Can we change Base unit of Measure ?

Hello,
I got a requirement to change the name TO(tonne) base unit of measure in MM01 into MT. Is it possible to achieve this if ys share me the procedure.
In short when i click F4 help in base unit of measure in the place of TO i want to change it into MT.
Thks

If u want to  change the base unit of measure... firstly do the conversion method... MM02 (If the material is a finished or semi finished) -> Work Scheduling View -> Put the UNIT OF ISSUE (MT) and then give the conversion factor unit measure.... and save...
if u want to change the base unit of measure... Change the MRP PRofile and then change the Base Unit of Measure...
It is better to consult PP and MM Consultant....
I think you got the solution... Give me the point....
With Regards,
Debopriyo

Similar Messages

  • Changing Base Unit Of Measure in Material Master

    Dear All,
                  We need to change the base unit of measure of certain materials who have been assigned inspection plan. We have deleted the material from Inspection Plan and later even the plan. But still the system not allowing to change the BASE UNIT OF MEASURE. The error thrown by the system is : Material is assigned to inspection Plan.
    Please guide in this regard as changing the material for us will be a very cumbersome act.
    Regards

    Hi Rohan,
    Please check 'display errors' in MM02 when you are trying to change the BUoM. It will say what prevents you from doing that.
    Please check:
    http://www.sap-img.com/materials/change-base-unit-of-measure.htm
    BR
    Csaba

  • Changing Base Unit Of Measure (Material Master)

    Hi
    1. How to check this? (Any successful changes in material master only took place when there is no open document from SD, PP, MM & FI for that material. )
    2. Base unit of measurement cannot be changed.  The reason being material movement history is there in table - MSEG mainly which otherwise create inconsistency in reporting.  -
    Is this line applicable for current period or previous period in current year or previous period previous year???
    3. There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material. -
    is this means open / pending purchase orders  or the the PO's created in system with respect to material where the GR and IR is already done
    4. You can change the base unit of measure if there is no stock of the material during current and previous period----
    is this means the term " previous preiod" is previous period in the current finacial year   or its applicable for the previous preiod in previous financial year
    5. Post the stock in the previous period to the current period  - -
    how can we do this???
    Vijay

    See this OSS note : especially the last sentence:
    From OSS note 138767
    Within the material master record maintenance, you want to change the base unit of measure (base unit). During the change, the system performs extensive checks in order to avoid inconsistencies in the applications which use the material master.
    In particular, the following checks are performed:
    The base unit must not be defined as an alternative unit of measure for the material
    No International Article Number must be assigned to the base unit
    No proportion/product units must be defined for the material
    No configurable material must be assigned
    The material must not be used as a configurable material
    Stock must neither exist for the previous period nor for the current period
    No physical inventory must be active
    No reservations or dependent requirements must exist for which the deletion indicator is not set
    No planned orders must exist
    No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
    No WM transfer requirements, no WM quants or no WM posting change notices must exist
    The material must not be a bill of material
    The material must not be contained in a bill of material
    The material must not be used as a production resource/tool
    The material must not be used in task lists
    No standard cost estimate must exist for the current or future period
    No production orders must exist
    No planned independent requirements must exist
    No run schedule headers must exist
    If the base unit has dimensions, no serial number profile must be assigned
    No sales and distribution documents must exist which have status Not processed or Partially processed.
    Solution
    If necessary, all reasons mentioned above must be eliminated by archiving the objects listed
    1) SAP checks this for you. A new button will appear in MM02 and after you click this button to check the error log, you will see which documents exist.
    2) I have not seen that an existing movement will restrict the change of a BUoM.
    3) No purchase requisitions, purchase orders or scheduling agreements must exist for which the deletion indicator is not set
           it is not caring about GR done or IR done. it telling you that the deletion indicator has to be active. As a deletion indicator can be reset easily, you probably have to archive the documents
    4) the previous period is the period before the current period.
       today we have February, hence the previous period is January.
    5) first make sure your current stock is higher than the stock of the previous period. if it is lower, then you have to create inventory in current period first e.g. with 202 movement with current date.
    Then you issue the previous period stock with 201 movement and previous period date (make sure periods are open in OB52 and MMRV allows posting to previous period).
    Finally you issue the left stock in the current period with 201 and current date.
    Now previous period and current period stock is zero. After the change of the base unit you have to get the stock back into the system
    Edited by: Jürgen L. on Feb 2, 2010 3:58 PM

