CANNOT CHANGE PLANNING DATE

HI GURUS,
We posted a SD document 180000XXXX Base line date 16.12.2008 and Payt terms C003 (30 days) thE planning date must be 15.01.2009 but the Planning date is 12.01.2008. We intented change the base line date, the Payment terms and the Planning date doesn´t change. Can someone knows how can we fix the date line??

We have  the OBB8 terms OK. but in this document in particular when we use FB03 the planning date is not correct, the Net Due Date is correct(15.01.2009), but for Treassury the Planning date is not correct
Payment Terms: C003 (30 days)
Bline Date:    16.12.2008
The planning date (claculated by SAP): 12.01.2008  (This day is not correct, SAP is not taken 16.12.2008 + 30 days)
I tried changing the bline date and the Payment Terms but it doesn´t work for this particular document? Anybody knows WHY?

Similar Messages

  • Function for changing planned dates of activity

    How can I change planned dates of activity in code ?
    Is anyone familar with a bapi/function for this ?
    Thanks,
    Nitzan

    Hi Nitzan,
    Actually When you want to change planned date of the activity?
    If it is during the processing of the activity, you can do it by  two methods
    1)Either by using a call back function module configured in CRMV_EVENT transaction. In this function module read the date using CRM_order_READ FM to read ET_APPOINTMENT table.
    Then use CRM_ORDER_MAINTAIN to change to change the date.
    2) use the BADI order_save and implement the method  CHANGE_BEFORE_UPDATE and put the same logic.
    OR
    if you want to do it externally, use the BAPI BAPI_ACTIVITYCRM_CHANGEMULTI to change the activity dates.
    Regards,
    Annu Cyriac

  • Cannot change posting date of a parked document. See addt'l details inside

    Hello again SAP experts,
    I was just wondering how come I cannot change the posting date of a parked document. The document type of the said parked document is a "BATCH INPUT" only document type.I already set in config that the posting date be changeable for parked docs.
    Is it not possible to change the posting date even if the status is only parked? Our client requires that the posting date still be changeable for BATCH INPUT only doc types. Please help.
    BTW, listed below is the error message that the system displays. Thanks
    Document type AA only defined for batch input

    Hi Loong,
    First and foremost, thanks for your time answering my queries. =)
    Going back to the topic, the OB32 suggestion didn't solve the issue. I added BKPF-BUDAT in the list, and made sure that it applies to all account types. I also tagged it as changeable field.Still, the system displays the error Document type AA only defined for batch input
    Is there such a rule that for doc types that are tagged as for BATCH INPUT only, you cannot change the posting date?
    Our client requires that the posting date still be editable.
    Please help. Thanks a lot!

  • Function module / BAPI for changing planning date (FDTAG)

    Hi everyone,
    Let's go for a problem.
    Many FI documents have been created in our system, with a wrong planning date, these documents have to be changed and I have been trying to develop a report.
    I am having a big trouble finding a function module or a BAPI which allows me to change the planning date (FDTAG field). I have been trying these function modules:
    FI_ITEMS_CHANGE
    FI_DOCUMENT_CHANGE
    The first one works for changind data in the FI documents but it seems like it can't change the planning date, it returns an error message that informs that the FDTAG field can not be changed.
    The second one is confusing, I have been unable to feed the function module with the data it needs to determine a single document.
    I am trying to use BAPI_ACC_DOCUMENT_POST right now, it doesn't seems promising but you never know.
    Has anyone had the same problem? I have been looking for an answer in both google and here but I can't find one, just some people with the same problem.
    I will keep trying to find the solution, if I find it I will post it here.
    Thanks in advance,

    Hi again Max,
    This worked perfectly, even better because we where already using the FDTAG field for mass changes (don't remember right now which note we implemented) so I have just used FI_ITEMS_MASS_CHANGE with no changes at all.
    Thank you very much for the help.

  • Cannot change Due Date in marketing Documents

    Hello to all
    i have a problem with marketing documents. while they are open-printed, i cannot change the due date. it is grey and read only
    the payment terms has one installments and the localization is Cyprus
    in another installation with localization Italy i can  edit the due date
    do you have any idea about it?

