Can we give same Excise Group to two diff. Plant within same company code
Hi,
Can anyone please tell that whether we can assign same Excise Group to two different plants within the same company code in SAP.
Regards,
Yes you can use but, you shouldn't use same excise group for two different plants in one company code, if their physical location is different.
As many excise report are fetched on the basis of excise group, there it will show combined values for both plants, whcih may not be acceptable to exices authorities.
Regards,
Sachendra Singh
Similar Messages
-
STO - Two plants within Different Company Codes
Hello,
Kindly help me out with this case, i want to create a STO for two plants within DIFFERENT company codes, so i've created all the required configuration and master data including creating the supplying plant as a vendor and the ordering plant as a customer, also all master data is maintained in both plants and i tried the scenario on the IDES system and it works okay so i know i'm on the right procedures. The problem is that i create the PO, but when i go to Transaction Code VL10B to create the delivery it gives me an error ( Delivery with no Line item not allowed ) even though there is more than enough stock in the storage location. Kindly help me out.17.01.2010 Stock 10.500,000 0,000 10.300,000
13.01.2010 Order Totals record 100,000- 100,000 10.300,000
13.01.2010 Deliv. Totals record 100,000- 100,000 10.300,000
17.01.2010 StLcSt SLFR 10.500,000 0,000 10.300,000
13.01.2010 Order Totals record 100,000- 100,000 10.300,000
13.01.2010 Deliv. Totals record 100,000- 100,000 10.300,000
17.01.2010 BtchSt 123 10.500,000 0,000 10.400,000
13.01.2010 Deliv. Totals record 100,000- 100,000 10.400,000
17.01.2010 BStLoc 123 /SLFR 10.500,000 0,000 10.400,000
13.01.2010 Deliv. Totals record 100,000- 100,000 10.400,000
This is the whole table.
This is what i got. i believe that it is an availability check problem, i just can't see what is the solution.
SLFR is the Storage location of the issuing plant. -
How to create group bom for multiple plants with different company codes
Dear all,
In my current scenario we have 5 Company codes with a plant with each company. The same kind of materials exist in all the 5 plants, so what i want is when i create any BOM, that BOM has to extend in all the company codes, as with GROUP BOM i can able to extend the same in only one company code.
So how to do this?
Thanks in Advance
BhushanFor that first extend all the materials to all the plants... In one plant create a BOM for the material..
In all other polants in CS01, click COpy from .. There you mention the matreial and the plant in which the BOm is alerady available..
karthick -
Hello there - how can I share my iTunes library between two users on the same computer? I put the library in a shared folder between both and have selected this library on both as well, but when I update iTunes with music etc it only appears on one?
Thank you Joe - I tried this but it's only showing a teensy amount of music - the stuff on the second users account as opposed to the giagntic library on the 'main' account. I actually went to a Genius Bar and they said that apple doesn't really want you to share music between accounts - parents don't want to hear their kids music etc. Which seemed strange, but it might be the case sadly Thanks anyway!
-
when i try to download an epub book it says i can't use the same adobe id on two diff computers. i installed a new hard drive, it is the same computer. how do i fix this
Hi donc58609443,
Can you attach the screenshot of application window so that i can assist you better?
Regards,
Rahul -
Stock Transfer Between two plants within same company code
Hello,
We are using scenario-'Stock transfer between two plants within same company code. Scenaro is like Plant A is receving plant and Plant B is delivering Plant.
Plant A release PO for 100 nos to Plant B
Plant B issues 100 nos (via delivery) to Plant A
But Plant A receives only 50 nos physically so they do Goods receipt for 50 nos , but document got generated for 100 nos (when plant B issues material).
Now Plant A do not want to receive remaining 50 nos physically, but wants to reduce material document which got created when goods issue posted by plant B
Now stock in transis (mb5t) is 50 nos.
How to reduce this material document. or any another alternative solution for this?
