Capacity allowed indicator in SOP parameters missing - ECC6.0

Hello Experts,
I am configuring SOP and was searching for the capacity allowed indicator in the SOP parameters screen. I was not able to see it anywhere. ECC version is 6.0. What could be the problem? Please help me out. Thanks.
WR,
Sreekant

Hi,
Try this... Go to Production -> Capacity Requirement Planning -> Operations -> Scheduling -> Define scheduling parameters for SOP.
Regards,
Gaurav

Similar Messages

  • How to make Mvt allowed indicator editable in CJ20N transection ?

    Dear Experts,
    How to make Mvt allowed indicator editable in CJ20N transaction ,I want to control material issue by reservations,waiting for your suggestions.
    Thanks

    What is the object status? if the status is Started, you might have problems becouse that status does not permit cost assignments.
    As the previous reply, at the moment of the release, you will have this field editable.
    Best Regards.

  • T Code: MB22, Disable/Enable Movemnt allowed indicator on a condition.

    I need to disable/enable the movement Allowed indicator depending on a specific condition in T Code MB22.
    I tried to put a break point in MB_RESERVATION_BADI implementation. But it is triggered only after I save the changes made in the Reservation.
    I want a BADI/ User exit that is triggered when I enter the MB22 screen before the changes are being made.
    Any Help?
    Edited by: qwerty_m on Oct 3, 2011 1:01 PM

    Hi ,
    In the subroutine DYNPRO_MODIFIZIEREN (include FM07MED0_DYNPRO_MODIFIZIEREN) you can implement the enhancement point DYNPRO_MODIFIZIEREN_03 and make the screen input 0 or 1 for the field 'RESB-XWAOK' based on the conditions when the tcode is MB22.
    Regards,
    Poornima

  • Error :Required parameters missing when calling up module MARC_SINGLE_READ

    Dear all,
    When trying to do the production order confirmation i am getting the error "Required parameters missing when calling up module MARC_SINGLE_READ".How can this error be solved?
    Thanks,
    Kumar

    Hi
    Please activate the corresponding programs again. I think you got a short dump for this error, if yes, you can see the program's name there.
    Best Regards.
    Leon.

  • [svn] 3151: Fix for bug SDK-16761 - Method parameters missing from generated document

    Revision: 3151
    Author: [email protected]
    Date: 2008-09-08 21:30:07 -0700 (Mon, 08 Sep 2008)
    Log Message:
    Fix for bug SDK-16761 - Method parameters missing from generated document
    Bugs: SDK-16761
    QA: Yes
    Doc:
    Tests: checkintests
    Ticket Links:
    http://bugs.adobe.com/jira/browse/SDK-16761
    http://bugs.adobe.com/jira/browse/SDK-16761
    Modified Paths:
    flex/sdk/trunk/modules/compiler/src/java/flex2/compiler/asdoc/TopLevelClassesGenerator.ja va

    Hi,
    Can you try putting the declaration of the URLLoader instance
    outside your fetchISSN function and see?
    That is:
    var loader;
    function fetchISSN(myform) {
    //your code above this line
    loader = new URLLoader();
    //rest of your code

  • Movement allowed indicator

    Dear All,
    I am facing this problem while planning material components for my project.
    When I assign some stock material  ( item cat. L) to a network activity, the system does not reflect the same in MB25. But in MB25, if I check the indicator " Goods movement not allowed", it reflects the reservation.
    When i go to material component in project structure, I can see that under "proc. parameter" tab, under section "general indicators" the radio button for Movement allowed is not active.
    Whereas for another project , this same indicator is active and hence i can see the reservation in MB25.
    Can u pls guide me, for what background setting, this "Movement allowed " indicators become active or inactive.
    Thanks in advance.
    Vikas sharma

