Can scheduling date redetermined in Deliver according to manual adjustment?

Hi, All
Picking Date
Trans. Planning Date
Loading Date
Planned GI Date
Delivery Date
As listed above, there are scheduling dates in Delivery, if I change one date manually, how could I make the other dates update automatically?
By backward/forward scheduling in the system, the schedule is determined automatically for ATP and the date would be copied from scheduling line of SalesOrder to Delivery docuemnt.
The duration between each two dates are calculated base on the settings of ShippingPoint and Route.
So...any solution out there?
Regards,
Michael

Hi,
The "Pick/Pack time" & "Loading time" comes from the Shipping point.
The "Transit time " and "Transportation planning time" comes from the Route.
Considering the above times, system calculates the "Material availability date", "Transportation planning date", "Loading date" , "Goods issue date" and "Confirm delivery date" automatically.
To understand how the system calculates the above times automatically please refer this below link:
[SCHEDULE LINE DATES|transportation planning date;
Regards

Similar Messages

  • BAPI PROCESS ORDER Creation u2013 can the SCHEDULE Date/Time be specified?

    I am currently using BAPI_PROCORD_CREATE to create a Process Order from an inbound IDOC.  This works well, when I pass the following fields:
    BAPI Parameter ORDERDATA
    ORDER_NUMBER      Process Order number (EXTERNAL)
    MATERIAL      Material to be produced
    PLANT              Plant
    ORDER_TYPE      Order Type
    BASIC_START_DATE Start Date
    BASIC_START_TIME Start Time
    BASIC_END_DATE   Basic End Date
    BASIC_END_TIME   Basic End Time
    QUANTITY         Process Order Quantity
    QUANTITY_UOM     Quantity Unit of Measure
    However, I have a requirement to also specify the SCHEDULED Start Date (GSTRS) and End Dates (GLTRS), but the BAPI parameters do not the SCHEDULE Dates to be specified.
    I have also used the functions CLOI_CHANGES_UPL_31 and CLOI_CHANGES_UPL_45 to create Process Orders successfully, but neither of these allow for the SCHEDULE dates to be passed in.  
    Does anyone know how I might be able to achieve such a result?
    I am trying to avoid the use of CALL TRANSACTION on COR1, so would be grateful if anyone has any thoughts.   
    In the mean time, Iu2019ll ask the business if it would be possible to apply any rules by whereby if we specified a BASIC_START_DATE, whether it would be able to derive the correct schedule date accordingly.
    PPu2019s not one of my better modules, so apologies if whatu2019s been asked above is a stupid question!
    Alistair

    HI...
    Pls chk in scheduling control for detailed scheduling in T code OPUZ. and change the scheduling type forwards to forwards in time and backwards to backwards in time.
    Now when ever you would create the order system would ask the scheduling dates either start or finish in stead of Basic dates.
    Instead of using BAPI you could make a simple LSMW pogram. It would talk 5 min.
    This is a standard SAP functionality to select Basic dates because SAP consider all master data for scheduling like Schedule margin key.
    I think It would help you.
    Regards
    Vivek

  • PO - Schedule Date

    HI all
    I have one query regading Schedule date (Purchase order).
    While creating PO , CUSTOMER fills the schedule Date for ITEMS to be delivered.
    Now when Vendor Sends confirmation,He states DELIVERY date in confirmation.
    How many days difference is possible/allowed in SCHEDULE DATE and DELIVERY date.
    For example: if SCHEDULE date is 12th NOVEMBER 2006
    WHAT could be last possible DELIVERY DATE that a vendor can fill while confirming for that PO?
    Thanks in Advance.
    Vijay Raheja

    Hi Viajay,
    I don't think SAP have any real control over the delivery date specified by the vendor.
    It can not be enforced in a standard system.We can use user exits to control this behavior.
    SAP has given the user exit to determine Earliest Delivery Date (GR Check (PO Only) ) EXIT_SAPLEINR_004 at the time of GR.
    Hope this helps you to some extend.
    Thank you.
    Regards,
    Karun.M

  • Could I update the schedule date by the add-in software OpenPS?

    I create the R/3 PS WBS using the add-in software OpenPS from MS Project at the beginning. But according to  our company working business , I can't update the WBS schedule date by  updating the activity schedule date under the WBS, i can only update the WBS schedule. (so I have done some set-up and set the duration of every activity is zero).  I hope I can update the schedule date by the add-in software OpenPS from MS Project during the R/3 system is online running(NOT the beginning). 
    We know the adjustment of schedule in MS Project is very easy and convinent.  So if I adjust the schedule  in MS Project, and I update the schedule in R/3 PS by the add-in software, then everything will be good.
    But  maybe this operation will have a bad effect on the running R/3 system.
    Please give me some advice and practice experience.

