periode".
    I was in the assumption that new Y-T-D members would be created. But this is not the case.
    I want to use the YTD functionality in financial reporting. But am unable to select DTS members.
    What is the proper way to set up DTS?

    Hi,
    Proper way of setting-up Dynamic time Series is: -
    1- Define one dimension as 'Time' in outline.
    2- Select any eight predefined Dynamic Time Series members like Q-T-D, Y-T-D and associated it with any generation. For example, if you want to calculate quarter-to-date values, you enable the Q-T-D member and associate it with the generation to which you want to apply the Dynamic Time Series member.
    3- Dynamic Time Series members are not displayed as members in the database outline. Instead, Essbase lists the currently active Dynamic Time Series members in a comment on the time dimension. For Ex. Y-T-D is showing after dimension 'Period' in yourcase.
    4- When you retrieve a Dynamic Time Series member, you need to tell Essbase the time period up to which you want to calculate the period-to-date value. This time period is known as the latest time period and must be a level 0 member on the time dimension. For. Ex - For example, Q-T-D(May) returns the quarter-to-date value by adding values for April and May.
    Hope it answers you.
    Atul K,

  • Enable Dynamic Time series

    hi,
    I am trying to look for dynamic time series option in planning web and i m not able to locate it. I am on planning 9.2. .
    Can anybody let me know where can i enable it on web and if i need to enable it via essbase as well once i refresh the outline??
    Thanks!

    To add on to John's comments beginning in 9.3.1 you have the ability to set this up in EPMA as well. A caveat is you should make sure to rename your Year dimension Years and your Period dimension Periods as these begin to be reserved words with DTS enabled.
    Regards,
    John
    http://www.metavero.com

  • Issue in activating Dynamic Time Series - EPM 11.1.2

    I am trying to activate Dynamic Time Series for one of Planning Application. To resolve the issue of reserved words, we have named "Year Dimension" as "YRS" in Dimension Library of EPMA.
    However, in essbase outline the dimension name is still appearing as "YEAR". Due to this, YTD is not getting activated. Is there any specific place where one can alter the alias for a Dimension.
    Has anyone noticed a similar anomaly ? Any input would be highly regarded.
    regards
    Navpreet
    [PS : We are using EPM 11.1.2]

    Nope that didn't work, but I figured out the error. I was running the command on a client machine. When I run the command on the server itself, it works fine.. well, now I have issues with my POVs, but at least it's finding my .csc file.
    Thanks for your help John.

  • How to set Dynamic Time Series in Planning application

    Dear All,
    I am having an issue by setting up dynamic time series (Y-T-D). I have set up at generation level 4. In our application the hierarchy of dimension Period is as follows.
    Yeartotal -> HY1 -> Q1 -> Jan, Feb, Mar
    Consider the following example
    Jan -> 100
    Feb -> 200
    Mar -> 300
    If I want to retrieve "Y-T-D Feb" the result should show me the sum of Jan & Feb in this case it should be 300. What is the syntax of retrieving YTD in smartview.
    In our application "Year" dimension name is "Year". How can I rename this dimension name if this is the requirement.
    Thanks in advance.
    Regards,
    Sami

    The format in Smart View would be Y-T-D(feb) more info at http://docs.oracle.com/cd/E17236_01/epm.1112/sv_user_11121102/ch17s02s02.html
    you will need to rename Year to something like Years, it depends if it is a classic or EPMA to how you rename it.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Issues using two-pass with dynamic time series?

    Is there any issues with using Dynamic time series [Q-T-D(May)] on a dynamic calc account which is defined as two-pass and has time balance property associated with it.
    The account is defined as "Dynamic Calc"+"Two-pass"+"TB First" and it works fine, but does not fetch result when used with DTS as Q-T-D(May). But, the same seems to work fine without the two-pass calc option on.
    Thanks in advance,
    cheers,
    revati

    Hi Revati,
    Yes u r right, I also tried with same scenario as you mentioned.
    Y-T-D values are not fetching with Twopass,but in that case Twopass is not required because of that member already having "Dynamic calc".
    so you can proceed with Dynamiccalc without twopass.
                   Actual                    
                   Sales     COGS     Margin     Margin %     Margin1 %
    New York     Cola     Jan     6000     5500     500     8.333333333     8.333333333
              Feb     5500     5000     500     9.090909091     9.090909091
              Mar     7000     6500     500     7.142857143     7.142857143
              Qtr1     18500     17000     1500     8.108108108     8.108108108
    With twopass          Q-T-D(Mar)     18500     17000     1500     8.108108108     #missing
    with out twopass          Q-T-D(Mar)     18500     17000     1500     8.108108108     7.142857143
    Praveenkumar.I
    TSPL
    mobile:09975686985

  • Problem in creating time series objects for a planning area

    Hi Friends,
    I am working on SCM 4.0 APO. I am trying to create the time  series objects for a  'Z'planning area which i have created. This Planning area is linked to a planning object structure which contains only three characteristics 9amatnr,9alocno & zplnpart. But the creation of time series objects is taking a long time. the screen just remains the same.
    Can anybody encountered such a problem any time?
    request you all to put some light as what could be wrong or causing the delay in creating them???
    All helpfull answers will be suitably rewarded.
    Thanks
    mvd

    Hi mv d,
    I have a couple of questions:
    1) how many Key Figures does your planning area have?
    2) what is the length of your time series horizon?
    3) how many characteristic combinations are currently in the Planning Object Structure? and how many newly character
    I am asking because these aspects might affect the running time of the time series creation. Have you also tried creating the time series in the background? How long did it take there?

Maybe you are looking for

  • Summarising Summary Fields

    Post Author: lazarus CA Forum: Formula Just want to say that i'm glad this forum exists. Many a late night has been spend trawling the net for solutions to CR issues which ultimately never get resolved. Hopefully this lovely forum can get me and the

  • How do you change default e-mail address in iPhoto 9.6?

    I've changed my e-mail address but iPhoto defaults to the old one when I try to e-mail photos directly from iPhoto

  • After upgrade to Maverick bootcamp doesn't work

    Hi I bought my computer on january 2011 it's a macbook pro and the version was 10.6.8 for all this time, yesterday I decided to upgrade to maverick because my computer was very slow and stoping all the time. So far is very good but I'm trying to put

  • How to create a Z* table which can maintain through SM30?

    How to create a Z* table which can maintain through SM30? Thanks!

  • JScrollBar on a JComponent

    Hi, in my JFrame I have a JComponent that does my graphic output (lines and stuff). To this JComponent i want to add 2 JScrollBars so that i can scroll the contents of the JC. I dont want to use a JScrollPane because i dont want to scroll over the JC