Can't Release firm planned order from ASCP.

I can't release firm planned order from ASCP the following massage appear " FRM-40200 , Field is protected against update ".
appreciate your help on that.
regards.
Ahmad.

Please post the details of the application release, database version and OS.
I can't release firm planned order from ASCP the following massage appear " FRM-40200 , Field is protected against update ".
appreciate your help on that.Please mention the navigation path along with the form name and version.
Thanks,
Hussein

Similar Messages

  • Release of Planned Orders from ASCP to Internal requisition

    Hi All,
    Is there a way to stop creation of ISO from IR which is released from ASCP Workbench?
    As per my knowledge, when we release a Planned Order, it will create an IR and ISO automatically. There is no such functionality like in Purchasing side where we can use ASL to restrict the PO creation process.
    Thanks for your pointers.
    Regards,
    N

    Hi,
    Yes but in that case the responsibility being used to release the planned orders should not have access on any OU.
    Below is the other thread where i gave the solution for requisitions.
    Release from Planner's workbench auto-triggers WIP Mass Load, how do we restrict
    Please let me know if you are interested and we can do it at user levels also if can't implemented at resp level..
    Thanks,
    Abhishek Sharma
    Please mark the post correct or helpful, if answered

  • Release Firm Planned Order

    Day 1 you release a recommendation of a planned order with an internal source.
    Planner checks the firm checkbox.
    On Day 2 (next plan run) would you expect that purchase requistion for the internal order to be firm?
    User does not have profiles set to firm internal orders when passed to OE
    Thanks in advance

    Please post the details of the application release, database version and OS.
    I can't release firm planned order from ASCP the following massage appear " FRM-40200 , Field is protected against update ".
    appreciate your help on that.Please mention the navigation path along with the form name and version.
    Thanks,
    Hussein

  • What are the ways to Copy Firm Planned Order from one ASCP Plan to another?

    We run two EDD Plans with very similar options, but with different plan horizons.
    To have the suggestions synchronized, we need to copy the "Firm Planned Orders" from one plan to another.
    We tried inserting the records in MSC_ST_SUPPLIES with Order type 5 and firm planned type 1 with appropriate plan id, but Planning ODS Load is not considering those inserted records.
    We don't want to insert directly into MSC_SUPPLIES.
    Any inputs is appreciated.
    Thanks
    Sundar

    You can also call a custom DTSX package in SSIS via the datamanager.
    there are at least 5 ways of transfering data in BPC between apps.
    1. Through the front end (excel etc) via evdre/evsnds
    2. Through Script logic using *Dest App
    3. Using BPC's standard export dtsx package via DM
    4. Using SSIS using BPC's custom SSIS tasks
    5. Through Script logic using stored procs.
    i am sure people will come up with more.
    remember if you use ssis and move data into any table but the wb, you need to process the cube afterwards.

  • "CLOSED": HOW TO LOAD FIRM PLANNED ORDERS OF ANOTHER PLAN INTO ASCP PLAN?

    Hi everybody,
    How to load firm planned orders of plan 1 into plan 2?
    Business Case:
    Customer uses a separate planning for order intake. During order intake the requested due date is validated based on ASCP Gantt Chart. Bottlenecks are resolved. For make items firm discrete jobs are created, if adjusted suggested due dates are manually changed. For buy items firm planned orders are created for manually changed suggested due dates.
    If the order is accepted the demand is transferred from the Order Intake MDS into the so called Operational MDS. The firm discrete job will be automatically visible in the operational ASCP Plan (after data collection/running ASCP Plan).
    But how is it possible to include ONLY firm planned orders of another plan into your current plan?
    PLAN1 asigned master demand schedules
    - O_MDS1
    - O_MDS2
    PLAN2 assigned master demand schedules
    - O_MDS1
    - O_MDS2
    - T_MDS
    I want to transfer the firm planned orders from plan2 to plan1.
    Thanks for all your inputs,
    Catalina
    Message was edited by:
    user447176

    Since you need to run a data collection to load the new discrete job, I suggest you to add a custom step in the data collection.
    This custom step will
    1) select all firmed planned order in plan 2
    2) put the firm planned order into a new schedule through staging tables (MST_ST_SUPPLIES) .
    3) collect the data
    Then run plan1 with this schedule defined as demand schedule for your new plan.

