In BOM , alternative items are assigned to alternative item group on the general data tab page.
In the production order in the general data tab page.
We can define the alternative item based on priority , strategy and usage probability.
Priority:
This defines the priority of the item within the alternative item group.
This determines the priority of planned withdrawls of items.
EX Two items are assigned to alternative item group
item A Priority 1
item B Priority 2
The system reads the item A first.
Strategy:
use the strategy to determine how the planned withdrawl is controlled
within the alternative item group.
The strategy should be same for all alternative items within a alternative
item group.
If the value 2( 100% check) is defined for the strategy the first material in
the defined priority sequence for which sufficient quantities are available
are reserved.
Usage Probability:
MRP Plans these alternative material components according to probability
of use.Material requirements for BOM Components are planned according
to usage probability.
The planned withdrawls for the production order are based on the reservation lists.These lists are based on the priority and strategy.
Regards,
nandha
Edited by: S.Nandakumar on Feb 21, 2008 7:21 AM

Similar Messages

  • How to do backflush of alternate material in a bom?

    Hi,
       My user wants to do choose alternate material at the time of backflushing  according to material availability..
    currently we are maintaining as following priority - 1
                                                               strategy - 2
                                                                probability - for first material (100)
                                                                 rest of material as  blank.
    any body please guide me what should be the right procedure to achieve this.
    Already iu have searched found a thread Can we define alternate material in a BOM  try to apply our expert suggestion but it is not working.
    Kindly anybody help me to solve the issue.
    Thanks & Regards
    Sandeep Kumar Praharaj

    Hi Ramagiri,
      I have gone through your document but my user wants he should select the component according to his requirement.
    for that purpose i have opened the planned order in md12
    select the first component make the usage probability to 0.
    select the second component change the usage probability to 100
    after that requirement has been transfer from first alternate component to second alternate component.
    But after when i am trying to do the backflushing through MFBF second alternate component is not showing in overview screen it is still showing the first component.
    can u please help me why it is happening & explain how to achieve this point as you mentioned
    Thanks& Regards
    Sandeep Kumar Praharaj

  • Plz can someone tell me where can I define the material type?

    Hi All,
    I want to create a new group of material, there is a material type should be specified. I want to use my own. plz can someone tell me where can i define it?
    thanks and regards,
    samson

    Hi Samson,
    U can create a new material type using the tcode OMS2 and then copy the material type which u need to modify and then define the name of the new material type and make the required changes which u want for that material type and save it.
    Hope it wud have answered ur question
    reward if useful
    Shawn

  • How can I add alternate component in same BOM

    Hi Experts,
    One of my requirement like this , in same alternative BOM I want to add alternative components with existing components.So please advise how to do.
    With Regards
    Aravind

    Hi,
    This is discussed before in SCN. Please go through below links for your query,
    Alternative component in BOM
    alternative materials in PP
    Alternate Item in BOM
    Re: PR( purchase requ) for Alternative material in BOM
    Regards,
    Narresh

  • Add alternate material to BOM

    Hi All,
             I have a requirement in which i have to add alternate material to the BOM, I am using the transaction MRTRS_START  for transformation of General recipe to Master recipe.
    I have implemented the BADI BOM_UPDATE and used the method CHANGE_BEFORE_UPDATE to add my code to add alternate material to the DELTA_STPOB table.
    Problem is,it is reflecting in C202/C203 but change number is not updated for the same and operation number  is also missing for the added material.
    Then i came across a class CL_RMXM_ROM_MR_MAT_ASSIGN and several other similar classes. I am not able to figure out how to proceed?
      Thanks in advance.
    Alok Patel

    If you want it to be last for sure, why don't give it a number like 999? Or 777, so you will be able to add more later?

