Yes you can do this go to OPK4 select your order type and plant go in details on first screen you will get field Dtae in future active this tick mark.
Regards,
R.Brahmankar

Similar Messages

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Production order confirmation thru IDoc , IDoc has been processed twice

    Hi Experts,
    Good day.
    I have a problem with my Production orders confirmation using IDoc automatic processing.
    I have an IDoc that has successfully confirmed a Production order, the Idoc has a status of 53.
    However, after a month, the Idoc has been used again on a different Production order confirmation, and the IDoc resulted again to status 53.
    Could you kindly confirm if this a SAP standard behavior or an error? If this is an error, is there any available SAP notes that I can use.
    Here is the spec of our system:
    ECC 5.00 - SP SAPKH50015
    Please kindly provide us your idea on this.
    Thank you very much.
    Kind regards,
    Rosalinda Ines Aben
    PP Support

    Hi Rosalinda, i have the same problem. You found some solution ?
    Thanks a lot !!!.
    Federico Cicerchia

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Extensionin parameter in the Production Order Confirmation BAPI

    Hi All,
    I am looking for a Production Order Confirmation BAPI which has the Extensionin parameter to append values for custom fields in table AFRU.
    But i could not find one with the Extensionin parameter.
    Please let me know if there is any option or any other Production Order Confirmation BAPI which can meet this requirement.
    Thanks in Advance.
    Jaffer Ali.S

    First off, thanks for these posts.  Worked for me, too.
    Let me just add a little more clarification:
    1) First you call BAPI_PRODORDCONF_GET_HDR_PROP
    2) Then you must update the field ENTRY_QNT from the internal table you pass in to "goodsmovements" because function BAPI_PRODORDCONF_GET_HDR_PROP wipes that field out and you will miss the posting without this filled
    3) Then you call BAPI_PRODORDCONF_CREATE_HDR with the same internal table you got back from the first function inclusive of you putting back ENTRY_QNT.
    4) Commit work and wait.
    So, in summary, the first fm is needed and the first fm changes some fields in the "goodsmovements" internal table that you really need to get the posting to work in the second fm.
    And one more thing, the exact function that an earlier posted referenced to find out that both of the functions in this note were called together is:  PP_CATT_CONFBAPI_HDR.
    Message was edited by:
            Kenneth Goldstein

  • Without Production order confirmation How to settle the cost of prd order

    Dear all,
    How to settle the cost production order with out production order confirmation.Any setting is there Or program.
    Regards,
    Naresh Redddy.

    Dear Naresh,
    To settle the cost of production order, you need not to confirm it. But on the same time if you want to settle the order when its not confirmed then WIP amount will be posted. WIP value will be posted if your order does not have DLV or TECO status. In your case, if you not confirmed the order, only material cost if any issued for order will be calculated, no activity cost will be calculate. And if you want to post the variance then order status needs to be either DLV (Completely Delivered) or TECO (Technically Completed). Here also the cost of activity will not be considered as you didn't confirmed the order.
    So if you want to settled the order without confirmation, then Activity cost will not be added in your settled cost. So your product costing will not be accurate.
    Please revert if you have any other doubts.
    Regards,
    Hiren Ramani

  • Batch Determination at the time of Production Order Confirmation

    Hi,
    I am working with Batch Determination at Item Level.
    I already have configured system to generate Batch Automatically at the Time of Production Order Release.
    But now i want to generate Batch Automatically at the Time of Production Order Confirmation
    Please help me with the necessary Configurations which would be required into achieving the same.
    Thanks in advance.
    Harris

    Hi,
    I have maintained the same for my Order Type in OPJ2 but still the same is not being picked at the time of Order Confirmation and it is being put to COGI mentioning the error as No batch specified in production order
    Also if i try to Manually Select the Batch through in Goods Movt. of CO15 it is giving a msg that No Strategy could be found.
    I have done following settings:
    1. Have maintained Condn Records in MBC1 for the component whose batch is to be determined.
    2. In material master in MRP2 Batch Determination: 2
    3. In OPL8: Batch determination search procedure
    4. In OPJ2: BD ticked for that relevant Order Type
    5. In OPKP: Automatic Batch creation kept as BLANK.
    Please support
    Thanks
    Harris