  • Migration of Planned Orders from one SAP system to another one

    Hi,
    A quick help needed.
    We are migrating SAP data from one SAP system to other due to business split. Regarding PP data, can Planned orders be migrated as it is from one SAP System to another? What is the impact if we do so?
    Appreciate your response.
    Kind Regards,
    tanuji

    hi ,
    As suggested , you can propose to migrate only Firmed Planned orders from SAP  to SAP system .
    How to acheive it ?
    You can use below BAPI to extract details of planned order from Table PLAF and upload in TARGET SYSTEM
    BAPI_PLANNEDORDER_CREATE
    Please note  newly created Planned order in Target system would not have BOM EXPLOSION and Scheduling .
    If need , Make a BDC recording as a add on step to explode Bom and Schedule by clicking those icons in Planned order .
    Technical Team can do this .

  • How we can block creation of PM order from non released notification

    Hi ,
    how we can block creation of PM order from notification if notification is not released.
    Regards
    AM

    Hi Luke and Maheshwaran ,
    thanx for your reply.
    One more thing the option 2 has not been suggested by some users in the thread mentioned by Maheshwaran.
    Can I still use BS22 or option 1 is the best one.
    REgards
    AM

  • Restrict release of planned orders

    Hi,
    I am working in ASCP - and my user would like the ability to restrict the release of planned orders by either planner code or user ID. Is there a way I can do this via profile option, or form personalization, or anything else?
    Please provide insight on other ways to achieve this!
    Thanks
    Valeria

    Hi,
    Yes but in that case the responsibility being used to release the planned orders should not have access on any OU.
    Below is the other thread where i gave the solution for requisitions.
    Release from Planner's workbench auto-triggers WIP Mass Load, how do we restrict
    Please let me know if you are interested and we can do it at user levels also if can't implemented at resp level..
    Thanks,
    Abhishek Sharma
    Please mark the post correct or helpful, if answered

  • Deletion of firmed Planned orders

    Hi,
    I want to delete the firmed planned orders & Purchase Requisitions for Multiple plants,(Not using MRP Run) so can any one advise me if there is any SAP standard transaction or Program available.
    I have tried using MD19, but here we can pick firmed Planned orders only w.r.t Material or MRP contriller, we can not select Planned orders of whole plant (or) for Multiple plants.
    Please let me know if required any further information.
    regards,
    PR

    Hi,
    Not sure if CO41 can meet this need. If you select the lines & click on delete it is just removed from the list & not from the database. However if there is any new functionality added to CO41 for deletion would be glad to know.
    However for mass deletion of planned orders you can do this via a Z program using Bapi - BAPI_PLANNEDORDER_DELETE & for Purchase Requisitions use BAPI_REQUISITION_DELETE along with BAPI_TRANSACTION_COMMIT. Provide your specifications to your abaper & it should be possible.
    Regards,
    Vivek

  • Make to Order- Avoid creating Firmed Planned Orders

    Hi Gurus,
    I am using strategy 50 for one of my materials and when i create sales order agains that material a firmed planned order is created automatically. As this is firmed planned order in case i stock in material for that sales order and fullfill its requirement and run MD50 MRP against sales order. The planned order still exists as it is firmed where as i need it to be deleted after running MD50, because required quantity has been fullfilled using transfer posting from another stock. Please suggest how can i achieve it. Is there any configuration available to create unfirmed planned orders instead of firmed planned orders against sales orders? as unfirmed planned orders get deleted after executing MD50 in such a scenario.
    Best Regards,
    Shah

    Dear,
    What is your MRP type for these material? Use PD and check
    Check the planning time fence field for those materials. If the requirements are within the planning time fence, then it will create firmed planned orders.
    Go to OPP1Master Data- > Check MRP Types--- here, on "Control parameters" tab you can find the desired field called "Firming type". Make it bank then system will not create the Firmed planned order.
    Also refer this link,
    Re: firmed planned orders
    Regards,
    R.Brahmankar

