Cancel Change Number control in material master routing maintance?

Dear expert
         In our company, we have PLM function and must enter change number in material master and routing  screen
MM01/MM02 CA01/CA02,could I cancel this control and where is the configuration  path in SPRO?
Thanks
Linfeng

Kindly check in OS54.
Under Revision Level, unselect the check box Rev. Level active. If you want that automatic, you can go for Rev. Lev. Automatic. Before doing any changes in config, please explore pros & cons of the same.
For routing, in OP5A, set the field selection as Change Number - Input
[Change Management|http://www.sap-img.com/pp007.htm]
Regards,
Edited by: Maheswaran.K on Aug 3, 2011 10:27 AM

Similar Messages

  • How to cancel serial no. profile from material master ?

    dear all SAP experts,
                I have 1 mateial in which i assign serial no. profile in work scheduling view in material master. So how can cancel serial no. profile from material master ?
    Suggest me
    regards,
    Nitin Nerkar

    As long as no serial numbers exist for the material you are able to cancel or change the serial number profile.
    As soon as serial numbers exist for the material and you want to change or delete the serial number profile, you must note the following:
    The previously assigned serial numbers are no longer suited to the current serial number profile.
    The indicator for the stock check may have changed. If this is the case, you can copy the profile settings in the serial number using the executable report program RISERNR9. However, you should only start this program once the changes have been updated in the material master record.
    You can no longer delete the serial number profile in the material master record. Instead of this, you create a serial number profile without serialization procedures in Customizing and enter this in the material master record.

  • How to find Change number for a Material

    Hi,
    If we know the material number and Revision level then how can we find the Change Number of that material.
    Is there any table in which i can find Change number for a revision level or is there any Function module available.
    Regards,
    Vaibhav

    Hi Vaibhav,
    Is there any table to find the change number and revision level of a material. I have change number and material and revision level coming from external system. But i need to check that with SAP whether it exists or not.
    Is there any table link to find whether a material has change number.

  • How to Change Batch Classification of material master

    Hi,
    How to Change Batch Classification of material master  in a production system,Pl note that there is no stock and no open qty still system is not allowing me to delete the old Classification and add my new classification.
    Guys any solution for this.
    Thanks in advance
    rgds
    bijaya pradhan

    I believe there is a FM VB_CHANGE_BATCH for this, any body tried this FM?

  • Change Message Control for Customer Master data

    Hi Friends,
    I have to choose/populate a message when the user is about to create an already existing customer.
    In SPRO --> Financial Accounting --> Accounts Receivable and Accounts Payable --> Customer Accounts --> Master Data --> Preparations for creating customer master data --> "change message control for customer master data" ...
    OK...
    When u click this it goes into Change View "message control by User" Overview screen wherein u can insert new messages and texts and the type of message ....
    Now .....
    I want to display the 145th message (F4 help of the Message column) ..... it picks up the text "Customer found with same address;check"..... with Online mesasage type 'I' and batch type 'I' and with standard type '-' ..
    I want to have the same message with message types 'E','E', and 'I' respectively.......
    How is this possible (or) what should i do to meet my requirement :-|
    Expecting ur answers
    Thanks in advance ........
    Cheers,
    R.Kripa.

    Hey yes it is not possible (as of now
    I ve met the requirement by just using message statement in the program itself ............
    My requirement is met but still if anyone knows about this do answer / reply
    Thanks
    Cheers,
    R.Kripa.

  • Change profit centre in material master

    Dear all,
    How to change profit centre in material master with stock(opening balance - 561 stock ?
    What are implications of changing profit centre in material master ?
    Jeyakanthan

    In standard SAP it is possible to change the profit center at any time.
    However this will create inconsistencies in your profit center accounting. Hence you should issue all stock first to a cost center with 201 movement, then change the profit center, then get the material back with 202 movement.
    You need to make MM335 message an error message in OMT4 to allow a change only if there is no stock
    If you dont follow this way, then you create inconsistencies in profit center accounting.
    Because...you received your stock without profit center (actually it is a certain default profit center), if you then change the PC in your material, then each issue will be posted to the new PC, while it never had a receipt.