  • How to maintain alternative material in a BOM for a component.

    how to maintain alternative material in a BOM for a component.if stock for existing bom component is less then it should consider other alternative material in the same BOM

    HI,
    You can maintain alternate material for BOM Component by specifying Alternate Item group as below;
    Go to CS03/CS02--> Items-> Select Component and go to details->Basic Data Tab--> General Data
    Pls. find more details about Alternate Item group maintainance as below:
    Alternative item: group
    Consolidation of alternative items within a BOM. Every material in the assembly can be included in the alternative item group.
    Use
    As soon as you enter an alternative item group, you see an additional dialog box with the following data: ranking order, strategy, usage probability.
    You can maintain alternative items in the following situations:
    Alternative positions with specific usage probability
    These alternative items are incorporated with a specific usage probability. Enter the usage probability for each alternative item in the group, so that:
    dependent requirements are determined in requirements planning
    dependent requirements are changed to a reservation in the production order
    Alternative positions as information
    You can enter an alternative item for information purposes. This item would then, for example, only be taken into account in situations involving missing parts.
    As there should be neither dependent requirements nor a reservation for this item, enter no usage probability.
    Procedure
    Enter the same character string to denote the alternative items of an alternative item group.
    Enter the same strategy for all alternative items in the alternative item group.
    Dependencies
    Alternative items are valuated in the following way:
    Dependent requirements determination
    Requirements planning determines the dependent requirements according to the usage probabilities that have been entered.
    If the usage probability is 0%, then no procurement is planned for the item. For information purposes, however, dependent requirements with 0 as quantity are created.
    Withdrawal posting
    You can control the withdrawal posting for the resevation in the production order in the following way:
    Withdrawal according to usage probability (manual change is possible)
    Withdrawal if there is 100% availability
    (Check ranking order and strategy)
    Example: See Strategy for alternative position
    Further you can also maintain alternate material if you want to stop using this material at certain time as below:
    In material master of the material ,
    Go to MRP-4 View----> Under Discongtinued parts specify
    Discontinuation Indicator
    Eff-out.
    Follow-up matl
    So system will automatically consider follow up material in BOM as per the settings you have maintained for the material to be replaced.
    Hope this helps.
    Regards,
    Tejas

  • Lot size in BOM as well as for alternate material

    how can we define the Lot size and validity period for a BOM means we want to define that 1 to 100 qty are to be produced with alternate 1 and 101 to 1000 for alternate 2. How the same can be defined in the master BOM.
    There is one component in the BOM and there is a alternate material is also, Users want to define that while issuing the material , system allow to issue only say qty " 50" and then alternate material for next lot.
    Is there any possibility to define the BOM as per the above requirement.
    thanks
    harish

    Dear Harish,
    if u have alternative BOM's, then creat production versions
    1) creat BOM with two alternatives (say alt 1 1to 100 & alt 2 101 to 200)
    2) creat multiple Routings with two group counters
    3) creat production version in MM02 in MRP 4 view or work scheduling view
    4) in BOM slection in MRP 4 view maitain the prameter as 3 or 4
    Then MRP takes care of lot sizes difined in PV & BOM and creat procurment proposals
    Regards
    kumar
    Edited by: kumar kumar on Aug 3, 2009 8:02 AM

  • How to define alternate BOM in SBO

    Hi all,
             Can you help me to define alternate BOM for an item?
    Thanks in Advance
    Suresh R

    Hi Suresh,
    One work around can be to define all permitition & combination in one BOM only and after selecting the BOM in Production order, user can decide which child items are to be kept and which child items are to be removed.
    Hope it helps
    BR
    Samir Gandhi