  • After firming planned order, new planned order is generating in MRP run

    Hi Experts,
    I am using SAP AFS. Planning strategy is 21- MTO with Project settlement. MRP type is PD. Lte size is EX. Procurement type is X.
    We are using the production versions. Individual / collective reqmts is 1. Planning time fence is not maintained.
    In sap AFS T.Code for MRP run is /n/afs/md02. After receiving the Sales order, MD04 screen gets updated accordingly and I am running the MRP.Planned orders are generated accordingly. I am firming the planned order manually through MD04. The satr mark is also appearing.
    My problem starts now. If I am running  the MRP again for the same requirements another planned order of the same qty. is getting generated. That means after the second MRP run, I am having two planned orders (one firmed plnd order) and second is the new planned order. My requirement is that MRP should not generate any new Plnd. order / PR's if there is no new Sales order.
    The parameters for MRP run are "1" for "Create PR's", '1" for "Plng Mode" and '"1" for "scheduling ".
    I have tried in all the possible ways, but of no use. Still new plnd order is generated after firming the 1st plnd. order in MRP run.

    Thanks all for your feedback..
    @ Vishal
    1. Yes, Both Old firmed planned order and newly generated planned order have the same grid value
    2. For both the planned orders :
    Special Stock is E u2013 Orders on hand,
    Consumption is V,
    Sales order is the same (As we are using MTO , Strategy 21) and same WBS element.
    3. First planned order is not in the assigned tab of MD04. This means that has been allocated to some object. u2013 I didu2019nt got this point. Can u please elaborate?
    @ Nikhil
    1. Quantity of sales order is not reducing after firming the sales order
    2. Account assignment category for both the planned orders is u201CZu201D - Indiv.cust./project
    I have made some more observations and found the following differences between the two planned orders
    From  MD04 , keep the cursor on corresponding planned order
    & click on upward arrow ( available on bottom side of the report).
    It will show what will be the originating requirements i e. for which requirements this planned order generated.
    For Firmed planned order it is taking me to screen u201CPegged Requirements
    u201D*And the following data is present:
    Planned dates: 04.07.2010
    MRP element No. 3100001185 (Sales Order No.)
    MRP element item 100
    Scheduling No. is 1
    MRP element indicator - VC u2013 Order
    MRP element data- 3100001185/000100/0001
    Plng segment u2013 3100001185000100000
    P.O / Order Type u2013 ZX
    Rec/reqd Quantity 10
    MRP element u2013 Order
    For new planned order generated, I am going to Screen *u201CProcurement without Requirementsu201D
    *The following data is present
    Planned date 03.07.2010
    MRP element No. 0000123522 (Planned order No. of the newly generated after MRP Run)
    MRP element Ind. u2013 PA
    MRP element data 0000123522/SO
    MRP element item 1
    Scheduling No. 1
    MRP segment 20
    Plng segment u2013 3100001185000100000
    Rec/reqd Quantity 10
    P.O/Order type- KD
    MRP element u2013 Plnd Order

  • Unable to view planned order from exceptional summary window

    Hello All,
    I have ran ASCP plan and it details out the exceptions and recommendations, but I am unable to view planned order from exceptional summary window>recommendations>cilck discrete jobs, no planned orders visible. This issue also shows up for other exceptions, on click of exceptions details it shows up the items but unable to take any actions.
    I have tried by giving large no of days to view recommendations in preference.
    Can someone help me to reslove issue.
    Thanks,
    Edited by: user604737 on Jul 18, 2011 6:09 AM

    We don't have any query built on the exceptional window. As I am able to view below recommendations
    Recommendations
    Discrete Jobs 8
    Purchase Req 27
    When we click on discrete jobs/purchase req, its not showing any planned orders in supply window.
    Can you please let me know, which is the backend table which stores supply information which are displayed in exceptional window.
    Edited by: user604737 on Jul 18, 2011 9:15 AM

  • Locating Planned order from a  purchase requisition

    Hi Gurus ,
    A purchase requisition has been created manually , by converting a planned order . Is it possible to find out the planned order , from a purchase requisition   Pls advise.