  • *How to change the Valuation Category & Price control in material master*

    Hello SAP Gurus,
    I have a requirement to change the valuation category from 'X' to '  ' in accounting view of material master.
    -> I have cancelled all the open PO's & SO's for the material
    -> I have ensured that there is no stock for the material in that valuation area.
    But still I get an error message that batch already exists for the material. When I check entries in MCHB I find that there are previous entires in MCHB with zero stock.
    I have gone through the SAP note 155874 which recomends the archiving the effected objects.
    Please let me know is there any work around to change the valuation category from 'X' to '  ' & price control 'V' to 'S'. I also need to change from '  '  to 'X' for a few materials.
    Thanks for your advise.
    Best Regards,
    Narayan.

    Note 155874 cleary describes what has to be done to be able to change.
    There is no workaround, and if you change anything in the tables directly, then this will cause inconsitencies, as described in this note as well.

  • Change of price control in material master

    Hi, SAP experts,
    We have  business scenario where the procurement type in MRP-2 view of material master gets changed from F to  E that is an externally procured item will be manufactured inhouse.
    In such case in costing view the price control needs to be changed from V to S. If both MAP & std. price  are not identical, system is not allowing to change. Secondly since the item will be manufactured inhouse from now onwards, I have to run the cost estimate & update the master.
    How do I deal with the situation.
    Valuable advice is awaited.
    Regds
    T.S.Shankar

    Hi Shankar,
    When the price control indicator is "V", system will allow changing the Standard price manually through Transaction code MM02.
    Similarly when the price control indicator is "M", system will allow changing the Moving average price manually through Transaction code MM02.
    Hope this clarifies
    Regards,
    Som

  • Error while changing the UoM in material master

    Hi experts....
    I am not able change the UoM in the material master. Even if,  all the PR , PO and reservations are cancelled .
    It still gives me error message " Manual  Reservations already  exists "
    Thanx
    Ganesh

    Hi
    may be some entries got not cancelled properly and entries got locked.
    Just check in SM12 if no entries are locked.
    regards
    Sidi

  • Price control in material master.

    Dear all,
    How can i change the Price control key(V to S) in material master.
    and what are the implication after change the price control.
    Please suggest.
    Regards,
    Vishal Garg

    Hello
    In the SAP System, there are two types of price control:
    Standard price & Moving average price.
    These two types of price control differ in how they handle price variances resulting from goods receipts or invoice receipts.
    Changing the Type of Price Control
    Under certain conditions, you can change the type of price control:
    From standard price to moving average price
    You can make this change at any time. The moving average price (which until now has been updated for informational purposes only) replaces the standard price and is used for valuation from now on.
    From moving average price to standard price
    You cannot make this change in the following two cases:
    If the material master record is set up as a valuation header record for a material subject to split valuation
    If the standard price comes from costing and is not equal to the moving average price
    If the change is possible, the moving average price becomes the standard price, which is then used for valuation.
    You change the type of price control by overwriting the price control indicator in the material master record with the new indicator.
    Changing the type of price control for a material does not change the value of the material stock, since in both cases the current price becomes the new price.
    An example is given below:
    Standard price to Moving average price
    Material A
    Price control: S
    Moving average Price: 8
    Standard Price: 10
    Total Stock: 100
    Total Stock value: 1000
    Now we change the material price control to 'V'. Then
    Material A
    Price control: M
    Moving average price:10
    Standard price: 10
    Total Stock: 100
    Total Stock value: 1000
    Moving average to standard price
    Material B
    Price control: V
    Moving average Price: 8
    Standard Price: 0
    Total Stock: 100
    Total Stock value: 800
    Now we change the material price control to 'S'. Then
    Material B
    Price control: S
    Moving average price:8
    Standard price: 8
    Total Stock: 100
    Total Stock value: 800
    Hope this will clear your doubts.

  • Changing field status in material master.

    Hi,
    how changing material status in material master so
    that moving average price will become a "display" field?
    Actually is possible modify the valua and this is dangerous.
    Best regards

    Hi,
    The material master moving average or standard price field values are tied to the Pricing Control field value (V or S). However, these values are open for changes only in first time creation mode and once you start processing using that material in any transction, it becomes greyed out automatically.  You just can't change the value from MM02.  However, FI team in general takes control over this value because it is a matter of costing.  The price change subsequently, will be taken up during cost rollup process periodically by the same CO consultant in the project using transactions MR21 and MR22.  Hope, this helps..
    REgards

  • Change of UOM in material master?