    Hi,
    You may test this solution:
    To change the due date of an installment, perform the following:
    Open the relevant document and choose the Accounting tab.
    Click the orange link arrow in the Installments field.
    In the Installments window, in the Date column, change the required date and choose the OK button.
    To save the changes, in the sales or purchasing document, choose the Update button.  
    it quoted from sap note 1333212 - Changing the due date on installment modifications
    Regards,

  • I cannot change the date on my iPhone 5

    The calendar on my phone says July 2556BE. I've went to setting, general and tried to change the date manually. But it seems a have a set date, and it does not allow me to change it. Help please?

    Glad it helped. It has obviously been asked about often enough that I knew what the problem was right away. Buddhist gremlins?

  • Cannot change planning package in BPS0

    Hello all,
    I am trying to create a test scenario for the BPS model we are trying to implement. I am at the stage where I have created a Planning package and now I am trying to change it and put in values for fiscal year but when I say change package it doesnt do anything. Can you guys help me out. Does the cube need data in it when we do this?
    Thanks in advance,

    Thanks Aneesh,
    Yes now I can see all my areas. I am almost to the stage where I can create layout but my excel settings are very high i guess I have to enable macros.
    I am going to work on it more, I will ask some more questions
    Do you have any document which explains the process more ? how to select the char in the planning level and how to we go step by step where does the planning folder come in picture and all..I have few documents, but sinc eits first time I need more like step by step process.How do we do web interface.
    I will appreciate all your help.
    [email protected]
    Thanks

  • Cannot change  planning profile group from Marketing Plan

    I try to change the Planning Profile Group of a marketing plan from 'Business Marketing' to blank and get the error message
    Transfer of char. val. combination only allowed with a time specification
    Does anyone know what it means?
    Philip

    Hi Philip,
    Are you specifying Time details in the Planning sheet.
    Please check the same as it is one of the primary dimensions.
    Best Regards,
    Pratik Patel

  • FM/ BApi to change Plan data of profit center

    Hi,
    My requirement is to clear  the planned amount of particular profit center . for that I am using 'PCA_PLANDATA_POST' and passing the amoutn values = 0. This is mot working, as this FM
    adds up the amount to the previous one that I pass though it.
    Please suggest me some bapi/Fm to clear the Plan values of   Profit center and also the way to use it .
    Thanks in advance

    Try Using
    BAPI_PCA_BELEG_SAVEREPLICA
    BAPI_PCA_PLANBELEG_SAVEREPLICA

  • OSX 10.5.8- cannot change date and time. Have changed pram battery, still have spinning rainbow dot.

    I have an older Powermac G5 dual PPC processor with OSX 5.8 (Leopard) on it. I cannot change the date and time, all I get is the spinning rainbow disc and the prefs have to be shut down. Does anyone know how to get this back on track? Thanks in advance!

    Let''s try a new admin account...
    Reset OS X Password Without an OS X CD...
    http://theappleblog.com/2008/06/22/reset-os-x-password-without-an-os-x-cd/
    Admin Hack...
    http://www.hackmac.org/?q=node/4
    Starts up like the first time you buy a new Mac, but after filling in all that info again, you should have access to the computer and the other Users & files will still be there... give the new User a different name than an existing one.

  • Changing operation date in co02

    Hello everyone,
    We have quite lengthy production operations and we need to change individual operation date, of planned or production orders (especially production order, in fact, before they are relased in fact).
    The problem is that when I access Co02, and go to the operation list view, I cannot change the date. I can enter an operation or delete one but I can't change the start date of each operation.
    It is absolutely needed in our case, as we have a lot of waiting time in the shop floor and need to review the schedule to match free slot. There is not a lot of orders , so the most convenient way is to do it from the Operation list, in Co02.
    Please could you tell me how it is possible.
    Many thanks,
    Pierre Mikael

