Can you change order of photos wihin an album?
Can you change the order of photos within an album?
Not natively in the iPad Photos app. Synced photo albums must be rearranged on the computer and then synced again. Camera roll photos can not be rearranged either. There are third party apps that allow you rearrange photos.
Look at Photo Sort for the iPad for one such app.
http://itunes.apple.com/us/app/photo-sort-for-ipad/id369610590?mt=8
I'm sure there are others. Just search in the App Store.
Similar Messages
-
I am searching for ways to organize my photo streams...alphabetical preferably.
Also how do you change the key photo from something random that i did not choose to be the key photo (in the photo stream/icloud mode).
Thank you!
sueAs far as I can see, sue, the shared Photo Streams will always show the photo last added as the key photo. So just make sure the last photo you add is a photo like to see as the key photo. I do no know of any method to arrange the photo streams alphabetically. My photo streams are neither shown in chronological order nor in the order I created them.
-
How can you change the thumbnail selected for an Album in Photos?
I'm having difficulty changing the photo that is automatically selected as the thumbnail on an iPad Air and iPad Mini. How can I change this, and what parameter governs which photo is selected?
There are a number of threads about changing the name, the creation date, the modified date, and none of those have worked for me. After changing these various parameters, I have unsynced and resynced photos, and at this point, it is becoming an obsession of mine to change this. :-)
I would appreciate any input if you've been able to do this in iOS7 and Maverics. Thanks in advance!
- RobertOkay, now it is working. I had to save the XLSX-file into the older XLS format, but that seems to work quite well.
But I won't ever understand why InDesign loses its backward compatibility from one version to the other.
Thank you, -hans-. -
Can you change the tab order in Muse forms?
Can you change the tab order in Muse forms?
Hi Rebecca,
By tabs do you mean the form fields? If yes, then you can simply rearrange them by repositioning the other fields using mouse.
However, the e-mails that are received on submission of the forms show the original sequence of the fields.
Regards,
Neha -
Can you still order photo books if you're running iPhoto '09?
I have an older MacBook and I'm running Snow Leopard and iPhoto '09. (I was thinking of upgrading to iPhoto '11 but it's no longer available for Snow Leopard in the App store. Don't really want to buy the CD version when I don't use any of the other apps.)
I'd like to create some iPhoto books as gifts but I don't want to spend a lot of time on them if they won't work with iPhoto '09. Can you still order them from the old version of iPhoto?yes - Also with iPhoto '08
LN -
When creating a book in iphoto, how can I get all the photos from the album I want to use to show up in the order that they are in the album? When I tried to use the option to add my own photos instead of having the program "flow" them, they showed up all mixed up.
iPhoto puts them in the book in chronological order. So to get your photos from an album into an iPhoto book in the same order you will need to use the Photos ➙ Batch Change ➙ Date menu option and set them all to the same date with a 1 minute time difference between each.
OT -
I have a Mac OSx 10.6.8 and iPhoto 7.1.5 and can no longer order printed photo albums unless I update to new version of iPhoto. But reviews of new iPhoto are so negative that I am uncomfortable about buying it. Will it be fine or should I steer clear of trouble and accept that i can no longer publish my photos?
iPhoto '11 is working well.
The reviews usually only show the comments of people who do not like the changed features.
To get an idea what to expect, when you upgrade, look at the iPhoto '11 support sites.
The video tutorials: http://help.apple.com/iphoto/index.html#button-0
Browse the help, to see how it works: http://help.apple.com/iphoto/index.html#button-1 -
How do I change the order of photos in ipad albums in ios 8 ?
Hi
I've just upgraded my ipad mini to IOS 8.1. I want to create a slideshow in Photo (iPhoto no longer supported) but can't find how to change the order of photos within an album. Has anyone any suggestions/ideas ?
Many thanksOpen the album. Tap select. Hold your finger on the photo till it enlarges then slide it to it's new position. Tap done when you're finished.
-
How can I change my Profile photo or edit the thumbnail?
QuestionHow can I change my Profile photo or edit the thumbnail?
AnswerThere are a couple of different ways to change your profile photo or thumbnail image on Tagged.
Here's a quick How-to video that shows you how to change your profile photo
If you wish to change your profile photo, follow the instructions listed below:
Hover your mouse over 'More' in the top Nav bar and select Photos.
To use one of your previously uploaded photos as your profile photo, place the cursor over the photo you wish to use, and click the small green “#1” box when it appears
If you wish to use a new image as your profile photo, upload the image to your photo gallery, and then click the small green “#1” box on the photo
If you are viewing one of your photos individually, you can also set it as your profile photo by hovering over it and clicking the same green "#1" button. You may also edit the caption and comment on your photo in this view
You can also change your profile photo by doing the following:
On the Navigation bar click Profile and select the Edit Profile link to the left of your Profile picture.
To upload a photo locally from your computer, click the “Browse” button, select the image you wish you use, and then click “Upload”.
To upload a photo using an image URL address, click the “Add from image URL” link, paste the URL address into the field, and click “Add Photo”.
To use a photo from your gallery, click the “Use one of my photos” link to open a thumbnail gallery of your uploaded images. Click on a thumbnail to set that image as your profile photo.
