Hi seniors
I want to relase my process order with missing parts. it is available in PP but not in PI in my system.
help plz
Hi
1. Kindly check the setting for thePlant / Order type combination in the OPJKDefine Checking Control
2. In this check for the fucntion 1 and also 2 Business function.
3. Check the indicator for the ""Release material"" in the material avaialability screen.
Reg
Dsk
Similar Messages
-
OSSNOTES for releasing process orders with missing parts in background
Hi All,
The bapi 'BAPI_PROCORD_RELEASE' is not releasing the process orders
with missing parts in background.
Is there any OSSNotes for releasing these process orders in backgound through this bapi.
Pls help.
Thanks .Hi Suri - Thanks for your response. I tried both with blank(individual and collective) and 2 (collective req. only) but I still get the same result. I found one other setting that can solve this issue and that is checking the activate full confirmation logic at the the MRP group level in OPPR. I will test more and let you know if that works but we dont use MRP groups here at our client and that is why I was little hesistant to set up collective availability check parameters at the MRP group level. But looks like this is the only option that we can use to get this resolved.
Thanks,
Bharath -
Stop user creating process order with material for specific order type
Hey Team,
Is there a way where I can stop creating process order with material for specific order type says Z*. We are using ZNMA order type to create trial batch and we do not want to create process order with material for this order type.
Any ideas?
Thanks
Bhavesh Patel.You can restrict the order creation in CO01 based on authorization, Remove the authorization for Z order type for the particular user, Check with your basis Guy
-
Is it possible to release Process Order with Material Shortage
Hi All,
We are using PP-PI & still wants to have behavior of the PP prod order
i.e. Release Process Order with Material shortage.
Is it Possible.
Regards,
JatinHi Jatin,
Go to Transaction OPJK. Select your Plant, order type and Business function as 2-Check availability during order release.
Under Material Availability tab, maintain '1- User decides on release if parts are missing' if user wants to decide for release of Process order or '2-Release permitted despite missing parts' if you want directly the Process order should be released despite of shortage in Release material field.
These settings are similar to PP.
Please check and revert.
Regards,
Hiren Ramani -
Goods receipt against process order with inbound idoc
Hi Experts,
We need to post good receipt against process order with movement type 101 and for By-product 531.
Can we use inbound idoc-WMMBID02,with message type WMMBXY to achieve this functionality?
Or please advise if we can achieve this from any other Idoc type.
We are getting below field values for external system
1. process order number
2.plant
3.material
4.quantity in unit of entry
5.unit of measure
6.storage location
7. movement type
8.Batch
Kindly advise how can we achieve this.
Best Regards
CS261 and 262 are two different movement types INDEPENDENT of each other. I definitely know for the fact that SAP allows you to create a 262 without a 261. if you were to restrict it... you can disable access through a tcode for that mov. type 262 and ask users to use MBST to cancel any material documents created via 261 movt type.. that would ensure a smooth process
-
Problem creating process order with ref of sale order
Dear all,
Kindly give solution for this scenerio..............................
I am creating Process Order with ref of sale order manually in cor1. In the COR1 screen copy from field i gave my ref sale order, so that particualr order and batch is assigned to that order only.
My problem was suppose if sale order is created for 10 tonns, but my batch size and resource capacity is 2 tonns only. so first time i change my batch quantity 2 tonns instead of 10 tonns and created my order and confirmed.
if i go to second time the same process i am doing creating process order with ref of same sale order but it comes again 10 tonns instead of 8 tonns. why it comes like this already i confirmed 2 tonns in this sale order?
my requirement is if any process order is created with ref of any sale order and again if i am creating any process order with ref of same sale order left quantity only system should show.
for this what i have to do kindly help to this
regards,
s.sakthivelDear KK,
Pls check whether ZKIN, ZKQT, ZKOR have all the properties similar to IN, QT, OR respectively. If they are different, please ensure that you know the reason why they are different. This check has to be done at tcode VOV8
Some fields like sales document category, Transaction group, screen seq group, Doc pricing procedure need to be similar to the parent document unless you know why you have changed them.
Once this check is done, check the copy controls in VTAA. Before that try creating these documents separately without reference. This shoudl work fine only after which you need to check copy control. If this is not working fine, then there is some problem with the document type settings in VOV8. Testing this is possible only if Reference mandatory field is left empty. Make sure that is properly configured.
Once this is done, check copy controls in VTAA. You can just copy the copycontrol between IN and QT and QT and OR and create for ZKIN to ZKQT and ZKQT to ZKOR.
Once this is done, check whether your item category settings are properly done , also the schedule line settings. The tcodes are VOV7, VOV6, VOV4, VOV5 etc.
Now check whether your material master and customer master are consistent with the item category settings(Item category group).
