Can UoM be at plant level?

Hi Experts,
  I know that UoM is specific to Material Level, but can it be specific to Plant level or any other? Since in one of our business scenario we need to distiniguish between dry and wet for the same material at plant level? Can we achieve this ?
Thanks,
Andy

Not possible with std SAP . may be you have to try with development .If you expalin your exact requireement we may think out some other work around.
/people/raja.ramasamy/blog/2010/02/22/batch-specific-units-of-measure-step-by-step-configuration-for-steel-industry

Similar Messages

  • How to assign sampling procedure at plant level.

    Hi Team,
    Pls suggest me "How to assign sampling procedure at plant level."
    Error message is  -  You can not use sampling procedure here.
    Not all sampling procedures can be used in this context.
    Example:
    Only the sampling procedures for an attributive inspection based on the
    number of nonconforming units are allowed.
    However I have assigned 0.05% sampling procedure in IDES system plant, which is accepted. However I am not allowed to assign this in client system..
    Pls suggest me solution.
    Thanks

    Hi,
       During creation of inspection plan you can assign SP at plant level, IP always at plant level
    Q.Error message is - You can not use sampling procedure here.
    ---> pl check the MIC where Sampling procedure in clicked or not
           pl revert
    Cheers,

  • Material master fields on plant level

    Hi all,
    is it possible that i can restrict fields on plant level, like one material type one field i want mand. in one plant and optional in other plant.
    regards,
    qsm sap

    hi,
    Yes, it posible:
    go to SPRO
    Logistics - General-> Material Master->Field Selection->Define Plant-Specific Field Selection and Plant-Specific Screen Selection (OMSA)
    see the settings for the plant in field reference - you need a diferent reference to the diferent plants (group together similar plants - all the ones that you want the field to be mandetory should have the same field reference)
    now go to OMS9 or OMSR
    and set the field as mandetory for the field reference you have made in OMSA
    good luck
    shachar

  • Blocking material for sale at plant level

    Hi,
    Can you please help me whether we can block the material for sale at plant level.
    We can block the material in sales organization view --> DChain-spec. status as BLOCKED FOR SALE , but it wil block sales of the material for all the plants in the sales organization.
    Please help whether we can go ahead at plant level.

    the posting block for goods issues can already be reached with a material status, so no phyiscal inventory document necessary.
    What you could try is to control the usage by a userexit.
    E.g.  you define a sales status AND a material status, just as table entry without any customizing in detail.
    and in the userexit you check for the combination of sales status and material status, and if your material has this combination then send a error message to the user.

  • Vendor master plant level PI partner func. can't be defaulted on contract

    Hi Experts,
    I set up partner functions at plant level on a vendor master.  How do I make the PI function populated for the contract's invoice party field.  Contract is at plant level.
    Thanks a lot

    Hello Jürgen!
    Thanks!
    Do you know of any user exit which will help on this.
    Best Regards

  • How Can We Change Batch Management Level From Client level to Plant Level?

    Hi all,
    I want to know whether it is possible to change the batch management level from client to plant level.Pls Help..

    Hi,
    Refer SAP Note 891902 - FAQ: Batch level

  • Payment Terms fetch Issue(Plant Level) @ SRM 7.0

    Hello Experts,
    We are currently implementing SRM 7.0 system(Classical Scenario) across regions.In one such scenario we found out that when we create a PO directly in SRM the Payment Terms is fetched correctly from the Vendor Master at Plant Level(Bypassing the Purch Org Level data, since Standard SAP looks for plant specific data & the same has been implemented in SRM by enahancing the BADI BBP_DOC_CHANGE_BADI (Implementation ZBBP_DOC_CHANGE_PO ,Method :- BBP_PO_CHANGE using a Custom FM with SQL Query on LFM2)
    However when a PO is ordered via the Shopping Cart method,the payment term is fetched at Purch org level,even though we have an Alternative Data(at Plant level) in R/3.
    The Header & Item Level Data are the same.for both the PO's. Can someone please give some pointers on fixing this issue.As we know from SAP,fetching Plant related Payment Term into SRM is not a SAP Standard Feature & thus a custom logic was implemented.Payment Term Table(BBP_PAYTERM) is updated with the latest data with all Payment Term translations maintained in R/3.
    Awaiting your suggestions.
    Thanks,
    Arnab Sinha
    Shanghai,China