    Hi,
    Another factor is the requirement date:
    The reservation management program sets the 'Movement allowed' indicator for requirements dates planning within certain preset time horizon. For requirements which lie beyond this preset time horizon movement is not allowed (for instance, reservations with requirement dates in the far future). The time horizon is set in customizing.
    Further, I think  'planned Independent requirements'  are normally created with 'movement not allowed' indicator.
    You can check what applies to your situation.
    regards
    Murali

  • Movement allowed indicator not on automatically

    Hi folks!!
    We are generating reservation with reference to production order through MRP.
    In customising, we have set the no of days 10 for the movment allowed indicator to be on in reservation automatically.
    But strangely for some material we are un able to make issuance due to movement allowed indicator is not check in reservation. Although the current date is 14.10.09 and requirement date is 20.10.09 so it is falling under the 10 days limitation set in customising.
    Please let me know is there any other setting available to solve this problem.
    Best regards

    Dear Pervez,
    Once when the production order's are released this indicator for the movement allowed will be automatically set by the
    system for the reservation number that is linked to the production order.
    Can you please let me know how did you achieve this setting the movement indicator automatically?Which customize setting
    helps for this issue?
    check and revert back.
    Regards
    Mangalraj.S

  • Rough cut Capacity load in Standard SOP

    Hi there,
                 I have created some sales & production plan syncronous to sales......but when I try to see the capacity load thru View- > Capacity Situation - > Rough Cut planning- > Show
    It is showing me that No Resource load exists ...... please guide me how can I see the load for the same
    Regards
    Kaushik

    Hi,
    Please maintain the settings as mentioned below.Then you can see the load.
    Before you can carry out resource leveling in SOP, you must:
    1.) Create a PP task list (a routing, a rate routing, or a rough-cut planning profile) for the material, product group, or characteristic values combination whose resources you want to plan.
    2).Configure resources planning in Customizing for Sales & Operations Planning.
    3).If you use routings or rate routings to do resource leveling, define the key figure to which the resources are tied. Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    4).Define the planning plant of any information structure whose plant is not uniquely identifiable (that is, either your information structure does not contain the characteristic "plant" or your rough-cut planning profile covers more than one plant). Do this in Customizing for Sales & Operations Planning under Set parameters for info structures and key figures.
    5).Set the default SOP plant for Sales & Operations Planning. Do this in Customizing for Sales & Operations Planning under Set planning plant for SOP.
    Thanks,
    DV

  • Web Service Export Parameters missing when consumed by Visual Studio 2005

    Hi,
    I am using Visual Studio 2005 (2.0 framework) to consume bespoke SAP Web Services (SAP 4.7) however some of the export parameters are missing. I have tested the SAP web services with various XML tools and they all work perfectly.
    Is there anything I can do to enable Visual Studio to genarate the correct proxy?
    Many thanks for any tips.
    Billy

    This isn't going to work as well as I had thought.
    That is correct that the Name and Value fields come back as XmlNode arrays. Each XmlNode array contains two XmlNode objects (or one if you received a null value from the db). One object contains the atrributes and one contains the value. I had planned on going into the ColumnValueType Value field and pulling the text of the 2nd XmlNode object.
    Now here is the problem:
    For every column you select you get a ColumnValueType object. Rather than being contained in some type of "Row" parent object, each column sits in the root of your results. For example, in the query I am using I am asking for the AlertingName and DnOrPattern columns of the NumPlan table. My results come back like this (simplified):
    AlertingName
    John Doe
    DnOrPattern
    1234
    With the data in this format, I can't just do a foreach loop and iterate over the ColumnValueType objects.

  • WiSM2 WLC 7.2 Maximum Allowed Clients under Global Parameters 802.11a/n b/g/n

    Hello everyone,
    Just loaded the 7.2.103.0 software onto the brand new WiSM2. Going throught the options and have found that under the global parameters for 802.11a/n, 802.11b/g/n radios is now the "Maximum Allowed Clients" option. The allowed setting is from 1 - 200 clients.
    Does that mean only 200 clients will be allowed to associate to the WLC on that radio at a maximum?
    Doesn't seems to make sense... I have the 500 AP license on this WiSM2... I know this option used to be an optional setting under a WLAN in previous releases.
    Any ideas?
    Regards,
    Sasha.