    Dear SAPIENTS,
    I created a material  with UOM (M)just now and than assigned to inspection plan. Now I am changing the UOM of material to Nos.. I was getting following
    Error: The base unit of measure cannot be changed
    The reasons for this are
    Routings already exist that are assigned to the material.
       RType          RtgGrp            GpC         Plant
       Q             QRW6MTQT        1            1100
    SO I removed the material from inspection plan. But still I am getting the same error. Can anybody tell me the reason behind it?
    Regards,
    Kaushal Rai

    Hi Kaushal,
    You need to delete it from the table also.
    The table is MAPL
    To delete entry from table
       1. Run trx SE16n (preferable) or SE16.
       2. Enter the Table MAPL.
       3. Enter the group and counter number.
       4. Now in the command window (Where you type the T Codes) type "_&sap_edit_". And press enter.
       5. A message such "SAP editing function is activated" will flash.
       6. Execute
       7. Delete the entry.
    Then change the UOM
    Regards,
    Shyamal

  • Costing error while change mrp data in material master

    Hi dears,
    This is Rem process. when i try to change the material master MRP data ex. ( mrp type M1 to M0)
    system not allow to change and show the error as
    Product cost collector 000000750122 is still active (assigned to PrCtr 50601-025)
    i need to change the mrp data in mm02 and i donot want to do delete the pcc .
    any process to carryover
    thanks
    Edited by: raj on May 24, 2010 12:22 PM

    Hi,
    MRP is mainly configured for a material so that tere would not be any need for manual checking of the stock so as to create a PR. 
    The parameters which you have specified for a particular material like reorder point and lot size will help in planning for a particular material.
    If you need only Qty of two (Less) then  there s no need of configuring a MRP for that material
    And lot size is also decided basing on certain other factors like
    1) Lead time
    2) Transportation costs involved in procuring the material etc
    So ifyou want to generate PR for a qty of 100 then you need ot change the lot size
    I hope this gives you clarity
    Thanks & Regards
    Pavan

  • How to change Valuation class in material master(have stock)

    HI,
    I would like to change the valuation class in material master, How to change VC? is there any process before changing VC?
    I heared when Material have nil stock then only it's possible to change VC, Is it correct? which TC can I use for change VC?
    Regards,
    venki

    Dear venki,
    To change Valuation class you must have zero stock in the current period, and zero stock at the end of the last period, plus no open PO lines .  flag for deletion all open PO lines,
    Regards
    shankar

  • Restrict change authorization for MM17 (Material master mass maintenance)

    Hi,
    Apologies if I have posted this in the wrong forum. I want to know if it is possible to use the mass maintenance transaction MM17 (indus. material) to display data only istead of change/create. Is there some setting at the basis object level which can enable this? There are currently a lot of custom abap reports and queries in our system for viewing material master data, these can all be replaced by MM17. Basically we want to use MM17 as a reporting tool to display data only. Is a solution possible? Help is appreciated, thanks.
    Regards

    Have you tried the MM Information System node in the SAP Easy Access menu? There are a bunch of standard reports with navigation options there, for the user who has the correct authorization to display only.
    Alternately, you may want to take a look into transaction MASS and use the B_MASSMAIN object, depending on your requirements - but test it well.
    Cheers,
    Julius

Maybe you are looking for

  • Issue while installing Exchange 2010 SP3 in SBS 2011

    I tried installing the SP3 on my SBS 2011 box but it asked for a Hotfix from KB2550886 to be installed. When I tried to install the Hotfix it said that it does not apply to my SBS 2011 box and did not install. However I went ahead with the installati

  • Exception in using rssutils.tld in jsp

    hi,I met an exception in using rssutils.tld My code is: <rss:feed url="http://rss.xinhuanet.com/rss/food.xml" feedId="food"/> <rss:forEachItem feedId="food" startIndex="0" endIndex="5"> <rss:itemTitle feedId="food"/> </rss:forEachItem> and it worded

  • Continuosly check in flex

    Fist of all, i've wrote my app in flex recently. It's an MP3 player. This is my result: http://124.104.15.82:3000/music/6b86b273f-1-2-3-ngoi-sao (i running locally, be gentle) i still not yet figured out how to make the slider run while the song is r

  • File Compare, Dreamweaver CC, OS X Yosemite

    I'm sure this is asked and answered somewhere, couldn't find a good search result. Moved from DW CS6 to CC and also to OS X 10.10 and (of course) the File Compare function no longer brings up FileMerge. There used to be a command line FileMerge at XX

  • Proper work flow before multiclip? Crop, Resize, Edit?

    Hey all, I have quick question as to what is the proper work flow that I should follow? I have 4 camera angles synced up with an external audio source in Sequence 'Sync'. Now should I go through and make any crop and resize adjustment to all of the c