    Hi Sanjay,
    You really MUST try things BEFORE saying that they are wrong.
    The CDHDR table DOES store the creation date AND time because the system treats the creation as a Change.
    If you simply enter ME51N as the transaction code in SE16N for table CDHDR you will see that it is YOU that is wrong.
    Please do try to verify your comments before challenging Seema in this way, who has provided a good and workable solution.
    Steve B

  • Shipping date redetermination

    Hi All,
    I have a query on the shipping date redetermination.
    If a sales order is created 10days back with the schedule line getting confirmed on the same day (for ex lets say  : 19/03/08).
    At that time the delivery document is not created.
    When I try to create a delivery document today the system gives me a error message saying
    " Since the outbound delivery is not to be rescheduled           
    (according to the agreement), the shipping dates are taken     
    from the order and not redetermined. Therefore, the pick date  
    that was originally planned and then copied into the outbound  
    delivery may be in the past.                                   
    However, make sure that the material staging data of the       
    items is redetermined in order to guarantee a correct          
    availability check for materials."
    After analysing the message it seems that the system cannot redetermine the date to todays date as the date in teh sales order in teh past and this is due to the setting made in the IMG.
    I would like to know where is the setting done.
    Any help will be of great help.
    Regards,
    Pandi

    Marc Chow wrote:
    It appears that my shipping date for a iPad 3g 32gb is scheduled for May 26th. The date of my order was May 12th with the shipping schedule of 7-10 business days. Do you think I will get it in California by June 4th with the Memorial Day Holiday etc...? Does apple use exclusively fed-ex?
    June 4 is the Friday after Memorial Day, and May 26 is this Wed. I doubt if they'll stop transporting packages over the holiday weekend, so I think there's a good chance you'll get it by June 4 (9 days after it ships).
    I believe all shipping is via FedEx and they may all ship from China, unless they've built up stock in a CONUS warehouse.
    Read this thread to get a feel for how delivery goes
    http://discussions.apple.com/thread.jspa?threadID=2434227&tstart=0
    Seems pretty fast.
    Phil
    Message was edited by: w7ox

  • Delivery schedule dates are coming in Past dates

    Hi Friends,
    In the Scheduling Agreements the delivery schedule dates are coming in the past dates even tough the scheduling agreements are having new schedules. There is also open quantities there for the scheduling agreements.
    please kindly explain me what is the delivery schedule date in Scheduling Agreement.
    Thanks in advance.
    Regards,
    Kannan M

    Hi Khan,
    Just check this thease might be the reasons to get correct the delivery schedule.
    To access a delivery schedule, mark a scheduling agreement item and choose Goto ® Item ® .
    The following data is displayed in the delivery schedule tabstrip:
    ·        Delivery schedule number and date
    ·        A wide range of standard cumulative quantities
    ·        Delivery information
    To display deliveries for the delivery schedule, choose Deliveries on the delivery schedule tabstrip.
    In scheduling agreements involving external agents, the system displays deliveries made to the customer by external agents as consignment issues.
    ·        Correction delivery information
    To display or create correction deliveries, choose Corr. delivery on the delivery schedule tabstrip.
    ·        An analysis function
    ·        Information at a glance
    To display a summary of delivery schedule data, choose Short disp. on the delivery schedule tabstrip.
    ·        Schedule lines
    Choose DlvSch.Hdr on the delivery schedule tabstrip to access the delivery schedule header. The following data is displayed here:
    ·        Information on quantities received by the customer
    ·        Information on the customer fiscal year and cumulative quantities reset due to a year change
    ·        A wide range of cumulative go-ahead quantities
    ·        Notes on the delivery schedule
    Correcting Cumulative Delivered Quantities
    Prerequisites
    You correct cumulative quantities in scheduling agreements:
    ·        In case of returns
    ·        When there has been a processing error
    ·        When there has been a year change
    ·        When you are transferring initial quantities from a legacy system into the SAP System
    To do this, you create a correction delivery within the delivery schedule itself. This delivery is not relevant for requirements planning, shipping, goods issue, or billing.
    Correct cumulative quantities only when the customer has not posted goods receipt.
    Procedure
    To create a correction delivery (document type LFKO):
           1.      Choose Corr. delivery on the delivery scheduletabstrip.
    The system displays a dialog box in which you enter a:
    -         Correction delivery date
    For help on deciding where you want to position the correction delivery, choose Display. The system lists delivery dates in chronological order.
    -         Correction quantity
    Enter a negative correction quantity by placing a minus sign after the quantity.
           2.      Choose Enter and save the scheduling agreement.
    Result
    When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.
    To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or  Environment ®  Display document flow.
    Example
    Your customer returns 200 pieces of material from a delivery made on 7/10 because of damage during transport. Several other deliveries have been made before you prepare the correction delivery, so you view a list and choose an appropriate date. In this case you decide on 7/14 because it occurs after the delivery on 7/10 and before the delivery on 7/15.
    Regards,
    Murthy V.N