Now create the transaction. It shoudl work fine.
Reward if this helps. -
Process order with reference to sales order
Dear All,
Is there any provision to create a manual process order with reference to a sales order .
Regards,
venkatIf you would like to create a process order with assignment to sales order item, then you have to enter the sales order item on the initial screen of the Transaction COR1 via the Arrow besides the input field for reference process order. This is the standard way to assign sales order for process order in COR1.
For production orders, there is a separate Transaction CO08 for this purpose. But for process order, there is no such separate transaction available. -
WIP status (RESA) not updated for process order with co-product
Hi,
We are facing the scenario below, please confirm whether item 2 behaviour is standard SAP.
1. Process order with settlement rule MAT - after WIP calculated, status RESA is updated & FI document it posted.
2. Process order with settlement rule OIT (co-product) - after WIP calculated, status RESA not updated & FI document posted.
Thank you.Self found answer
-
Link process order with PM Module
Hy,
I know it looks crazy but, is it possible to link the process order with the Measuring counter and counter reading.
We are working with pharma compny and due to some of ragulatroy reasons it is required.
if possible then pls guide?
Regards,
DhavalHy Rambabu,
Thank u for the taking intrest.
Actually we are using Filters which we have maintain as a Measuring Counter in PM. Our intention is just to track the which filter is used during the production process and also how much product is passed through that speciifc filer.I know my second point is covered through the measuring counter reading but I want to link it with PP module.
Regads
Dhaval
Edited by: Dhaval Choksi on Jun 3, 2008 2:46 PM -
Availability check during production order creation - Missing parts details
Hai Gurus,
I have one problem during Availability check when converting Planned order to production order.
1) A- is the finished material, which has A1 to A7 components.
2) A2 is the procured item with safety stock and it has safety stock also.
3) When sale order is created , the material A2 is reserved against the planned order for finished material - A.
4) so when availability is checked during planned order stage , system says no missing parts, when planned order
is converted to production order system says missing parts for component A2, which is stock and reserved against
planned order
5) Checking rule for Production order is maintained as follows,
a) Include safety stock.
b) Include reservation.
c) Include sales requirement
d) Include deliveries.
e) Include dependent reservations.(x)
f) Include production orders.(X)
g) Check release for stock transport orders only.( A)
So now i don't know where I went wrong , so that the system could consider the safety stock of Component A2 which is in stock and already reserved against planned order and it does not show missing parts when planned order is checked.
Waiting for your positive feed back.
Regards,
Sekar chandDear,
What checking rule you have maintained for planned order.???
As what i can understand by your question that you have maintained to check reservation only in production order not in planned order. Or one important thing mostly people configure to reserve material only after release or creation of production order. Are you reserving material at planned order stage.?
Check these things. you will automatically find the answer. Hope it will help you. Revert back for more clarification.
Regards,
Alok Tiwari -
Process order with variant configuration material
Hi,
I create a process order for a material XX.
This material has a BOM with a material that has variant configuration "class type 300" for price configuration.
When I save the process order I get a message saying "There are still characteristics for components to evaluate". I dont want to evaluate this material in my process order.
What can I do to not have this message?
Regards.Hi all,
Yes, I work with variant configuration. But sales orders are not involved.
What I do is:
1) I create a purchase order for material X (this material belongs to a BOM), this material has variant configuration. I give a value to the characteristics in the PO.
2) I create a process for a material XXX that has a BOM (material X is in the BOM and cannot be removed).
3) When I save the process order the system asks me to evaluate again the characteristics. This is what I dont want it to do.
Any ideas?
Regards.
Eduardo -
Can we assign process order in MB21 RESEVATION for extra material
Sir,
in Production sometimes we required extra raw material but already we issues raw material against process order then that time where we assign extra raw material in process order or where we check costing of extra material qnty aginst process order.
can we asssign extra material against process order in MB21 with movement type 261Dear,
It is not possible to create the manual reservation against the order for 261 movement type. Because system generate the automatic reservation for an order whcih can not be modified. Better you go for component or operation scarp to plan the extra requirement. MB21 you create the reservation with 311 movement here you give reference of an order also maintain the long text for same. By this you can transfer the extra consumption from main storage location to production storage location. And issue material against the order with MB1A 261 against the oder as unplanned consumption.
Hope clear to you.
Regards,
R.Brahmankar -
Process Order with respect to WIP concept
Dear SAP Gurus,
I am implementing the product Costing with cost object as Process Order for cement industry. Hence can some one help me out the concept of With backfulush and without backfulsh and how to treat the WIP concept with and without backfulsh.
your inputs will help me lot for my project.
Thanks in advance for your great support.