    Does that mean only 200 clients will be allowed to associate to the WLC on that radio at a maximum?
    As what Scott has responded, this means 200 clients per WAP.
    If you do exceed 200 clients per WAP (or whatever value you put in there) the clients will just get a nag and the system will let you in eventually.

  • Essential Transfer Parameters Missing in record during Inbound IDOC process

    Dear Gurus
    We are creating a Inbound delivery in one system, we have made all the custom settings for IDOC processing for inbound and outbound idoc in both the systems. Upon the execution of inbound delivery, the system 
    During the Inound delivery processing, the outbound IDOC is successfully distributed. However in the receving system, the IDOC is not posted and it throws the below erroe\r
    Essential transfer parameters are missing in record: 0180000055 000010 / Mess number 561 and message type E
    We are using Outbound IDOC mess type DESADV basic type DELVRY01 process code DELV with FM IDOC_OUT PUT_DELVRY
    In the receiving system message type DESADV , process code DELS, and FM IDOC_INPUT_DESADV1
    What is that which is going wrong.
    Please help me out
    Thanks

    Hello
    To create inbound delivery from outbound delivery, use following setting -
    Outbound idoc -
    idoc type - DESADV01
    message type - DESADV
    Process code - SD05
    FM - IDOC_OUTPUT_DESADV01
    Inbound iDOC -
    Message Type - DESADV
    Process Code - DESA
    FM - IDOC_INPUT_DESADV
    Idoc Type - DESADV01

  • Essential transfer parameters missing while GR into a HU managed Sloc.

    Hi Gurus,
    I am doing GR into a HU managed storage location. I am expecting the system to create an inbound delivery & HU internally. But the error is
    "Essential transfer parameters are missing in record: 45000XXXXX 000010       Message no. VL561".
    in IMG-Shipping I have maintained "Assign Goods Receiving Points for Inbound Deliveries". I dont know whether Packing instruction determination is necessary for this, but I have done that also.
    Please let me know where I am missing
    Nagesh

    Hi,
    That's new for me. What is then the use of the inbound delivery if you do the GR on the PO with MIGO?
    Standard process:
    GR on PO through MIGO
    GR on inbound delivery through VL32N or MIGO (or VL36/ BORGR).
    Required for usage of inbound deliveries:
    confirmation control key in the PO (defaulted through vendor) which requires an inbound delivery.
    MdZ

  • LLC generation with a "recursiveness allowed" indicator in BOM

    Dear planning friends,
    I have the following problem with the low-level code generation in SNP.
    We have few products, that have indicator "recursiveness allowed" in the material BOM.
    How in the APO side the PPM reflects that (the circular reference - the product is produced from itself and another component). Has something to do with the "Primary product" indicator in the PPM? If yes, is it checked automatically (in the PP/DS PPM and in SNP PPM)? Should it be checked for the input or for the output product.
    Anyway now the LLC generation fails. I'd like to include these materials in planning, but how to set up the master data?
    Thank you for your help.
    Message was edited by:
            Mikhail Kenanoff

    Hi Mikhail,
    Please note recursiveness in BOM components is not standard in APO PPMs. <a href="http://service.sap.com/notes">SMP Notes</a> 611063 gives the restrictions where recursiveness is allowed. You may also like to look at Note 648093.
    Thanks,
    Somnath

  • Setting up adjustment layers and smart filters to allow fine tuning of parameters