    Dear Poster,
    As no response has been provided to the thread in some time I must assume the issue is resolved, if the question is still valid please create a new thread rephrasing the query and providing as much data as possible to promote response from the community.
    Best Regards,
    SDN SRM Moderation Team

  • MCHB,MARD - Stock available at plant level and storage location level

    Hi ,
    How to determine how much stock available at Storage location level and Plant level. (Lot is not maintained).
    In MCHB-Stock at lot level is shown.
    In MARD-Stock at Storage Location level is shown lncluding
    the stock maintaned at the lot level.
    If i want to know the stock which is not maintained in Lot, i.e, Stocks directly maintained at Storage location / Plant.
    Do I need to subtract the MCHB Value from MARD Value ?
    Is there any other way available to find the stocks which is not maintained at lot level.
    Regards
    Prasath

    Hi prashant,
    What do u mean by stock maintained at SL level without batch level.  Do u mean that some materials are subjected to batch management and some or not?
    If that is the case, for all batch managed materials, u can see the stock at batch level and also same is summed up at SL level.  But still what ever u are getting from MARD table isstock at SL level only.
    If u have activated batch management for any material, it will always be shown at lot level also.
    hope this clarfifies query
    award points if found useful

  • STOCK QUNTITY on posting date at a plant level

    I need the stock quntity , issue quntity , reciept quntity and averege quantity at <b>plant level</b> for a period of<b> week</b>, and <b>month</b>
    Is there any function that can do it or any table that has those detailes or any program?

    Hi,
    Check S031 table. It is a LIS info structure which store all goods movements in your system. But the key would based be on the variant your system configured to. I mean it will be either by Fiscal period/ Week/ Calendar Month for plant material.
    Hope this will give you some clue.
    Regards,
    Nagaraju Chidurupalli.

  • Order split- at plant level

    My client have 3 plants at different location. My client requirement is Every month he will receive order from his customers in one predefined format. That order should be copied into sales order ( VA 01) automatically. After receiving sales order, at the time of delivery , that delivery should be processed at plant level as per availability of products delivery . They are producing different products at different plant. Please explain me how it is possible into SAP. Thank in advance

    Regarding SOs:
    You can try out by scheduling batch jobs periodically.
    Regarding Av. Chk :
    1)Av chk happens at plant level only.
    2) Av chk, according to ATP logic, will consider ONLY one/Single plant.
    3) If you want Av chk across multiple plants, you must consider "Rule based Av. chk". For this APO must be connected to your system, where the Av chk takes place & the results are transferred to your system.
    Hope , you are clear now.
    Rgds
    Sumanth.G

  • Activating auto PO Check Box in the purchasing view for plant level.

    Hi Techies,
    Right now i have an issue related to auto PO check box in the purchasing view for the plant level. There are three plants A,B,C.. For the plants A and B the automatic PO check box is visible and the user is able to provide input values. But when it comes to plant C the auto PO field is not available and hence the user is unable to provide input for auto PO.
    Is there any configuration to be done to activate the auto PO check box in the purchasing view in the material master with respect to plant C?
    If so could you please guide me with the settings?
    Thanking you in advance.
    Regards,
    Gopalakrishnan.S
    Edited by: krishu100 on Jul 13, 2011 2:25 AM

    Hi Techies thanks for you all info.
    Now today i just tried to created a new HALB Material in the plant C which i had issues yesterday. But when i created today a new material the Auto PO feild is available for entry. THen i tried to go to the material which i created yesterday for editing it. But i was unable to do it.
    I checked the transactions which most of you referred(Very Useful). I found that all the plant s had the same screen selction setting and set as Opt Entry. The field screen referrence for MM01, MM02 Transaction s are also set as opt entry. The screen reference for HALB is also set as Opt entry. Still i m not able to find the field auto PO in the purchasing field.
    So does it mean that a material once created without auto PO enabled or visible can never be updated after that? But i think its not the case and we should be able to edit it(correct me if im wrong).
    Really having my fingers crossed to find a solution for this issue.
    Regards,
    Gopalakrishnan.S