  • Sales order item data & sales order schedule data

    Hello,
    I have a Sales Orders cube which is pulling data from two DSOs (one for sales order item data and the other for sales order schedule data). The common fields between these two DSOs is the Sales Order number but in my cube I have dual entries for each Sales Order document (item and schedule info).
    Example of how the data looks now:
    Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . . Act GI Date
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10
    1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1 . . . . . . . . 01/01/2000
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15
    2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 . . . . . . . . 01/02/2000
    How do I merge the data on the Sales Order number in the cube so it looks like below?
    Sales Order . . Item Cat. . . Article . . . Net Price . . . Delivery . . . Act GI Date
    1. . . . . . . . . ...TAN. . . . . ABC123. . . .10 . . . . . . . . . .1 . . . . . . . . 01/01/2000
    2. . . . . . . . . ...TAN. . . . . CBA321. . . .15 . . . . . . . . . .2 . . . . . . . . 01/02/2000
    Many thanks,
    Matt

    > Hello,
    >
    > I have a Sales Orders cube which is pulling data from
    > two DSOs (one for sales order item data and the other
    > for sales order schedule data). The common fields
    > between these two DSOs is the Sales Order number but
    > in my cube I have dual entries for each Sales Order
    > document (item and schedule info).
    >
    Two previous remarks:
    1) If you need to report on very detailed data consider doing an info-set joining both datastores. 2 reasons why:
    - not a good idea to report on very detailed information (sales order, GI dates) on cube level, if you have a scenario with lots of data. You end up with big dimension tables a poor report times;
    - there are better alternatives, like drill-through from cube query to DS query with report to report interface or Datastore-based reporting...so...
    With this solution you do not need to change the data model, I think, but test to be sure. See if the reporting times are acceptable. If not...
    2) First confirm your requirements, because what you show in your example as "to-be" have details that do not make sense, probably..
    - if you have more that one schedule line for each item then you would have many times the item information like material/price;
    - if not or if you could cope with that, then you can consider:
    2.1) create a new DS that agregattes from the previous on, with the same key of sales order item; do you have schedule line kf's? if so you these KF's should be additive in DS update; But if you may have more one scheduled line for 1 item then you have to decide what to do with the GI data (keep the last one posted, use code..) and other characteristics.
    2.2) update the shedule line datasource to the sales order item DS; same comments apply.
    2.3) maintain the missing data in the cube update rules from sheduled lines DS. Using code, refer to the respective item in the order item ODS. You would have to make sure that DS's data are correctly activated before updating the infocube.
    What solutions to choose?
    2.1 is better in terms of flexibility and architecture...because you could re-arrange the new DS to answer future needs, without loosing the 1st line DS's data;
    2.2 choose if data volumes and disk space are a concern...
    or
    2.3 it's OK, but i do not like it because of what explained in point 1...
    Message was edited by:
            Miguel Costa

  • Sales order schedule dates

    Hai,
         I have created a sales order, whenever we created a SO it displays possible delivery dates, we enter that possible delivery date in delivery creation, I want to know where those schedule dates are getting stored when we save a sales order. I have seen for those in VBAK and VBAP tables but i havent found those schedule lines can anybody say where these dates are getting saved
                                                                                    Thank you in advance
                                                        Srinivas

    When the order quantity is available as on the delivery date and confirmed then there will be only one schedule line created. If stock is not available then as delivery date the confirmed quantity will be 0 and another schedule line will be created as on material availability date where the order quantity will be confirmed.
    Its not necessary that there are only one or two schedule lines...but there can be more than two also.
    Regards,
    GSL.

  • Sales order schedule date is a (working) day before Scheduled ship date

    In MRP/MPS planning, the forecast consumption is occuring for all sales orders at a date (sales order schedule date) which is always a working day before the Scheduled Ship Date (SSD). What is the logic?
    Time fences are not used.
    E.g. Sales order is scheduled to ship (SSD) on 30th Nov, in forecast set > Forecast items > Consumptiion > Detail, the sales order schedule date is a day before SSD.