    Dear ,
    I am not sure whether you have Capacity Requirement Planning is in place  for PP cycle .Basically , operation dates and production order schedule dates can be changes based on the available capacity of Work Centre wehre the respective operations are happing in shop floor.There two kind of production scheduling happend in any production order .One is operation level scheduling and another order level scheduling .Order level scheuling should havppned based on the total details scheduling of operation based on the work centre load ( available , over load , requirement hrs at work centre ) .
    Any operation in a scheuled production order , can have changes in date wheile deispathing the operation for work centre once the CRP in place .Here , we have Scheduling margine ( FBP, FAP, Opening periods ) contributes to Basic Start Dates in Production order .It is possible though Capacity Leveling -CM21/CM22/CM31/CM23  after cheking the Capacity Load in CM05/CM07 for a particular work centre level.
    The simplest way to adop CRP and explore the same .please find belwo the detaiuls of  the same :
    Setting Required :*
    1. Settings for Available Capacity
    2. Setting for Capacity requirements
    3. Settings for Capacity evaluation and leveling
    4.Materials Master define the Production scheduler and production scheduling profile
    5.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view. 6.Routing - enter the values for the standard values. Use control key with scheduling.
    7.In transaction OPU5 and OPU3Z - define the scheduling parameters for planned order and productiion orders and activate the checkbox Capacity requirement and Scheduling.
    8.Capacity Setup :
    1.Define time profile in OPD2.
    2.Define the strategy profile in OPDB
    3.Define the Overall profiles in OPD0.
    4.In the order control OPJK  maintained check capacity with SAPSFCG013 profile.
    5.Define Scheduling parameters for Production orders-OPKP-Maintain Capacity Checked /Finite Scheduling Cheked /Scheduing Type -BW/FW .
    Hope this will help u in analysis
    Regards
    JH

  • Can we change the data type of a field based on the value of the field

    HI Gurus,
    My Requirement is as below -- Could you please guide me
    in the Printable Adobe form -- for ex - as usual for dates fields in the Object Pallette the object type is a date/time field  and for quantity/currency fields corresponding fields are taken
    now in case the either the date, quantity or currency is initial in place of displaying 0.00 or empty date we need to display N/A (Not Applicable)
    for this I would like to change the data type of the field
    to put it simply --
    we need to change the data type of date field from DATE&TIME to Char type to hold N/A or  Quantity field to Char field to hold N/A
    how can we realize this in SAP adobe forms
    Thanks in Advace
    Ramchander Rao.K

    Hello Ramchander,
         You cannot change the data type of the field at run time in Adobe forms because the type of field you choose at the time of design level is associated with the data type itself.
    If you want to achieve your requirement, then your main idea should be to set the data type as CHARACTER itself while designing the field in the adobe form itself. CHAR field will comfortably hold the value of Calculation/amount field, Currency field, Amount, Date, Time HHMMSS, Unit Accuracy, Currency key, Floating point number, Numeric text, Client, Language and many other data types.
    After designing the field as TEXT field in Adobe form you have two options.
    Option 1:
    Select the Date field initially as type TEXT field or CHAR field in Adobe forms.
    Suppose the name of the field is TEXTFIELD1, then write the Javascript code on this field in Initialize event as below.
    if ( this.rawvalue == null )
         this.rawvalue = "N/A";
    If the field is not blank, then it will show the date. Else it will show "N/A".
    Option 2:
    Select the Date field initially as type TEXT field or CHAR field in Adobe forms. Do the formatting part in ABAP itself. It will increase the performance. Avoid Javascript as much as possible.
    Suppose you have a DATE variable l_dats of type DATS. Then take another variable l_date of type CHAR. Then write the below ABAP code.
    MOVE l_dats TO l_date.
    IF l_date IS INITIAL.
         l_date = 'N/A'.
    ENDIF.
    Bind the l_date to the TEXT field in the form.
    Even in this case, if the field is not blank, then it will show the date. Else it will show "N/A".
    But I will suggest you to use Option 2 of keeping the AMOUNT, QUANTITY, DATE, TIME fields etc as CHAR or TEXT fields in Adobe form and do the required formatting in ABAP itself.

  • Deletion of Plan Budget/Reset of Plan Data

    Hi
    I entered the plan budget by transaction "FMPLCPD - Change Plan Data"  in planning version. after that I executed the deletion budget program to delete this  planning data.  system deleted the line items from table FMBDP but not from table FMBDT.
    Then I reset the plan data by transaction "FMCYRESET - Reset Plan Data ", Now system deleted the amount from FMBDT and created line items in FMBDP. After that I again executed the deletion program, system deleted the line items from FMBDP and updated the double amount in table FMBDT
    Please advise