  • Alternate material in BOM

    Can we use any material as a alternate material in BOM

    Check this good explanation from Rich... U can easily understand the concept
    A Bill of Material is used to know how to build a product. For example, say your product is a bicycle. What are the components of the bicycle. Well, we have a frame, seat, wheels, handle bars, brakes, etc. These components make up the bill of material. In SAP, you create a BOM using transaction CS01, to change is CS02, to display is CS03. Alternative BOMs, are versions of BOMs tied to the same parent material.
    codeParent Materail - Bicycle
    Component Materials - Frame
    Wheels
    Seat
    Handle Bars
    Brakes[/code]
    In simple words... Alternate BOM means for the same material group we can have have multiple alternatives 1 and 2 with the same BOM.
    goog example would be....
    Let the FERT be a car.
    The BOM of a car will have various components. Suppose if we want to use
    a different type of siren in some models then here we can create a 2 bom(alternate) & add siren along with the other components.
    Hence depending upon the model ordered we can choose the BOM.
    For a normal car, BOM 1 &
    for a car along with siren BOM 2.

  • How to define alternate items for Spare Parts

    Hi SAP Gurus,
    My Client wants to implement Alternate items for Spare Parts. It is not a Manufacturing unit.
    Actually Client wants their Service Partners to know that
    ex., Material A is an alternate item to Material B and can be used for servicing without ordering for Material A.
    Whether there is any Possibility to define alternate item in the Material Master.
    Off course I have gone through the thread and document of Alternate items in BOM.
    I would appreciate for providing Clarity on the subject.
    Best Regards,
    R.Velmurugan

    Hi Velmurugan,
    As per your requirement  i think you can achieve alternate item group functionality ( as your client is not manufacturing)
    You can maintain alternate material in MRP 4 view followup material field or basic data 1 old material Field than develop a ZReport extract the same as of client not manufacturing  any thing.
    Otherwise refer this document if you to go to Follow up material Functionality.
    Concept of Discontinuation Data - Material Master and BOM
    If you have any other query kindly revert back otherwise close the thread.
    Thanks & Regards
    Sandeep Kumar Praharaj

  • Cs11 not Display Alternate Material Qty

    Dear Experts
    Whenever we r Putting Alternate Material in BOM and Set it Prioty And define the Qty as similar with other one and after that
    whenever we r checking Display in Cs11 Then System will Not Show Us the Alternate Material Qty And Also The Qty of Number 1 Material whose alternate is Define. both material R Blank Qty .
    What would be there.
    Rgds
    Pankaj Agarwal

    Dear Pankaj,
    Whenever you are checking the BOM display using T code CS11for a product which has alternative item group,then after
    executing the report,click on the change layout(control+F8) and select the fields like component quantity and not
    comp.Qty,and also usage probability and alternative item group,because if you have only the field comp.Qty,then in case if you
    have given the usage prob as zero means then it wont get displayed in the report.
    So select the change layout and select for the field Component quantity and check the same.
    Regards
    Mangalraj.S

  • Missing raw material position (from BOM) in process order

    Hello to all,
    Please help me on my issue on missing raw material position (from BOM) in process order.
    On transaction CS11, for a particular formula/plant/BOM application, the BOM was produced.  It was found that this BOM has 20 positions (from 0010 to 0200). 
    Now, when the user proceed on the process order for this, the position 20 is missing into the order.  What checks should be needed to proceed on checking why the item is missing into the process order?
    Thanks.
    Regards,
    Patrick

    Patrick,
    The last check what i would suggest is to check the "Plant-Spl- material status" of the material in line item 0020. You have to check this using transaction "MM03" and in MPR1 - view.
    You can check the defination of the status in the customizing transaction "OMS4", here check under "Production Section".
    I definately think that there was a error message which should have popped up and ignored by the user due to this defination of the status.
    Regards,
    Prasobh

  • Define own no ranges for Boms & Routings(task list type)

    hello all,
    I need to confirm if we can have seperate no ranges for materials Boms or routings on the same client?
    I think we can assign a new Bom no range but can't have different no ranges for different material boms on the same system. Moreover, using CS90 we can only define the internal no range for material boms?
    For task list we can define external no ranges but this gets assigned to the task list types. Is it possible to define our own task list type? I don't think so, but not a 100% sure.
    Pls can somebody confirm this for me.
    Many thanks.