  • Change base unit of measure

    Hi,
    Its me again. I need to change the base unit of measure of a material but a task listw as created via QP01. I tried to delete this via QP02 but i still cannot change the base unit of measure. Is there any way except for deleting the task list via CA98?
    Thanks.
    Elen

    Ellen,
    Unfortunately the answer to your question is no..You have to use a transaction like CA98 or QSR6 to delete the Inspection plan from Database. Please take necessary authorisation and delete this plan.
    Alternately set this material to with deletion flag and client & plant level status, so that you cannnot use this material any longer. Now create a new material with correct Base unit of measure and use this material.
    Regards,
    Prasobh

  • Change Base unit of measurment while creating BOM-CS01

    Dear Experts,
    Base UoM in material master is in Metric Tonne "MT",While Creating the BOM of the Material My Base qunatity is also in MT by default but I want to change Base Uom to in KiloLiter "KL".But system is not allowing to change.
    In system there are many Transactions iof material in current period.
    Please suggest as it is in production server.
    Thanks,
    GBS

    Hi ,
    We are Using User Exists,
    If Production Order Header material's unit of entry is not same as base UOM then system will check conversion ratio maintained in material master-->additional data.
    Convert quantity in UOE to quantity in Base UOM for Header material i.e.101 movement.
    Calculate componenet quantity (261 movement) as per bom.
    Calculate 95% of component quantity for lower tolerance limit
    Calculate 105% of component quantity for upper tolerance limit
    If component quantity entered against 261 movement is not within lower and upper tolerance then system will give error message and will restrict to post entry.
    This for information part.But still my question is how can alt. Uom of Measurment can be used while creation of BOM instead of Base Uom at header level.
    GBS

  • Changes in Base Unit of Measure

    Hi,
    We got an issue,User tried to change the Base unit of Measure from NO to KG.
    1.For this material we dont have stock in unrestricted and quality,But it has reservations. 2.It has got Scheduling agreement,3.This material is used In BOM.
    So if i cancel reservations,then remove this item from scheduling agreement and delete it from BOM.Will it work further to change the Base Unit of Measure.
    Please Do help me in this matter
    Thanks and Regards

    1) You can only change the base units of measure under the following circumstances
    •No stocks are available for the material.
    •There are no existing purchase requisitions, purchase orders, or scheduling agreements for the material.
    •At present, no purchase orders or purchase order items are being created or changed.
    •Item is not linked in any BOM as chield part
    If requests for quotations, purchasing info records, or contracts are available for a material, the system emits a warning while changing base unit of measure. Still if you want to change unit of measure specify in a dialog box the factor for converting the base unit of measure into the new base unit of measure. The purchasing info records are then, if necessary, updated.
    2)  Solution
       As system is not allowing changing base unit of measure there will be either stock of this material or existing purchase document
    1) If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    2) If there are Open purchase requisitions, purchase orders, or scheduling agreements for the material.complete all P2P cycle for open orders (purchase requisitions, purchase orders, or scheduling agreements) and then close it.
    3)Delete item from BOM
    Then
    1.     Run Trnx MM02 (Change Material Master immediately.
    2.     Overwrite the old base unit of measure with the new one in basic data screen.
    3.     Save the change.
    3) System checks
    If a change criterion (Trnx. code MM02) is meeting all necessary prerequisites (as mentioned in point 1).System allows changing base unit of measure. Otherwise it displays warning or error. U can display the reason for this, by choosing Display Errors (ctrl+F1)

  • Error while changing base unit of measurere

    Dear
            i hav prob. while changing base unit of measure system gives error massage is material used in BOM, ECM is activated in our system and that material is showing only when valid from date is not  entered othervise that material is not shown in BOM.how to remove that material from so i can change base unit of measure.