    I'm trying to set up a set of layers for a sort of Jill Greenberg effect that enables me to easily (dynamically) fine tune the parameters used in the various layers and filters, but I cannot find a way to set this up without using a layer group converted to a smart object (which obviously puts in a big out-of-process step)
    I'm using cc: Is there a better way to do this that will enable me to tweak everything dynamically?
    Here is what I am doing so far:
    open adjusted photo
    duplicate background
    convert dup to smart object
    apply high pass filter (about 60)
    apply gaussian blur (about 30)
    make this layer into group
    add a black and white adjustment layer inside the group
    add a curves adjustment layer inside the group
    tweak curves so that value below 115 outputs zero and evey value above 140 outputs 255
    change blend mode of group to overlay (or 1 of that family)
    turn down opacity of the layer
    this results in 'contour lines' in the image - to fix this the group image needs to be blurred, but to do this I either need to convert the group to a smart object
    -or-
    flatten the group and apply a blur filter and set overlay mode then turn off group.
    By using alt-ctrl-shift-e it's actually a bit easier to tweak using the flatten technique than the group as a smart object (which means an out of process edit), but neither method is ideal.
    Any smart idea to improve this?

    Selecting Bridge Mode will make the router as an access point and there is no need for you to manually disable the DHCP capability of the router. When in Bridge Mode:
    13. Can I set up my router in Bridge Mode?
    Yes. Setting up your Linksys Smart Wi-Fi Router, E4200 router in Bridge Mode will allow your device to act as an access point or a wireless bridge. However, take note of the following once you decide to set your device into Bridge mode:
    Your device’s DHCP server will be disabled.
    Other features of your router such as Firewall, Access      Restrictions, and Applications and Gaming, among others will      also be disabled.
    You will only be able to set the device to Bridge Mode      using the web-based setup page.
    http://kb.linksys.com/Linksys/ukp.aspx?vw=1&docid=02b368886e424d0daa9a756a75e86bc0_E4200_Frequently_...
    You can actually select the Bridge Mode option on the router.

  • Completeness indicator of an asset missing

    Dear FI-AA experts,
    We are on 46C and have a problem with the asset module. We have assigned the cost center in the time-dependent tab as a required field. Yet we are able to save and post to an asset that does not have a cost center assigned.
    Now I found information about a completeness indicator for assets and that you can even have SAP send an email to the correct people to update the incomplete asset(s). But I cannot find anywhere how to set this functionality up.

    hi,
    look here:http://help.sap.com/saphelp_47x200/helpdata/en/4f/71ec9a448011d189f00000e81ddfac/frameset.htm
    and transaction AUVA
    -i've just switch kostl to obligatory
    and i cannot save without filling cost centre???!!!
    regards
    Andreas

Maybe you are looking for

  • Surprised with lack of brightness with new Macbook Pro

    I was thinking of up grading from my 2 year old 13 in Macbook to the new 15 in Macbook Pro. But when I compared the glossy screens side by side, the new ones are not as bright, not as white as my older one. Settings and color space were set the same.

  • Preserve whitespace in xml parsing

    Hi, I am using PL.SQL to parse XML documents using DBMS_XMLDOM.. and using XMLTYPE... Below is the code... set serveroutput on declare      var_xmltype     XMLType;      doc          dbms_xmldom.DOMDocument;      ndoc          dbms_xmldom.DOMNode;   

  • EFAX UK INVALID ZIPCODE ESTATION c510a - **URGENT** PLEASE HELP!!

    COULD A SENIOR HP TECH SUPPORT OR MARKETING REP TAKE OWNERSHIP OF THIS COMPLAINT URGENTLY AND RESPOND WITH A FIX ASAP. THANKYOU THIS IS THE SECOND C510A I HAVE BOUGHT IN THE UK WITH THE EXACT SAME PROBLEM!! PROBLEM: Efax UK does not work with my esta

  • Email attachment photos not appearing as thumbnails

    When I receive a Yahoo email using Safari, the email attachment preview photos appear as a grey box with an inner blue box with a question mark in the middle. When I checked my Yahoo email using Firefox, the email attachment preview photos also do no

  • Will not load Vista Desktop screen. HP IQ 804

    Will not load Vista desktop screen. Will load to internet, works well otherwise.