    hi
    what you mentioned is correct there is no option of creating the task list types and also of youcan have external number ranges for BOMs check t-code SNUM with object STUE.
    -ashok

  • PP-PI How can i generate two material creation(101) in a single operation.

    i am creating a process order for material fert material A having 2 operation in the recipe i want to carry out consumption of roh material b1,b2,b3 (261 mvmt) when i confirm order & i also need halb product generation C (101 MVMT) when i create GR.that is mb31. for first operation.the second operation has to consume material C.(which is produced from operation one) & consume d1,d2,d3 roh material & mb31 should generate halb material E & order header material A.
    HOW CAN U DO THIS?
    when i confirm first operation i can consume b1,b2,b3 & when i do mb31 for gr gainst then system generates both material,  A  & C & further possibility is not possible?
    can any one help me in this?
    pl. help asap
    thanks
    kareena

    Hi,
    Please check this link about co-products (co-product and by-product):
    http://help.sap.com/saphelp_46c/helpdata/en/89/a433e6461e11d182b50000e829fbfe/frameset.htm
    1. You have to write in your BOM both with negative sign.
    2. In case of co-product scenario you have to mark the co-product indicator in material masters of both BOM-header material and co-product (co-product is the material in the header's material BOM with negative sign) (co-product checkbox is on one of the MRP views...maybe on MRP2...)
    3. You have to mark the co-product checkbox for the co-product in BOM (select co-product BOM item in CS02 > menu > Goto > item...I don't know by heart but you can find on general data tab of the BOM item in CS02)
    4. Please define a proportion rate for BOM-header material and the co-product (it is in material master of header material > check the link)
    (in case of by-product step1 is enough)
    a) you can confirm BOM-header (mvt 101), by-product (mvt 531) and components (consumption, mvt 261) in CO15 / CO11N.
    b) co-product and BOM-header can be confirmed only in MB31 (mvt 101), components can be confirmed in usual way. No automatic confirmation is possible for co-product.
    Please use the search function of the forum in this issue to get more details.
    BR
    Csaba

  • ALTERNATE NO CHANGE FOR BOM

    Hi,
    we are having alternate bom concept. We had created two bom for one material M1. alternate no for first bom is 1 and for second bom is 2.
    But now we want to use alternate no 2 for inhouse prod. so we want to make 2nd bom as first and first as second for material M1.
    please help

    Dear Dutt,
    This is not possible in SAP.But you can set the status as 02 inactive for the first alternative and 01 active for the second one.
    This will give the correct results while taking MRP run or else use production version ,assign the second alternative BOM in the
    production version,keep the BOM selection method as - 2 or else 3.
    This will help you.
    Check and revert back.
    Regards
    Mangalraj.S

Maybe you are looking for

  • How To Give Print Option In Module Pool

    Hi , I am displaying the Output in table control. I have to give the Print option. I have tried to enable the same in the PF status but it is not working as it is in Report. Regards, Srinivas

  • Invoice List: Pricing Condition Tab is empty

    hi guys, need your help please... we have set up configuration and pre requirements for invoice list to address the different sold-to party but same payer requirement. however, we are experiencing problem with the pricing condition. what are the poss

  • Print a single page

    I have downloaded a document from the web that has 55 pages. I only need to print 1 page (page 10). How can I do this?

  • WSRP Portlet and Default Minimized Property

    Good Morning, i'm working with Oracle WLP 10.3.4 and i have a problem with Default Minimized Property for a Remote Portlet. I set this property to true for a portlet and if i run it in a local environment this portlet show, correctly, itself minimize

  • Enter Time Machine does not work

    When I click "Enter Time Machine" - nothing happens.  No errors or messages in the console.  Nothing. Never had a problem with restore (or backup) in Leopard, this is the first time I tried restoring a file since I've had Lion installed. Backups alwa