    Hi
    Once planned order converted in to Production order or Purchase requisition, we can't see any details of the planned order.Planned orders are stored dynamically in tables.once it is  coverted,Details can not be seen even in PLAF-Plan order table.
    In production order, you can see the planned order number but for PR , it is difficult to get the reference Plan order number.
    Regards
    Ramakrishna

  • Change firmed planned order to Unfirm Planned order

    Hi ,
    if we change firmed planned order to unfirm planned order ,is there any effect on WIP and routing changes?
    please respond with an answer.
    Regards
    Rekha
    Edited by: REKHA MAHAJAN on Mar 31, 2008 1:34 PM

    Hi Rekha ,
    planned order Unfirmed -
      will allow automatic changes with respect to requirement
    planned order firmed  -
      Any manual change in the planned order is called firmed
                                                          and will not allow any automatic changes with respect to requirement
    Planned order is just the requirement only there will no change in the WIP .
    for example : you have some requirement say PIR is 50 on 31st march you perform MRP
    by selecting the MRP type so that you will get firmed planned order for 50
    on  1st you have another requirement ( PIR )  for 100  and if you perform MRP again system will create another planned order if this is also firmed . you need to convert manually into production order.
    once planned order is converted into production order and there is no link with either routing or
    workin process with planned order and is meant for only open production orders . You can convert all the planned orders collectively also
    if any doubt come back
    regards,
    Vimalbalaji.J

  • Automatic Firmed Planned Order / Mass Change Planned Order

    Hi PP Gurus,
    My requirement is I want to make all planned order created from planning run will be automatically firmed. I tried several option :
    1. MRP type : P1, automatic create firmed planned order within planning time fence but for new requirement, planned order will be created after planning time fence date. Example planning time fence date lies on 20/10/2011
    PIR
    09/2011     3 pc
    10/2011     4 pc
    end of planning time fence date
    11/2011     5 pc
    run MRP
    Planned order firmed for month 9 and 10. for 11 is not firmed. But the problem is if PIR on month 10 is change from 4 to 6. the other 2 planned order will be created at end of planning time fence date.
    Is it possible for planned order created at appropriate date as requirement date ???
    2. Mass Change of Planned Order
    I browse the help SAP there is function module : MD_SET_ACTION_PLAF for mass changes of planned orders.
    http://help.sap.com/saphelp_46c/helpdata/en/9e/e84226c1c311d3b54a0004ac160649/content.htm
    I execute it with SE37 but i don't know what should i do with this function module after the next screen.
    In my mind, there will be selection screen for choosing which planned order will be perform firmed action.
    Any other idea to solve my requirement is welcome.
    Regards,
    Arman Lie

    Dear Arman,
    Use T.Code MD19 for firming the planned orders,also check MDBA for firming the planned order.
    For your first question let me check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • How do you change the volume used for group folders in Lion Server?

    So I'm slowly acclimating to Lion Server, however, I'm not able to determine how to specify the parent folder for Groups.  By default it's the /Groups root directory on the boot volume however I'm trying to change it to an alternate drive on a separa

  • Approximate equality

    Sorry to clog the boards with my question but I've exhausted all other avenues of research. I have a program that recursively generates the powers of a number. Base x to the nth power. The numbers that this program generates are sometimes large and w

  • Controlling transition timing in multiple multistate objects

    How can you control the timing of multiple multistate transitions in DPS? If you have two slideshows with a single button telling each to go to a particular state, the transitions go in sequence rather than simultaneously. Can you adjust the timing s

  • Problem connecting (read only) to Sybase Server using Crystal XI

    Hi, I'm having a very similar problem to Renuha in the thread 'Problem connecting to Sybase Server using Crystal XI-Version-11.0.0.1994' The thread is marked as assumed answered but I suspect not! I am experiencing this issue in Crystal XI R1 11.0.0.

  • Unable to open pdf files even though have installed the latest version of adobe reader

    New computer. Old computer had windows 7, new one has windows 8. On the old computer I can open the files, and I can download fillable forms and save them. On the new computer I can not open some files, and the fillable forms will only save empty, no