    HI
    You can only change the BUM if there is no stock  production order planned orders reservations, PO s etc are not in the system  there should be no transaction of the material ,after ensuring all this, u can change unit of measure
    For more info
    check these threads
    Base unit of measure cannot be changed
    Re: BOM unit of measure
    change base unit of measure
    Regards
    Anupam Sharma

  • QM_Change of base unit of measure not possible

    Dear QM Experts,
    Scenario is,
    1.     Material master created with QM view activation.
    2.     The Base Unit of Measure kept as EA
    3.     Inspection plan prepared for material with usage 5 and status 4.
    4.     Material has not undergone any purchase order / production order / routing or any other transactions except inspection plan.
    5.     No movements have done and the stock is zero
    6.     The requirement is to change Base Unit of Measure from EA to KG
    When tried through MM02 system throws an error message as The base unit of measure cannot be changed; choose "Display errors" Message no. M3189
    When viewed through log another information gets displayed as Routings already exist that are assigned to the material. Task list type Q.
    I tried through trial and error method. First material assignment was deleted from task list, problem did not resolve. Thereafter deletion flag put to task list. No impact. At last entire task list deleted. Still system does not allow changing unit.
    Has anybody faced the same problem ever? Whether deletion of task list (By T-Code QSR6) from data base will server the purpose? What are the obligations that one must follow while execution QSR6?
    Or if there is any other solution to this requirement?
    Thanks in advance
    Best Regards,
    Anand Rao

    Hi
    *What are the obligations that one must follow while execution QSR6?*
    By this T code  Deletion is very much possible provided that
    If there are no stocks of the material in the current period and in the previous period
    If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
    Material Is used in any task list/Rauting.
    Now as per your schenario I hope you have checked Inspection lot & PR,PO.
    Error showing Q type of task list.
    Go to PLKO & MAPL table for this material & group & Gr counter check the entry.
    Check deletion Indicator in both the tables. If it has status "X" then this task list is very much possible to delete through QSR6.
    I hope this will add some value to your Execuation.
    Regards
    Sujit

  • Base unit of measure

    Dear Expert
    my query is whenever i add new base unit of measure what are the effect it had on the system , i mean how base unit effect in the back end ...how system process base unit of measurement .
    Regards

    Dear usmfarhan 
    Actually Base unit of Measurement is the UoM which u want to maintiain ur inventory in the system.
    i.e whater u r buying it from vendor ...it might be in Ea or Box or Carton
    And you want to store in KG
    So you can have Additional unit of Measurement and its conversion that can be defined in AMterial master in additional unit of measurement
    Let us say Base UoM is KG and ur Ordering unit is TON
    So u have to define Conversion rule as 1 Ton = 1000 KG in material master.
    ,While changing Base unit of measurement you should make sure that stock should not be there.
    Secondly neither Purchase order for Raw material not Sales order for FG should exist in the system ,Neitehr routing should exist for FG
    Or else system will not allow u to change UoM
    Regds
    shailesh

  • Base unit of measure can not be changed since EAN is already assigned.

    Hi,
    We would like to change the UOM from EA to SET .In order to tag MM # as BOM Header and ZCEN (Serial number profile)but the error massage appears as below print screensystem is not allowing to do so ,throwing following error message:
    "Base unit of measure can not be changed since EAN is already assigned."
    Could you help to resolve the same.
    Thanks,
    Amit