    Thanks for your  query
    I am still unable to solve the issue, when the system delete the plan items from FMBDP, it update the total table FMBDT with double amount with deletion program. e.g if in table FMBDP amount is 100, deletion program delete this line item and update in total table with amount -200
    Also in the report FMRP_RW_BUDGET - Budget Overview displaying the data with no line item
    Thanks

  • Fox formula for actual/plan data  - Planning function

    Hello,
    I am working on the following scenarios for developing a  planning functions for a monthly forecast.
    It is rolling montly forcast where user starts the planning in Jan and he has to show the actaul value for the month of Jan and blank values for the remaining 11 months of the year and then the user post his new forecast values for the remain 11 of the year(to replace initial balnk values) so that the data will be saved to real time cube with version v108
    In Feb, Jan & Feb months has to show the act values and remaining 10 months has to show last month forecast data. The the user may revise the forecast for the 10 months and then we have to write the data to the real time cube with version v208
    In Mar, Jan, Feb and Mar has to show the actual values and the reamining 9 months has to show the last month forecast and then users may revise the forecast data and then i have to write back to the cube with version v308.
    I want to automate this process for all the months and all years without manual intervention. So, i decideed to write a fox formula for this scenario with following draft code.
    I will get the fy period & year as a variable values and then take the system date into the variable
    for each fy period
    if the fy perio <= sys date.
      {version, infoprovider,value type,amount} = {0,act cube, 10, 0amount)
    else
    {version, infoprovider,value type,amount} = {result,plan cube, 20, 0amount)
    endif.
    result will be calculated on the separe routine and populated here
    case (fy per)
    when 01.
    concatenate v1 with fy+2(2) into y
    result = v1+y
    when 02.
    concatenate v2 with fy+2(2) into y
    result = v2+y
    when 03.
    concatenate v3 with fy+2(2) into y
    result = v3+y
    when 04.
    concatenate v4 with fy+2(2) into y
    result = v4+y
    when 05.
    concatenate v5 with fy+2(2) into y
    result = v5+y
    when 06.
    concatenate v6 with fy+2(2) into y
    result = v6+y
    when 07.
    concatenate v7 with fy+2(2) into y
    result = v7+y
    etc...for all months
    So, can you please let me know the best way to implement this (either by fox formuls or exits)...your inputs are really appreciated
    Thanks,
    Srini
    Edited by: srini on Mar 28, 2008 12:05 PM

    Hi Srini,
    If I 've understood u r problem clearly ,You have to write two Fox Functions and you can call exit variable in both to check the system date.
    I think first you should create exit varriable which would return the system date,use the same variable in data slice to lock the data till current period.
    After that create one fox restricted with any one version where you can copy the data for planning .for example:-
    1)First Fox:-
    DATA TIM_FISCPER TYPE 0FISCPER.
    TIM_REF_FISCPER = VARV(ZEXIT_FPER).
    Get the last month
    version using modlue or any another logic .(v108)
    FOREACH TIM_FISCPER.
        IF TIM_FISCPER <= TIM_REF_FISCPER.
      {0amount,version(001) ,tim_fiscper} = {0amount,version(000) ,tim_fiscper}.
    else.
      {0amount,version(001) ,tim_fiscper} = {0amount,version(v108) ,tim_fiscper}.
         endfor.
    Its just n example use the granularity according to the requirement.
    2)Second fox would save the changed plan data:-
    DATA TIM_FISCPER TYPE 0FISCPER.
    TIM_REF_FISCPER = VARV(ZEXIT_FPER).
    Get the last month
    version using modlue or any another logic .(v208)
    FOREACH TIM_FISCPER.
        IF TIM_FISCPER > TIM_REF_FISCPER.
      {0amount,version(v208) ,tim_fiscper} = {0amount,version(001) ,tim_fiscper}.
         endfor.
    Here ZEXIT_FPER is an exit variable created using cmod and populated with system date.
    Hope it will helpful for u.
    Rgds,
    Indu

  • Changing a date on a Milestone.

    Hi All,
    How can I ensure that the moment I enter the Actual date against a Milestone it gets disabled, and you cannot change the date again?
    I have problems where they enter an Actual date, and then they change the date again later on. The bussiness does not want this to happen.
    Thanks.
    Regards,

    Hi,
    If you are using milestone on network activity then actual date will get copied from activity confirmation, in this case you can make the actual date on milestone as display field in OPUC.
    Tnx.
    Abdul