Regards,
KKHi,
Please reffer the following Link:
http://help.sap.com/saphelp_470/helpdata/en/90/ba6609446711d189420000e829fbbd/content.htm
http://wiki.sdn.sap.com/wiki/display/ERPFI/UnderstandingResultsAnalysisforWIP
Thanks and Regards
Binoj M D -
Goods Issue on Process Order with BAPI_GOODSMVT_CREATE
Hi together,
I want to post a goods issue on an process order (some of them are networks) but I have some problem with filling the structures.
Could you please help me?
Book material
ls_bapi_head-pstng_date = ls_booking-budat.
ls_bapi_head-doc_date = sy-datum.
ls_bapi_head-pr_uname = sy-uname.
ls_bapi_item-material = ls_booking-idnrk.
ls_bapi_item-plant = p_werks.
ls_bapi_item-stge_loc = ls_booking-lgort.
ls_bapi_item-entry_qnt = ls_booking-dmeng.
ls_bapi_item-entry_uom = ls_booking-meins.
ls_bapi_item-orderid = ls_booking-aufnr.
ls_bapi_item-mvt_ind = gc_mvt_ind.
IF ls_bapi_item-entry_qnt > 0.
ls_bapi_item-move_type = '261'.
ELSE.
ls_bapi_item-move_type = '262'.
ENDIF.
APPEND ls_bapi_item TO lt_bapi_item.
CLEAR: lt_bapi_ret, ls_bapi_item.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
goodsmvt_header = ls_bapi_head
goodsmvt_code = '03'
testrun = p_test
IMPORTING
materialdocument = ls_mat_bel
TABLES
goodsmvt_item = lt_bapi_item
return = lt_bapi_ret.Here send a example:
DATA: RTR LIKE BAPIRET2.
DATA: G_HEADER LIKE BAPI2017_GM_HEAD_01,
G_CODE LIKE BAPI2017_GM_CODE,
TESTRUN LIKE BAPI2017_GM_GEN-TESTRUN,
G_HEADRET LIKE BAPI2017_GM_HEAD_RET,
MATDOCUMENT TYPE BAPI2017_GM_HEAD_RET-MAT_DOC,
MATYEAR TYPE BAPI2017_GM_HEAD_RET-DOC_YEAR,
G_ITEM TYPE STANDARD TABLE OF BAPI2017_GM_ITEM_CREATE WITH HEADER LINE,
RETURN TYPE STANDARD TABLE OF BAPIRET2 WITH HEADER LINE.
TOMO DATOS DE LA TABLA Z
SELECT * FROM ZCOTT_ACT_VOLUM
INTO CORRESPONDING FIELDS OF TABLE TI_VOLUMEN.
CLEAR: RETURN. REFRESH: RETURN.
CLEAR: WA_MJES.
WA_MJES-ICONID = '@DH@'.
WA_MJES-TYPE = 'S'.
WA_MJES-MSGTXT = 'Errores del Proceso Nro 2'.
APPEND WA_MJES TO TI_MJES.
LOOP AT TI_VOLUMEN INTO WA_VOL.
CLEAR: G_HEADER, G_CODE, TESTRUN, G_HEADRET, MATDOCUMENT,
MATYEAR, G_ITEM.
REFRESH: G_ITEM.
G_HEADER-PSTNG_DATE = WA_VOL-BUDAT. " Fecha de contabilización en el documento
G_HEADER-DOC_DATE = WA_VOL-BLDAT. " Fecha de documento en documento
G_HEADER-REF_DOC_NO = 'REF NRO:'. " Número de documento de referencia
G_HEADER-PR_UNAME = SY-UNAME. " Nombre de usuario
G_HEADER-HEADER_TXT = WA_VOL-BKTXT. " Texto de cabecera de documento
G_CODE = '04'. " Traspaso
Emisor
G_ITEM-MATERIAL = WA_VOL-DE_MATNR. " Nro de Material
G_ITEM-PLANT = WA_VOL-DE_WERKS. " Centro
G_ITEM-STGE_LOC = WA_VOL-DE_LGORT. " Almacen
G_ITEM-MOVE_TYPE = WA_VOL-BWART. " Clase de Mov.
G_ITEM-COSTCENTER = WA_VOL-KOSTL. " Centro de Costo.
G_ITEM-ENTRY_QNT = WA_VOL-MENGE. " Cantidad en unidad de medida de entrada
G_ITEM-ENTRY_UOM = WA_VOL-UNIT. " Unidad de medida de entrada
G_ITEM-ENTRY_UOM_ISO = WA_VOL-UNIT. " Código ISO p.unidad de medida
G_ITEM-BATCH = WA_VOL-DE_LGORT. " Lote
Receptor
G_ITEM-MOVE_MAT = WA_VOL-A_MATNR. " Nro de Material.