    Hi,
    Thats correct you must be getting Error message M3 341 ,
    EAN international article number is tied with material number in basic data view with EAN Category and seperate number range
    EAN is a standardized unit that uniquely identifies a material relating to a unit of measure or type of packaging.
    The International Article Number (EAN) is assigned by the manufacturer of the material. In this case, the EAN identifies the
    manufacturer uniquely. A company can assign EANs using "in-store" numbering techniques known only to the company.
    If you still want to change UOM you need to first remove the EAN assigned..please explore further if you have internal number range
    for EAN or external ..etc
    Thanks
    Diwakar

  • Follow up material with different base unit of measure

    Hi all,
    I have the BOM with material Mat1 as a component. The base unit of measure of Mat1 is KG.
    Is it possible to replace Mat1 with Mat 2 material in MRP once the Mat1 warehouse stock is depleted.
    The base unit of measure of Mat 2 is KGK.
    The required quantity of MAT1 should be recalculated from KG to KGK accordanly unit ratio.
    Please, expain, where does it maintain?
    Thanks,
    Peter

    Hello Peter,
    You can use follow-up setting (set Mat2 as follow-up of Mat1 in MRP 4 view of material master if this follow-up scenario is valid for all BOM) with discontinuation indicator '1', w/o effective-out date. In this case Mat1's stock will run out (no PldOrd, PR, etc) will be created, and from the date, when Mat1's stock runs out, MRP will calculate with Mat2.
    As I told you, according to my best knowledge, you cannot realize this with different base unit of measures. (you have to change the buom of one of the related material masters or create a new material master if you cannot cope with buom-change).
    Follow-up group scenario can also be used but I guess different buoms will be a problem in that case as well.
    Maybe there are better solution but I'm not aware of it...
    BR
    Csaba

  • Base unit of measure is cahnging after creation of material master

    Hi
    I have created a material with material type Raw material with BUM  "Ton" , after save the material, when iam checking the material with display mode, the BUM is changed into "EA",i dont know where the sustem picks the BUM as "EA", kindly suggest where i have to do the configuration settings.
    Thanks

    Hi,
    Have you created the New Material referencing from another material.
    Please check the following links for details. It should be able to answer your queries.
    [Re: can't able to change into alternate UOM]
    [Re: variable order unit]
    [Re: Base Unit of Measure]
    Hope it helps,
    Best regards
    Amit Bakshi
    Edited by: AMIT BAKSHI on Aug 4, 2011 12:44 PM

  • Base Unit of Measure issue

    Hi Experts,
    As per the scenario, my client is manufacturing a rod whose std length is 6m. But, he is selling it in other sizes also like 4.3, 5.5 so on. So, the price should be get calculated on length & no of pieces.
    As, per my understanding I had put base unit of measure as meter & sales unit as ea. Conversion rate has been maintained as 1ea=6meter. But, then as he is selling it in different sizes also. How to calculate price in such condition. Please throw some light on it.
    Regards,
    Prashant

    hi
    i am not expert
    based on b knowledge
    when you fix the unit of measure  1ea=6m , based on this system will pick the quantity , you raise the sale order for each then system will take meters like 1ea=6m,
    you requirement it 4.3.5.5 m , so you can change the unit of measure for particular material , like 1m =1m , then system will take correct quantity , and based on this system will take price , your pricing is manual or automatic , when manual no problem , automatic you maintain , quantity based price ,
    you can change the unit of measure for material at mm02 , at additional data, you can maintain
    please try this
    regards
    sankar

