Can we delete production order or Process Order
1.Can we delete production order or Process Order
2. Significance of TECO
3. How we can do Goods Reciept apart from production scheduling profile
Dear,
Delete production order check this link,
http://www.sap-img.com/production/how-to-delete-old-production-orders.htm
Go to CO02- Change production orderin menu choose-Functions--Restrict Processing-Technically Complete
Teco will close the Production order from Logistic point of view , reservation get deleted, capacity requirement also get deleted.
Auto GR can possible through control key with mark as auto GR in work center.
Regards,
R.Brahmankar
Similar Messages
-
Track Deleted BOM item in Process Order
Hi Guys,
I am facing one issue which is described as below.
when user is converting the Planned order into Process order at that time he has deleted 1 BOM item.
Now i he is saying that i have not deleted that item and after that he released and done the GI conf GR.
Now i want to track the change history but i am not able to find the changes done by him.
I have check so many blogs but i come to know that if he is deleting BOM item during creation we will not able to find.
Pls helpHi D R,
To the best of my knowledge at the time of creation if some component has been deleted, you can not track. Because up to that time table entry has not happened. After saving you can see the component.
If you have some existing process order which is without item deletion, you can compare and check. As well Check the BOM in CS03 and check the BOM inside process order. You can easily find out the component.
Hope this clarifies and at per your requirement.
Success.
Regards,
Krishnendu. -
Converison of planned order to process order in background
Hi ,
Can we do conversion of planned order to process order in background.
I know for production order conversion Program PPBICO40 will do the needful. Can we have anything like that for process order also?
Thanks in advanceHi,
PPBICOR8 is the program.
Hope it answers your query.
Regards,
Vivek -
Get the supply source of planned order and process order.
Hi experts,
I would like to display production version (supply source) on prduct view.
But, I don't know that how to get supply source of planned order and process order.
APO table is complax.
Do you know that?
Regards,
SatoruHello Tushar,
Are components also plan in APO with MRP type X0?
Does PDS or PPM contain all the components?
Verify if the component is maintained properly in the PDS.
Check whether there is an active integration model for the components, also execute the RAPOKZFX report for all the materials in question.
When you convert the PPDS order to process order then conversion happens in ECC/R/3 system. This is the place BOM has to be reexploded in ECC. Please check if you have any enhancement which restrict BOM explosion.
Also check OSS note 1576703 suggested by an expert Caetano.
Best Regards,
R.Brahmankar -
Stop new planned order when process order GR qty less then sales order qty
Hi All,
How should SAP be configured so that when a process order is GRu2019ed, the sales order requirement is fulfilled regardless of the quantity difference between the sales order and process order?
The system behavior we are currently experiencing is MRP will generate another planned order for the fixed lot size if the GRu2019ed quantity is less than the sales order quantity.
Additional background information:
Make to order scenario
Process industries
Batch control
Warehouse management
Fixed lot size
Any comments or suggestion are welcome.
Thanks.Brahmaji,
Thanks for the reply.
I agree that changing from FX to EX will produce a planned order for the quantity difference (SO qty less the GR qty). So this would be an improvement to our present situation, but not quite what we are looking for.
The system behavior we want is MRP to ignore the requirement for the difference, in other words, when the GR is done for the entire batch quantity, we won't be producing any addition product. The sales order would be considered complete. -
Function Module to fetch Customer Number from Sales Order or Process Order
Hi Gurus,
I am looking for a Function module which gives me customer number from Sales order or Process order.
Please let me know of any FM's available.
Regards,
MadanHi,
Thanks for your response.
I am actually looking for function modules which take "Sales Order" or "Process Order" as input (import parameter) and return Customer Number as output (export parameter).
Please suggest some function modules you know any.
Many Thanks,
Madan -
Option to convert Planned orders to Process order C
Kindly suggest, which is the best option to convert Planned order to Process order C from below mentioned options
1) Convert Planned orders to Process order C & send it to R/3. or
2) Send Planned orders to R/3 & convert it into Process order C in R/3
Regards,
ChetanDepends on the process and how stable your planning is. If there is a lot more decisions to be made in the R3 side you let the planned orders be converted in R3 else
you normally would use the conversion indicator and send the planned order to R3 and it gets converted to Process Order there -
Error when convert planned order to process order
when using tcode COR7, unable to convert planned order (make to stock) to process order.
error message: No default value is maintained for operation generation for order type ZI03
note: order type is customised.
please assist where to check or maintain the default value..TQVMDear ,
Create default operation for the process order type and plant combination in OPJG and then check for converting the planned
order to process order.
If you want the system to automatically pick the master recipe,then make the necessary settings and selection ID for the process
order type and plant combination in COR4.
Check and revert
Regards
S Mangalraj
Edited by: Mangalraj.S on Sep 24, 2010 1:51 PM -
Purchase order vs planned order vs process order vs production order
Hi,
Kinldy explain difference between the Purchase order, planned order, process order and production order?
Thanks & Regards
Ravi kumarHi Ravi,
In simple terms:
planned order - A procurement proposal generated by the system to meet a need, this can then be converted to a production / process order (for internal procurement) or into a purchase reqn & in-turn to Purchase order (for external procurement)
Purchase order - A firmed procurement proposal which is sent to your vendor (external procurement) to supply the items as per your order
process order - A firmed procurment proposal which is used for in-house procurement, this is used in process industries eg: chemicals, oil & gas etc
production order - A firmed procurment proposal which is used for in-house procurement, this is used in discrete production industries
Based on the above am quite sure you should be able to figure out the differenced. If any doubts revert.
Regards,
Vivek -
Is there any soln to display production line for process order in COOISPI?