    Hi,
    This is a complex issue; best solution is by using APO/GATP.
    If not, then in ERP only, the second best is:
    1) Work with assembly processing in SO, meaning that a production/planned order is automatically created in the customer order during order creation.
    2) Then, after the order is created it is scheduled, and the delivery date proposal is based on that.
    3) Now you can check in the order that there are no capacity overloads, and all capacity required to produce on the proposed date is available. If yes, you're done. If not, it gets a bit complex, since you actualy need to switch to capacity planning, do capacity leveling and dispatch (PP), and the you get a new feasible schedule proposal based on that.
    APO/GATP could do all that automatically!
    Regards,
    Mario

  • Error while scheduling data in QA

    Hi Experts,
                I am having this problem while Scheduling data in QA. I tried activating Infosource in se38 with program rs_transtru_activate_all but still i am getting the below error, can anyone let me know why is this happening....
    Diagnosis
    DataSource ZFAB_BILLINGCALC does not have the same status as the source
    system in the Business Information Warehouse.
    The time stamp in the source system is 10/06/2006 09:33:40 .
    The time stamp in the BW system is 08/09/2006 15:52:25 .
    System response
    The load process has been terminated.
    Procedure
    Copy the DataSource again and then activate the transfer rules that
    belong to it. You have to activate the transfer rules in every case,
    even if they are still active after the DataSource has been copied.

    Kris,
    I also got the similar error (time stamp)
    Try this.
    Replicate data source
    Activate transfer structure in source system. For this
    you navigate from source system tab---> your data source --> context menu --> display data source in source and then come back. It will activate the transfer structure in source. ( I dont know exact procedure but this worked for me many times)
    I  think this is sufficient.
    If this not works include this step also Use the program for activating transfer structure in BW.
    Hope this helps.
    Vijay

  • Scheduling a Report to Deliver As an Email Attachment

    Hi,
    I want to schedule a Report to Deliver As an Email Attachment. But I am getting the below error.
    oracle.apps.xdo.service.delivery.DeliveryException: oracle.apps.xdo.delivery.DeliveryException: Exception reading response;
    nested exception is:
         java.net.SocketException: Connection reset
         at oracle.apps.xdo.service.delivery.impl.DeliveryServiceImpl.deliverToEmail(DeliveryServiceImpl.java:235)
         at oracle.apps.xdo.servlet.scheduler.XDOJob.deliver(XDOJob.java:1215)
         at oracle.apps.xdo.servlet.scheduler.XDOJob.execute(XDOJob.java:493)
         at org.quartz.core.JobRunShell.run(JobRunShell.java:195)
         at org.quartz.simpl.SimpleThreadPool$WorkerThread.run(SimpleThreadPool.java:520)
    In the below link its given to setup the email server (ArGoSoft Mail Server Freeware)
    http://www.oracle.com/technology/obe/obe_bi/bipub/advance/advance.htm
    But I did not do the steps mentioned in the above link. Since I have email server configured on my system.
    I am using the proper Host name and Port. Can you please suggest why I am getting this error.
    Thanks,
    Shiva

    Not really the best way to go.  You'll waste a lot of time and it may not work for your receiver.  Most email hosts have file size limits that make emailing video files a problem.  Better choice is upload you video to YouTube or some other file sharing site then email a link.

  • Scheduling Date issue in Assemble to Order Scenario

    Hi Friends,
    I am facing a Weird issue with Production order Scheduled dates created automatically after creation of Sales Order for configurable material.
    Our availability check is set to check  open Purchase orders, for one component the delivery date in the PO is 20.12.2011, currently at the time of creation of SO the availability check shows this component as a missing part and committed date as 20.12.2011.
    Now the issue is that for one type of customers when the SO is saved, the production order gets created with basic start and finish date of 20.12.2011 with a status CRTD PRC MACM SETC.
    But with another customer group it creates the Production order with today's date basic start and finish date, with a status CRTD MSPT PRC  SETC.
    Now since in both the cases the Material is same and also the components are exactly the same, the only difference is the customer, I am unable to make out why it is happening.
    I am basically a MM  Consultant so am unaware if there is any standard setting relating to customer or something relating to that which is causing such  a issue in scheduling date of the Production Order.
    Regards
    Chandra Shekhar