After selecting a photo, you can alter its thumbnail by the marquee box by dragging the “anchor” points of the box. When you are finished, click "Save Thumbnail"HELP! I was fooling around with my profile pic and selected and saved a cropped thumbnail. I hate it, and I haven't been able to figure out how to return my thumbnail to just a mini-version of my full profile pic. I've even re-up-loaded a copy of the original photo, with a different file name, but Tagged automatically crops it to the same thumbnail. Is there any way to return my thumbnail to just a mini-version of my whole pic? Thanks for your help :~)
-
After having updated Ipad2 to IOS7 I can't change Video to Photo and viceversa on photocamera. Solutions?
Have you tried swiping up or down on the screen in the photos app? When you swipe up or down, that cycles through the Photo, Video and Square modes in the app. The current mode appears in yellow type.
The screen on the iPad in photos App is going to look different that what you see if you click on the link that was posted for you above - that link shows what the screen will look like on the iPhone, but they are similar. -
Can you mirror image a photo in iphoto
Can you mirror image a photo in iphoto? Or is there another way it can be done?
You need to either set Preview as the external editor and then flip the photo using it tha tway or export the photo to the desktop, flip it and then import the new photos into iPhoto
You must NEVER make changes directly to the content of the iPhoto library using any program including previes
LN -
Can you change RAW to DGN in cs5?
Can you change RAW photos to DGN with CS5?
Is there a download?You can download it here: http://www.adobe.com/products/photoshop/extend.displayTab2.html#downloads
As an alternative, you can save the raw file as a DNG in Camera Raw, if your camera is supported. -
HT201250 How can you just back up photos. 2000 of them
How can you just back up photos with Time Machine. 2000 of them
peterz911 wrote:
I am a photographer and trying to backup my photos. I would be using Seagate Backup Plus USB 3.0 , 1TB.
I am very computer illeriate so please dumb it down so I understand.
Hook up the Seagate drive (don't use their software) to the Mac and a TimeMachine window should appear, click yes and let it work for hours until completed. Hook up occassionally and it will backup your entire boot drive.
If you need to format the drive, open Disk Utiltiy in your Applications > Utilities folder, click on your new drive on the left and Partition, 1, Option GUID and OS X Extended Journaled as the format and click apply.
You should get another external drive, this will be your storage drive for a duplicate of all your photo's.
Connect it to the Mac, format it the same way as above, then you need to drag and drop your photo's to it.
If your photo's are in iPhoto, then inside your Pictures folder is a iPhoto Library, drag and drop it onto the icon of the external storage drive every time you want to make a backup.
The first time you drag and drop, it will copy it.
The next time you do it, it will ask if you want to replace the iPhoto Library with the new one.
If your sure you want to do this, then say YES.
If you want to make multiple dated backups of the iPhoto Library, double click on the external hard drive icon and it will open into a window.
Use the Finder > New Folder and you can click on the name and change the type to date, then drag the more recent copy of iPhoto Library to that folder.
This way you can have more than one copy of the iPhoto Library on the external storage drive at the same time as they are in folders. This way you can create a archive of dated photo's.
Good Luck, and take a class or have someone teach you about basic OS X user interface. -
How can you change your security question for I tunes?
How can you change your security question for I tunes?
If you have a rescue email address (which is not the same thing as an alternate email address) set up on your account then the steps half-way down this page give you a reset link on your account : http://support.apple.com/kb/HT5312
If you don't have a rescue email address (you won't be able to add one until you can answer 2 of your questions) then you will need to contact iTunes Support / Apple to get the questions reset.
Contacting Apple about account security : http://support.apple.com/kb/HT5699
When they've been reset (and if you don't already have a rescue email address) you can then use the steps half-way down the HT5312 link above to add a rescue email address for potential future use -
Can you change the legth of time (or number of rings) it takes for on iphone 4 to time out making an outgonig call?
Mostly it's to call in for radio contests. The Iphone is really good at making a quick call, but it seems to timeout after 15-20 rings. I realise this is a small thing, but free tickets is free tickets.
Most commenst I see is abotu incoling calls, not outging.
Thanks.No. You can't do this with any phone.
Maybe you are looking for
-
Is it possible to transfer money from one account to another?
Basically I just want to know if it's possible to transfer money (for like, downloading apps and stuff) from one account to another and, if it is possible, how. Thanks in advance.
-
First Generation iPod Mini Pauses Between Songs
Hello, all! I have a first generation iPod Mini. I also have several albums that were designed to flow naturally from one song into the next with little to no break in between the songs. This does not come through in the iPod mini. There seems to be
-
What is Ads Removal 1.0.0 ? Is it malware or a virus?
When I opened firefox today, this add-on just appeared. I don't know if I can trust this or not. Is it malware? If so, how will I be able to remove it?
-
How to open Excel when Safari downloads
I am using Safari 7 in Mac OS X Mavericks I download many Excel and Word documents during the work day. Pdf's open automatically, but not Excel or Word. I have searched and found a few posts that say adding com.apple.DownloadAssessment.plist to Libra
-
I have changed broadband providers - when I type in their Wireless Security Key (WPA) into my Ipod it comes up - INCORRECT PASSWORD - I know it is case sensitive I am putting in numbers and capitals but does not work. Is there another Passwo