G_ITEM-MOVE_PLANT = WA_VOL-A_WERKS. " Centro
G_ITEM-MOVE_STLOC = WA_VOL-A_LGORT. " Almacen
G_ITEM-MOVE_BATCH = WA_VOL-A_LGORT. " Lote
APPEND G_ITEM.
CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
EXPORTING
GOODSMVT_HEADER = G_HEADER
GOODSMVT_CODE = G_CODE
TESTRUN = ' ' "TESTRUN
IMPORTING
GOODSMVT_HEADRET = G_HEADRET
MATERIALDOCUMENT = MATDOCUMENT
MATDOCUMENTYEAR = MATYEAR
TABLES
GOODSMVT_ITEM = G_ITEM
RETURN = RETURN.
CLEAR: RTR.
CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
EXPORTING
WAIT = 'X'
IMPORTING
RETURN = RTR.
LOOP AT RETURN.
CLEAR: WA_MJES.
WA_MJES-TYPE = RETURN-TYPE.
CASE WA_MJES-TYPE.
WHEN 'S'.
WA_MJES-ICONID = '@08@'.
WHEN 'W'.
WA_MJES-ICONID = '@09@'.
WHEN 'E'.
WA_MJES-ICONID = '@0A@'.
ENDCASE.
WA_MJES-MSGTXT = RETURN-MESSAGE.
APPEND WA_MJES TO TI_MJES.
ENDLOOP.
ENDLOOP. -
Reprint the processed order with BDC call transaction
Hi Mentors,
I have a problem with printing the order which is coming in a cockpit program.
for that i am using the bdc and call transaction 'ZVA31' which is exactly the standard program 'SD70AV1A'.
but after first processing i am not able to reprint the processed order.
Below is my bdc code and i am using processing mode 1 at the time of recording.
FORM ZSD70AV1A_PRINT_BA01 USING p_vbeln TYPE vbeln.
DATA: wa_ba01 TYPE nast-kschl VALUE 'BA01'.
perform bdc_dynpro using 'SD70AV1A' '1000'.
perform bdc_field using 'BDC_CURSOR'
'RG_KSCHL-LOW'.
perform bdc_field using 'BDC_OKCODE'
'=ONLI'.
perform bdc_field using 'RG_KSCHL-LOW'
wa_ba01."wa_ba01."'ba01'.
perform bdc_field using 'PM_NSORT'
'01'.
perform bdc_field using 'PM_VERMO'
'1'.
perform bdc_field using 'RG_VBELN-LOW'
p_vbeln."'513785'.
perform bdc_dynpro using 'SAPMSSY0' '0120'.
perform bdc_field using 'BDC_CURSOR'
'04/03'.
perform bdc_field using 'BDC_OKCODE'
'=&ALL'.
perform bdc_dynpro using 'SAPMSSY0' '0120'.
perform bdc_field using 'BDC_CURSOR'
'04/03'.
perform bdc_field using 'BDC_OKCODE'
'=PROC'.
CALL TRANSACTION 'ZVA31' USING BDCDATA
MODE 'A'
MESSAGES INTO MESSTAB.
CLEAR BDCDATA[].
ENDFORM. " ZSD70AV1A_PRINT_BA01
Br,
SuryaSolved myself.
DATA: wa_ba00 TYPE nast-kschl VALUE 'BA00'.
DATA: p_vermo TYPE kschl.
DATA: cur_vstat TYPE nast-vstat.
SELECT SINGLE vstat INTO cur_vstat FROM nast
WHERE objky = p_vbeln
AND kschl = 'BA00'.
IF sy-subrc = 0 AND cur_vstat = 0.
p_vermo = '1'."wa_vstat.
ELSE.
p_vermo = '2'.
ENDIF.
p_vermo is processing status.
Br,
Surya
Maybe you are looking for
-
Adobe Functional Content and the Creative Cloud
Hello All To any Adobe Employee who may read this, can you please get someone at Adobe to take control of this issue and see that the library, templates and all other functional content gets packaged correctly and enabled as a download and "sub-insta
-
Hi All, For few finished goods we have not entered stock in our opening balance since we didnt ahev any stock for them. now the customer has returned some FG item which we have taken as sales return item. while trying to issue these items in the Bill
-
How to photoshop migrate license? Guideline does´t work
I have sold my Photoshop Extended 3 CS. The Guideline on the Transfer of License Form does´t work since the steps shown on the form do not correspond to the website. How would I have to procede in order to mange the license transfer?
-
I just can't fix my iPhone4, it requests restore more than 8 times
-
How to Handle BatchUpdateException
Hi, I am using JSF, Spring and Hibernate with mysql as my db. I want to save pcode and pname,etc in the db. I used getHibernateTemplate.save(obj); I am facing an issue like when i add the same pcode and pname which is existing.... It is throwing Erro