    Hi Vivek,
    Yes, the availability check is working in both the cases, when I create the sales order, I key in the Configurable material code, then do the configuration, after that system does availability check, in both the cases the result of availability check is same with one component marked as a missing part, available date as 20.12.2011.
    One more thing if I try to view the Production order at the time of SO creation before saving it, the Production order shows today's date, but when I save the SO, and do Credit release, the actual Production order gives different scheduling date based on customer. Just wondering what could be affecting based on Customer, is there any other field present in Customer master which could alter the date.
    I also saw today's scheduling note in some of the cases, but its not coming up in all of the orders created with today's date and moreover the same components are getting scheduled for 20.12.2011 also for diff customer.
    I am afraid I can't provide any screenshots for this as am not permitted to publish any screenshots of the client.
    Regards
    Chandra Shekhar

  • Link Between Gr posting Date & Schedule Date

    Dear All
    Kindly can know which tables will help in linking grn posting date with schedule delivery date.
    we are doing Po with multi schedule for each items,
    and so for every item we get more than one grns.
    I want to know the link how the system updates the Grn qty & open Qty .
    Let me give example
    Eg: For Po 4100000321 ,line item 10,
          schedules        qty
    01.01.2008             30
    10.05.2008             50
    01.06.2008             60
    Grn  date       grn Qty
    11.01.2008           28
    12.05.2008           52
    01.06.2008           60 now by the same i just want to know  difference between the schedule date and grn date. if can link these dates with reference to any other field kindly let me know

    Hi,
    You can find Schedule lines in EKET table and PO GR history in EKBE,
    but they can be joined only with PO & line item no. and not with schedule lien no. (becuase while doing GR in MIGO u don't refer to Schedule line  no. )
    Regards
    Dheeraj

  • Update scheduling data in material master

    Hi,
    How to update scheduling data from Process order to master recipe in mass. As I can schedule recipe in C202 and update the sceduled data in material master by CA96 & CA97 transactions. But i wants to schedule master recipe in mass. Is there any way to mass update it ?
    Regards
    Amit

    Hello
    I have tested in my internal test systems and system correctly updated the material master using CA97, without aky kind of previous scheduling of the master recipe.
    Can you please provide a more detailed description of the issue? What is happening if you try to run CA97 without running the scheduling of the mater recipe? How are you running CA97?
    You may also try CA97N, which is a newer version of CA97.
    BR
    Caetano

  • Basic and scheduling  dates & time calculation in process order creation

    Hi guru's,
    i have one requirement, i need to calculate and display the basic and scheduled dates & times based on the given input i.e material , plant , process order type , quantity , UOM and scheduling type ( for corresponding scheduling type user will provide either start date or finish date ) using RFC. can  u plz provide any function module for this purpose or logic for calculating the same  , as i am working on version 4.7ee .
    Awaiting for a quick response.
    Regards,
    Madan

    Dear Rohan,
    1.Check the length of break timings defined in the resource that is assigned in the phase.
    2.Check in OPUZ whether for the process order type and plant combination whether scheduling is to include the break time also
    (whether the check box for scheduling with breaks) is included.
    Check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • So slow 16 hours to compile 50 min Movie

    Hi, just bought an i5 Mac Mini and installed 8GB ram in it.  played with the IMOVIE and created a 50 min HD movie when clicked on finalized the project it estimated a 16H compilation time.  All other apps were closed and the system monitor showed som

  • BADI: TRIP_POST_FI

    Hi Experts, In the Travel trip PR05 after the trip is setteled, the trip no. need to run with the Posting run through Tcode: PRFI. Then we need to Run the Created Document using the Tcode: PRRW. My Requirement is that for some WAGE TYPE which are ass

  • Java Error installing OWB Repository

    Hi All, I'm attempting to install the repository owner using OMBPlus: OMBINSTALL OWB_REPOSITORY OWB_OWNER/$OWNER_PASSWORD DATA_TABLESPACE \'OWB_REPOSITORY' INDEX_TABLESPACE 'OWB_REPOSITORY' TEMPORARY_TABLESPACE 'TEMP' \ But I'm getting this error 10

  • Just a little help needed please!

    Hello all - My name is John, new poster here on the forums. I'm taking a Java class and I'm really really stuck - I took this 'TestScanner.java' right outta my text and it gives me an error when I compile it at cmd prompt; I checked and rechecked my

  • Transporting a REdeveloped with UNDO in changes in the object..

    Lets  suppose i have a  Report  which is  already  developed and if i need to do Changes in the code.. and lets suppose i did it .. and later  i have  TRANSPORTED the   changed object to QA ..to PROD...... and lets suppose if i realized  that the cha