HI,
When we run COOISPI for planned orders, the field MDV01 "Production Line" populates correctly (based on the value in the production version associated with the planned order). However, you run COOISPI for process orders, that same field is now blank.
Any pointer on how to display MDV01 in case of Process order.
Thanks in advanceThanks for your reply. my requirement is to populate the field value of production line in the CIOISPI report. I have production line assigned to production version. It does display if you see the results for Planned order but not for process order and the 'production line' field remains blank. More importantly i am trying to display the results for the same production version in case of process order,
Can you plz provide me any pointers or the way we can have production line value if want to display COOISPI for process order.
Regards,
Nitin -
Can we delete or cancel a Transfer order after confirmation?
Hi,
We want to delete or Cancel a Transfer order after confirmation.
We reversed PGI, cancelled shipment and trying to delete a line in the delivery, but it says "item already confirmed by TO".
Any pointers?
Thanks
Edited by: Chandru on Jun 28, 2008 3:01 AMHello,
Cancellation of TO - LT15.
Cancellation of TO for Storage unit - LT16.
LT0G - Return delivery to stock
Prase -
How can I delete pics from photos in order to free up space on my iPod 5 with iOS 8?
In iOS 8, how can I delete pictures from photos app because I have run out of space, I need to delete at least 6 GB of pics. I deleted many purchased apps but it did not restore space. When I connect to iTunes it shows about 4 GB's allocated to documents & Data. I do not have any documents or data , also it shows a couple of GB's allocated to "other" I checked everything on the iPod and the only thing I can see using all my space is the pictures. Almost 12 GB's of space. I have all the videos and pics backed to iPhoto library on my iMac. The trash can is disabled on iPod, but enabled on iPhone and iPad. Why is the delete/trash can feature disable on my iopd? I need to delete the videos and a lot of pics.
Were the photos synced to the iPod?
If so you have to unsync them or use a third-party computer program like TouchCopy or PhoneView
An "other" larger than about 1 1/2 GB indicates corrupted files.
What is the Other on my iPhone and How to Remove It
What is "Other" and What Can I Do About It?
Next, usually restoring from backup eliminated the corrupted files. However, sometimes restoring to factory settings/new iPod is required.
To restore from backup see:
iOS: How to back up
To restore to factory settings/new iPod see:
iTunes: Restoring iOS software -
MTO-Need to block (Not to Change)plant in sales order after process order
Hi All,
We are creating MTO sales order and requirement has been forwarded to MRP. Planning person is creating process order and will start their work. Sometime sales person change the plant in the existing sales order. Say for ex: changing the plant from 1000 to 1001. But requirement is already been transferred to 1000 plant. After changing the plant in sales order again the same requirement transferring to 1001 plant for planning. So based on this, 1001 plant also started producing the material. Here the problem is both the plants are producing for the same requirement. Now I need to control the this problem. Is there any way to control in std sap? if possible which way we can control? Please share your ideas.
Thanks in advance,
Babuhi
use user exit
MV45AFZZ
FORM USEREXIT_FIELD_MODIFICATION
here you write the logic
when production order exit that line item plant is not changeable , -
Conversion of planned order into process order not respecting F-S
Hi Experts,
I am working in Upgrade project from 4.6c to ECC 6 .
I have an isuue in PPPI
I have a process order which has to be converted to process order .
This operation should take place by phase 210 first then phase 300 .
But in our case the Phase 300 is starting first .
please suggest me where to find the trouble.
Thanks in advanceHello,
I am afraid that when I enter procurement type=X & special procurement=30 in material master data, planned orders created by MRP have then a order type = NB (standard purchase order) and special produrement type = 3 (subcontracting).
So this kind of planned orders can only be converted into purchase request and NOT into production order.
It looks like it is not standard to do so in SAP and that I will have to manage subcontracting in prodution order; 1 routing for internal operation and 1 routing for subcontracting.
Thanks
Amaury -
Spliting of planned order to process order
Hai gurus,
I have an issue:
For example if i have requirement for 1000numbers of finished goods, and if I run MRP and create a planned order under
PI scenario, But I want to create process order for the qty daily (For example 100 numbers), can I do this, and also this
daily qty may vary based on the available resources,( some times it may be 100 or 110 or 120) for that day production.
If that is the case can I create the process order daily based on the master planned order .
waiting for the positive reply.
with regards,
sekar chandDear,
Through COR7 - Individual Conversion or COR8 you can partial convert your planned order to the process order as per your resource availability you can define the order quantity during conversion.
Regards,
R.Brahmankar
Maybe you are looking for
-
Where can I get a 2nd Tray for this HP 8600 PRO and how much? I am in Brisbane
Where can I get a 2nd Tray for this HP 8600 PRO and how much? I am in Brisbane Thanks Ftcukoz
-
Lightroom 3 wiping all my presets
I purchased Lightroom 3 as a download last year, and I've had constant issues with it ever since. Problems include the following: -On startup, it says my camera profiles are missing, and to reinstall Lightroom to fix the issue. Of course, reinstallin
-
PC00_M40_CALC_SIMU
I want to save the contents of the RT table for a particular wage type into an excel sheet after I run the Payroll Simulation program using the tcode PC00_M40_CALC_SIMU. The RT table is not updated with the new values since its a simulation program.
-
I can't open my Hotmail account in Firefox
I think I know what my problem is but I don't know how to fix it. I attempted to delete unauthorized contacts in my contact list on one of my Hotmail accounts, and I think I messed up the default settings. Since then, I've been unable to access the a
-
Installation of Photoshop CC to non-default drive via symlink
I downloaded Creative Cloud and installed Lightroom 5 without issue, but because they defaulted to my very tiny SSD system drive I moved them to my storage drive and created a symlink for both in their original locations. Now I am attempting to insta