  • Mass deletion of material master at plant level

    Hi,
    Is there any way to flag materials nearly 500 Nos for deletion at plant level.
    Regards,
    Vengat

    hi,
    Use mass transaction for putting the delete indicator for the material master...this is to be done from MM17 tcode...
    and later they all could archived...Archive it from MM71 and can display this from MM72..
    Regards
    Priyanka.P

  • Batch management level change to plant level

    Hi,
    Currently,i am using batch managment at material level.I have created material and has its stocks.
    I need to convert it to plant level..How can i convert it to plant level?
    Thanks
    Srini

    Hi,
    Please check the OSS Note 41715 - Resetting batch level from material to plant level.
    Hope it helps you.
    Kuber

  • Seperate Inco Terms on at Plant level

    Hi
    I am new to this forum and I need your help to find out if there are any quick solution to my below issue. Our business has a requirement where there would be a new plant rolled-out under the same company code but having a different delivery address so for any external purchasing from Vendors, they are suggesting we have a new Purchase Organisation in order to in-corporate a seperate Inco-terms so it would appear on the PO print. I am not sure if this is the correct solution as because that would be lot of work in terms of Master data creation, etc. Instead I proposed we could maintain Inco-terms at Plant level in the PIR's so that would be picked on the PO output. But since we also have A/c assigned PO's and other Service items for which there are no PIR's, how can we handle this situation? Obviously for these orders, the Inco terms are getting picked from the Vendor Master. And I am sure this is not a unique problem as anyone will have the same issue!!
    Could you please tell me if there is any better solution or any user exit which solely handle these type of situations? We are on ECC 6.0 btw.
    Thanks in advance
    Cath

    Hi Ajit / Jurgen
    Your valuable answers pointed me to the right direction, many thanks for that!! When we wish to raise a PO with A/C assignment (free text items) or for service items, the concept of Inco terms does not arise. So in these cases, the Alternative data in the Purchasing view of Vendor Master really helps to have different sets of data with the plant combinations. So when I maintained different Inco terms for two seperate plants for the same Vendor (even though he is with different Company Codes!), I could able to create two PO's with outputs showing different Inco terms. So this test proves what I am aiming for and clear any confusions (I am talking about me
    Thanks once again guys
    Cath

  • Plant level authorization for Notification Change

    Hi All
    We have 7 plants and person belong to one plant is able to open and change the notification of other plants.
    In the role we have given restriction for the plant for the Tcode IW 22 and for the object SWERK .In the Notification only Workcenter and Plant fields are mandatory.
    How can we restrict for a user belong to a particular plant can only change his plant notifications using IW22 only ---not IW28
    Thanks in advance
    gangs

    Dear gangs,
    Check in all the roles of that user in orgnozation levels maintenance plant and planning plant.
    It may happen in one role you have ristricted for that user, but in other roles it may be having the t.code authorization for IW22 and with other plant also.
    Check that also.
    Regards,
    Praveen.

Maybe you are looking for

  • Need to download Adobe Acrobat 7.0 Standard

    I'm the netadmin at my place of employment and have recently formatted one of my user's PCs. Unfortunately the Adobe 7.0 std. CD I have doesn't work anymore so I need to download an .iso or something of it so that I can install it back on his PC. He

  • Adjusting margins in Reader

    Hello all, and thank you for taking the time to read this. I'm trying to print a PDF of a document which original I don't have.  The document already has a significant margin, and Reader is adding 25 Milimeters. If I were to print it straight, I woul

  • Failed to load kernel because driver won't build

    Hi. After I upgraded and restarted my computer Network Manager did not automatically connect to my wireless network as it usually does. Instead, when I clicked on the icon it says Ethernet Networks disconnected (in grey so I can't click on it). It on

  • Impact for exchange server when schema master move

    Hi team, I had issue to my DC. I have three DC one is holding all FSMO function. the others just additional DC of DC one. and last DC is have separate domain name DC one ( that holding FSMO role) is reach tombstone liftetime, so I need to transfer al