  • To Change Basic Unit of Measure

    Dear Sappers,
    With refernce to my previous posted thread, below  I am giving the detailed copy of *PERFORMANCE ASSISTANCE*
    The Performance Assistance is giving me solution to proceed but for proceeding further is not possible. As max no of sessions are 2.
    Also massege is generated by MM02 & solution given is also same MM02.
    Please find below pasted Performance assistance.
    The base unit of measure cannot be changed; choose "Display errors"
    Message no. M3189
    Diagnosis
    You wanted to change the base unit of measure. However, you can do so only under certain circumstances, including the following:
    If there are no stocks of the material in the current period and in the previous period
    If there are stocks in the previous period, you can clear them as follows:
    a) Post the stock in the previous period to the current period (for example, using movement type 561) so that the stock for the previous period is the same as the stock for the current period.
    b) Clear the stock with the posting date in the previous period (for example, using movement type 562).
    If no purchase requisitions, purchase orders, or scheduling agreements exist for the material
    Procedure
    Choose Display errors to see why you cannot change the base unit of measure for this material.
    The pushbutton Display errors appears only in dialog mode, not in data transfer or in mass maintenance. If this message appears in data transfer or in mass maintenance, and you want to know why the base unit of measure cannot be changed, access the material in dialog mode using the relevant transaction below, try to change the base unit of measure as required, and then choose Display errors:
    Industry
    Proceed
    Retail
    Proceed

    Dear Friend,
    Please do the following:
    1. MM02 + material number, select basic view 1
    2. Change the BUoM + press enter
    3. A button called 'Display error' will appear between the description of the transaction and 'basic view 1' tab. ( left from 'Additional data' button ) > please click on it
    4. Examine the message
    If you have question please come back!
    BR
    Csaba

  • Convert between EDI order Unit of Measure to Base Unit of Measure

    Hi all,
    I am looking for a method whereby the following can be accomplished
    -  Customer orders certain products in LBS UOM...they have been quoted a per LB price and an equivalent CS price by sales and they choose to send EDI orders in LBS
    -  Base unit of measure for these products is in CS.  Stocking unit is cases.  Pricing also maintained in cases
    -   I've maintained alternative UOM in the MM records to convert LBS TO CASES
    What i really want is for the customer to submit the EDI order specifying LBS but when  the sales order is created i want the order lines in CS.  I want to deliver and bill in CS as well.  I do not want the sales units to be the units that the order was submitted in.   
    Any suggestions are appreciated.

    Thomas,
    We make creative use of the customer-material info record (CMIR) to do what you describe.
    Standard functionality of the CMIR will allow the customer to send their internal SKU on an EDI PO, converting it to our SAP material number for use in the sales order. 
    We maintain a u201Cconversion factoru201D in the CMIR field called Search Term.  We use an exit in the inbound IDoc processing code to apply the factor to the quantity ordered and the EDI1 price condition.  For example, the factor u201C/006CASu201D would divide the customeru2019s order quantity by six and use CAS as the UOM on the sales order.  The EDI1 price is multiplied by six, so that our CAS pricing matches up.
    This allows any customer to order with their internal SKU and UOM, while we process the orders with our internal material numbers and preferred units.
    An exit on the outbound process code allows us to use the same factor to change the values back into what the customer wants to see.
    This works great in the consumer products industry, where we, the supplier, have to deal with inflexible customer EDI requirements.
    Regards,
    Ken

Maybe you are looking for

  • How to update multiple records in custom table using checkbox in APEX 4.1?

    Hi, I have a SQL report which brings up all the data records using the following query. select "REC_NO" AS hidden_rec_no, "REC_NO", APEX_ITEM.CHECKBOX (3,rec_no) AS edit, "MEETING_TYPE", "PAGE_NO", "CHECKBOX" from "XX_TEST" m WHERE page_no = :p_page_

  • Automatic creation of Generic Transactions

    Hi colleagues I am thinking about using generic transaction in our TRM implemetation. But I havn't found a way for creating them except manual enter via RCA00. I am sure there must be a kind of user-exit for their automatic creation (a sort of BADi o

  • Document Management App that runs on OS X Server?

    I need a CMS or EDMS application (for document management) that runs on the mini-mac server.  Others will access via browser. Thin-client application. Similar to DocuWare or OnBase or IBM Content Manager, but APPLE FRIENDLY!!!!! Many thanks - [email 

  • How to implement facade class

    I am suppose to retrive multiple rows data from a table having multiple columns in response to a user query. It is required that I use a facade class which provides an abstraction layer between execution of query and display of table data using jsp.H

  • Can i read a book using windows 7

    can i read a book using windows 7