  • Serial Number. Production Order Confirmation. GR. UD. Sales Delivery

    Hi Gurus,
    Please help on this issue to get any user exits .....
    As part of Serial number management, we have a certain issues on serial number confirmation, goods receipt from production order and quality inspection with UD.
    Master data:
    Finished product material master, Workscheduling view, Serial number profile maintained " ASRN"
    Process flow:
    1) Avalon Specific Serial numbers generation for finished goods through production order release status.
                  (A11206000001)
                                        A  - Avalon
                                        1   - PCB Unit 1
                                        12 - Year 2012
                                        06 - Week
                                        000001 - Running serial number for the week.
    2) Production order confirmation through CO11n transaction.
    3) Production order Goods receipt through MIGO transaction against order.
    4) Quality Inspection with Usage Decision through QA32 transaction.
    5) Goods Issue for Delivery.
    SAP Product Error:
    1) System does not track and control the operation wise confirmed serial numbers during order confirmation.
    2) System does not track and control the finally confirmed serial numbers during order goods receipt.
    3) System does not track and control the last goods receipt qty in Usage Decision.
    4)  For semi finished product, if we maintain serial number profile in workscheduling view, system is not showing goods issue material list in Co11n transaction for the finished goods.
    5) Interfacing the serial number reading scanner with SAP,  is not working without entering material number and serial number manually.
    6) System does not tracking and controlling the last Usage Decision done serial number during Goods issue to Sale order Delivery.
    Regards,
    Santha

    Hi Santha,
    This is a bit vast, but I'll try to address at least some of the issues:
    1- serial number in operation confirmation is not possible, for the reason that serailization is part of stock management, and as WIP in an order, this is not stock yet. Actually you cannot confirm the manufactured material either, and those 2 go together.
    For tracking specificly WIP, there's something called WIP batches; you may look into it to see if you can use it.
    2- during GR system will propose those SNs that you have defined for the order at release or creation.
    3- ?
    4- GI in CO11N is provided only for BACKFLUSHED material components. Serialized materials CANNOT be backflushed.
    5- You can use a barcode reader to read the serial number (instead of keyboard entry) when cursor is on the right field in the respective screen.
    6- ?

  • URGENT: Prob with Production Order Confirmation

    Hi Gurus,
    I have a problem with Production Order Confirmation.
    When I am confirming a Prod Order and if the components present are more than '999', then error is being thrown and Material Document Number is not being created.
    I want to split the records into 500 slots and pass them at a time for the creation of the Production Order so that it doesnt throw me an error while creating a Material Document No.
    While saving the Production Order confirmation order, it should split the records into 500 slots each and then create Material Document No for each slot.
    Can anyone please help me out in this regard, how to solve this.
    Thanks & Regards,
    Harish Kalla

    Hi Harish,
    This problem is addressed in OSS Note : 36353
    The Symptom reads like this
    ==========================================================================
    When you post documents using the AC interface (from SD, MM or other applications), items appear in the FI document which are identical in all or in almost all fields.
    This can also cause error message F5 727 ("Maximum number of items in FI reached"). The system issues this error if more than 999 items occur in an FI document.
    ===========================================================================
    This Note is an elaborate one..
    Hence, go through this and ask your FI Consultant to help you in this regard.
    All the best..
    Regards,
    Siva

  • Restricting Good Receipt Unless Production Order Confirmed

    Hi
    Experts,
    I want to Restricting Good Receipt Unless Production Order Confirmed
    I am doing following thing but the error is occured.
    Use Tcode BS02 ( Customising USer status profile).
    2. Select the order type which you want to configure (eg:PP000001) and choose "Details" button.
    3. In the User status table do the following:
    a. In the status no field type"1" , status field "Sta1", short text"GR not allowed",  lowest no "1",  Highest No "2". Mark a tick in the initial stats check box.
    b.Next line, type status no field "2" ,status field "sta2", short text"Gr allowed", lowest no "2" , highest no "2".
    4. Select the STA1 line and choose details. select the "create"button.select the "GR for prod order", mark "forbidden
    radio button" and "set radio button".
    5. Select the STA2 line and choose details. Selct the "create"button. select "confirm order", mark "permitted radio button" and "set radio button". Next choose "GR for prod order" , mark "permitted radio button".
    6.Save.
    Create a prod order and check whether the required scenario is working.
    I have created user status profile as PP000001   GR
    ERROR
    First define allowed object types
    Message no. BS218
    Diagnosis
    The object types for which a status profile may be used define which business transactions are included in business transaction control.
    Procedure
    First define for which object types this status profile can be used.
    What is object type how to define?
    Thanks & Regards
    Pert

    Hi,
    Refer to the below thread which addresses the same need:
    Re: GR not allowed :BS02
    Revert if you face any issues.
    Regards,
    Vivek

  • Is possible to create a TO automatically after production order confirmation?

    Hi all
    I have just a question in order to know if we can configurate a procedure to a Production Order, so my question
    is possible to create a TO automatically after production order confirmation in a standard enviroment?
    Thanks in advance for all your comments

    Hi Gurus,
    Thank you for your help in this case.
    Process:
    The customer create a production order in CO01 and then they confirm the order in CO15, after confirmation TR is created ( we can see this in LB10 ) and negative stock is created (  we can see this in LS24 ).
    Requirement:
    They are asking to create the TO automatically after the production order confirmation. Negative stock is afecting the process.
    Workaround:
    They are creating the TO in background in LB10. ( negative is fixed )
    Question:
    Can we create the TO automatically after confirmation in standard configuration?
    if no ,  how can we confirm this TO .using a JOB option?
    TR created after confirmation
        TR header
    LS24 negative units.
    Regards!!
    Ronald