Thanks,
ShaileshHi There
Reversal of partial is not possible ,
But you can use the Mov Type 557 and 558 to do the adjustments in Stock in transit qty
Few more details on STO adjustments
Hi There
it can be settle in many ways,,,
1. Receive the goods as 100 and Scrap the 50 nos from the received plant,,- If the receiving plant is responsible
2.Revert the PGI/Transfer movement(Vl09) and send the 50 nos again from the supplying plant- of the Supplying plant is responsible,
3.Also we have the movement type 557 and 558 without doing the above two steps you can correct the qty from stock in transit itself,,
4. also you can check the below similar thread
STO - material lost during tranfer from plant A to plant B
5. If above are not ok, then receive the goods as 100, And raise the STO as your plant as supplying plant and receiving plant is (Supplied 50 nos less) plant,, Do the process without sending the material.. in this way that 50 nos can be adjusted,,
6.Here is some more details
557 Issue from stock in transit (adjustment posting)
Only use this movement type (also the reversal movement type) under the following circumstances:
Using movement type 557, you can correct purchase-order-independent stock in transit if
- a good receipt cannot be posted to a purchase order without stock in transit, even though there is still stock in transit according to the purchase order history
- stock in transit still exists, even though there are no open stock transfer orders for the particular material
This movement type may ONLY be used in the cases mentioned above after careful analysis, to correct stock in transit that has rounding errors.
This movement type may not be copied.
Note!
Before using this movement type, note the following:
- 392205 Analysis stock in transit / Correction if split valuation
Possible special stock indicators:
E, Q
7. As previous post says if you have the note for this issue you can use that also
You can use any one of the way to solve the issue, Hope it helps
Cheers
Senthil P -
Can we call an ODI package from another ODI package within same Project?
hi All,
Can we call an ODI package from another ODI package within same Project?What you can do is get all the interfaces on the old package that you want to be included in the new package. This way, the new package will have the exact code from the old package.Or generate a scenario out of your ("old") package and drag&drop the scenario in the "new" package.
That seems easier to me, because you can re-use the scenario as often as you want.
But you have to take care: If you change your original ("old") package, you have to regenerate the scenario, otherwise the changes do not affect the scenario.
Edited by: h_elmu_t on 02.07.2009 08:50 -
Can Equipment No same for 2 Equip in different Plants of same company code?
Hi Gurus,
Please tell me if there is any possibility of having same Equipment No for 2 Equipments in Different Plants.
The 2 plants are in the Same Company code.
e.g. Equip Plant Company Code
1) Equip_DIE Plant1 A
2) Equip_DIE Plant2 A
If it is possible how the Equipment histroy and Breakdown history is updated in the PMIS.
Also tell me the advantages and Disadvantages of keeping same Equipment no for 2 diiferernt Equipments or otherwise keeping different equipment no.
With best regards,
Narendra DereHi Pete ,
Thanks for your valuable reply.
Actually I am doing implementation for 5 plants within same Company Code.
They are geographically distant (say 50km from each Other.)
The Finish Product is same but the method is different.
They have already assigned some Equipment Numbers in the Plant for Regular Maintenance Activities.
Since Planning and Maintenance can be done at the different Plant and team of the MAintenance is different, they dont hv anyproblem if equipment number is same. Otherway they wll have the added advantage that they can continue with there own Equipment no which can be same in differnt Plant.
e.g 800TONPRESS - Plant1
800TONPRESS - Plant 2.
With best regards,
Narendra Dere -
Transfer between two co.codes and two diff plants
Hi All,
I am trasferring material between two co.codes and two diff plants.I have choosen NB doc type.
I am facing problem in PO "Customer P2301 does not exist (please change entry in plant 2301)".
is that I have missed some settings?Hi,
Use Tcode XD01 and Assign the Plant 2301 to it..
Now try.
Hope it helps..
Uts
Award if helpfull -
We should give salary for GM from 2 companies , ie from 2 company codes ,
Team,
We should give salary for GM from 2 companies , ie from 2 company codes , how to do this?
plz help.
RexBut Concurrent Employment is for employee working for 2 countries, do we use this for 2 companies in a country
Rex -
Can i share music and photos between two users on the same machine?
How can I share my music and photos between two users on the same machine?
Thank you Joe - I tried this but it's only showing a teensy amount of music - the stuff on the second users account as opposed to the giagntic library on the 'main' account. I actually went to a Genius Bar and they said that apple doesn't really want you to share music between accounts - parents don't want to hear their kids music etc. Which seemed strange, but it might be the case sadly Thanks anyway!