  • Price difference on cancellation of production order confirmation

    Hi,
    We are having a material which is maintained at price control "S". We have created a production order for the material. In due course of business, we did confirmation for say 100 pcs of the material. However, immediatly on confirmation, we realized that we do not need to do the confirmation & hence we did the cancellation of the production order confirmation using CO13.
    On doing the production order confirmation cancellation, we observed that the system has posted some amount to "price difference account"
    We also observed that once in a while this kind of entries do get posted.
    It is requested to please let us know in why system is behaving this way?
    We have checked SAP Note no 216080 "Price difference when reversing GI for S-Priced material" & SAP Note no 215980 'Price difference during GR for the production order". However we are not convinced that these could be the reason for the price difference.
    Thanking you in anticipation
    Regards
    Santosh Kumar Agarwal

    Hi,
    Yes, you are correct in the understanding that the system creates quants in 914 when the production order confirmation is cancelled. But, it does not generate any TR or TO in the background to post the stock back into the original storage type.
    Can we not use the put away strategies so that the system determines where to place the material? My query is that despite all the configurations for automatic TO creation and confirmation for movement type 262, it does not generate a TO (or TR) in the background when a production order confirmation is cancelled using CO13.
    However, if I manually post a material using MB1A for 261 movement type and reverse it using 262, it generates a TO and confirms it as per the setting in configuration.
    The same thing does not work when we run it through PP (CO11N and then CO13).
    Any suggestions on how to approach this and where to check for missing configurations?
    Thanks and Regards,
    Gaurishankar

  • Total Production Order Confirmation..Urgent

    Hi
    Can anyone tell me where to find the total production order confirmation by Second ( or minutes or hours ) for any month i.e. say for example March 2007  
    Please suggest......Its urgent
    Rgds

    Hi Vichy,
    Try this,  COOIS,
    List =confirmation
    Profile =std profile
    selection -> sys status =CNF
    Resrict ther report with Dates with Order header level.
    To get activity values use change layout option inside the report.
    Select the field  like unit/activity. from change lay out menu.
    Pradeep
    Edited by: Pradeep Kumar on Apr 18, 2008 9:19 AM

  • Different methods of production order confirmation

    Hi,
    Can someone explain with details what is the difference between using CO11/CO11N and CO15 for confirmation of a production order? Thanks.
    Regards

    Hi,
    In addition to the above posts, I would like to add some points:
    1. CO11N helps you to monitor the performance of all the operations in the production order. All the activities (setup, machining etc.) in operations can be booked with actual data. In CO15 only the details for conplete order can be entered.
    Confirming with CO11N, would provide data pertaining to all the operations separately, which will be helpful in monitoring and assessing the operations. With CO15 operation level study is not possible.
    2. With CO11N, you can have the details of the operator of a particular operation.
    3. CO15 is a faster process and do not involve more effort.
    Finally the decision to confirm the order at order level (CO15) or operational level (CO11N) will depend upon the kind of details required by the management to control and monitor the production activities.
    Hope that helps.
    Regards,
    Rohit.

  • Goods movement tab in production order confirmation

    Hi Gurus, please suggest me with the solution for my requirement.
    while performing production order confirmation, some user should be restricted to see goods movements and some can. how is can me done?
    Thanks in advance.

    Dear,
    Please refer my reply from this link,
    [CO15/CO11N  Goods Movement Screen Hide or Non-editable  |CO15/CO11N quantity column should be non editable in Goods Movement Screen]
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Cache not cleared when branching to a page with before-header branch?

    I tried to make up and example in apex.oracle com. http://apex.oracle.com/pls/apex/f?p=20469:112 Assign some value to items and experiment the with the buttons. The first button: Action: Redirect to Page in this application Page: 112 Clear Cache: APP

  • Posting not possible (Posting yr.earlier than capitalization yr.)

    Hi gurus while posting write up through ABZU ; I am getting an error message that posting year is earlier than Capitalization year Message No: AA328. When i checked the group asset first acqusition on date was in future. I donot know how it was happe

  • Deny logon to an admin user.

    I have the need to only allow a user elevated access to an administrators account (to unlock system preferences and install software). So the user can use their standard account and if required enter other credentials to so simple admin tasks, howeve

  • Disable download protection only. "Blocked: may contain virus or spyware"

    Is there a way to do this. Many legitimate downloads are blocked by this behaviour. Why isn't the download stopped the moment it is initiated? (spend hours downloading legitimate files and documents only to realize firefox deletes them without any us

  • Optimum Premiere Pro settings of Sony's AVCHD

    Is there a cheat sheet (or a routine) for Premiere Pro CS4 that can give me the very best capture settings for Sony's AVCHD files for a professional TV project? Thank you in advance, Terry Chambers (WGAw  ~ Film and Video  Editors Guild - retired)