-
Can you give names to groups?
Can one give unique names to groups in a slide?
I don't know how to move an object from it's starting position to another position on the screen. I know it can move off the screen but not to another position on the screen without a major workaround.
-
Different material group for two CO companies with same material no.
Hi all
We are implementing another CO company in COPA. The issue is that both companies use the same materials number, but in COPA grouping categories (MATKL) must be different . I was thinking in using another category, but is there another option?Hi,
By definition the materials should have the same material group (operationg concern - same market grouping).
However, if you have this as business requirement you need to first identify a field to store this. and then you an also use exit / derivation rule to replace the value with a condition on the company code. Advantage you have reduced the use of one more characteristic in CO-PA.
Hope this helps you.
Varadharajan -
APP for two separate plants for same vendor
Hello Experts
I have one company code and two plants. These plants are created as different profit centers. These two plants have their own payment offices and bank accounts. Both of them are individually responsible for payment of their own invoices only.
Now they both procure from one vendor. Say vendor X. Vendor ledger is same. When I see vendor line item report (FBL1N), I can see 70 open line items (open invoices). 40 line items pertains to 1st plant and 30 line items 2nd plant.
Now 1st Plant wants to execute APP. Their requirement is that it should only pick invoices pertaining to their plant only. How its possible?.
Note: since number of invoices are more, mentioning individual invoices in exclusion is not possible.
Please help
-MHi
Select document to change the assignment field in FBL1N through mass change update as PLANT1 for 40 line item and for 30 line items update PLANT2 in assignment.
In F110, select field Assignment and enter value PLANT1. system will pick up only PLANT1 invoices.
for future invoice you can update assignment field through validations, you have to check work around for validations
Regards
Sampat -
Same FGmaterial manufacturing in two difeerent plants
Hi all,
same FG material is manufacturing in two different plants andat the time of production planning ,how to evaluate the capacity of the each plant.
But the plannning will be done based on the available capacity of the each plant.
example,
for the FG materail 'XYZ' , planning plant is 'A' and the the production plants are 'A and B'.And the Fg inventory stovck is keeping as stock in the plant 'A'.
How to can i take a decission, how much quantity to be planned for the plant 'A' and for plant 'B'.
Scenario is MTS.
please provide the appropriate solution.
Thanx in advance.
Regards
SrinivasHi,
If you want to consider stock from more than two plants, you can use Quota arrangement.
Special procurement key 40 is not useful in this situation. Because in 40, you can assign one alt plant only.
Quota arrangements you can use it for,
1. Individual vendor
2. Another plant
3. Production version.
Hope you you are well known in Quota arrangements. In tcode MEQI assign the plant.
Regards,
Dharma
Maybe you are looking for
-
Using HTTPService to import data from a XML file
Hello there! I'm having some problem's with this import... If anyone can help, I would appreciate it! I'm using this type of information as data source: public var dataCollection:ArrayCollection = new ArrayCollection([ { id: "P1", name: "Porto", type
-
Error while creating document with attachment.
Hi, I am getting an error "An error occured while creating the original attribute for PDF" I tried with out file attachment, it works as you know it is simple.... I tried with various types of attachments like .TXT and .WRD (changed both wsapplicatio
-
NIMax has encountered a problem and needs to close.
I'm running LabView 7.1 on a Win XP machine. I started using LabView about a month ago to collect data with my pci-6014. Everything went fine until this morning, when I turned on the computer and immediately got an error message saying "NIMax has e
-
Suggestion in FOLIO PRODUCER panel : date the articles
hi is there any way to date the articles soon in the folio produer panel ? sometimes you can't remember if you uploaded this one or that one (espeically with the mess for upload we all know ...) becaus ewhen it comes to uploading AGAIN an article wit
-
Adjustments tab taking forever to load
Upon opening the adjustments tab for the first time after opening Aperture 3, it takes about 3 minutes to open. If I switch to a different tab and back its immediate, but if I close Aperture 3 and back into adjustments, looooooong wait again. Why doe